blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3076702

EP3076702 - METHOD AND SYSTEM FOR DETERMINING SIGNAL PENETRATION OF ONE OR MORE NEIGHBOR BASE STATIONS [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  11.09.2020
Database last updated on 11.09.2024
FormerThe patent has been granted
Status updated on  04.10.2019
FormerGrant of patent is intended
Status updated on  09.09.2019
FormerExamination is in progress
Status updated on  01.06.2018
FormerRequest for examination was made
Status updated on  18.04.2017
Most recent event   Tooltip01.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 03.08.2022  [2022/31]
Applicant(s)For all designated states
Wipro Limited
Doddakannelli
Sarjapur Road
Bangalore
560 035 Karnataka / IN
[2016/40]
Inventor(s)01 / CHAUDHURI, Saptarshi
LAA Glory
APT-201
244/263
34th Main, BTM 2nd Stage, Bangalore
560068 Karnataka / IN
02 / MANNA, Avijit
Amrapali Castle
Blk-C
Flat No. - 3A
3/1, Bediadanga 1st Lane, Kolkata
700039 West Bengal / IN
03 / PAL, Shyam Sundar
Flat No: 14
Block: L/J
Kusthia Govt. Housing Estate
Picnic Garden Road, Kolkata
700039 West Bengal / IN
 [2016/40]
Representative(s)Finnegan Europe LLP
1 London Bridge
London SE1 9BG / GB
[2019/45]
Former [2016/40]Finnegan Europe LLP
16 Old Bailey
London EC4M 7EG / GB
Application number, filing date15196497.026.11.2015
[2016/40]
Priority number, dateIN2015CHE160628.03.2015         Original published format: IN 1606CH2015
US20151474808023.06.2015         Original published format: US201514748080
[2016/40]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3076702
Date:05.10.2016
Language:EN
[2016/40]
Type: B1 Patent specification 
No.:EP3076702
Date:06.11.2019
Language:EN
[2019/45]
Search report(s)(Supplementary) European search report - dispatched on:EP02.08.2016
ClassificationIPC:H04W24/08, // H04W52/14, H04W52/24
[2019/31]
CPC:
H04W24/08 (EP); H04W52/243 (EP); H04W52/143 (EP);
H04W52/241 (EP)
Former IPC [2016/40]H04W24/08
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2017/20]
Former [2016/40]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:VERFAHREN UND SYSTEM ZUR BESTIMMUNG DER SIGNALPENETRATION EINER ODER MEHRERER BENACHBARTER BASISSTATIONEN[2016/40]
English:METHOD AND SYSTEM FOR DETERMINING SIGNAL PENETRATION OF ONE OR MORE NEIGHBOR BASE STATIONS[2016/40]
French:PROCÉDÉ ET SYSTÈME DE DÉTERMINATION DE PÉNÉTRATION D'UN SIGNAL D'UNE OU DE PLUSIEURS STATIONS DE BASE VOISINES[2016/40]
Examination procedure26.11.2015Date on which the examining division has become responsible
05.04.2017Amendment by applicant (claims and/or description)
05.04.2017Examination requested  [2017/20]
31.05.2018Despatch of a communication from the examining division (Time limit: M06)
10.12.2018Reply to a communication from the examining division
10.09.2019Communication of intention to grant the patent
26.09.2019Fee for grant paid
26.09.2019Fee for publishing/printing paid
26.09.2019Receipt of the translation of the claim(s)
Opposition(s)07.08.2020No opposition filed within time limit [2020/42]
Fees paidRenewal fee
15.01.2018Renewal fee patent year 03
14.11.2018Renewal fee patent year 04
Penalty fee
Additional fee for renewal fee
30.11.201703   M06   Fee paid on   15.01.2018
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU26.11.2015
AL06.11.2019
AT06.11.2019
CY06.11.2019
CZ06.11.2019
DK06.11.2019
EE06.11.2019
ES06.11.2019
FI06.11.2019
HR06.11.2019
IT06.11.2019
LT06.11.2019
LV06.11.2019
MC06.11.2019
MK06.11.2019
MT06.11.2019
NL06.11.2019
PL06.11.2019
RO06.11.2019
RS06.11.2019
SE06.11.2019
SI06.11.2019
SK06.11.2019
SM06.11.2019
TR06.11.2019
IE26.11.2019
LU26.11.2019
BE30.11.2019
CH30.11.2019
LI30.11.2019
BG06.02.2020
NO06.02.2020
GR07.02.2020
IS06.03.2020
PT06.03.2020
[2022/31]
Former [2022/27]HU26.11.2015
AL06.11.2019
AT06.11.2019
CY06.11.2019
CZ06.11.2019
DK06.11.2019
EE06.11.2019
ES06.11.2019
FI06.11.2019
HR06.11.2019
IT06.11.2019
LT06.11.2019
LV06.11.2019
MC06.11.2019
MT06.11.2019
NL06.11.2019
PL06.11.2019
RO06.11.2019
RS06.11.2019
SE06.11.2019
SI06.11.2019
SK06.11.2019
SM06.11.2019
TR06.11.2019
IE26.11.2019
LU26.11.2019
BE30.11.2019
CH30.11.2019
LI30.11.2019
BG06.02.2020
NO06.02.2020
GR07.02.2020
IS06.03.2020
PT06.03.2020
Former [2021/34]HU26.11.2015
AL06.11.2019
AT06.11.2019
CY06.11.2019
CZ06.11.2019
DK06.11.2019
EE06.11.2019
ES06.11.2019
FI06.11.2019
HR06.11.2019
IT06.11.2019
LT06.11.2019
LV06.11.2019
MC06.11.2019
MT06.11.2019
NL06.11.2019
PL06.11.2019
RO06.11.2019
RS06.11.2019
SE06.11.2019
SI06.11.2019
SK06.11.2019
SM06.11.2019
IE26.11.2019
LU26.11.2019
BE30.11.2019
CH30.11.2019
LI30.11.2019
BG06.02.2020
NO06.02.2020
GR07.02.2020
IS06.03.2020
PT06.03.2020
Former [2021/32]HU26.11.2015
AL06.11.2019
AT06.11.2019
CY06.11.2019
CZ06.11.2019
DK06.11.2019
EE06.11.2019
ES06.11.2019
FI06.11.2019
HR06.11.2019
IT06.11.2019
LT06.11.2019
LV06.11.2019
MC06.11.2019
NL06.11.2019
PL06.11.2019
RO06.11.2019
RS06.11.2019
SE06.11.2019
SI06.11.2019
SK06.11.2019
SM06.11.2019
IE26.11.2019
LU26.11.2019
BE30.11.2019
CH30.11.2019
LI30.11.2019
BG06.02.2020
NO06.02.2020
GR07.02.2020
IS06.03.2020
PT06.03.2020
Former [2021/26]AL06.11.2019
AT06.11.2019
CY06.11.2019
CZ06.11.2019
DK06.11.2019
EE06.11.2019
ES06.11.2019
FI06.11.2019
HR06.11.2019
IT06.11.2019
LT06.11.2019
LV06.11.2019
MC06.11.2019
NL06.11.2019
PL06.11.2019
RO06.11.2019
RS06.11.2019
SE06.11.2019
SI06.11.2019
SK06.11.2019
SM06.11.2019
IE26.11.2019
LU26.11.2019
BE30.11.2019
CH30.11.2019
LI30.11.2019
BG06.02.2020
NO06.02.2020
GR07.02.2020
IS06.03.2020
PT06.03.2020
Former [2021/10]AL06.11.2019
AT06.11.2019
CZ06.11.2019
DK06.11.2019
EE06.11.2019
ES06.11.2019
FI06.11.2019
HR06.11.2019
IT06.11.2019
LT06.11.2019
LV06.11.2019
MC06.11.2019
NL06.11.2019
PL06.11.2019
RO06.11.2019
RS06.11.2019
SE06.11.2019
SI06.11.2019
SK06.11.2019
SM06.11.2019
IE26.11.2019
LU26.11.2019
BE30.11.2019
CH30.11.2019
LI30.11.2019
BG06.02.2020
NO06.02.2020
GR07.02.2020
IS06.03.2020
PT06.03.2020
Former [2020/51]AL06.11.2019
AT06.11.2019
CZ06.11.2019
DK06.11.2019
EE06.11.2019
ES06.11.2019
FI06.11.2019
HR06.11.2019
LT06.11.2019
LV06.11.2019
MC06.11.2019
NL06.11.2019
PL06.11.2019
RO06.11.2019
RS06.11.2019
SE06.11.2019
SI06.11.2019
SK06.11.2019
SM06.11.2019
IE26.11.2019
LU26.11.2019
BE30.11.2019
CH30.11.2019
LI30.11.2019
BG06.02.2020
NO06.02.2020
GR07.02.2020
IS06.03.2020
PT06.03.2020
Former [2020/46]AL06.11.2019
CZ06.11.2019
DK06.11.2019
EE06.11.2019
ES06.11.2019
FI06.11.2019
HR06.11.2019
LT06.11.2019
LV06.11.2019
MC06.11.2019
NL06.11.2019
PL06.11.2019
RO06.11.2019
RS06.11.2019
SE06.11.2019
SK06.11.2019
SM06.11.2019
IE26.11.2019
LU26.11.2019
CH30.11.2019
LI30.11.2019
BG06.02.2020
NO06.02.2020
GR07.02.2020
IS06.03.2020
PT06.03.2020
Former [2020/39]AL06.11.2019
CZ06.11.2019
DK06.11.2019
EE06.11.2019
ES06.11.2019
FI06.11.2019
HR06.11.2019
LT06.11.2019
LV06.11.2019
MC06.11.2019
NL06.11.2019
PL06.11.2019
RO06.11.2019
RS06.11.2019
SE06.11.2019
SK06.11.2019
SM06.11.2019
LU26.11.2019
CH30.11.2019
LI30.11.2019
BG06.02.2020
NO06.02.2020
GR07.02.2020
IS06.03.2020
PT06.03.2020
Former [2020/37]AL06.11.2019
CZ06.11.2019
DK06.11.2019
EE06.11.2019
ES06.11.2019
FI06.11.2019
HR06.11.2019
LT06.11.2019
LV06.11.2019
NL06.11.2019
PL06.11.2019
RO06.11.2019
RS06.11.2019
SE06.11.2019
SK06.11.2019
SM06.11.2019
LU26.11.2019
CH30.11.2019
LI30.11.2019
BG06.02.2020
NO06.02.2020
GR07.02.2020
IS06.03.2020
PT06.03.2020
Former [2020/36]AL06.11.2019
CZ06.11.2019
DK06.11.2019
EE06.11.2019
ES06.11.2019
FI06.11.2019
HR06.11.2019
LT06.11.2019
LV06.11.2019
NL06.11.2019
PL06.11.2019
RO06.11.2019
RS06.11.2019
SE06.11.2019
LU26.11.2019
CH30.11.2019
LI30.11.2019
BG06.02.2020
NO06.02.2020
GR07.02.2020
IS06.03.2020
PT06.03.2020
Former [2020/35]AL06.11.2019
CZ06.11.2019
ES06.11.2019
FI06.11.2019
HR06.11.2019
LT06.11.2019
LV06.11.2019
NL06.11.2019
PL06.11.2019
RO06.11.2019
RS06.11.2019
SE06.11.2019
LU26.11.2019
CH30.11.2019
LI30.11.2019
BG06.02.2020
NO06.02.2020
GR07.02.2020
IS06.03.2020
PT06.03.2020
Former [2020/34]AL06.11.2019
ES06.11.2019
FI06.11.2019
HR06.11.2019
LT06.11.2019
LV06.11.2019
NL06.11.2019
PL06.11.2019
RS06.11.2019
SE06.11.2019
CH30.11.2019
LI30.11.2019
BG06.02.2020
NO06.02.2020
GR07.02.2020
IS06.03.2020
PT06.03.2020
Former [2020/32]AL06.11.2019
FI06.11.2019
HR06.11.2019
LT06.11.2019
LV06.11.2019
NL06.11.2019
PL06.11.2019
RS06.11.2019
SE06.11.2019
BG06.02.2020
NO06.02.2020
GR07.02.2020
IS06.03.2020
PT06.03.2020
Former [2020/25]FI06.11.2019
HR06.11.2019
LT06.11.2019
LV06.11.2019
NL06.11.2019
PL06.11.2019
RS06.11.2019
SE06.11.2019
BG06.02.2020
NO06.02.2020
GR07.02.2020
IS06.03.2020
PT06.03.2020
Former [2020/24]FI06.11.2019
LT06.11.2019
LV06.11.2019
NL06.11.2019
PL06.11.2019
SE06.11.2019
BG06.02.2020
NO06.02.2020
GR07.02.2020
IS06.03.2020
PT06.03.2020
Former [2020/23]FI06.11.2019
LT06.11.2019
LV06.11.2019
NL06.11.2019
PL06.11.2019
SE06.11.2019
BG06.02.2020
NO06.02.2020
GR07.02.2020
PT06.03.2020
Former [2020/22]FI06.11.2019
LT06.11.2019
SE06.11.2019
BG06.02.2020
NO06.02.2020
PT06.03.2020
Former [2020/21]NO06.02.2020
Documents cited:Search[IY]US2011256833  (RACZ ANDRAS [HU], et al) [I] 1,2,4-10 * abstract * * paragraphs [0009] , [0029] - [0030] - [0053] - [0065] - [0078] - [0091] * [Y] 3;
 [A]US8862134  (ZHOU FEI FRANK [US]) [A] 1-10 * abstract ** column 3, line 20 - column 6, line 66 *;
 [IY]  - ERICSSON ET AL, "Proposed solution for eCoMP", vol. RAN WG3, no. Seoul, South Korea; 20140519 - 20140523, (20140518), 3GPP DRAFT; R3-141304_ECOMP_SOLUTION, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/RAN1/RAN3/Docs/, (20140518), XP050790855 [I] 1,2,4-10 * chapter 2 * [Y] 3
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.