blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3182030

EP3182030 - HEAT EXCHANGE SYSTEM WITH SIPHON FOR DRAINING A CONDENSATE [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  10.07.2020
Database last updated on 12.07.2024
FormerThe patent has been granted
Status updated on  02.08.2019
FormerGrant of patent is intended
Status updated on  07.04.2019
FormerRequest for examination was made
Status updated on  11.08.2017
FormerThe application has been published
Status updated on  19.05.2017
Most recent event   Tooltip01.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 03.08.2022  [2022/31]
Applicant(s)For all designated states
DAIKIN INDUSTRIES, LIMITED
Umeda Center Building
4-12, Nakazaki-nishi 2-chome
Kita-ku
Osaka-shi
Osaka 530 / JP
For all designated states
Daikin Europe N.V.
Zandvoordestraat 300
8400 Oostende / BE
[N/P]
Former [2017/25]For all designated states
DAIKIN INDUSTRIES, LIMITED
Umeda Center Building 4-12, Nakazaki-nishi 2-chome Kita-ku Osaka-shi
Osaka 530 / JP
For all designated states
Daikin Europe N.V.
Zandvoordestraat 300
8400 Oostende / BE
Inventor(s)01 / KILIC, M.Serhan
Daikin Turkey
2.OSB
54300 Hendek / TR
02 / PEKER, Hakan
Daikin Turkey
2.OSB
54300 Hendek / TR
03 / AKYOL, Abdulkadir
Daikin Turkey
2.OSB
54300 Hendek / TR
 [2017/50]
Former [2017/25]01 / KILIC, M.Serhan
Daikin Turkey
2.OSB
54300 Hendek / TR
02 / PEKER, Hakan
Daikin Turkey
2.OSB
54300 Hendek / TR
03 / AKYOL, Abdulkadis
Daikin Turkey
2.OSB
54300 Hendek / TR
Representative(s)Global IP Europe Patentanwaltskanzlei
Pfarrstraße 14
80538 München / DE
[2017/25]
Application number, filing date15199929.914.12.2015
[2017/25]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3182030
Date:21.06.2017
Language:EN
[2017/25]
Type: B1 Patent specification 
No.:EP3182030
Date:04.09.2019
Language:EN
[2019/36]
Search report(s)(Supplementary) European search report - dispatched on:EP08.06.2016
ClassificationIPC:F24H8/00, F28D21/00, F16L43/00, F28F7/02
[2019/17]
CPC:
F24H8/006 (EP,US); F16L43/00 (EP); F28D21/0003 (EP,US);
F28F7/02 (EP,US); F28D2021/0024 (EP,US); F28F2255/14 (EP,US);
Y02B30/00 (EP) (-)
Former IPC [2017/25]F24H8/00, F28D21/00, F16L43/00
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2017/37]
Former [2017/25]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:WÄRMEAUSTAUSCHSYSTEM MIT SIPHON ZUM ENTLEEREN EINES KONDENSAT[2017/25]
English:HEAT EXCHANGE SYSTEM WITH SIPHON FOR DRAINING A CONDENSATE[2017/25]
French:SYSTÈME D' ÉCHANGE DE CHALEUR AVEC SIPHON POUR VIDANGE UN CONDENSAT[2019/19]
Former [2017/25]SYSTÈME DE ÉCHANGE DE CHALEUR AVEC SIPHON POUR VIDANGE UN CONDENSAT
Examination procedure14.12.2015Date on which the examining division has become responsible
08.08.2017Amendment by applicant (claims and/or description)
08.08.2017Examination requested  [2017/37]
08.04.2019Communication of intention to grant the patent
25.07.2019Fee for grant paid
25.07.2019Fee for publishing/printing paid
25.07.2019Receipt of the translation of the claim(s)
Opposition(s)05.06.2020No opposition filed within time limit [2020/33]
Fees paidRenewal fee
06.12.2017Renewal fee patent year 03
06.12.2018Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU14.12.2015
AL04.09.2019
AT04.09.2019
CY04.09.2019
CZ04.09.2019
DK04.09.2019
EE04.09.2019
ES04.09.2019
FI04.09.2019
HR04.09.2019
LT04.09.2019
LV04.09.2019
MC04.09.2019
MK04.09.2019
MT04.09.2019
NL04.09.2019
PL04.09.2019
RO04.09.2019
RS04.09.2019
SE04.09.2019
SI04.09.2019
SK04.09.2019
SM04.09.2019
BG04.12.2019
NO04.12.2019
GR05.12.2019
IE14.12.2019
LU14.12.2019
CH31.12.2019
LI31.12.2019
IS05.01.2020
PT06.01.2020
[2022/31]
Former [2021/34]HU14.12.2015
AL04.09.2019
AT04.09.2019
CY04.09.2019
CZ04.09.2019
DK04.09.2019
EE04.09.2019
ES04.09.2019
FI04.09.2019
HR04.09.2019
LT04.09.2019
LV04.09.2019
MC04.09.2019
MT04.09.2019
NL04.09.2019
PL04.09.2019
RO04.09.2019
RS04.09.2019
SE04.09.2019
SI04.09.2019
SK04.09.2019
SM04.09.2019
BG04.12.2019
NO04.12.2019
GR05.12.2019
IE14.12.2019
LU14.12.2019
CH31.12.2019
LI31.12.2019
IS05.01.2020
PT06.01.2020
Former [2021/32]HU14.12.2015
AL04.09.2019
AT04.09.2019
CY04.09.2019
CZ04.09.2019
DK04.09.2019
EE04.09.2019
ES04.09.2019
FI04.09.2019
HR04.09.2019
LT04.09.2019
LV04.09.2019
MC04.09.2019
NL04.09.2019
PL04.09.2019
RO04.09.2019
RS04.09.2019
SE04.09.2019
SI04.09.2019
SK04.09.2019
SM04.09.2019
BG04.12.2019
NO04.12.2019
GR05.12.2019
IE14.12.2019
LU14.12.2019
CH31.12.2019
LI31.12.2019
IS05.01.2020
PT06.01.2020
Former [2021/26]AL04.09.2019
AT04.09.2019
CY04.09.2019
CZ04.09.2019
DK04.09.2019
EE04.09.2019
ES04.09.2019
FI04.09.2019
HR04.09.2019
LT04.09.2019
LV04.09.2019
MC04.09.2019
NL04.09.2019
PL04.09.2019
RO04.09.2019
RS04.09.2019
SE04.09.2019
SI04.09.2019
SK04.09.2019
SM04.09.2019
BG04.12.2019
NO04.12.2019
GR05.12.2019
IE14.12.2019
LU14.12.2019
CH31.12.2019
LI31.12.2019
IS05.01.2020
PT06.01.2020
Former [2020/52]AL04.09.2019
AT04.09.2019
CZ04.09.2019
DK04.09.2019
EE04.09.2019
ES04.09.2019
FI04.09.2019
HR04.09.2019
LT04.09.2019
LV04.09.2019
MC04.09.2019
NL04.09.2019
PL04.09.2019
RO04.09.2019
RS04.09.2019
SE04.09.2019
SI04.09.2019
SK04.09.2019
SM04.09.2019
BG04.12.2019
NO04.12.2019
GR05.12.2019
IE14.12.2019
LU14.12.2019
CH31.12.2019
LI31.12.2019
IS05.01.2020
PT06.01.2020
Former [2020/46]AL04.09.2019
AT04.09.2019
CZ04.09.2019
DK04.09.2019
EE04.09.2019
ES04.09.2019
FI04.09.2019
HR04.09.2019
LT04.09.2019
LV04.09.2019
MC04.09.2019
NL04.09.2019
PL04.09.2019
RO04.09.2019
RS04.09.2019
SE04.09.2019
SI04.09.2019
SK04.09.2019
SM04.09.2019
BG04.12.2019
NO04.12.2019
GR05.12.2019
IE14.12.2019
LU14.12.2019
IS05.01.2020
PT06.01.2020
Former [2020/39]AL04.09.2019
AT04.09.2019
CZ04.09.2019
DK04.09.2019
EE04.09.2019
ES04.09.2019
FI04.09.2019
HR04.09.2019
LT04.09.2019
LV04.09.2019
MC04.09.2019
NL04.09.2019
PL04.09.2019
RO04.09.2019
RS04.09.2019
SE04.09.2019
SI04.09.2019
SK04.09.2019
SM04.09.2019
BG04.12.2019
NO04.12.2019
GR05.12.2019
IS05.01.2020
PT06.01.2020
Former [2020/37]AL04.09.2019
AT04.09.2019
CZ04.09.2019
DK04.09.2019
EE04.09.2019
ES04.09.2019
FI04.09.2019
HR04.09.2019
LT04.09.2019
LV04.09.2019
NL04.09.2019
PL04.09.2019
RO04.09.2019
RS04.09.2019
SE04.09.2019
SI04.09.2019
SK04.09.2019
SM04.09.2019
BG04.12.2019
NO04.12.2019
GR05.12.2019
IS05.01.2020
PT06.01.2020
Former [2020/36]AL04.09.2019
AT04.09.2019
CZ04.09.2019
DK04.09.2019
EE04.09.2019
ES04.09.2019
FI04.09.2019
HR04.09.2019
LT04.09.2019
LV04.09.2019
NL04.09.2019
PL04.09.2019
RO04.09.2019
RS04.09.2019
SE04.09.2019
SK04.09.2019
SM04.09.2019
BG04.12.2019
NO04.12.2019
GR05.12.2019
IS05.01.2020
PT06.01.2020
Former [2020/27]AL04.09.2019
AT04.09.2019
CZ04.09.2019
EE04.09.2019
ES04.09.2019
FI04.09.2019
HR04.09.2019
LT04.09.2019
LV04.09.2019
NL04.09.2019
PL04.09.2019
RO04.09.2019
RS04.09.2019
SE04.09.2019
SK04.09.2019
SM04.09.2019
BG04.12.2019
NO04.12.2019
GR05.12.2019
PT06.01.2020
IS24.02.2020
Former [2020/25]AL04.09.2019
AT04.09.2019
CZ04.09.2019
EE04.09.2019
ES04.09.2019
FI04.09.2019
HR04.09.2019
LT04.09.2019
LV04.09.2019
NL04.09.2019
PL04.09.2019
RO04.09.2019
RS04.09.2019
SE04.09.2019
SK04.09.2019
BG04.12.2019
NO04.12.2019
GR05.12.2019
PT06.01.2020
IS24.02.2020
Former [2020/23]AL04.09.2019
AT04.09.2019
EE04.09.2019
ES04.09.2019
FI04.09.2019
HR04.09.2019
LT04.09.2019
LV04.09.2019
NL04.09.2019
PL04.09.2019
RO04.09.2019
RS04.09.2019
SE04.09.2019
BG04.12.2019
NO04.12.2019
GR05.12.2019
PT06.01.2020
Former [2020/22]AL04.09.2019
EE04.09.2019
ES04.09.2019
FI04.09.2019
HR04.09.2019
LT04.09.2019
LV04.09.2019
NL04.09.2019
RS04.09.2019
SE04.09.2019
BG04.12.2019
NO04.12.2019
GR05.12.2019
PT06.01.2020
Former [2020/20]AL04.09.2019
ES04.09.2019
FI04.09.2019
HR04.09.2019
LT04.09.2019
LV04.09.2019
NL04.09.2019
RS04.09.2019
SE04.09.2019
BG04.12.2019
NO04.12.2019
GR05.12.2019
Former [2020/15]AL04.09.2019
ES04.09.2019
FI04.09.2019
HR04.09.2019
LT04.09.2019
LV04.09.2019
RS04.09.2019
SE04.09.2019
BG04.12.2019
NO04.12.2019
GR05.12.2019
Former [2020/11]ES04.09.2019
FI04.09.2019
HR04.09.2019
LT04.09.2019
LV04.09.2019
RS04.09.2019
SE04.09.2019
BG04.12.2019
NO04.12.2019
GR05.12.2019
Former [2020/10]FI04.09.2019
LT04.09.2019
SE04.09.2019
BG04.12.2019
NO04.12.2019
Former [2020/09]FI04.09.2019
LT04.09.2019
NO04.12.2019
Former [2020/08]LT04.09.2019
NO04.12.2019
Documents cited:Search[A]EP0470053  (AFA TEC SRL [IT]) [A] 1-14 * figures 1-4 *;
 [XAI]DE9314195U  (VAILLANT JOH GMBH & CO [DE]) [X] 1,2,4-6 * page 1 - page 6; figures 1,2 * [A] 9-14 [I] 3,7,8;
 [A]DE19923546  (BOSCH GMBH ROBERT [DE]) [A] 1-14 * abstract *;
 [A]DE20012030U  (VIESSMANN WERKE KG [DE]) [A] 1-14* abstract *;
 [AD]EP2853840  (RIELLO SPA [IT]) [AD] 1-14 * the whole document *
by applicantWO2009053248
 EP2853840
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.