EP3159990 - IMPROVEMENTS IN OR RELATING TO ELECTRICAL POWER SYSTEMS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 07.12.2018 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 29.12.2017 | ||
Former | Grant of patent is intended Status updated on 10.08.2017 | ||
Former | Request for examination was made Status updated on 26.05.2017 | ||
Former | The application has been published Status updated on 24.03.2017 | Most recent event Tooltip | 04.12.2020 | Lapse of the patent in a contracting state New state(s): SI | published on 06.01.2021 [2021/01] | Applicant(s) | For all designated states General Electric Technology GmbH Brown Boveri Strasse 7 5400 Baden / CH | [2018/05] |
Former [2017/30] | For all designated states General Electric Technology GmbH Brown Boveri Strasse 7 5400 Baden / CH | ||
Former [2017/17] | For all designated states ALSTOM Technology Ltd Brown Boveri Strasse 7 5400 Baden / CH | Inventor(s) | 01 /
HA, Hengxu 249 Weston Road Stafford ST16 3SL / GB | 02 /
SRI GOPALA KRISHNA MURTHI, Sankara Subramanian 74 Ampleforth Drive Stafford ST17 4TR / GB | [2017/17] | Representative(s) | General Electric Technology GmbH Global Patent Operation - Europe Brown Boveri Strasse 7 5400 Baden / CH | [2018/05] |
Former [2017/17] | Potter Clarkson LLP The Belgrave Centre Talbot Street Nottingham NG1 5GG / GB | Application number, filing date | 15275221.8 | 22.10.2015 | [2017/17] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3159990 | Date: | 26.04.2017 | Language: | EN | [2017/17] | Type: | B1 Patent specification | No.: | EP3159990 | Date: | 31.01.2018 | Language: | EN | [2018/05] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 08.06.2016 | Classification | IPC: | H02H1/00, G01R31/08, H04J3/06, H04L12/40, // H02H3/28, H02H7/26 | [2017/17] | CPC: |
H02H1/0061 (EP,US);
G01R31/085 (US);
G01R31/088 (EP);
H02H3/28 (EP,US);
H04J3/06 (EP,US);
H04L12/40 (EP);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/26] |
Former [2017/17] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | VERBESSERUNGEN AN ODER IM ZUSAMMENHANG MIT ELEKTRISCHEN LEISTUNGSSYSTEMEN | [2017/17] | English: | IMPROVEMENTS IN OR RELATING TO ELECTRICAL POWER SYSTEMS | [2017/17] | French: | AMÉLIORATIONS DE OU ASSOCIÉES À DES SYSTÈMES DE GÉNÉRATION D'ÉLECTRICITE | [2017/36] |
Former [2017/17] | AMELIORATIONS DE OU ASSOCIEES A DES SYSTEMES DE GENERATION D'ELECTRICITE | Examination procedure | 22.10.2015 | Date on which the examining division has become responsible | 18.05.2017 | Examination requested [2017/26] | 11.08.2017 | Communication of intention to grant the patent | 14.12.2017 | Fee for grant paid | 14.12.2017 | Fee for publishing/printing paid | 14.12.2017 | Receipt of the translation of the claim(s) | Opposition(s) | 02.11.2018 | No opposition filed within time limit [2019/02] | Fees paid | Renewal fee | 27.10.2017 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 22.10.2015 | AL | 31.01.2018 | AT | 31.01.2018 | CY | 31.01.2018 | CZ | 31.01.2018 | EE | 31.01.2018 | ES | 31.01.2018 | FI | 31.01.2018 | HR | 31.01.2018 | LT | 31.01.2018 | LV | 31.01.2018 | MC | 31.01.2018 | MK | 31.01.2018 | NL | 31.01.2018 | PL | 31.01.2018 | PT | 31.01.2018 | RO | 31.01.2018 | RS | 31.01.2018 | SK | 31.01.2018 | SM | 31.01.2018 | TR | 31.01.2018 | BG | 30.04.2018 | NO | 30.04.2018 | GR | 01.05.2018 | IS | 31.05.2018 | IE | 22.10.2018 | LU | 22.10.2018 | MT | 22.10.2018 | SI | 22.10.2018 | BE | 31.10.2018 | [2021/01] |
Former [2020/31] | HU | 22.10.2015 | |
AL | 31.01.2018 | ||
AT | 31.01.2018 | ||
CY | 31.01.2018 | ||
CZ | 31.01.2018 | ||
EE | 31.01.2018 | ||
ES | 31.01.2018 | ||
FI | 31.01.2018 | ||
HR | 31.01.2018 | ||
LT | 31.01.2018 | ||
LV | 31.01.2018 | ||
MC | 31.01.2018 | ||
MK | 31.01.2018 | ||
NL | 31.01.2018 | ||
PL | 31.01.2018 | ||
PT | 31.01.2018 | ||
RO | 31.01.2018 | ||
RS | 31.01.2018 | ||
SK | 31.01.2018 | ||
SM | 31.01.2018 | ||
TR | 31.01.2018 | ||
BG | 30.04.2018 | ||
NO | 30.04.2018 | ||
GR | 01.05.2018 | ||
IS | 31.05.2018 | ||
IE | 22.10.2018 | ||
LU | 22.10.2018 | ||
MT | 22.10.2018 | ||
BE | 31.10.2018 | ||
Former [2020/28] | AL | 31.01.2018 | |
AT | 31.01.2018 | ||
CZ | 31.01.2018 | ||
EE | 31.01.2018 | ||
ES | 31.01.2018 | ||
FI | 31.01.2018 | ||
HR | 31.01.2018 | ||
LT | 31.01.2018 | ||
LV | 31.01.2018 | ||
MC | 31.01.2018 | ||
NL | 31.01.2018 | ||
PL | 31.01.2018 | ||
PT | 31.01.2018 | ||
RO | 31.01.2018 | ||
RS | 31.01.2018 | ||
SK | 31.01.2018 | ||
SM | 31.01.2018 | ||
TR | 31.01.2018 | ||
BG | 30.04.2018 | ||
NO | 30.04.2018 | ||
GR | 01.05.2018 | ||
IS | 31.05.2018 | ||
IE | 22.10.2018 | ||
LU | 22.10.2018 | ||
MT | 22.10.2018 | ||
BE | 31.10.2018 | ||
Former [2020/16] | AL | 31.01.2018 | |
AT | 31.01.2018 | ||
CZ | 31.01.2018 | ||
EE | 31.01.2018 | ||
ES | 31.01.2018 | ||
FI | 31.01.2018 | ||
HR | 31.01.2018 | ||
LT | 31.01.2018 | ||
LV | 31.01.2018 | ||
MC | 31.01.2018 | ||
NL | 31.01.2018 | ||
PL | 31.01.2018 | ||
RO | 31.01.2018 | ||
RS | 31.01.2018 | ||
SK | 31.01.2018 | ||
SM | 31.01.2018 | ||
TR | 31.01.2018 | ||
BG | 30.04.2018 | ||
NO | 30.04.2018 | ||
GR | 01.05.2018 | ||
IS | 31.05.2018 | ||
IE | 22.10.2018 | ||
LU | 22.10.2018 | ||
MT | 22.10.2018 | ||
BE | 31.10.2018 | ||
Former [2020/08] | AL | 31.01.2018 | |
AT | 31.01.2018 | ||
CZ | 31.01.2018 | ||
EE | 31.01.2018 | ||
ES | 31.01.2018 | ||
FI | 31.01.2018 | ||
HR | 31.01.2018 | ||
LT | 31.01.2018 | ||
LV | 31.01.2018 | ||
MC | 31.01.2018 | ||
NL | 31.01.2018 | ||
PL | 31.01.2018 | ||
RO | 31.01.2018 | ||
RS | 31.01.2018 | ||
SK | 31.01.2018 | ||
SM | 31.01.2018 | ||
BG | 30.04.2018 | ||
NO | 30.04.2018 | ||
GR | 01.05.2018 | ||
IS | 31.05.2018 | ||
IE | 22.10.2018 | ||
LU | 22.10.2018 | ||
MT | 22.10.2018 | ||
BE | 31.10.2018 | ||
Former [2019/48] | AL | 31.01.2018 | |
AT | 31.01.2018 | ||
CZ | 31.01.2018 | ||
EE | 31.01.2018 | ||
ES | 31.01.2018 | ||
FI | 31.01.2018 | ||
HR | 31.01.2018 | ||
LT | 31.01.2018 | ||
LV | 31.01.2018 | ||
MC | 31.01.2018 | ||
NL | 31.01.2018 | ||
PL | 31.01.2018 | ||
RO | 31.01.2018 | ||
RS | 31.01.2018 | ||
SK | 31.01.2018 | ||
SM | 31.01.2018 | ||
BG | 30.04.2018 | ||
NO | 30.04.2018 | ||
GR | 01.05.2018 | ||
IS | 31.05.2018 | ||
IE | 22.10.2018 | ||
LU | 22.10.2018 | ||
BE | 31.10.2018 | ||
Former [2019/38] | AL | 31.01.2018 | |
AT | 31.01.2018 | ||
CZ | 31.01.2018 | ||
EE | 31.01.2018 | ||
ES | 31.01.2018 | ||
FI | 31.01.2018 | ||
HR | 31.01.2018 | ||
LT | 31.01.2018 | ||
LV | 31.01.2018 | ||
MC | 31.01.2018 | ||
NL | 31.01.2018 | ||
PL | 31.01.2018 | ||
RO | 31.01.2018 | ||
RS | 31.01.2018 | ||
SK | 31.01.2018 | ||
SM | 31.01.2018 | ||
BG | 30.04.2018 | ||
NO | 30.04.2018 | ||
GR | 01.05.2018 | ||
IS | 31.05.2018 | ||
LU | 22.10.2018 | ||
BE | 31.10.2018 | ||
Former [2019/30] | AL | 31.01.2018 | |
AT | 31.01.2018 | ||
CZ | 31.01.2018 | ||
EE | 31.01.2018 | ||
ES | 31.01.2018 | ||
FI | 31.01.2018 | ||
HR | 31.01.2018 | ||
LT | 31.01.2018 | ||
LV | 31.01.2018 | ||
MC | 31.01.2018 | ||
NL | 31.01.2018 | ||
PL | 31.01.2018 | ||
RO | 31.01.2018 | ||
RS | 31.01.2018 | ||
SK | 31.01.2018 | ||
SM | 31.01.2018 | ||
BG | 30.04.2018 | ||
NO | 30.04.2018 | ||
GR | 01.05.2018 | ||
IS | 31.05.2018 | ||
LU | 22.10.2018 | ||
Former [2019/28] | AL | 31.01.2018 | |
AT | 31.01.2018 | ||
CZ | 31.01.2018 | ||
EE | 31.01.2018 | ||
ES | 31.01.2018 | ||
FI | 31.01.2018 | ||
HR | 31.01.2018 | ||
LT | 31.01.2018 | ||
LV | 31.01.2018 | ||
MC | 31.01.2018 | ||
NL | 31.01.2018 | ||
PL | 31.01.2018 | ||
RO | 31.01.2018 | ||
RS | 31.01.2018 | ||
SK | 31.01.2018 | ||
SM | 31.01.2018 | ||
BG | 30.04.2018 | ||
NO | 30.04.2018 | ||
GR | 01.05.2018 | ||
IS | 31.05.2018 | ||
Former [2018/52] | AL | 31.01.2018 | |
AT | 31.01.2018 | ||
CZ | 31.01.2018 | ||
EE | 31.01.2018 | ||
ES | 31.01.2018 | ||
FI | 31.01.2018 | ||
HR | 31.01.2018 | ||
LT | 31.01.2018 | ||
LV | 31.01.2018 | ||
NL | 31.01.2018 | ||
PL | 31.01.2018 | ||
RO | 31.01.2018 | ||
RS | 31.01.2018 | ||
SK | 31.01.2018 | ||
SM | 31.01.2018 | ||
BG | 30.04.2018 | ||
NO | 30.04.2018 | ||
GR | 01.05.2018 | ||
IS | 31.05.2018 | ||
Former [2018/50] | AL | 31.01.2018 | |
AT | 31.01.2018 | ||
CZ | 31.01.2018 | ||
EE | 31.01.2018 | ||
ES | 31.01.2018 | ||
FI | 31.01.2018 | ||
HR | 31.01.2018 | ||
LT | 31.01.2018 | ||
LV | 31.01.2018 | ||
NL | 31.01.2018 | ||
PL | 31.01.2018 | ||
RO | 31.01.2018 | ||
RS | 31.01.2018 | ||
SK | 31.01.2018 | ||
BG | 30.04.2018 | ||
NO | 30.04.2018 | ||
GR | 01.05.2018 | ||
IS | 31.05.2018 | ||
Former [2018/46] | AL | 31.01.2018 | |
AT | 31.01.2018 | ||
ES | 31.01.2018 | ||
FI | 31.01.2018 | ||
HR | 31.01.2018 | ||
LT | 31.01.2018 | ||
LV | 31.01.2018 | ||
NL | 31.01.2018 | ||
PL | 31.01.2018 | ||
RS | 31.01.2018 | ||
BG | 30.04.2018 | ||
NO | 30.04.2018 | ||
GR | 01.05.2018 | ||
IS | 31.05.2018 | ||
Former [2018/40] | AT | 31.01.2018 | |
ES | 31.01.2018 | ||
FI | 31.01.2018 | ||
HR | 31.01.2018 | ||
LT | 31.01.2018 | ||
LV | 31.01.2018 | ||
NL | 31.01.2018 | ||
PL | 31.01.2018 | ||
RS | 31.01.2018 | ||
BG | 30.04.2018 | ||
NO | 30.04.2018 | ||
GR | 01.05.2018 | ||
IS | 31.05.2018 | ||
Former [2018/39] | AT | 31.01.2018 | |
ES | 31.01.2018 | ||
FI | 31.01.2018 | ||
HR | 31.01.2018 | ||
LT | 31.01.2018 | ||
LV | 31.01.2018 | ||
NL | 31.01.2018 | ||
PL | 31.01.2018 | ||
RS | 31.01.2018 | ||
NO | 30.04.2018 | ||
GR | 01.05.2018 | ||
IS | 31.05.2018 | ||
Former [2018/37] | ES | 31.01.2018 | |
FI | 31.01.2018 | ||
HR | 31.01.2018 | ||
LT | 31.01.2018 | ||
NL | 31.01.2018 | ||
PL | 31.01.2018 | ||
NO | 30.04.2018 | ||
GR | 01.05.2018 | ||
Former [2018/36] | ES | 31.01.2018 | |
FI | 31.01.2018 | ||
HR | 31.01.2018 | ||
LT | 31.01.2018 | ||
NL | 31.01.2018 | ||
PL | 31.01.2018 | ||
NO | 30.04.2018 | ||
Former [2018/35] | FI | 31.01.2018 | |
HR | 31.01.2018 | ||
LT | 31.01.2018 | ||
NL | 31.01.2018 | ||
NO | 30.04.2018 | Documents cited: | Search | [A]US2012057479 (MARUYAMA TATSUYA [JP], et al) [A] 1,16-20 * paragraphs [0088] - [0098]; figure 7 *; | [A]WO2012061978 (ABB RESEARCH LTD [CH], et al) [A] 1-20 * the whole document *; | [A]EP2744130 (GEN ELECTRIC [US]) [A] 1,16-20* paragraphs [0031] - [0045]; figures 4,5 * |