blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2921227

EP2921227 - FISCHER-TROPSCH CATALYST BASED ON A GROUP VIIIB METAL AND A CARRIER OF OXIDES INCLUDING ALUMINA, SILICA, A SPINEL AND PHOSPHORUS [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  16.02.2018
Database last updated on 05.10.2024
FormerThe patent has been granted
Status updated on  10.03.2017
FormerGrant of patent is intended
Status updated on  04.12.2016
Most recent event   Tooltip17.07.2020Lapse of the patent in a contracting state
New state(s): AL
published on 19.08.2020  [2020/34]
Applicant(s)For all designated states
IFP Energies nouvelles
1 & 4 avenue de Bois-Préau
92500 Rueil-Malmaison / FR
For all designated states
ENI S.p.A.
Piazzale E. Mattei 1
00144 Roma / IT
[2017/44]
Former [2015/39]For all designated states
IFP Énergies nouvelles
1 & 4, avenue de Bois-Préau
92852 Rueil-Malmaison Cedex / FR
For all designated states
ENI S.p.A.
Piazzale E. Mattei 1
00144 Roma / IT
Inventor(s)01 / Decottignies, Dominique
0053 Rte de Vourles
69230 Saint-Genis-Laval / FR
02 / Diehl, Fabrice
0009 T Rue de Montbrillant
69003 Lyon / FR
03 / Lecocq, Vincent
0560 Rte du Paradis
69530 Orlienas / FR
04 / Velly, Marie
0013 Rte de Pelussin
42520 Maclas / FR
 [2015/39]
Representative(s)Schmitt, Nicolas A.J., et al
IFP Energies nouvelles
Département Propriété Industrielle
Rond-point de l'Echangeur de Solaize
BP3
69360 Solaize / FR
[N/P]
Former [2017/15]Ruis, Alain, et al
IFP Energies nouvelles
Département Propriété Industrielle
1 & 4 avenue de Bois-Préau
92852 Rueil-Malmaison Cedex / FR
Former [2015/39]Ruis, Alain, et al
IFP Energies nouvelles 1 et 4 avenue de Bois-Préau
92852 Rueil-Malmaison Cedex / FR
Application number, filing date15305245.119.02.2015
[2015/39]
Priority number, dateFR2014005231120.03.2014         Original published format: FR 1452311
[2015/39]
Filing languageFR
Procedural languageFR
PublicationType: A1 Application with search report 
No.:EP2921227
Date:23.09.2015
Language:FR
[2015/39]
Type: B1 Patent specification 
No.:EP2921227
Date:12.04.2017
Language:FR
[2017/15]
Search report(s)(Supplementary) European search report - dispatched on:EP10.08.2015
ClassificationIPC:B01J23/75, C10G2/00
[2015/39]
CPC:
B01J27/1853 (EP,US); B01J21/12 (EP,US); B01J23/005 (EP,US);
B01J23/75 (EP,US); B01J23/755 (EP,US); B01J35/613 (EP,US);
B01J35/615 (EP,US); B01J35/633 (EP,US); B01J35/635 (EP,US);
B01J37/0201 (EP,US); B01J37/0205 (EP,US); B01J37/0209 (EP,US);
B01J37/08 (US); B01J37/088 (EP,US); B01J37/28 (EP,US);
C10G2/33 (US); C10G2/332 (EP,US); C10G2/342 (EP,US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2016/18]
Former [2015/39]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:FISCHER-TROPSCH-KATALYSATOR AUF DER BASIS EINES METALLS DER GRUPPE VIIIB UND EINES TRÄGERS AUS OXIDEN, DER ALUMINIUMOXID, SILIZIUMDIOXID, EIN SPINELL UND PHOSPHOR UMFASST[2015/39]
English:FISCHER-TROPSCH CATALYST BASED ON A GROUP VIIIB METAL AND A CARRIER OF OXIDES INCLUDING ALUMINA, SILICA, A SPINEL AND PHOSPHORUS[2015/39]
French:CATALYSEUR FISCHER-TROPSCH À BASE D'UN METAL DU GROUPE VIIIB ET D'UN SUPPORT D'OXYDES COMPRENANT DE L'ALUMINE, DE LA SILICE, UNE SPINELLE ET DU PHOSPHORE[2016/52]
Former [2015/39]Catalyseur Fischer-Tropsch à base d'un metal du groupe VIIIB et d'un support d'oxydes comprenant de l'alumine, de la silice, une spinelle et du phosphore
Examination procedure12.02.2016Amendment by applicant (claims and/or description)
23.03.2016Examination requested  [2016/18]
17.06.2016Despatch of a communication from the examining division (Time limit: M04)
04.10.2016Reply to a communication from the examining division
05.12.2016Communication of intention to grant the patent
21.02.2017Fee for grant paid
21.02.2017Fee for publishing/printing paid
21.02.2017Receipt of the translation of the claim(s)
Opposition(s)15.01.2018No opposition filed within time limit [2018/12]
Fees paidRenewal fee
28.02.2017Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU19.02.2015
AL12.04.2017
AT12.04.2017
CY12.04.2017
CZ12.04.2017
EE12.04.2017
ES12.04.2017
FI12.04.2017
HR12.04.2017
LT12.04.2017
LV12.04.2017
MC12.04.2017
MK12.04.2017
MT12.04.2017
PL12.04.2017
PT12.04.2017
RO12.04.2017
RS12.04.2017
SE12.04.2017
SI12.04.2017
SK12.04.2017
SM12.04.2017
TR12.04.2017
BG12.07.2017
NO12.07.2017
GR13.07.2017
IS12.08.2017
[2020/34]
Former [2020/31]HU19.02.2015
AT12.04.2017
CY12.04.2017
CZ12.04.2017
EE12.04.2017
ES12.04.2017
FI12.04.2017
HR12.04.2017
LT12.04.2017
LV12.04.2017
MC12.04.2017
MK12.04.2017
MT12.04.2017
PL12.04.2017
PT12.04.2017
RO12.04.2017
RS12.04.2017
SE12.04.2017
SI12.04.2017
SK12.04.2017
SM12.04.2017
TR12.04.2017
BG12.07.2017
NO12.07.2017
GR13.07.2017
IS12.08.2017
Former [2020/30]HU19.02.2015
AT12.04.2017
CZ12.04.2017
EE12.04.2017
ES12.04.2017
FI12.04.2017
HR12.04.2017
LT12.04.2017
LV12.04.2017
MC12.04.2017
MT12.04.2017
PL12.04.2017
PT12.04.2017
RO12.04.2017
RS12.04.2017
SE12.04.2017
SI12.04.2017
SK12.04.2017
SM12.04.2017
TR12.04.2017
BG12.07.2017
NO12.07.2017
GR13.07.2017
IS12.08.2017
Former [2020/28]AT12.04.2017
CZ12.04.2017
EE12.04.2017
ES12.04.2017
FI12.04.2017
HR12.04.2017
LT12.04.2017
LV12.04.2017
MC12.04.2017
MT12.04.2017
PL12.04.2017
PT12.04.2017
RO12.04.2017
RS12.04.2017
SE12.04.2017
SI12.04.2017
SK12.04.2017
SM12.04.2017
TR12.04.2017
BG12.07.2017
NO12.07.2017
GR13.07.2017
IS12.08.2017
Former [2020/15]AT12.04.2017
CZ12.04.2017
EE12.04.2017
ES12.04.2017
FI12.04.2017
HR12.04.2017
LT12.04.2017
LV12.04.2017
MC12.04.2017
MT12.04.2017
PL12.04.2017
RO12.04.2017
RS12.04.2017
SE12.04.2017
SI12.04.2017
SK12.04.2017
SM12.04.2017
TR12.04.2017
BG12.07.2017
NO12.07.2017
GR13.07.2017
IS12.08.2017
Former [2018/44]AT12.04.2017
CZ12.04.2017
EE12.04.2017
ES12.04.2017
FI12.04.2017
HR12.04.2017
LT12.04.2017
LV12.04.2017
MC12.04.2017
MT12.04.2017
PL12.04.2017
RO12.04.2017
RS12.04.2017
SE12.04.2017
SI12.04.2017
SK12.04.2017
SM12.04.2017
BG12.07.2017
NO12.07.2017
GR13.07.2017
IS12.08.2017
Former [2018/43]AT12.04.2017
CZ12.04.2017
EE12.04.2017
ES12.04.2017
FI12.04.2017
HR12.04.2017
LT12.04.2017
LV12.04.2017
MT12.04.2017
PL12.04.2017
RO12.04.2017
RS12.04.2017
SE12.04.2017
SI12.04.2017
SK12.04.2017
SM12.04.2017
BG12.07.2017
NO12.07.2017
GR13.07.2017
IS12.08.2017
Former [2018/25]AT12.04.2017
CZ12.04.2017
EE12.04.2017
ES12.04.2017
FI12.04.2017
HR12.04.2017
LT12.04.2017
LV12.04.2017
PL12.04.2017
RO12.04.2017
RS12.04.2017
SE12.04.2017
SI12.04.2017
SK12.04.2017
SM12.04.2017
BG12.07.2017
NO12.07.2017
GR13.07.2017
IS12.08.2017
Former [2018/11]AT12.04.2017
CZ12.04.2017
EE12.04.2017
ES12.04.2017
FI12.04.2017
HR12.04.2017
LT12.04.2017
LV12.04.2017
PL12.04.2017
RO12.04.2017
RS12.04.2017
SE12.04.2017
SK12.04.2017
SM12.04.2017
BG12.07.2017
NO12.07.2017
GR13.07.2017
IS12.08.2017
Former [2018/10]AT12.04.2017
CZ12.04.2017
EE12.04.2017
ES12.04.2017
FI12.04.2017
HR12.04.2017
LT12.04.2017
LV12.04.2017
PL12.04.2017
RO12.04.2017
RS12.04.2017
SE12.04.2017
SK12.04.2017
BG12.07.2017
NO12.07.2017
GR13.07.2017
IS12.08.2017
Former [2018/09]AT12.04.2017
EE12.04.2017
ES12.04.2017
FI12.04.2017
HR12.04.2017
LT12.04.2017
LV12.04.2017
PL12.04.2017
RS12.04.2017
SE12.04.2017
BG12.07.2017
NO12.07.2017
GR13.07.2017
IS12.08.2017
Former [2017/50]AT12.04.2017
ES12.04.2017
FI12.04.2017
HR12.04.2017
LT12.04.2017
LV12.04.2017
PL12.04.2017
RS12.04.2017
SE12.04.2017
BG12.07.2017
NO12.07.2017
GR13.07.2017
IS12.08.2017
Former [2017/49]AT12.04.2017
ES12.04.2017
FI12.04.2017
HR12.04.2017
LT12.04.2017
NO12.07.2017
GR13.07.2017
IS12.08.2017
Documents cited:Search[Y]WO2009119977  (KOREA RES INST CHEM TECH [KR], et al);
 [X]WO2012020210  (GTL F1 AG [CH], et al);
 [Y]EP2669006  (IFP ENERGIES NOUVELLES [FR], et al)
by applicantWO2005072866
 FR2879478
 WO2009014292
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.