blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2923542

EP2923542 - Seed drill with a console having two working tools [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  11.03.2022
Database last updated on 15.06.2024
FormerThe patent has been granted
Status updated on  03.04.2021
FormerGrant of patent is intended
Status updated on  17.11.2020
FormerExamination is in progress
Status updated on  31.01.2020
Most recent event   Tooltip27.04.2024Lapse of the patent in a contracting state
New state(s): MK
published on 29.05.2024  [2024/22]
Applicant(s)For all designated states
Kuhn SAS
4 impasse des Fabriques
67700 Saverne / FR
[2020/29]
Former [2015/40]For all designated states
KUHN S.A.
4, Impasse des Fabriques
67700 Saverne / FR
Inventor(s)01 / Potier, Philippe
3 Moderfeld
67290 Zittersheim / FR
02 / Viriat, Laurent
4 rue des Acacias
67440 Westhouse-Marmoutier / FR
 [2015/40]
Representative(s)Cabinet Nuss
10, rue Jacques Kablé
67080 Strasbourg Cedex / FR
[2021/18]
Former [2015/40]Nuss, Laurent, et al
Cabinet Nuss
10, rue Jacques Kablé
67080 Strasbourg Cedex / FR
Application number, filing date15305434.125.03.2015
[2015/40]
Priority number, dateFR2014005257726.03.2014         Original published format: FR 1452577
[2015/40]
Filing languageFR
Procedural languageFR
PublicationType: A1 Application with search report 
No.:EP2923542
Date:30.09.2015
Language:FR
[2015/40]
Type: B1 Patent specification 
No.:EP2923542
Date:05.05.2021
Language:FR
[2021/18]
Search report(s)(Supplementary) European search report - dispatched on:EP24.07.2015
ClassificationIPC:A01C5/06
[2015/40]
CPC:
A01C5/064 (EP); A01C7/201 (EP)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2016/17]
Former [2015/40]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:Sämaschine, die eine Konsole mit zwei Werkzeugen umfasst[2015/40]
English:Seed drill with a console having two working tools[2015/40]
French:Semoir avec une console portant deux outils[2015/40]
Examination procedure17.03.2016Amendment by applicant (claims and/or description)
17.03.2016Examination requested  [2016/17]
04.02.2020Despatch of a communication from the examining division (Time limit: M04)
08.06.2020Reply to a communication from the examining division
18.11.2020Communication of intention to grant the patent
16.03.2021Fee for grant paid
16.03.2021Fee for publishing/printing paid
16.03.2021Receipt of the translation of the claim(s)
Opposition(s)08.02.2022No opposition filed within time limit [2022/15]
Fees paidRenewal fee
23.03.2017Renewal fee patent year 03
27.03.2018Renewal fee patent year 04
27.03.2019Renewal fee patent year 05
27.03.2020Renewal fee patent year 06
29.03.2021Renewal fee patent year 07
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU25.03.2015
AL05.05.2021
AT05.05.2021
CY05.05.2021
CZ05.05.2021
DK05.05.2021
EE05.05.2021
ES05.05.2021
FI05.05.2021
HR05.05.2021
IT05.05.2021
LT05.05.2021
LV05.05.2021
MC05.05.2021
MK05.05.2021
NL05.05.2021
PL05.05.2021
RO05.05.2021
RS05.05.2021
SE05.05.2021
SI05.05.2021
SK05.05.2021
SM05.05.2021
BG05.08.2021
NO05.08.2021
GR06.08.2021
IS05.09.2021
PT06.09.2021
[2024/22]
Former [2024/20]HU25.03.2015
AL05.05.2021
AT05.05.2021
CY05.05.2021
CZ05.05.2021
DK05.05.2021
EE05.05.2021
ES05.05.2021
FI05.05.2021
HR05.05.2021
IT05.05.2021
LT05.05.2021
LV05.05.2021
MC05.05.2021
NL05.05.2021
PL05.05.2021
RO05.05.2021
RS05.05.2021
SE05.05.2021
SI05.05.2021
SK05.05.2021
SM05.05.2021
BG05.08.2021
NO05.08.2021
GR06.08.2021
IS05.09.2021
PT06.09.2021
Former [2024/18]HU25.03.2015
AL05.05.2021
AT05.05.2021
CZ05.05.2021
DK05.05.2021
EE05.05.2021
ES05.05.2021
FI05.05.2021
HR05.05.2021
IT05.05.2021
LT05.05.2021
LV05.05.2021
MC05.05.2021
NL05.05.2021
PL05.05.2021
RO05.05.2021
RS05.05.2021
SE05.05.2021
SI05.05.2021
SK05.05.2021
SM05.05.2021
BG05.08.2021
NO05.08.2021
GR06.08.2021
IS05.09.2021
PT06.09.2021
Former [2022/47]AL05.05.2021
AT05.05.2021
CZ05.05.2021
DK05.05.2021
EE05.05.2021
ES05.05.2021
FI05.05.2021
HR05.05.2021
IT05.05.2021
LT05.05.2021
LV05.05.2021
MC05.05.2021
NL05.05.2021
PL05.05.2021
RO05.05.2021
RS05.05.2021
SE05.05.2021
SI05.05.2021
SK05.05.2021
SM05.05.2021
BG05.08.2021
NO05.08.2021
GR06.08.2021
IS05.09.2021
PT06.09.2021
Former [2022/36]AL05.05.2021
AT05.05.2021
CZ05.05.2021
DK05.05.2021
EE05.05.2021
ES05.05.2021
FI05.05.2021
HR05.05.2021
IT05.05.2021
LT05.05.2021
LV05.05.2021
NL05.05.2021
PL05.05.2021
RO05.05.2021
RS05.05.2021
SE05.05.2021
SI05.05.2021
SK05.05.2021
SM05.05.2021
BG05.08.2021
NO05.08.2021
GR06.08.2021
IS05.09.2021
PT06.09.2021
Former [2022/29]AL05.05.2021
AT05.05.2021
CZ05.05.2021
DK05.05.2021
EE05.05.2021
ES05.05.2021
FI05.05.2021
HR05.05.2021
LT05.05.2021
LV05.05.2021
NL05.05.2021
PL05.05.2021
RO05.05.2021
RS05.05.2021
SE05.05.2021
SI05.05.2021
SK05.05.2021
SM05.05.2021
BG05.08.2021
NO05.08.2021
GR06.08.2021
IS05.09.2021
PT06.09.2021
Former [2022/26]AL05.05.2021
AT05.05.2021
CZ05.05.2021
DK05.05.2021
EE05.05.2021
ES05.05.2021
FI05.05.2021
HR05.05.2021
LT05.05.2021
LV05.05.2021
NL05.05.2021
PL05.05.2021
RO05.05.2021
RS05.05.2021
SE05.05.2021
SK05.05.2021
SM05.05.2021
BG05.08.2021
NO05.08.2021
GR06.08.2021
IS05.09.2021
PT06.09.2021
Former [2022/23]AT05.05.2021
CZ05.05.2021
DK05.05.2021
EE05.05.2021
ES05.05.2021
FI05.05.2021
HR05.05.2021
LT05.05.2021
LV05.05.2021
NL05.05.2021
PL05.05.2021
RO05.05.2021
RS05.05.2021
SE05.05.2021
SK05.05.2021
SM05.05.2021
BG05.08.2021
NO05.08.2021
GR06.08.2021
IS05.09.2021
PT06.09.2021
Former [2022/10]AT05.05.2021
CZ05.05.2021
DK05.05.2021
EE05.05.2021
ES05.05.2021
FI05.05.2021
HR05.05.2021
LT05.05.2021
LV05.05.2021
NL05.05.2021
PL05.05.2021
RO05.05.2021
RS05.05.2021
SE05.05.2021
SK05.05.2021
SM05.05.2021
BG05.08.2021
NO05.08.2021
GR06.08.2021
PT06.09.2021
IS22.12.2021
Former [2022/09]AT05.05.2021
CZ05.05.2021
DK05.05.2021
ES05.05.2021
FI05.05.2021
HR05.05.2021
LT05.05.2021
LV05.05.2021
NL05.05.2021
PL05.05.2021
RO05.05.2021
RS05.05.2021
SE05.05.2021
SK05.05.2021
SM05.05.2021
BG05.08.2021
NO05.08.2021
GR06.08.2021
IS05.09.2021
PT06.09.2021
Former [2022/08]AT05.05.2021
CZ05.05.2021
DK05.05.2021
ES05.05.2021
FI05.05.2021
HR05.05.2021
LT05.05.2021
LV05.05.2021
NL05.05.2021
PL05.05.2021
RS05.05.2021
SE05.05.2021
SM05.05.2021
BG05.08.2021
NO05.08.2021
GR06.08.2021
IS05.09.2021
PT06.09.2021
Former [2022/07]AT05.05.2021
ES05.05.2021
FI05.05.2021
HR05.05.2021
LT05.05.2021
LV05.05.2021
NL05.05.2021
PL05.05.2021
RS05.05.2021
SE05.05.2021
SM05.05.2021
BG05.08.2021
NO05.08.2021
GR06.08.2021
IS05.09.2021
PT06.09.2021
Former [2022/04]AT05.05.2021
ES05.05.2021
FI05.05.2021
HR05.05.2021
LT05.05.2021
LV05.05.2021
NL05.05.2021
PL05.05.2021
RS05.05.2021
SE05.05.2021
BG05.08.2021
NO05.08.2021
GR06.08.2021
IS05.09.2021
PT06.09.2021
Former [2021/52]AT05.05.2021
ES05.05.2021
FI05.05.2021
HR05.05.2021
LT05.05.2021
LV05.05.2021
PL05.05.2021
RS05.05.2021
SE05.05.2021
BG05.08.2021
NO05.08.2021
GR06.08.2021
IS05.09.2021
PT06.09.2021
Former [2021/51]AT05.05.2021
ES05.05.2021
FI05.05.2021
HR05.05.2021
LT05.05.2021
LV05.05.2021
RS05.05.2021
SE05.05.2021
BG05.08.2021
NO05.08.2021
GR06.08.2021
IS05.09.2021
PT06.09.2021
Former [2021/50]AT05.05.2021
FI05.05.2021
HR05.05.2021
LT05.05.2021
LV05.05.2021
SE05.05.2021
BG05.08.2021
NO05.08.2021
GR06.08.2021
PT06.09.2021
Former [2021/49]AT05.05.2021
FI05.05.2021
HR05.05.2021
LT05.05.2021
LV05.05.2021
SE05.05.2021
BG05.08.2021
NO05.08.2021
GR06.08.2021
Former [2021/47]AT05.05.2021
FI05.05.2021
LT05.05.2021
BG05.08.2021
Former [2021/46]AT05.05.2021
FI05.05.2021
LT05.05.2021
Documents cited:Search[XI]EP1813139  (POETTINGER OHG ALOIS [AT]) [X] 1,4,6-10,12-15 * abstract * * page 4, paragraphs 26,27 * * page 5, paragraph 35 * * figure -; claim - * [I] 2,3,11;
 [XI]EP1285564  (AMAZONEN WERKE DREYER H [DE]) [X] 1,4,6-9,12-14 * abstract * * pages 2,3, paragraph 8 * * figure -; claim - * [I] 2,3,10,15;
 [XI]WO2012093958  (VAEDERSTAD VERKEN AB [SE], et al) [X] 1,4,6-9,12-15 * abstract * * page 6, line 28 - page 7, line 3 * * figure -; claim - * [I] 2,3;
 [XI]EP1529431  (POETTINGER OHG ALOIS [AT]) [X] 1,4,6-9,12-15 * abstract * * page 6, paragraph 32 * * figure -; claim - * [I] 2,3;
 [A]WO03037064  (AMAZONEN WERKE DREYER H [DE], et al) [A] 1-15 * abstract * * page 5, paragraph 1 * * figure -; claim - *;
 [A]EP1234489  (VAEDERSTAD VERKEN AB [SE]) [A] 1-15 * abstract * * figure -; claim - *;
 [A]US2010096149  (FRIGGSTAD TERRANCE A [CA], et al) [A] 1-15 * abstract * * page 2, paragraphs 25,26,30 * * figure -; claim - *
ExaminationWO2007050185
by applicantFR2722362
 US2010096149
 WO03037064
 EP1234489
 EP1285564
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.