blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3085570

EP3085570 - AN ELECTRICAL POWER SUPPLY SYSTEM FOR AN ELECTRICALLY PROPELLED VEHICLE AND METHODS OF CONTROLLING SUCH AN ELECTRICAL POWER SUPPLY SYSTEM [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  09.10.2020
Database last updated on 02.09.2024
FormerThe patent has been granted
Status updated on  01.11.2019
FormerGrant of patent is intended
Status updated on  18.07.2019
FormerExamination is in progress
Status updated on  30.11.2018
FormerRequest for examination was made
Status updated on  24.03.2017
Most recent event   Tooltip08.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 10.08.2022  [2022/32]
Applicant(s)For all designated states
ALSTOM Transport Technologies
48, rue Albert Dhalenne
93400 Saint-Ouen / FR
[2019/49]
Former [2016/43]For all designated states
ALSTOM Transport Technologies
48 rue Albert Dhalenne
93400 Saint-Ouen / FR
Inventor(s)01 / Barlini, Davide
Via Chiarelli 2A
20151 Milano / IT
02 / Losito, Michele
Via Ca' De Volpi 2G
24034 Cisano Bergamasco / IT
 [2016/43]
Representative(s)Lavoix
2, place d'Estienne d'Orves
75441 Paris Cedex 09 / FR
[2016/43]
Application number, filing date15305594.220.04.2015
[2016/43]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3085570
Date:26.10.2016
Language:EN
[2016/43]
Type: B1 Patent specification 
No.:EP3085570
Date:04.12.2019
Language:EN
[2019/49]
Search report(s)(Supplementary) European search report - dispatched on:EP12.10.2015
ClassificationIPC:B60M1/18, B61C17/06, B60M3/06, B60M7/00
[2019/32]
CPC:
B60M1/18 (EP,US); B60L50/51 (CN); B60M7/003 (US);
B60L50/53 (CN); B60L53/14 (CN); B60L53/20 (CN);
B60L9/22 (CN); B60M1/12 (CN); B60M3/06 (US);
B61C17/06 (US); B60L2200/26 (CN); Y02T10/70 (EP);
Y02T10/7072 (EP); Y02T30/00 (EP); Y02T90/14 (EP) (-)
Former IPC [2016/43]B60M1/18
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2017/17]
Former [2016/43]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:STROMVERSORGUNGSNETZ FÜR EIN ELEKTRISCH ANGETRIEBENES FAHRZEUG UND VERFAHREN ZUR STEUERUNG SOLCH EINES STROMVERSORGUNGSSYSTEMS[2016/43]
English:AN ELECTRICAL POWER SUPPLY SYSTEM FOR AN ELECTRICALLY PROPELLED VEHICLE AND METHODS OF CONTROLLING SUCH AN ELECTRICAL POWER SUPPLY SYSTEM[2016/43]
French:SYSTÈME D'ALIMENTATION ÉLECTRIQUE POUR UN VÉHICULE À PROPULSION ÉLECTRIQUE ET PROCÉDÉS DE COMMANDE D'UN TEL SYSTÈME D'ALIMENTATION ÉLECTRIQUE[2016/43]
Examination procedure20.04.2015Date on which the examining division has become responsible
19.09.2016Amendment by applicant (claims and/or description)
15.03.2017Examination requested  [2017/17]
04.12.2018Despatch of a communication from the examining division (Time limit: M06)
07.05.2019Reply to a communication from the examining division
19.07.2019Communication of intention to grant the patent
29.10.2019Fee for grant paid
29.10.2019Fee for publishing/printing paid
29.10.2019Receipt of the translation of the claim(s)
Opposition(s)07.09.2020No opposition filed within time limit [2020/46]
Fees paidRenewal fee
21.04.2017Renewal fee patent year 03
23.04.2018Renewal fee patent year 04
23.04.2019Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU20.04.2015
AL04.12.2019
AT04.12.2019
CY04.12.2019
CZ04.12.2019
DK04.12.2019
EE04.12.2019
FI04.12.2019
HR04.12.2019
LT04.12.2019
LV04.12.2019
MC04.12.2019
MK04.12.2019
MT04.12.2019
RO04.12.2019
RS04.12.2019
SE04.12.2019
SI04.12.2019
SK04.12.2019
SM04.12.2019
TR04.12.2019
BG04.03.2020
NO04.03.2020
GR05.03.2020
IS04.04.2020
IE20.04.2020
LU20.04.2020
PT29.04.2020
CH30.04.2020
LI30.04.2020
[2022/32]
Former [2022/27]HU20.04.2015
AL04.12.2019
AT04.12.2019
CY04.12.2019
CZ04.12.2019
DK04.12.2019
EE04.12.2019
FI04.12.2019
HR04.12.2019
LT04.12.2019
LV04.12.2019
MC04.12.2019
MT04.12.2019
RO04.12.2019
RS04.12.2019
SE04.12.2019
SI04.12.2019
SK04.12.2019
SM04.12.2019
TR04.12.2019
BG04.03.2020
NO04.03.2020
GR05.03.2020
IS04.04.2020
IE20.04.2020
LU20.04.2020
PT29.04.2020
CH30.04.2020
LI30.04.2020
Former [2021/20]AL04.12.2019
AT04.12.2019
CZ04.12.2019
DK04.12.2019
EE04.12.2019
FI04.12.2019
HR04.12.2019
LT04.12.2019
LV04.12.2019
MC04.12.2019
RO04.12.2019
RS04.12.2019
SE04.12.2019
SI04.12.2019
SK04.12.2019
SM04.12.2019
BG04.03.2020
NO04.03.2020
GR05.03.2020
IS04.04.2020
IE20.04.2020
LU20.04.2020
PT29.04.2020
CH30.04.2020
LI30.04.2020
Former [2021/08]AL04.12.2019
AT04.12.2019
CZ04.12.2019
DK04.12.2019
EE04.12.2019
FI04.12.2019
HR04.12.2019
LT04.12.2019
LV04.12.2019
MC04.12.2019
RO04.12.2019
RS04.12.2019
SE04.12.2019
SI04.12.2019
SK04.12.2019
SM04.12.2019
BG04.03.2020
NO04.03.2020
GR05.03.2020
IS04.04.2020
LU20.04.2020
PT29.04.2020
CH30.04.2020
LI30.04.2020
Former [2021/07]AL04.12.2019
AT04.12.2019
CZ04.12.2019
DK04.12.2019
EE04.12.2019
FI04.12.2019
HR04.12.2019
LT04.12.2019
LV04.12.2019
MC04.12.2019
RO04.12.2019
RS04.12.2019
SE04.12.2019
SI04.12.2019
SK04.12.2019
SM04.12.2019
BG04.03.2020
NO04.03.2020
GR05.03.2020
IS04.04.2020
PT29.04.2020
CH30.04.2020
LI30.04.2020
Former [2020/52]AL04.12.2019
AT04.12.2019
CZ04.12.2019
DK04.12.2019
EE04.12.2019
FI04.12.2019
HR04.12.2019
LT04.12.2019
LV04.12.2019
MC04.12.2019
RO04.12.2019
RS04.12.2019
SE04.12.2019
SI04.12.2019
SK04.12.2019
SM04.12.2019
BG04.03.2020
NO04.03.2020
GR05.03.2020
IS04.04.2020
PT29.04.2020
Former [2020/51]AL04.12.2019
AT04.12.2019
CZ04.12.2019
DK04.12.2019
EE04.12.2019
FI04.12.2019
HR04.12.2019
LT04.12.2019
LV04.12.2019
RO04.12.2019
RS04.12.2019
SE04.12.2019
SI04.12.2019
SK04.12.2019
SM04.12.2019
BG04.03.2020
NO04.03.2020
GR05.03.2020
IS04.04.2020
PT29.04.2020
Former [2020/47]AL04.12.2019
CZ04.12.2019
DK04.12.2019
EE04.12.2019
FI04.12.2019
HR04.12.2019
LT04.12.2019
LV04.12.2019
RO04.12.2019
RS04.12.2019
SE04.12.2019
SK04.12.2019
SM04.12.2019
BG04.03.2020
NO04.03.2020
GR05.03.2020
IS04.04.2020
PT29.04.2020
Former [2020/40]AL04.12.2019
CZ04.12.2019
EE04.12.2019
FI04.12.2019
HR04.12.2019
LT04.12.2019
LV04.12.2019
RO04.12.2019
RS04.12.2019
SE04.12.2019
SK04.12.2019
SM04.12.2019
BG04.03.2020
NO04.03.2020
GR05.03.2020
IS04.04.2020
PT29.04.2020
Former [2020/37]AL04.12.2019
CZ04.12.2019
EE04.12.2019
FI04.12.2019
HR04.12.2019
LT04.12.2019
LV04.12.2019
RO04.12.2019
RS04.12.2019
SE04.12.2019
SK04.12.2019
SM04.12.2019
BG04.03.2020
NO04.03.2020
GR05.03.2020
PT29.04.2020
Former [2020/36]AL04.12.2019
CZ04.12.2019
EE04.12.2019
FI04.12.2019
HR04.12.2019
LT04.12.2019
LV04.12.2019
RO04.12.2019
RS04.12.2019
SE04.12.2019
BG04.03.2020
NO04.03.2020
GR05.03.2020
PT29.04.2020
Former [2020/35]AL04.12.2019
CZ04.12.2019
FI04.12.2019
HR04.12.2019
LT04.12.2019
LV04.12.2019
RO04.12.2019
RS04.12.2019
SE04.12.2019
BG04.03.2020
NO04.03.2020
GR05.03.2020
Former [2020/32]AL04.12.2019
FI04.12.2019
HR04.12.2019
LT04.12.2019
LV04.12.2019
RS04.12.2019
SE04.12.2019
BG04.03.2020
NO04.03.2020
GR05.03.2020
Former [2020/26]FI04.12.2019
HR04.12.2019
LT04.12.2019
LV04.12.2019
RS04.12.2019
SE04.12.2019
BG04.03.2020
NO04.03.2020
GR05.03.2020
Former [2020/23]FI04.12.2019
LT04.12.2019
LV04.12.2019
SE04.12.2019
BG04.03.2020
NO04.03.2020
GR05.03.2020
Former [2020/22]FI04.12.2019
LT04.12.2019
SE04.12.2019
BG04.03.2020
NO04.03.2020
Former [2020/21]NO04.03.2020
Documents cited:Search[A]FR2398634  (REGIE AUTONOME TRANSPORTS [FR]) [A] 1* the whole document *;
 [I]DE10233842  (SIEMENS AG [DE]) [I] 1,3 * paragraph [0013] - paragraph [0017]; figures 1-3 *;
 [A]EP2848458  (SIEMENS AG [DE]) [A] 1 * the whole document *
ExaminationEP1245432
 EP2275300
by applicantWO2011147708
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.