EP3097218 - METHOD AND SYSTEM FOR HOT-DIP COATING HOT-ROLLED STEEL STRIPS [Right-click to bookmark this link] | Status | The patent has been granted Status updated on 23.08.2019 Database last updated on 15.06.2024 | |
Former | Grant of patent is intended Status updated on 27.05.2019 | ||
Former | Examination is in progress Status updated on 23.06.2017 | Most recent event Tooltip | 01.03.2024 | Change: Date of oral proceedings | 01.03.2024 | Deletion: Despatch of minutes of oral proceedings | Applicant(s) | For all designated states SMS group GmbH Eduard-Schloemann-Strasse 4 40237 Düsseldorf / DE | [2016/48] | Inventor(s) | 01 /
GRAMER, Andreas Hossenhauser-Strasse 147 42655 Solingen / DE | 02 /
HAUPT, Werner Waldenburger Strasse 20 47238 Duisburg / DE | 03 /
SULENSKI, Hartmut Selma-Lagerlöf-Strasse 10 45481 Mülheim / DE | 04 /
EDER, Anja Maria Allmendenweg 53 40221 Düsseldorf / DE | 05 /
JOLLET, Peter Parkstrasse 39 40477 Düsseldorf / DE | 06 /
KLÖCKNER, Hans Georg Marsstrasse 5 46487 Wesel / DE | [2019/39] |
Former [2016/48] | 01 /
GRAMER, Andreas Hossenhauserstrasse 147 42655 Solingen / DE | ||
02 /
HAUPT, Werner Waldenburgerstrasse 20 47238 Duisburg / DE | |||
03 /
SULENSKI, Hartmut Selma Lagerlöfstrasse 10 45481 Mülheim / DE | |||
04 /
EDER, Anja Maria Allmendenweg 53 40221 Düsseldorf / DE | |||
05 /
JOLLET, Peter Parkstrasse 39 40477 Düsseldorf / DE | |||
06 /
KLÖCKNER, Hans Georg Marsstrasse 5 46487 Wesel / DE | Representative(s) | Klüppel, Walter Hemmerich & Kollegen Patentanwälte Hammerstraße 2 57072 Siegen / DE | [2016/48] | Application number, filing date | 15702989.3 | 21.01.2015 | [2016/48] | WO2015EP51175 | Priority number, date | DE201410201068 | 22.01.2014 Original published format: DE102014201068 | DE201510200764 | 20.01.2015 Original published format: DE102015200764 | [2016/48] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | WO2015110490 | Date: | 30.07.2015 | Language: | DE | [2015/30] | Type: | A1 Application with search report | No.: | EP3097218 | Date: | 30.11.2016 | Language: | DE | The application published by WIPO in one of the EPO official languages on 30.07.2015 takes the place of the publication of the European patent application. | [2016/48] | Type: | B1 Patent specification | No.: | EP3097218 | Date: | 25.09.2019 | Language: | DE | [2019/39] | Search report(s) | International search report - published on: | EP | 30.07.2015 | Classification | IPC: | C23C2/02, C23C2/26, C23C2/06, C23C2/40, C21D8/04, B21B1/22, B21B1/28 | [2016/48] | CPC: |
C23C2/024 (EP,US);
B21B1/227 (EP);
B21B1/28 (EP);
C21D8/0236 (EP);
C21D8/0242 (EP);
C21D8/0284 (EP);
C21D8/0436 (EP);
C21D8/0442 (EP);
C21D8/0484 (EP);
C21D9/56 (EP);
C21D9/562 (EP);
C23C2/02 (EP,US);
C23C2/06 (EP);
C23C2/26 (EP,US);
C23C2/40 (EP);
B21B2001/228 (EP);
B21B2265/14 (EP);
B21B27/021 (EP);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/48] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | VERFAHREN UND ANLAGE ZUM SCHMELZTAUCHBESCHICHTEN VON WARMGEWALZTEM STAHLBAND | [2016/48] | English: | METHOD AND SYSTEM FOR HOT-DIP COATING HOT-ROLLED STEEL STRIPS | [2016/48] | French: | PROCÉDÉ ET INSTALLATION DE REVÊTEMENT AU TREMPÉ À CHAUD DE FEUILLARD D'ACIER LAMINÉ À CHAUD | [2016/48] | Entry into regional phase | 22.08.2016 | National basic fee paid | 22.08.2016 | Designation fee(s) paid | 22.08.2016 | Examination fee paid | Examination procedure | 05.11.2015 | Request for preliminary examination filed International Preliminary Examining Authority: EP | 22.08.2016 | Examination requested [2016/48] | 15.03.2017 | Amendment by applicant (claims and/or description) | 27.06.2017 | Despatch of a communication from the examining division (Time limit: M06) | 05.01.2018 | Reply to a communication from the examining division | 03.04.2018 | Despatch of a communication from the examining division (Time limit: M02) | 29.05.2018 | Reply to a communication from the examining division | 28.05.2019 | Communication of intention to grant the patent | 14.08.2019 | Fee for grant paid | 14.08.2019 | Fee for publishing/printing paid | 14.08.2019 | Receipt of the translation of the claim(s) | Opposition(s) | Opponent(s) | 01
24.06.2020
26.06.2020
ADMISSIBLE CLECIM SAS 41 Route de Feurs 42600 Savigneux / FR Opponent's representative Siemens Patent Attorneys Postfach 22 16 34 80506 München / DE | 02
24.06.2020
26.06.2020
ADMISSIBLE ANDRITZ AG Stattegger Strasse 18 8045 Graz / AT Opponent's representative Tschinder, Thomas Andritz AG Stattegger Straße 18 8045 Graz / AT | [2022/48] |
Former [2022/23] | |||
Opponent(s) | 01
24.06.2020
26.06.2020
ADMISSIBLE Primetals Technologies France SAS 41, Route de Feurs 42600 Savigneux / FR Opponent's representative Siemens Patent Attorneys Postfach 22 16 34 80506 München / DE | ||
02
24.06.2020
26.06.2020
ADMISSIBLE ANDRITZ AG Stattegger Strasse 18 8045 Graz / AT Opponent's representative Tschinder, Thomas Andritz AG Stattegger Straße 18 8045 Graz / AT | |||
Former [2021/34] | |||
Opponent(s) | 01
24.06.2020
26.06.2020
ADMISSIBLE Primetals Technologies France SAS 41, Route de Feurs 42600 Savigneux / FR Opponent's representative Siemens Patent Attorneys Postfach 22 16 34 80506 München / DE | ||
02
24.06.2020
26.06.2020
ADMISSIBLE ANDRITZ AG Stattegger Strasse 18 8045 Graz / AT Opponent's representative Timonen, Tuomo Markus Antero Andritz Oy Tammasaarenkatu 1 00180 Helsinki / FI | |||
Former [2020/32] | |||
Opponent(s) | 01
24.06.2020
26.06.2020
ADMISSIBLE Primetals Technologies France SAS 41, Route de Feurs 42600 Savigneux / FR Opponent's representative Metals@Linz Primetals Technologies Austria GmbH Intellectual Property Upstream IP UP Turmstraße 44 4031 Linz / AT | ||
02
24.06.2020
26.06.2020
ADMISSIBLE ANDRITZ AG Stattegger Strasse 18 8045 Graz / AT Opponent's representative Timonen, Tuomo Markus Antero Andritz Oy…Tammasaarenkatu 1 00180 Helsinki / FI | |||
Former [2020/31] | |||
Opponent(s) | 01
24.06.2020
ADMISSIBLE Primetals Technologies France SAS 41, Route de Feurs 42600 Savigneux / FR Opponent's representative Metals@Linz Primetals Technologies Austria GmbH Intellectual Property Upstream IP UP Turmstraße 44 4031 Linz / AT | ||
02
24.06.2020
ANDRITZ AG Stattegger Strasse 18 8045 Graz / AT | 07.07.2020 | Invitation to proprietor to file observations on the notice of opposition | 16.11.2020 | Reply of patent proprietor to notice(s) of opposition | 07.02.2022 | Despatch of communication that the patent will be revoked | Appeal following opposition | 28.03.2022 | Appeal received No. T0834/22 | 28.03.2022 | Payment of appeal fee | 07.06.2022 | Statement of grounds filed | 15.10.2024 | Date of oral proceedings | Fees paid | Renewal fee | 31.01.2017 | Renewal fee patent year 03 | 31.01.2018 | Renewal fee patent year 04 | 31.01.2019 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 21.01.2015 | AL | 25.09.2019 | CY | 25.09.2019 | CZ | 25.09.2019 | DK | 25.09.2019 | EE | 25.09.2019 | ES | 25.09.2019 | FI | 25.09.2019 | HR | 25.09.2019 | LT | 25.09.2019 | LV | 25.09.2019 | MC | 25.09.2019 | MK | 25.09.2019 | MT | 25.09.2019 | NL | 25.09.2019 | PL | 25.09.2019 | RO | 25.09.2019 | RS | 25.09.2019 | SE | 25.09.2019 | SI | 25.09.2019 | SK | 25.09.2019 | SM | 25.09.2019 | TR | 25.09.2019 | BG | 25.12.2019 | NO | 25.12.2019 | GR | 26.12.2019 | IE | 21.01.2020 | LU | 21.01.2020 | IS | 26.01.2020 | PT | 27.01.2020 | BE | 31.01.2020 | CH | 31.01.2020 | LI | 31.01.2020 | [2022/32] |
Former [2022/27] | HU | 21.01.2015 | |
AL | 25.09.2019 | ||
CY | 25.09.2019 | ||
CZ | 25.09.2019 | ||
DK | 25.09.2019 | ||
EE | 25.09.2019 | ||
ES | 25.09.2019 | ||
FI | 25.09.2019 | ||
HR | 25.09.2019 | ||
LT | 25.09.2019 | ||
LV | 25.09.2019 | ||
MC | 25.09.2019 | ||
MT | 25.09.2019 | ||
NL | 25.09.2019 | ||
PL | 25.09.2019 | ||
RO | 25.09.2019 | ||
RS | 25.09.2019 | ||
SE | 25.09.2019 | ||
SI | 25.09.2019 | ||
SK | 25.09.2019 | ||
SM | 25.09.2019 | ||
TR | 25.09.2019 | ||
BG | 25.12.2019 | ||
NO | 25.12.2019 | ||
GR | 26.12.2019 | ||
IE | 21.01.2020 | ||
LU | 21.01.2020 | ||
IS | 26.01.2020 | ||
PT | 27.01.2020 | ||
BE | 31.01.2020 | ||
CH | 31.01.2020 | ||
LI | 31.01.2020 | ||
Former [2021/08] | AL | 25.09.2019 | |
CZ | 25.09.2019 | ||
DK | 25.09.2019 | ||
EE | 25.09.2019 | ||
ES | 25.09.2019 | ||
FI | 25.09.2019 | ||
HR | 25.09.2019 | ||
LT | 25.09.2019 | ||
LV | 25.09.2019 | ||
MC | 25.09.2019 | ||
NL | 25.09.2019 | ||
PL | 25.09.2019 | ||
RO | 25.09.2019 | ||
RS | 25.09.2019 | ||
SE | 25.09.2019 | ||
SI | 25.09.2019 | ||
SK | 25.09.2019 | ||
SM | 25.09.2019 | ||
BG | 25.12.2019 | ||
NO | 25.12.2019 | ||
GR | 26.12.2019 | ||
IE | 21.01.2020 | ||
LU | 21.01.2020 | ||
IS | 26.01.2020 | ||
PT | 27.01.2020 | ||
BE | 31.01.2020 | ||
CH | 31.01.2020 | ||
LI | 31.01.2020 | ||
Former [2020/51] | AL | 25.09.2019 | |
CZ | 25.09.2019 | ||
DK | 25.09.2019 | ||
EE | 25.09.2019 | ||
ES | 25.09.2019 | ||
FI | 25.09.2019 | ||
HR | 25.09.2019 | ||
LT | 25.09.2019 | ||
LV | 25.09.2019 | ||
MC | 25.09.2019 | ||
NL | 25.09.2019 | ||
PL | 25.09.2019 | ||
RO | 25.09.2019 | ||
RS | 25.09.2019 | ||
SE | 25.09.2019 | ||
SI | 25.09.2019 | ||
SK | 25.09.2019 | ||
SM | 25.09.2019 | ||
BG | 25.12.2019 | ||
NO | 25.12.2019 | ||
GR | 26.12.2019 | ||
LU | 21.01.2020 | ||
IS | 26.01.2020 | ||
PT | 27.01.2020 | ||
BE | 31.01.2020 | ||
CH | 31.01.2020 | ||
LI | 31.01.2020 | ||
Former [2020/46] | AL | 25.09.2019 | |
CZ | 25.09.2019 | ||
DK | 25.09.2019 | ||
EE | 25.09.2019 | ||
ES | 25.09.2019 | ||
FI | 25.09.2019 | ||
HR | 25.09.2019 | ||
LT | 25.09.2019 | ||
LV | 25.09.2019 | ||
MC | 25.09.2019 | ||
NL | 25.09.2019 | ||
PL | 25.09.2019 | ||
RO | 25.09.2019 | ||
RS | 25.09.2019 | ||
SE | 25.09.2019 | ||
SK | 25.09.2019 | ||
SM | 25.09.2019 | ||
BG | 25.12.2019 | ||
NO | 25.12.2019 | ||
GR | 26.12.2019 | ||
LU | 21.01.2020 | ||
IS | 26.01.2020 | ||
PT | 27.01.2020 | ||
Former [2020/39] | AL | 25.09.2019 | |
CZ | 25.09.2019 | ||
DK | 25.09.2019 | ||
EE | 25.09.2019 | ||
ES | 25.09.2019 | ||
FI | 25.09.2019 | ||
HR | 25.09.2019 | ||
LT | 25.09.2019 | ||
LV | 25.09.2019 | ||
MC | 25.09.2019 | ||
NL | 25.09.2019 | ||
PL | 25.09.2019 | ||
RO | 25.09.2019 | ||
RS | 25.09.2019 | ||
SE | 25.09.2019 | ||
SK | 25.09.2019 | ||
SM | 25.09.2019 | ||
BG | 25.12.2019 | ||
NO | 25.12.2019 | ||
GR | 26.12.2019 | ||
IS | 26.01.2020 | ||
PT | 27.01.2020 | ||
Former [2020/36] | AL | 25.09.2019 | |
CZ | 25.09.2019 | ||
DK | 25.09.2019 | ||
EE | 25.09.2019 | ||
ES | 25.09.2019 | ||
FI | 25.09.2019 | ||
HR | 25.09.2019 | ||
LT | 25.09.2019 | ||
LV | 25.09.2019 | ||
NL | 25.09.2019 | ||
PL | 25.09.2019 | ||
RO | 25.09.2019 | ||
RS | 25.09.2019 | ||
SE | 25.09.2019 | ||
SK | 25.09.2019 | ||
SM | 25.09.2019 | ||
BG | 25.12.2019 | ||
NO | 25.12.2019 | ||
GR | 26.12.2019 | ||
IS | 26.01.2020 | ||
PT | 27.01.2020 | ||
Former [2020/27] | AL | 25.09.2019 | |
CZ | 25.09.2019 | ||
EE | 25.09.2019 | ||
ES | 25.09.2019 | ||
FI | 25.09.2019 | ||
HR | 25.09.2019 | ||
LT | 25.09.2019 | ||
LV | 25.09.2019 | ||
NL | 25.09.2019 | ||
PL | 25.09.2019 | ||
RO | 25.09.2019 | ||
RS | 25.09.2019 | ||
SE | 25.09.2019 | ||
SK | 25.09.2019 | ||
SM | 25.09.2019 | ||
BG | 25.12.2019 | ||
NO | 25.12.2019 | ||
GR | 26.12.2019 | ||
PT | 27.01.2020 | ||
IS | 24.02.2020 | ||
Former [2020/25] | AL | 25.09.2019 | |
CZ | 25.09.2019 | ||
EE | 25.09.2019 | ||
ES | 25.09.2019 | ||
FI | 25.09.2019 | ||
HR | 25.09.2019 | ||
LT | 25.09.2019 | ||
LV | 25.09.2019 | ||
NL | 25.09.2019 | ||
PL | 25.09.2019 | ||
RO | 25.09.2019 | ||
RS | 25.09.2019 | ||
SE | 25.09.2019 | ||
SK | 25.09.2019 | ||
BG | 25.12.2019 | ||
NO | 25.12.2019 | ||
GR | 26.12.2019 | ||
PT | 27.01.2020 | ||
IS | 24.02.2020 | ||
Former [2020/24] | AL | 25.09.2019 | |
EE | 25.09.2019 | ||
ES | 25.09.2019 | ||
FI | 25.09.2019 | ||
HR | 25.09.2019 | ||
LT | 25.09.2019 | ||
LV | 25.09.2019 | ||
NL | 25.09.2019 | ||
PL | 25.09.2019 | ||
RO | 25.09.2019 | ||
RS | 25.09.2019 | ||
SE | 25.09.2019 | ||
BG | 25.12.2019 | ||
NO | 25.12.2019 | ||
GR | 26.12.2019 | ||
PT | 27.01.2020 | ||
IS | 24.02.2020 | ||
Former [2020/23] | AL | 25.09.2019 | |
EE | 25.09.2019 | ||
ES | 25.09.2019 | ||
FI | 25.09.2019 | ||
HR | 25.09.2019 | ||
LT | 25.09.2019 | ||
LV | 25.09.2019 | ||
NL | 25.09.2019 | ||
PL | 25.09.2019 | ||
RO | 25.09.2019 | ||
RS | 25.09.2019 | ||
SE | 25.09.2019 | ||
BG | 25.12.2019 | ||
NO | 25.12.2019 | ||
GR | 26.12.2019 | ||
PT | 27.01.2020 | ||
Former [2020/22] | AL | 25.09.2019 | |
EE | 25.09.2019 | ||
FI | 25.09.2019 | ||
HR | 25.09.2019 | ||
LT | 25.09.2019 | ||
LV | 25.09.2019 | ||
NL | 25.09.2019 | ||
RS | 25.09.2019 | ||
SE | 25.09.2019 | ||
BG | 25.12.2019 | ||
NO | 25.12.2019 | ||
GR | 26.12.2019 | ||
PT | 27.01.2020 | ||
Former [2020/20] | FI | 25.09.2019 | |
HR | 25.09.2019 | ||
LT | 25.09.2019 | ||
LV | 25.09.2019 | ||
NL | 25.09.2019 | ||
RS | 25.09.2019 | ||
SE | 25.09.2019 | ||
BG | 25.12.2019 | ||
NO | 25.12.2019 | ||
GR | 26.12.2019 | ||
Former [2020/11] | FI | 25.09.2019 | |
HR | 25.09.2019 | ||
LT | 25.09.2019 | ||
LV | 25.09.2019 | ||
RS | 25.09.2019 | ||
SE | 25.09.2019 | ||
BG | 25.12.2019 | ||
NO | 25.12.2019 | ||
GR | 26.12.2019 | ||
Former [2020/10] | FI | 25.09.2019 | |
LT | 25.09.2019 | ||
SE | 25.09.2019 | ||
BG | 25.12.2019 | ||
NO | 25.12.2019 | ||
Former [2020/09] | FI | 25.09.2019 | |
LT | 25.09.2019 | ||
NO | 25.12.2019 | ||
Former [2020/08] | LT | 25.09.2019 | |
NO | 25.12.2019 | Cited in | International search | [XYI]EP0613736 (HITACHI LTD [JP]) [X] 1,3,4,7,9-12,14-17,19 * column 1, line 4 * * column 3, line 33 - column 4, line 27; figures 1,2,3; claim 4 * * column 6, line 18 - line 49 * [Y] 2-4,8,11,12,15,16,18 [I] 2,6,8,13,18; | [XYI]JP2965969B (KAWASAKI HEAVY IND LTD) [X] 1,6,7,10-14 * Machine Translated by ThomsonReuters; paragraphs [0002] , [0010] , [0013] , [0014] , [0017] , [0021] - paragraph [0024] * [Y] 2-4,8,11,12,15,16,18 [I] 2-4,15-19; | [XYI]EP1681363 (NIPPON STEEL CORP [JP]) [X] 1,5-7,9-17,19 * paragraphs [0083] , [0086] - [0089] - [0094] , [0096] , [0109] - [0112] - [0120]; tables 2,3 * [Y] 2-4,8,11,12,15,16,18 [I] 2-4,8,18; | [Y]WO2006097237 (SMS DEMAG AG [DE], et al) [Y] 3,4,11,12,15,16 * claims 1,2,4,5,6,8,10 *; | [Y]DE102007032874 (WUPPERMANN AG [DE]) [Y] 2,8,18* paragraphs [0002] , [0007] , [0009] , [0010] , [0016] , [0017] , [0032] *; | [XYI]WO2013121963 (NIPPON STEEL & SUMITOMO METAL CORP [JP]) [X] 1,5-7,10-17 * Based on transalation from the family member EP2816132; paragraphs [0037] , [0041] , [0043] * [Y] 2-4,8,11,12,15,16,18 [I] 2-4,8,9,18,19 | Opposition | CN1315886 | EP1681363 | KR100985349B | US2012031528 | EP2816132 | WO0003816 | US8163348 | WO2013103125 | EP2801637 | - Holz, "Advanced technology in skin pass rolling", Millennium Steel, (20100101), pages 129 - 133, Millennium Steel, URL: http://www.millennium-steel.com/wp-content/uploads/articles/pdf/2010/pp129-133%20MS10.pdf, (20201221), XP055761803 | - Pawelski, "Reduction rolling of carbon steel on a reversing mill", Freiberger Forschungshefte , B326 Werkstofftechnologie, (20040101), pages 237 - 251, XP055761809 | - The Sendzimir Manual, Waterbury , CT, (20000000), pages 1 - 492 | - Anforderungen an ein modernes Dressiergerüst, Verein Deutsche r Eisenhüttenleute, (20090000), pages 1 - 51 |