blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3094201

EP3094201 - COLOR CHANGE SYSTEM AND METHOD [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  05.03.2021
Database last updated on 14.06.2024
FormerThe patent has been granted
Status updated on  27.03.2020
FormerGrant of patent is intended
Status updated on  14.11.2019
FormerExamination is in progress
Status updated on  07.09.2018
Most recent event   Tooltip27.04.2024Lapse of the patent in a contracting state
New state(s): MK
published on 29.05.2024  [2024/22]
Applicant(s)For all designated states
NIKE Innovate C.V.
One Bowerman Drive
Beaverton, OR 97005-6453 / US
[2016/47]
Inventor(s)01 / HULL, N. Scot
c/o Nike, Inc.
One Bowerman Drive
Beaverton, OR 97005-6453 / US
 [2019/50]
Former [2016/47]01 / HULL, N. Scot
c/o Nike Inc.
One Bowerman Drive
Beaverton, OR 97005-6453 / US
Representative(s)Müller-Boré & Partner Patentanwälte PartG mbB
Friedenheimer Brücke 21
80639 München / DE
[2016/47]
Application number, filing date15706323.106.02.2015
[2016/47]
WO2015US14755
Priority number, dateUS20141422580626.03.2014         Original published format: US201414225806
[2016/47]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2015147994
Date:01.10.2015
Language:EN
[2015/39]
Type: A1 Application with search report 
No.:EP3094201
Date:23.11.2016
Language:EN
The application published by WIPO in one of the EPO official languages on 01.10.2015 takes the place of the publication of the European patent application.
[2016/47]
Type: B1 Patent specification 
No.:EP3094201
Date:29.04.2020
Language:EN
[2020/18]
Search report(s)International search report - published on:EP01.10.2015
ClassificationIPC:A43B1/00, A43B3/00, G02F1/153
[2016/47]
CPC:
A43B1/0027 (EP,US); G09G5/026 (US); A43B1/0036 (EP,US);
A43B3/36 (EP,US); G02F1/15165 (EP,US); G02F1/1533 (EP,US);
G09G2320/0666 (US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2016/47]
Extension statesBANot yet paid
MENot yet paid
TitleGerman:FARBÄNDERUNGSSYSTEM UND VERFAHREN[2016/47]
English:COLOR CHANGE SYSTEM AND METHOD[2016/47]
French:SYSTÈME ET PROCÉDÉ DE CHANGEMENT DE COULEUR[2016/47]
Entry into regional phase19.08.2016National basic fee paid 
19.08.2016Designation fee(s) paid 
19.08.2016Examination fee paid 
Examination procedure19.08.2016Examination requested  [2016/47]
04.04.2017Amendment by applicant (claims and/or description)
11.09.2018Despatch of a communication from the examining division (Time limit: M04)
21.12.2018Reply to a communication from the examining division
15.11.2019Communication of intention to grant the patent
24.03.2020Fee for grant paid
24.03.2020Fee for publishing/printing paid
24.03.2020Receipt of the translation of the claim(s)
Opposition(s)01.02.2021No opposition filed within time limit [2021/14]
Fees paidRenewal fee
10.02.2017Renewal fee patent year 03
14.02.2018Renewal fee patent year 04
13.02.2019Renewal fee patent year 05
13.02.2020Renewal fee patent year 06
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU06.02.2015
AL29.04.2020
AT29.04.2020
CY29.04.2020
CZ29.04.2020
DK29.04.2020
EE29.04.2020
ES29.04.2020
FI29.04.2020
HR29.04.2020
IT29.04.2020
LT29.04.2020
LV29.04.2020
MC29.04.2020
MK29.04.2020
NL29.04.2020
PL29.04.2020
RO29.04.2020
RS29.04.2020
SE29.04.2020
SI29.04.2020
SK29.04.2020
SM29.04.2020
BG29.07.2020
NO29.07.2020
GR30.07.2020
IS29.08.2020
PT31.08.2020
[2024/22]
Former [2023/30]HU06.02.2015
AL29.04.2020
AT29.04.2020
CY29.04.2020
CZ29.04.2020
DK29.04.2020
EE29.04.2020
ES29.04.2020
FI29.04.2020
HR29.04.2020
IT29.04.2020
LT29.04.2020
LV29.04.2020
MC29.04.2020
NL29.04.2020
PL29.04.2020
RO29.04.2020
RS29.04.2020
SE29.04.2020
SI29.04.2020
SK29.04.2020
SM29.04.2020
BG29.07.2020
NO29.07.2020
GR30.07.2020
IS29.08.2020
PT31.08.2020
Former [2023/27]HU06.02.2015
AL29.04.2020
AT29.04.2020
CZ29.04.2020
DK29.04.2020
EE29.04.2020
ES29.04.2020
FI29.04.2020
HR29.04.2020
IT29.04.2020
LT29.04.2020
LV29.04.2020
MC29.04.2020
NL29.04.2020
PL29.04.2020
RO29.04.2020
RS29.04.2020
SE29.04.2020
SI29.04.2020
SK29.04.2020
SM29.04.2020
BG29.07.2020
NO29.07.2020
GR30.07.2020
IS29.08.2020
PT31.08.2020
Former [2021/41]AL29.04.2020
AT29.04.2020
CZ29.04.2020
DK29.04.2020
EE29.04.2020
ES29.04.2020
FI29.04.2020
HR29.04.2020
IT29.04.2020
LT29.04.2020
LV29.04.2020
MC29.04.2020
NL29.04.2020
PL29.04.2020
RO29.04.2020
RS29.04.2020
SE29.04.2020
SI29.04.2020
SK29.04.2020
SM29.04.2020
BG29.07.2020
NO29.07.2020
GR30.07.2020
IS29.08.2020
PT31.08.2020
Former [2021/24]AL29.04.2020
AT29.04.2020
CZ29.04.2020
DK29.04.2020
EE29.04.2020
ES29.04.2020
FI29.04.2020
HR29.04.2020
IT29.04.2020
LT29.04.2020
LV29.04.2020
NL29.04.2020
PL29.04.2020
RO29.04.2020
RS29.04.2020
SE29.04.2020
SI29.04.2020
SK29.04.2020
SM29.04.2020
BG29.07.2020
NO29.07.2020
GR30.07.2020
IS29.08.2020
PT31.08.2020
Former [2021/10]AL29.04.2020
AT29.04.2020
CZ29.04.2020
DK29.04.2020
EE29.04.2020
ES29.04.2020
FI29.04.2020
HR29.04.2020
IT29.04.2020
LT29.04.2020
LV29.04.2020
NL29.04.2020
PL29.04.2020
RO29.04.2020
RS29.04.2020
SE29.04.2020
SK29.04.2020
SM29.04.2020
BG29.07.2020
NO29.07.2020
GR30.07.2020
IS29.08.2020
PT31.08.2020
Former [2021/09]AL29.04.2020
AT29.04.2020
CZ29.04.2020
DK29.04.2020
EE29.04.2020
ES29.04.2020
FI29.04.2020
HR29.04.2020
IT29.04.2020
LT29.04.2020
LV29.04.2020
NL29.04.2020
RO29.04.2020
RS29.04.2020
SE29.04.2020
SM29.04.2020
BG29.07.2020
NO29.07.2020
GR30.07.2020
IS29.08.2020
PT31.08.2020
Former [2021/08]AL29.04.2020
DK29.04.2020
ES29.04.2020
FI29.04.2020
HR29.04.2020
LT29.04.2020
LV29.04.2020
NL29.04.2020
RO29.04.2020
RS29.04.2020
SE29.04.2020
SM29.04.2020
BG29.07.2020
NO29.07.2020
GR30.07.2020
IS29.08.2020
PT31.08.2020
Former [2021/04]AL29.04.2020
FI29.04.2020
HR29.04.2020
LT29.04.2020
LV29.04.2020
NL29.04.2020
RS29.04.2020
SE29.04.2020
BG29.07.2020
NO29.07.2020
GR30.07.2020
IS29.08.2020
PT31.08.2020
Former [2021/01]FI29.04.2020
HR29.04.2020
LT29.04.2020
LV29.04.2020
RS29.04.2020
SE29.04.2020
BG29.07.2020
NO29.07.2020
GR30.07.2020
IS29.08.2020
PT31.08.2020
Former [2020/51]FI29.04.2020
HR29.04.2020
LT29.04.2020
LV29.04.2020
RS29.04.2020
SE29.04.2020
NO29.07.2020
GR30.07.2020
IS29.08.2020
PT31.08.2020
Former [2020/50]FI29.04.2020
HR29.04.2020
LT29.04.2020
LV29.04.2020
SE29.04.2020
NO29.07.2020
GR30.07.2020
IS29.08.2020
PT31.08.2020
Former [2020/48]FI29.04.2020
LT29.04.2020
SE29.04.2020
NO29.07.2020
IS29.08.2020
PT31.08.2020
Former [2020/47]LT29.04.2020
NO29.07.2020
IS29.08.2020
Former [2020/46]IS29.08.2020
Cited inInternational search[XI]US6473058  (HOTOMI HIDEO [JP], et al) [X] 1,10 * column 4; figure 2 * [I] 2-9,11-18;
 [XI]US2008297030  (ZHANG MIN-XIAN M [US], et al) [X] 1,10 * paragraphs [0017] , [0020] , [0032]; figures 2,8 * [I] 2-9,11-18;
 [XI]US2009027577  (NOSE MASAKI [JP]) [X] 1,10 * paragraphs [0002] , [0026] , [0056]; figures 1,2,4,10 * [I] 2-9,11-18;
 [A]US2009316253  (FAIRLEY PETER DOUGLAS [GB], et al) [A] 1-18* paragraph [0011] - paragraph [0012] *;
 [XI]US2012139825  (YASHIRO TOHRU [JP], et al) [X] 1,10 * paragraphs [0026] - [0029] - [0067]; figure 1 * [I] 2-9,11-18;
 [A]US2013033378  (DONOVAN SHARNA M [US], et al) [A] 1-18 * paragraphs [0038]-[0062]; [0079]-[0137];; figures 7-25 *;
 [A]US2013033531  (KIM SANGIL [KR], et al) [A] 1-18 * paragraph [0134] - paragraph [0157]; figure 9 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.