EP3114161 - PHOTOCURABLE EPOXY RESIN SYSTEMS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 22.08.2024 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 15.09.2023 | ||
Former | Grant of patent is intended Status updated on 22.06.2023 | ||
Former | Examination is in progress Status updated on 23.02.2018 | ||
Former | Request for examination was made Status updated on 09.12.2016 | ||
Former | The international publication has been made Status updated on 18.11.2016 | Most recent event Tooltip | 22.08.2024 | No opposition filed within time limit | published on 25.09.2024 [2024/39] | Applicant(s) | For all designated states Henkel AG & Co. KGaA Henkelstraße 67 40589 Düsseldorf / DE | [2023/42] |
Former [2017/02] | For all designated states Henkel AG & Co. KGaA Henkelstrasse 67 40589 Düsseldorf / DE | Inventor(s) | 01 /
HAGENBUCHER, Melanie Luisenstr. 53 40215 Düsseldorf / DE | 02 /
HORNUNG, Martin Rahmengasse 4 69120 Heidelberg / DE | [2017/02] | Application number, filing date | 15710151.0 | 06.03.2015 | [2017/02] | WO2015EP54697 | Priority number, date | DE201410204265 | 07.03.2014 Original published format: DE102014204265 | [2017/02] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | WO2015132372 | Date: | 11.09.2015 | Language: | DE | [2015/36] | Type: | A1 Application with search report | No.: | EP3114161 | Date: | 11.01.2017 | Language: | DE | The application published by WIPO in one of the EPO official languages on 11.09.2015 takes the place of the publication of the European patent application. | [2017/02] | Type: | B1 Patent specification | No.: | EP3114161 | Date: | 18.10.2023 | Language: | DE | [2023/42] | Search report(s) | International search report - published on: | EP | 11.09.2015 | Classification | IPC: | C08K5/00, C08L63/00 | [2017/02] | CPC: |
C08L63/00 (EP,KR,US);
B05D1/02 (US);
B05D1/18 (US);
B05D3/067 (US);
C08G59/22 (US);
C08G59/245 (KR);
C08K5/00 (EP,US);
C08K5/0025 (EP,KR,US);
C08L51/04 (KR);
C23F15/00 (US);
B05D2202/00 (US);
B05D2504/00 (US);
| C-Set: |
C08K5/0025, C08L51/04 (EP,US);
C08K5/0025, C08L63/00 (US,EP);
C08K5/00, C08L51/04 (US,EP);
C08K5/00, C08L63/00 (US,EP); | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/02] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | Title | German: | PHOTOHÄRTBARE EPOXIDHARZSYSTEME | [2017/02] | English: | PHOTOCURABLE EPOXY RESIN SYSTEMS | [2017/02] | French: | SYSTÈMES DE RÉSINE ÉPOXYDE PHOTODURCISSABLES | [2017/02] | Entry into regional phase | 15.08.2016 | National basic fee paid | 15.08.2016 | Designation fee(s) paid | 15.08.2016 | Examination fee paid | Examination procedure | 15.08.2016 | Examination requested [2017/02] | 15.08.2016 | Date on which the examining division has become responsible | 05.04.2017 | Amendment by applicant (claims and/or description) | 26.02.2018 | Despatch of a communication from the examining division (Time limit: M04) | 28.06.2018 | Reply to a communication from the examining division | 03.01.2019 | Despatch of a communication from the examining division (Time limit: M04) | 18.04.2019 | Reply to a communication from the examining division | 15.10.2019 | Despatch of a communication from the examining division (Time limit: M06) | 16.04.2020 | Reply to a communication from the examining division | 19.11.2020 | Despatch of a communication from the examining division (Time limit: M06) | 28.05.2021 | Reply to a communication from the examining division | 14.02.2023 | Despatch of a communication from the examining division (Time limit: M04) | 06.06.2023 | Reply to a communication from the examining division | 23.06.2023 | Communication of intention to grant the patent | 06.09.2023 | Fee for grant paid | 06.09.2023 | Fee for publishing/printing paid | 06.09.2023 | Receipt of the translation of the claim(s) | Opposition(s) | 19.07.2024 | No opposition filed within time limit [2024/39] | Fees paid | Renewal fee | 24.03.2017 | Renewal fee patent year 03 | 23.03.2018 | Renewal fee patent year 04 | 26.03.2019 | Renewal fee patent year 05 | 24.03.2020 | Renewal fee patent year 06 | 23.03.2021 | Renewal fee patent year 07 | 25.03.2022 | Renewal fee patent year 08 | 23.03.2023 | Renewal fee patent year 09 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | CZ | 18.10.2023 | DK | 18.10.2023 | EE | 18.10.2023 | ES | 18.10.2023 | HR | 18.10.2023 | LT | 18.10.2023 | LV | 18.10.2023 | NL | 18.10.2023 | PL | 18.10.2023 | RO | 18.10.2023 | RS | 18.10.2023 | SE | 18.10.2023 | SK | 18.10.2023 | SM | 18.10.2023 | BG | 18.01.2024 | NO | 18.01.2024 | GR | 19.01.2024 | IS | 18.02.2024 | PT | 19.02.2024 | [2024/36] |
Former [2024/35] | CZ | 18.10.2023 | |
DK | 18.10.2023 | ||
EE | 18.10.2023 | ||
ES | 18.10.2023 | ||
HR | 18.10.2023 | ||
LT | 18.10.2023 | ||
LV | 18.10.2023 | ||
NL | 18.10.2023 | ||
PL | 18.10.2023 | ||
RO | 18.10.2023 | ||
RS | 18.10.2023 | ||
SE | 18.10.2023 | ||
SM | 18.10.2023 | ||
BG | 18.01.2024 | ||
NO | 18.01.2024 | ||
GR | 19.01.2024 | ||
IS | 18.02.2024 | ||
PT | 19.02.2024 | ||
Former [2024/34] | DK | 18.10.2023 | |
EE | 18.10.2023 | ||
ES | 18.10.2023 | ||
HR | 18.10.2023 | ||
LT | 18.10.2023 | ||
LV | 18.10.2023 | ||
NL | 18.10.2023 | ||
PL | 18.10.2023 | ||
RS | 18.10.2023 | ||
SE | 18.10.2023 | ||
SM | 18.10.2023 | ||
BG | 18.01.2024 | ||
NO | 18.01.2024 | ||
GR | 19.01.2024 | ||
IS | 18.02.2024 | ||
PT | 19.02.2024 | ||
Former [2024/33] | DK | 18.10.2023 | |
ES | 18.10.2023 | ||
HR | 18.10.2023 | ||
LT | 18.10.2023 | ||
LV | 18.10.2023 | ||
NL | 18.10.2023 | ||
PL | 18.10.2023 | ||
RS | 18.10.2023 | ||
SE | 18.10.2023 | ||
SM | 18.10.2023 | ||
BG | 18.01.2024 | ||
NO | 18.01.2024 | ||
GR | 19.01.2024 | ||
IS | 18.02.2024 | ||
PT | 19.02.2024 | ||
Former [2024/26] | ES | 18.10.2023 | |
HR | 18.10.2023 | ||
LT | 18.10.2023 | ||
LV | 18.10.2023 | ||
NL | 18.10.2023 | ||
PL | 18.10.2023 | ||
RS | 18.10.2023 | ||
SE | 18.10.2023 | ||
BG | 18.01.2024 | ||
NO | 18.01.2024 | ||
GR | 19.01.2024 | ||
IS | 18.02.2024 | ||
PT | 19.02.2024 | ||
Former [2024/25] | ES | 18.10.2023 | |
HR | 18.10.2023 | ||
LT | 18.10.2023 | ||
NL | 18.10.2023 | ||
PL | 18.10.2023 | ||
RS | 18.10.2023 | ||
SE | 18.10.2023 | ||
BG | 18.01.2024 | ||
NO | 18.01.2024 | ||
GR | 19.01.2024 | ||
IS | 18.02.2024 | ||
PT | 19.02.2024 | ||
Former [2024/24] | ES | 18.10.2023 | |
HR | 18.10.2023 | ||
LT | 18.10.2023 | ||
NL | 18.10.2023 | ||
RS | 18.10.2023 | ||
SE | 18.10.2023 | ||
BG | 18.01.2024 | ||
NO | 18.01.2024 | ||
GR | 19.01.2024 | ||
IS | 18.02.2024 | ||
PT | 19.02.2024 | ||
Former [2024/21] | LT | 18.10.2023 | |
NL | 18.10.2023 | ||
BG | 18.01.2024 | ||
GR | 19.01.2024 | ||
IS | 18.02.2024 | ||
Former [2024/20] | NL | 18.10.2023 | |
GR | 19.01.2024 | ||
IS | 18.02.2024 | ||
Former [2024/17] | NL | 18.10.2023 | Cited in | International search | [I]WO9705172 (LOCKHEED MARTIN ENERGY SYS INC [US]) [I] 1-14 * page 12, line 23 * * page 16, line 18 * * page 20, line 10 * * page 21, line 22 - page 22, line 3 ** page 26, line 11; example 7 * | Examination | EP1299448 | WO2010104603 |