blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3116777

EP3116777 - LANDING GEAR DRIVE SYSTEM AND METHOD [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  18.12.2020
Database last updated on 04.06.2024
FormerThe patent has been granted
Status updated on  10.01.2020
FormerGrant of patent is intended
Status updated on  11.08.2019
FormerExamination is in progress
Status updated on  23.03.2018
FormerRequest for examination was made
Status updated on  16.12.2016
FormerThe international publication has been made
Status updated on  18.11.2016
Most recent event   Tooltip08.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 10.08.2022  [2022/32]
Applicant(s)For all designated states
Airbus Operations Limited
Pegasus House
Aerospace Avenue
Filton
Bristol BS34 7PA / GB
[2017/03]
Inventor(s)01 / DIDEY, Arnaud
c/o Airbus Operations Limited
Pegasus House
Aerospace Avenue
Filton Bristol BS34 7PA / GB
02 / WILSON, Fraser
c/o Airbus Operations Limited
Pegasus House
Aerospace Avenue
Filton Bristol BS34 7PA / GB
 [2017/03]
Representative(s)Abel & Imray LLP
Westpoint Building
James Street West
Bath BA1 2DA / GB
[N/P]
Former [2020/07]Abel & Imray
Westpoint Building
James Street West
Bath BA1 2DA / GB
Former [2017/03]Teesdale, Emily Catherine, et al
Abel & Imray 20 Red Lion Street
London WC1R 4PQ / GB
Application number, filing date15710573.513.03.2015
[2017/03]
WO2015GB50739
Priority number, dateGB2014000460714.03.2014         Original published format: GB 201404607
[2017/03]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2015136301
Date:17.09.2015
Language:EN
[2015/37]
Type: A1 Application with search report 
No.:EP3116777
Date:18.01.2017
Language:EN
The application published by WIPO in one of the EPO official languages on 17.09.2015 takes the place of the publication of the European patent application.
[2017/03]
Type: B1 Patent specification 
No.:EP3116777
Date:12.02.2020
Language:EN
[2020/07]
Search report(s)International search report - published on:EP17.09.2015
ClassificationIPC:B64C25/40, B64C25/34
[2019/32]
CPC:
B64C25/405 (EP,GB,US); B64C25/34 (US); Y02T50/80 (EP,US)
Former IPC [2017/03]B64C25/40
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2017/03]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
TitleGerman:FAHRWERKSANTRIEBSSYSTEM UND -VERFAHREN[2017/03]
English:LANDING GEAR DRIVE SYSTEM AND METHOD[2017/03]
French:SYSTÈME ET PROCÉDÉ D'ENTRAÎNEMENT DE TRAIN D'ATTERRISSAGE[2017/03]
Entry into regional phase04.10.2016National basic fee paid 
04.10.2016Designation fee(s) paid 
04.10.2016Examination fee paid 
Examination procedure04.10.2016Examination requested  [2017/03]
04.10.2016Date on which the examining division has become responsible
23.05.2017Amendment by applicant (claims and/or description)
27.03.2018Despatch of a communication from the examining division (Time limit: M04)
18.07.2018Reply to a communication from the examining division
05.11.2018Despatch of a communication from the examining division (Time limit: M02)
10.01.2019Reply to a communication from the examining division
12.08.2019Communication of intention to grant the patent
19.12.2019Fee for grant paid
19.12.2019Fee for publishing/printing paid
19.12.2019Receipt of the translation of the claim(s)
Opposition(s)13.11.2020No opposition filed within time limit [2021/03]
Fees paidRenewal fee
24.03.2017Renewal fee patent year 03
23.03.2018Renewal fee patent year 04
26.03.2019Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU13.03.2015
AL12.02.2020
AT12.02.2020
CY12.02.2020
CZ12.02.2020
DK12.02.2020
EE12.02.2020
ES12.02.2020
FI12.02.2020
HR12.02.2020
IT12.02.2020
LT12.02.2020
LV12.02.2020
MC12.02.2020
MK12.02.2020
MT12.02.2020
NL12.02.2020
PL12.02.2020
RO12.02.2020
RS12.02.2020
SE12.02.2020
SI12.02.2020
SK12.02.2020
SM12.02.2020
TR12.02.2020
IE13.03.2020
LU13.03.2020
BE31.03.2020
CH31.03.2020
LI31.03.2020
BG12.05.2020
NO12.05.2020
GR13.05.2020
IS12.06.2020
PT05.07.2020
[2022/31]
Former [2022/30]HU13.03.2015
AL12.02.2020
AT12.02.2020
CY12.02.2020
CZ12.02.2020
DK12.02.2020
EE12.02.2020
ES12.02.2020
FI12.02.2020
HR12.02.2020
IT12.02.2020
LT12.02.2020
LV12.02.2020
MC12.02.2020
MT12.02.2020
NL12.02.2020
PL12.02.2020
RO12.02.2020
RS12.02.2020
SE12.02.2020
SI12.02.2020
SK12.02.2020
SM12.02.2020
TR12.02.2020
IE13.03.2020
LU13.03.2020
BE31.03.2020
CH31.03.2020
LI31.03.2020
BG12.05.2020
NO12.05.2020
GR13.05.2020
IS12.06.2020
PT05.07.2020
Former [2022/27]HU13.03.2015
AT12.02.2020
CY12.02.2020
CZ12.02.2020
DK12.02.2020
EE12.02.2020
ES12.02.2020
FI12.02.2020
HR12.02.2020
IT12.02.2020
LT12.02.2020
LV12.02.2020
MC12.02.2020
MT12.02.2020
NL12.02.2020
PL12.02.2020
RO12.02.2020
RS12.02.2020
SE12.02.2020
SI12.02.2020
SK12.02.2020
SM12.02.2020
TR12.02.2020
IE13.03.2020
LU13.03.2020
BE31.03.2020
CH31.03.2020
LI31.03.2020
BG12.05.2020
NO12.05.2020
GR13.05.2020
IS12.06.2020
PT05.07.2020
Former [2021/10]AT12.02.2020
CZ12.02.2020
DK12.02.2020
EE12.02.2020
ES12.02.2020
FI12.02.2020
HR12.02.2020
IT12.02.2020
LT12.02.2020
LV12.02.2020
MC12.02.2020
NL12.02.2020
PL12.02.2020
RO12.02.2020
RS12.02.2020
SE12.02.2020
SI12.02.2020
SK12.02.2020
SM12.02.2020
IE13.03.2020
LU13.03.2020
BE31.03.2020
CH31.03.2020
LI31.03.2020
BG12.05.2020
NO12.05.2020
GR13.05.2020
IS12.06.2020
PT05.07.2020
Former [2021/07]CZ12.02.2020
DK12.02.2020
EE12.02.2020
ES12.02.2020
FI12.02.2020
HR12.02.2020
LT12.02.2020
LV12.02.2020
MC12.02.2020
NL12.02.2020
RO12.02.2020
RS12.02.2020
SE12.02.2020
SK12.02.2020
SM12.02.2020
IE13.03.2020
LU13.03.2020
CH31.03.2020
LI31.03.2020
BG12.05.2020
NO12.05.2020
GR13.05.2020
IS12.06.2020
PT05.07.2020
Former [2021/04]CZ12.02.2020
DK12.02.2020
EE12.02.2020
ES12.02.2020
FI12.02.2020
HR12.02.2020
LT12.02.2020
LV12.02.2020
MC12.02.2020
NL12.02.2020
RO12.02.2020
RS12.02.2020
SE12.02.2020
SK12.02.2020
SM12.02.2020
LU13.03.2020
BG12.05.2020
NO12.05.2020
GR13.05.2020
IS12.06.2020
PT05.07.2020
Former [2020/52]CZ12.02.2020
DK12.02.2020
EE12.02.2020
ES12.02.2020
FI12.02.2020
HR12.02.2020
LT12.02.2020
LV12.02.2020
MC12.02.2020
NL12.02.2020
RO12.02.2020
RS12.02.2020
SE12.02.2020
SK12.02.2020
SM12.02.2020
BG12.05.2020
NO12.05.2020
GR13.05.2020
IS12.06.2020
PT05.07.2020
Former [2020/50]CZ12.02.2020
DK12.02.2020
EE12.02.2020
ES12.02.2020
FI12.02.2020
HR12.02.2020
LT12.02.2020
LV12.02.2020
NL12.02.2020
RO12.02.2020
RS12.02.2020
SE12.02.2020
SK12.02.2020
SM12.02.2020
BG12.05.2020
NO12.05.2020
GR13.05.2020
IS12.06.2020
PT05.07.2020
Former [2020/49]CZ12.02.2020
DK12.02.2020
ES12.02.2020
FI12.02.2020
HR12.02.2020
LT12.02.2020
LV12.02.2020
NL12.02.2020
RO12.02.2020
RS12.02.2020
SE12.02.2020
SK12.02.2020
SM12.02.2020
BG12.05.2020
NO12.05.2020
GR13.05.2020
IS12.06.2020
PT05.07.2020
Former [2020/48]DK12.02.2020
ES12.02.2020
FI12.02.2020
HR12.02.2020
LT12.02.2020
LV12.02.2020
NL12.02.2020
RO12.02.2020
RS12.02.2020
SE12.02.2020
SM12.02.2020
BG12.05.2020
NO12.05.2020
GR13.05.2020
IS12.06.2020
PT05.07.2020
Former [2020/47]DK12.02.2020
ES12.02.2020
FI12.02.2020
HR12.02.2020
LT12.02.2020
LV12.02.2020
NL12.02.2020
RS12.02.2020
SE12.02.2020
BG12.05.2020
NO12.05.2020
GR13.05.2020
IS12.06.2020
Former [2020/45]FI12.02.2020
HR12.02.2020
LV12.02.2020
NL12.02.2020
RS12.02.2020
SE12.02.2020
BG12.05.2020
NO12.05.2020
GR13.05.2020
IS12.06.2020
Former [2020/40]FI12.02.2020
HR12.02.2020
LV12.02.2020
RS12.02.2020
SE12.02.2020
BG12.05.2020
NO12.05.2020
GR13.05.2020
IS12.06.2020
Former [2020/39]FI12.02.2020
HR12.02.2020
LV12.02.2020
RS12.02.2020
SE12.02.2020
BG12.05.2020
NO12.05.2020
GR13.05.2020
Former [2020/38]FI12.02.2020
HR12.02.2020
LV12.02.2020
RS12.02.2020
SE12.02.2020
NO12.05.2020
GR13.05.2020
Former [2020/37]FI12.02.2020
HR12.02.2020
LV12.02.2020
RS12.02.2020
SE12.02.2020
NO12.05.2020
Former [2020/35]FI12.02.2020
NO12.05.2020
Cited inInternational search[A]US5247847  (GU INHOY [KR]) [A] 1-15* the whole document *;
 [AD]US2012312112  (TIZAC LAURENT [FR]) [AD] 1-15 * the whole document *;
 [A]WO2014023941  (AIRBUS OPERATIONS LTD [GB]) [A] 1-15 * page 8, line 13 - page 20, line 24; figures 1-23 *;
 [A]WO2014023939  (AIRBUS OPERATIONS LTD [GB]) [A] 1-15 * page 9, line 19 - page 12, line 29; figures 1-16 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.