EP3123829 - POWER-OVER-ETHERNET POWER DISTRIBUTION SYSTEM [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 18.10.2019 Database last updated on 20.07.2024 | |
Former | The patent has been granted Status updated on 09.11.2018 | ||
Former | Grant of patent is intended Status updated on 27.06.2018 | ||
Former | Examination is in progress Status updated on 21.04.2017 | ||
Former | Request for examination was made Status updated on 30.12.2016 | ||
Former | The international publication has been made Status updated on 05.12.2016 | Most recent event Tooltip | 01.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 03.08.2022 [2022/31] | Applicant(s) | For all designated states Signify Holding B.V. High Tech Campus 48 5656 AE Eindhoven / NL | [2019/11] |
Former [2018/50] | For all designated states Philips Lighting Holding B.V. High Tech Campus 48 5656 AE Eindhoven / NL | ||
Former [2017/05] | For all designated states Philips Lighting Holding B.V. High Tech Campus 45 5656 AE Eindhoven / NL | Inventor(s) | 01 /
VAN ENDERT, Tony Petrus c/o High Tech Campus 45 NL-5656 AE Eindhoven / NL | [2017/34] |
Former [2017/05] | 01 /
VAN ENDERT, Tony Petrus c/o High Tech Campus Building 5 NL-5656 AE Eindhoven / NL | Representative(s) | Verweij, Petronella Daniëlle Signify Netherlands B.V. Intellectual Property High Tech Campus 7 5656 AE Eindhoven / NL | [N/P] |
Former [2018/50] | Verweij, Petronella Daniëlle Philips Lighting B.V. Philips Lighting Intellectual Property High Tech Campus 7 5656 AE Eindhoven / NL | ||
Former [2017/05] | Verweij, Petronella Daniëlle Philips Lighting B.V. Philips Lighting Intellectual Property High Tech Campus 45 5656 AE Eindhoven / NL | Application number, filing date | 15711460.4 | 13.03.2015 | [2017/05] | WO2015EP55277 | Priority number, date | EP20140161354 | 24.03.2014 Original published format: EP 14161354 | [2017/05] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2015144457 | Date: | 01.10.2015 | Language: | EN | [2015/39] | Type: | A1 Application with search report | No.: | EP3123829 | Date: | 01.02.2017 | Language: | EN | The application published by WIPO in one of the EPO official languages on 01.10.2015 takes the place of the publication of the European patent application. | [2017/05] | Type: | B1 Patent specification | No.: | EP3123829 | Date: | 12.12.2018 | Language: | EN | [2018/50] | Search report(s) | International search report - published on: | EP | 01.10.2015 | Classification | IPC: | H04L12/10, H05B37/02 | [2018/28] | CPC: |
H04L12/10 (EP,CN,US);
H05B47/18 (EP,CN,US)
|
Former IPC [2017/05] | H05B37/02 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/05] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | Title | German: | POWER-OVER-ETHERNET-ENERGIEVERTEILUNGSSYSTEM | [2018/28] | English: | POWER-OVER-ETHERNET POWER DISTRIBUTION SYSTEM | [2017/05] | French: | SYSTÈME DE DISTRIBUTION DE PUISSANCE À ALIMENTATION ÉLECTRIQUE PAR CÂBLE ETHERNET | [2018/28] |
Former [2017/05] | STROM-ÜBER-ETHERNET-ENERGIEVERTEILUNGSSYSTEM | ||
Former [2017/05] | SYSTÈME DE DISTRIBUTION D'ÉLECTRICITÉ POWER-OVER-ETHERNET | Entry into regional phase | 24.10.2016 | National basic fee paid | 24.10.2016 | Designation fee(s) paid | 24.10.2016 | Examination fee paid | Examination procedure | 25.08.2016 | Amendment by applicant (claims and/or description) | 25.08.2016 | Date on which the examining division has become responsible | 24.10.2016 | Examination requested [2017/05] | 25.04.2017 | Despatch of a communication from the examining division (Time limit: M04) | 03.08.2017 | Reply to a communication from the examining division | 01.12.2017 | Despatch of a communication from the examining division (Time limit: M02) | 18.01.2018 | Reply to a communication from the examining division | 28.06.2018 | Communication of intention to grant the patent | 24.10.2018 | Fee for grant paid | 24.10.2018 | Fee for publishing/printing paid | 24.10.2018 | Receipt of the translation of the claim(s) | Opposition(s) | 13.09.2019 | No opposition filed within time limit [2019/47] | Fees paid | Renewal fee | 31.03.2017 | Renewal fee patent year 03 | 03.04.2018 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 13.03.2015 | AL | 12.12.2018 | AT | 12.12.2018 | CY | 12.12.2018 | CZ | 12.12.2018 | DK | 12.12.2018 | EE | 12.12.2018 | ES | 12.12.2018 | FI | 12.12.2018 | HR | 12.12.2018 | IT | 12.12.2018 | LT | 12.12.2018 | LV | 12.12.2018 | MC | 12.12.2018 | MK | 12.12.2018 | NL | 12.12.2018 | PL | 12.12.2018 | RO | 12.12.2018 | RS | 12.12.2018 | SE | 12.12.2018 | SI | 12.12.2018 | SK | 12.12.2018 | SM | 12.12.2018 | TR | 12.12.2018 | BG | 12.03.2019 | NO | 12.03.2019 | GR | 13.03.2019 | IE | 13.03.2019 | LU | 13.03.2019 | MT | 13.03.2019 | BE | 31.03.2019 | CH | 31.03.2019 | LI | 31.03.2019 | IS | 12.04.2019 | PT | 12.04.2019 | [2022/31] |
Former [2021/32] | HU | 13.03.2015 | |
AL | 12.12.2018 | ||
AT | 12.12.2018 | ||
CY | 12.12.2018 | ||
CZ | 12.12.2018 | ||
DK | 12.12.2018 | ||
EE | 12.12.2018 | ||
ES | 12.12.2018 | ||
FI | 12.12.2018 | ||
HR | 12.12.2018 | ||
IT | 12.12.2018 | ||
LT | 12.12.2018 | ||
LV | 12.12.2018 | ||
MC | 12.12.2018 | ||
NL | 12.12.2018 | ||
PL | 12.12.2018 | ||
RO | 12.12.2018 | ||
RS | 12.12.2018 | ||
SE | 12.12.2018 | ||
SI | 12.12.2018 | ||
SK | 12.12.2018 | ||
SM | 12.12.2018 | ||
TR | 12.12.2018 | ||
BG | 12.03.2019 | ||
NO | 12.03.2019 | ||
GR | 13.03.2019 | ||
IE | 13.03.2019 | ||
LU | 13.03.2019 | ||
MT | 13.03.2019 | ||
BE | 31.03.2019 | ||
CH | 31.03.2019 | ||
LI | 31.03.2019 | ||
IS | 12.04.2019 | ||
PT | 12.04.2019 | ||
Former [2021/26] | AL | 12.12.2018 | |
AT | 12.12.2018 | ||
CY | 12.12.2018 | ||
CZ | 12.12.2018 | ||
DK | 12.12.2018 | ||
EE | 12.12.2018 | ||
ES | 12.12.2018 | ||
FI | 12.12.2018 | ||
HR | 12.12.2018 | ||
IT | 12.12.2018 | ||
LT | 12.12.2018 | ||
LV | 12.12.2018 | ||
MC | 12.12.2018 | ||
NL | 12.12.2018 | ||
PL | 12.12.2018 | ||
RO | 12.12.2018 | ||
RS | 12.12.2018 | ||
SE | 12.12.2018 | ||
SI | 12.12.2018 | ||
SK | 12.12.2018 | ||
SM | 12.12.2018 | ||
TR | 12.12.2018 | ||
BG | 12.03.2019 | ||
NO | 12.03.2019 | ||
GR | 13.03.2019 | ||
IE | 13.03.2019 | ||
LU | 13.03.2019 | ||
MT | 13.03.2019 | ||
BE | 31.03.2019 | ||
CH | 31.03.2019 | ||
LI | 31.03.2019 | ||
IS | 12.04.2019 | ||
PT | 12.04.2019 | ||
Former [2020/29] | AL | 12.12.2018 | |
AT | 12.12.2018 | ||
CZ | 12.12.2018 | ||
DK | 12.12.2018 | ||
EE | 12.12.2018 | ||
ES | 12.12.2018 | ||
FI | 12.12.2018 | ||
HR | 12.12.2018 | ||
IT | 12.12.2018 | ||
LT | 12.12.2018 | ||
LV | 12.12.2018 | ||
MC | 12.12.2018 | ||
NL | 12.12.2018 | ||
PL | 12.12.2018 | ||
RO | 12.12.2018 | ||
RS | 12.12.2018 | ||
SE | 12.12.2018 | ||
SI | 12.12.2018 | ||
SK | 12.12.2018 | ||
SM | 12.12.2018 | ||
TR | 12.12.2018 | ||
BG | 12.03.2019 | ||
NO | 12.03.2019 | ||
GR | 13.03.2019 | ||
IE | 13.03.2019 | ||
LU | 13.03.2019 | ||
MT | 13.03.2019 | ||
BE | 31.03.2019 | ||
CH | 31.03.2019 | ||
LI | 31.03.2019 | ||
IS | 12.04.2019 | ||
PT | 12.04.2019 | ||
Former [2020/17] | AL | 12.12.2018 | |
AT | 12.12.2018 | ||
CZ | 12.12.2018 | ||
DK | 12.12.2018 | ||
EE | 12.12.2018 | ||
ES | 12.12.2018 | ||
FI | 12.12.2018 | ||
HR | 12.12.2018 | ||
IT | 12.12.2018 | ||
LT | 12.12.2018 | ||
LV | 12.12.2018 | ||
MC | 12.12.2018 | ||
NL | 12.12.2018 | ||
PL | 12.12.2018 | ||
RO | 12.12.2018 | ||
RS | 12.12.2018 | ||
SE | 12.12.2018 | ||
SI | 12.12.2018 | ||
SK | 12.12.2018 | ||
SM | 12.12.2018 | ||
TR | 12.12.2018 | ||
BG | 12.03.2019 | ||
NO | 12.03.2019 | ||
GR | 13.03.2019 | ||
IE | 13.03.2019 | ||
LU | 13.03.2019 | ||
BE | 31.03.2019 | ||
CH | 31.03.2019 | ||
LI | 31.03.2019 | ||
IS | 12.04.2019 | ||
PT | 12.04.2019 | ||
Former [2020/11] | AL | 12.12.2018 | |
AT | 12.12.2018 | ||
CZ | 12.12.2018 | ||
DK | 12.12.2018 | ||
EE | 12.12.2018 | ||
ES | 12.12.2018 | ||
FI | 12.12.2018 | ||
HR | 12.12.2018 | ||
IT | 12.12.2018 | ||
LT | 12.12.2018 | ||
LV | 12.12.2018 | ||
MC | 12.12.2018 | ||
NL | 12.12.2018 | ||
PL | 12.12.2018 | ||
RO | 12.12.2018 | ||
RS | 12.12.2018 | ||
SE | 12.12.2018 | ||
SI | 12.12.2018 | ||
SK | 12.12.2018 | ||
SM | 12.12.2018 | ||
BG | 12.03.2019 | ||
NO | 12.03.2019 | ||
GR | 13.03.2019 | ||
IE | 13.03.2019 | ||
LU | 13.03.2019 | ||
BE | 31.03.2019 | ||
CH | 31.03.2019 | ||
LI | 31.03.2019 | ||
IS | 12.04.2019 | ||
PT | 12.04.2019 | ||
Former [2020/09] | AL | 12.12.2018 | |
AT | 12.12.2018 | ||
CZ | 12.12.2018 | ||
DK | 12.12.2018 | ||
EE | 12.12.2018 | ||
ES | 12.12.2018 | ||
FI | 12.12.2018 | ||
HR | 12.12.2018 | ||
IT | 12.12.2018 | ||
LT | 12.12.2018 | ||
LV | 12.12.2018 | ||
MC | 12.12.2018 | ||
NL | 12.12.2018 | ||
PL | 12.12.2018 | ||
RO | 12.12.2018 | ||
RS | 12.12.2018 | ||
SE | 12.12.2018 | ||
SI | 12.12.2018 | ||
SK | 12.12.2018 | ||
SM | 12.12.2018 | ||
BG | 12.03.2019 | ||
NO | 12.03.2019 | ||
GR | 13.03.2019 | ||
IE | 13.03.2019 | ||
LU | 13.03.2019 | ||
IS | 12.04.2019 | ||
PT | 12.04.2019 | ||
Former [2020/01] | AL | 12.12.2018 | |
AT | 12.12.2018 | ||
CZ | 12.12.2018 | ||
DK | 12.12.2018 | ||
EE | 12.12.2018 | ||
ES | 12.12.2018 | ||
FI | 12.12.2018 | ||
HR | 12.12.2018 | ||
IT | 12.12.2018 | ||
LT | 12.12.2018 | ||
LV | 12.12.2018 | ||
MC | 12.12.2018 | ||
NL | 12.12.2018 | ||
PL | 12.12.2018 | ||
RO | 12.12.2018 | ||
RS | 12.12.2018 | ||
SE | 12.12.2018 | ||
SI | 12.12.2018 | ||
SK | 12.12.2018 | ||
SM | 12.12.2018 | ||
BG | 12.03.2019 | ||
NO | 12.03.2019 | ||
GR | 13.03.2019 | ||
LU | 13.03.2019 | ||
IS | 12.04.2019 | ||
PT | 12.04.2019 | ||
Former [2019/50] | AL | 12.12.2018 | |
AT | 12.12.2018 | ||
CZ | 12.12.2018 | ||
DK | 12.12.2018 | ||
EE | 12.12.2018 | ||
ES | 12.12.2018 | ||
FI | 12.12.2018 | ||
HR | 12.12.2018 | ||
IT | 12.12.2018 | ||
LT | 12.12.2018 | ||
LV | 12.12.2018 | ||
MC | 12.12.2018 | ||
NL | 12.12.2018 | ||
PL | 12.12.2018 | ||
RO | 12.12.2018 | ||
RS | 12.12.2018 | ||
SE | 12.12.2018 | ||
SI | 12.12.2018 | ||
SK | 12.12.2018 | ||
SM | 12.12.2018 | ||
BG | 12.03.2019 | ||
NO | 12.03.2019 | ||
GR | 13.03.2019 | ||
IS | 12.04.2019 | ||
PT | 12.04.2019 | ||
Former [2019/48] | AL | 12.12.2018 | |
AT | 12.12.2018 | ||
CZ | 12.12.2018 | ||
DK | 12.12.2018 | ||
EE | 12.12.2018 | ||
ES | 12.12.2018 | ||
FI | 12.12.2018 | ||
HR | 12.12.2018 | ||
IT | 12.12.2018 | ||
LT | 12.12.2018 | ||
LV | 12.12.2018 | ||
MC | 12.12.2018 | ||
NL | 12.12.2018 | ||
PL | 12.12.2018 | ||
RO | 12.12.2018 | ||
RS | 12.12.2018 | ||
SE | 12.12.2018 | ||
SK | 12.12.2018 | ||
SM | 12.12.2018 | ||
BG | 12.03.2019 | ||
NO | 12.03.2019 | ||
GR | 13.03.2019 | ||
IS | 12.04.2019 | ||
PT | 12.04.2019 | ||
Former [2019/46] | AL | 12.12.2018 | |
AT | 12.12.2018 | ||
CZ | 12.12.2018 | ||
EE | 12.12.2018 | ||
ES | 12.12.2018 | ||
FI | 12.12.2018 | ||
HR | 12.12.2018 | ||
IT | 12.12.2018 | ||
LT | 12.12.2018 | ||
LV | 12.12.2018 | ||
MC | 12.12.2018 | ||
NL | 12.12.2018 | ||
PL | 12.12.2018 | ||
RO | 12.12.2018 | ||
RS | 12.12.2018 | ||
SE | 12.12.2018 | ||
SK | 12.12.2018 | ||
SM | 12.12.2018 | ||
BG | 12.03.2019 | ||
NO | 12.03.2019 | ||
GR | 13.03.2019 | ||
IS | 12.04.2019 | ||
PT | 12.04.2019 | ||
Former [2019/39] | AL | 12.12.2018 | |
CZ | 12.12.2018 | ||
EE | 12.12.2018 | ||
ES | 12.12.2018 | ||
FI | 12.12.2018 | ||
HR | 12.12.2018 | ||
IT | 12.12.2018 | ||
LT | 12.12.2018 | ||
LV | 12.12.2018 | ||
NL | 12.12.2018 | ||
PL | 12.12.2018 | ||
RO | 12.12.2018 | ||
RS | 12.12.2018 | ||
SE | 12.12.2018 | ||
SK | 12.12.2018 | ||
SM | 12.12.2018 | ||
BG | 12.03.2019 | ||
NO | 12.03.2019 | ||
GR | 13.03.2019 | ||
IS | 12.04.2019 | ||
PT | 12.04.2019 | ||
Former [2019/37] | AL | 12.12.2018 | |
CZ | 12.12.2018 | ||
EE | 12.12.2018 | ||
ES | 12.12.2018 | ||
FI | 12.12.2018 | ||
HR | 12.12.2018 | ||
IT | 12.12.2018 | ||
LT | 12.12.2018 | ||
LV | 12.12.2018 | ||
NL | 12.12.2018 | ||
PL | 12.12.2018 | ||
RO | 12.12.2018 | ||
RS | 12.12.2018 | ||
SE | 12.12.2018 | ||
SM | 12.12.2018 | ||
BG | 12.03.2019 | ||
NO | 12.03.2019 | ||
GR | 13.03.2019 | ||
PT | 12.04.2019 | ||
Former [2019/35] | AL | 12.12.2018 | |
CZ | 12.12.2018 | ||
ES | 12.12.2018 | ||
FI | 12.12.2018 | ||
HR | 12.12.2018 | ||
IT | 12.12.2018 | ||
LT | 12.12.2018 | ||
LV | 12.12.2018 | ||
NL | 12.12.2018 | ||
PL | 12.12.2018 | ||
RS | 12.12.2018 | ||
SE | 12.12.2018 | ||
BG | 12.03.2019 | ||
NO | 12.03.2019 | ||
GR | 13.03.2019 | ||
PT | 12.04.2019 | ||
Former [2019/34] | AL | 12.12.2018 | |
ES | 12.12.2018 | ||
FI | 12.12.2018 | ||
HR | 12.12.2018 | ||
IT | 12.12.2018 | ||
LT | 12.12.2018 | ||
LV | 12.12.2018 | ||
NL | 12.12.2018 | ||
RS | 12.12.2018 | ||
SE | 12.12.2018 | ||
BG | 12.03.2019 | ||
NO | 12.03.2019 | ||
GR | 13.03.2019 | ||
PT | 12.04.2019 | ||
Former [2019/33] | AL | 12.12.2018 | |
ES | 12.12.2018 | ||
FI | 12.12.2018 | ||
HR | 12.12.2018 | ||
LT | 12.12.2018 | ||
LV | 12.12.2018 | ||
NL | 12.12.2018 | ||
RS | 12.12.2018 | ||
SE | 12.12.2018 | ||
BG | 12.03.2019 | ||
NO | 12.03.2019 | ||
GR | 13.03.2019 | ||
PT | 12.04.2019 | ||
Former [2019/30] | AL | 12.12.2018 | |
ES | 12.12.2018 | ||
FI | 12.12.2018 | ||
HR | 12.12.2018 | ||
LT | 12.12.2018 | ||
LV | 12.12.2018 | ||
NL | 12.12.2018 | ||
RS | 12.12.2018 | ||
SE | 12.12.2018 | ||
BG | 12.03.2019 | ||
NO | 12.03.2019 | ||
GR | 13.03.2019 | ||
Former [2019/26] | AL | 12.12.2018 | |
ES | 12.12.2018 | ||
FI | 12.12.2018 | ||
HR | 12.12.2018 | ||
LT | 12.12.2018 | ||
LV | 12.12.2018 | ||
RS | 12.12.2018 | ||
SE | 12.12.2018 | ||
BG | 12.03.2019 | ||
NO | 12.03.2019 | ||
GR | 13.03.2019 | ||
Former [2019/25] | ES | 12.12.2018 | |
FI | 12.12.2018 | ||
HR | 12.12.2018 | ||
LT | 12.12.2018 | ||
LV | 12.12.2018 | ||
RS | 12.12.2018 | ||
SE | 12.12.2018 | ||
BG | 12.03.2019 | ||
NO | 12.03.2019 | ||
GR | 13.03.2019 | ||
Former [2019/23] | ES | 12.12.2018 | |
FI | 12.12.2018 | ||
HR | 12.12.2018 | ||
LT | 12.12.2018 | ||
LV | 12.12.2018 | ||
BG | 12.03.2019 | ||
NO | 12.03.2019 | ||
Former [2019/22] | FI | 12.12.2018 | |
LT | 12.12.2018 | ||
BG | 12.03.2019 | ||
NO | 12.03.2019 | ||
Former [2019/21] | FI | 12.12.2018 | |
LT | 12.12.2018 | ||
NO | 12.03.2019 | ||
Former [2019/20] | LT | 12.12.2018 | |
NO | 12.03.2019 | Cited in | International search | [A]WO2008134433 (SURETEC ENERGY INNOVATIONS [US], et al) [A] 1-10 * paragraphs [0039] - [0058]; figure 1 *; | [A]US7587289 (SIVERTSEN CLAS GERHARD [US]) [A] 1-10* page 2, line 51 - page 5, line 20; figures 1-2 *; | [A]WO2012028981 (KONINKL PHILIPS ELECTRONICS NV [NL], et al) [A] 1-10 * page 1, line 14 - page 7, line 23; figure 1 *; | [XI]WO2013128339 (KONINKL PHILIPS NV [NL]) [X] 1 * page 6, line 12 - page 7, line 27; figure 1 * [I] 2-10 |