blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3122956

EP3122956 - INSULATION BRICK FOR A MULTI-LAYERED WALL, MULTI-LAYER WALL PROVIDED THEREWITH AND BUILDING BUILT FROM SAME, AND METHOD FOR PRODUCING A MULTI-LAYERED WALL [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  03.06.2022
Database last updated on 11.09.2024
FormerThe patent has been granted
Status updated on  25.06.2021
FormerGrant of patent is intended
Status updated on  09.02.2021
FormerExamination is in progress
Status updated on  02.11.2018
FormerRequest for examination was made
Status updated on  30.12.2016
FormerThe international publication has been made
Status updated on  07.12.2016
Most recent event   Tooltip14.06.2024Lapse of the patent in a contracting state
New state(s): TR
published on 17.07.2024  [2024/29]
Applicant(s)For all designated states
Kellerer, Michael
Ortsstrasse 18a
82281 Oberweikertshofen / DE
[2017/05]
Inventor(s)01 / see applicant
...
 [2017/05]
Representative(s)Kuhnen & Wacker Patent- und Rechtsanwaltsbüro PartG mbB
Prinz-Ludwig-Straße 40A
85354 Freising / DE
[2021/30]
Former [2017/05]Kuhnen & Wacker
Patent- und Rechtsanwaltsbüro
Prinz-Ludwig-Straße 40A
85354 Freising / DE
Application number, filing date15712840.619.03.2015
[2017/05]
WO2015EP55802
Priority number, dateDE20141010431927.03.2014         Original published format: DE102014104319
[2017/05]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report
No.:WO2015144559
Date:01.10.2015
Language:DE
[2015/39]
Type: A1 Application with search report 
No.:EP3122956
Date:01.02.2017
Language:DE
The application published by WIPO in one of the EPO official languages on 01.10.2015 takes the place of the publication of the European patent application.
[2017/05]
Type: B1 Patent specification 
No.:EP3122956
Date:28.07.2021
Language:DE
[2021/30]
Search report(s)International search report - published on:EP01.10.2015
ClassificationIPC:E04F13/08, E04C2/288, E04C1/41, E04B2/02, E04B1/94, E04B1/76, E04F13/14, B29K25/00, B29K75/00, B29C44/18, B29L31/00
[2021/08]
CPC:
E04F13/0819 (EP); B29C44/188 (EP); E04B1/762 (EP);
E04B1/942 (EP); E04B2/02 (EP); E04C1/41 (EP);
E04F13/083 (EP); E04F13/0875 (EP); E04F13/14 (EP);
B29K2025/06 (EP); B29K2075/00 (EP); B29K2995/0015 (EP);
B29L2031/776 (EP); E04B2002/0289 (EP) (-)
Former IPC [2017/05]E04F13/08, E04F13/14, E04B1/76, E04B1/94, E04B2/02, E04C1/41, E04C2/288
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2017/05]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
TitleGerman:DÄMMZIEGEL FÜR EINE MEHRSCHICHTIGE WAND, DAMIT VERSEHENE MEHRSCHICHTIGE WAND SOWIE HIERAUS AUSGEBILDETES GEBÄUDE UND VERFAHREN ZUM ERSTELLEN EINER MEHRSCHICHTIGEN WAND[2017/05]
English:INSULATION BRICK FOR A MULTI-LAYERED WALL, MULTI-LAYER WALL PROVIDED THEREWITH AND BUILDING BUILT FROM SAME, AND METHOD FOR PRODUCING A MULTI-LAYERED WALL[2017/05]
French:BRIQUE D'ISOLATION POUR MUR MULTICOUCHE, MUR MULTICOUCHE POURVU D'UNE TELLE BRIQUE ET BÂTIMENT FORMÉ À UN TEL MUR ET PROCÉDÉ D'ÉRECTION D'UN MUR MULTICOUCHE[2017/05]
Entry into regional phase22.09.2016National basic fee paid 
22.09.2016Designation fee(s) paid 
22.09.2016Examination fee paid 
Examination procedure22.09.2016Examination requested  [2017/05]
22.09.2016Date on which the examining division has become responsible
13.06.2017Amendment by applicant (claims and/or description)
29.10.2018Despatch of a communication from the examining division (Time limit: M04)
20.02.2019Reply to a communication from the examining division
05.07.2019Despatch of a communication from the examining division (Time limit: M06)
15.01.2020Reply to a communication from the examining division
10.02.2021Communication of intention to grant the patent
18.06.2021Fee for grant paid
18.06.2021Fee for publishing/printing paid
18.06.2021Receipt of the translation of the claim(s)
Opposition(s)29.04.2022No opposition filed within time limit [2022/27]
Fees paidRenewal fee
10.03.2017Renewal fee patent year 03
12.03.2018Renewal fee patent year 04
11.03.2019Renewal fee patent year 05
05.03.2020Renewal fee patent year 06
09.03.2021Renewal fee patent year 07
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU19.03.2015
AL28.07.2021
CY28.07.2021
DK28.07.2021
EE28.07.2021
ES28.07.2021
FI28.07.2021
HR28.07.2021
LT28.07.2021
LV28.07.2021
MC28.07.2021
MK28.07.2021
NL28.07.2021
RO28.07.2021
RS28.07.2021
SE28.07.2021
SI28.07.2021
SK28.07.2021
SM28.07.2021
TR28.07.2021
BG28.10.2021
NO28.10.2021
GR29.10.2021
IS28.11.2021
PT29.11.2021
IE19.03.2022
LU19.03.2022
[2024/29]
Former [2024/22]HU19.03.2015
AL28.07.2021
CY28.07.2021
DK28.07.2021
EE28.07.2021
ES28.07.2021
FI28.07.2021
HR28.07.2021
LT28.07.2021
LV28.07.2021
MC28.07.2021
MK28.07.2021
NL28.07.2021
RO28.07.2021
RS28.07.2021
SE28.07.2021
SI28.07.2021
SK28.07.2021
SM28.07.2021
BG28.10.2021
NO28.10.2021
GR29.10.2021
IS28.11.2021
PT29.11.2021
IE19.03.2022
LU19.03.2022
Former [2024/20]HU19.03.2015
AL28.07.2021
CY28.07.2021
DK28.07.2021
EE28.07.2021
ES28.07.2021
FI28.07.2021
HR28.07.2021
LT28.07.2021
LV28.07.2021
MC28.07.2021
NL28.07.2021
RO28.07.2021
RS28.07.2021
SE28.07.2021
SI28.07.2021
SK28.07.2021
SM28.07.2021
BG28.10.2021
NO28.10.2021
GR29.10.2021
IS28.11.2021
PT29.11.2021
IE19.03.2022
LU19.03.2022
Former [2024/18]HU19.03.2015
AL28.07.2021
DK28.07.2021
EE28.07.2021
ES28.07.2021
FI28.07.2021
HR28.07.2021
LT28.07.2021
LV28.07.2021
MC28.07.2021
NL28.07.2021
RO28.07.2021
RS28.07.2021
SE28.07.2021
SI28.07.2021
SK28.07.2021
SM28.07.2021
BG28.10.2021
NO28.10.2021
GR29.10.2021
IS28.11.2021
PT29.11.2021
IE19.03.2022
LU19.03.2022
Former [2023/08]AL28.07.2021
DK28.07.2021
EE28.07.2021
ES28.07.2021
FI28.07.2021
HR28.07.2021
LT28.07.2021
LV28.07.2021
MC28.07.2021
NL28.07.2021
RO28.07.2021
RS28.07.2021
SE28.07.2021
SI28.07.2021
SK28.07.2021
SM28.07.2021
BG28.10.2021
NO28.10.2021
GR29.10.2021
IS28.11.2021
PT29.11.2021
IE19.03.2022
LU19.03.2022
Former [2022/47]AL28.07.2021
DK28.07.2021
EE28.07.2021
ES28.07.2021
FI28.07.2021
HR28.07.2021
LT28.07.2021
LV28.07.2021
MC28.07.2021
NL28.07.2021
RO28.07.2021
RS28.07.2021
SE28.07.2021
SI28.07.2021
SK28.07.2021
SM28.07.2021
BG28.10.2021
NO28.10.2021
GR29.10.2021
IS28.11.2021
PT29.11.2021
Former [2022/29]AL28.07.2021
DK28.07.2021
EE28.07.2021
ES28.07.2021
FI28.07.2021
HR28.07.2021
LT28.07.2021
LV28.07.2021
NL28.07.2021
RO28.07.2021
RS28.07.2021
SE28.07.2021
SI28.07.2021
SK28.07.2021
SM28.07.2021
BG28.10.2021
NO28.10.2021
GR29.10.2021
IS28.11.2021
PT29.11.2021
Former [2022/26]DK28.07.2021
EE28.07.2021
ES28.07.2021
FI28.07.2021
HR28.07.2021
LT28.07.2021
LV28.07.2021
NL28.07.2021
RO28.07.2021
RS28.07.2021
SE28.07.2021
SK28.07.2021
SM28.07.2021
BG28.10.2021
NO28.10.2021
GR29.10.2021
IS28.11.2021
PT29.11.2021
Former [2022/24]DK28.07.2021
EE28.07.2021
ES28.07.2021
FI28.07.2021
HR28.07.2021
LT28.07.2021
LV28.07.2021
NL28.07.2021
RO28.07.2021
RS28.07.2021
SE28.07.2021
SK28.07.2021
BG28.10.2021
NO28.10.2021
GR29.10.2021
IS28.11.2021
PT29.11.2021
Former [2022/21]DK28.07.2021
ES28.07.2021
FI28.07.2021
HR28.07.2021
LT28.07.2021
LV28.07.2021
NL28.07.2021
RS28.07.2021
SE28.07.2021
BG28.10.2021
NO28.10.2021
GR29.10.2021
IS28.11.2021
PT29.11.2021
Former [2022/11]ES28.07.2021
FI28.07.2021
HR28.07.2021
LT28.07.2021
LV28.07.2021
NL28.07.2021
RS28.07.2021
SE28.07.2021
BG28.10.2021
NO28.10.2021
GR29.10.2021
IS28.11.2021
PT29.11.2021
Former [2022/09]ES28.07.2021
FI28.07.2021
LT28.07.2021
NL28.07.2021
RS28.07.2021
SE28.07.2021
BG28.10.2021
NO28.10.2021
PT29.11.2021
Former [2022/08]ES28.07.2021
FI28.07.2021
LT28.07.2021
NL28.07.2021
SE28.07.2021
BG28.10.2021
NO28.10.2021
Former [2022/07]LT28.07.2021
NL28.07.2021
NO28.10.2021
Cited inInternational search[Y]DE2048387  (AGROP AG) [Y] 1-17 * page 2, line 2 - page 5, line 3; figure 1 *;
 [Y]FR2573110  (ENTREPRISES CONST SOC GEN [FR]) [Y] 1-17 * page 4, line 34 - page 6, line 25; figures 1,3 *;
 [Y]WO9011419  (MARIANI ROMEO [IT]) [Y] 1-17 * abstract *;
 [Y]EP0397598  (FERRARA SANTO [CH]) [Y] 1-17 * column 1, line 29 - column 2, line 30; figures 1,2 *;
 [YD]DE102004043494  (MAIER HERBERT [DE]) [YD] 1-17 * paragraph [0020] - paragraph [0026]; figures 1,3,5 *;
 [Y]EP1936067  (TERREAL [FR]) [Y] 1-17 * paragraph [0021] - paragraph [0024]; figure 1 *;
 [Y]GB2497569  (ENVIRUP LTD [GB]) [Y] 1-17* abstract *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.