blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3149834

EP3149834 - ELEKTRICAL POWER SUPPLY WITH OUTPUT CURRENT DEPENDENT TRANSITIONS BETWEEN OPERATION AND STAND-BY [Right-click to bookmark this link]
Former [2017/14]ENERGY SUPPLY DEVICE HAVING TRANSITIONS BETWEEN OPERATION AND STAND-BY THAT ARE DEPENDENT ON THE OUTPUT CURRENT
[2019/48]
StatusNo opposition filed within time limit
Status updated on  05.03.2021
Database last updated on 24.08.2024
FormerThe patent has been granted
Status updated on  27.03.2020
FormerGrant of patent is intended
Status updated on  10.11.2019
FormerExamination is in progress
Status updated on  27.04.2018
FormerRequest for examination was made
Status updated on  03.03.2017
FormerThe international publication has been made
Status updated on  23.12.2016
Most recent event   Tooltip14.06.2024Lapse of the patent in a contracting state
New state(s): TR
published on 17.07.2024  [2024/29]
Applicant(s)For all designated states
Phoenix Contact GmbH & Co. KG
Flachsmarktstraße 8
32825 Blomberg / DE
[N/P]
Former [2017/14]For all designated states
Phoenix Contact GmbH & Co. KG
Flachsmarktstrasse 8
32825 Blomberg / DE
Inventor(s)01 / ZEUCH, Jochen
Huxwiedestrasse 25
32825 Blomberg / DE
02 / HENKEL, Hartmut
Plantagenweg 9
32825 Blomberg / DE
 [2017/14]
Representative(s)Patentship Patentanwaltsgesellschaft mbH
Paul-Gerhardt-Allee 50
81245 München / DE
[N/P]
Former [2020/18]Patentship Patentanwaltsgesellschaft mbH
Elsenheimerstraße 65
80687 München / DE
Former [2017/14]Patentship Patentanwaltsgesellschaft mbH
Elsenheimerstaße 65
80687 München / DE
Application number, filing date15713308.324.03.2015
[2017/14]
WO2015EP56303
Priority number, dateDE20141010754528.05.2014         Original published format: DE102014107545
[2017/14]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report
No.:WO2015180861
Date:03.12.2015
Language:DE
[2015/48]
Type: A1 Application with search report 
No.:EP3149834
Date:05.04.2017
Language:DE
The application published by WIPO in one of the EPO official languages on 03.12.2015 takes the place of the publication of the European patent application.
[2017/14]
Type: B1 Patent specification 
No.:EP3149834
Date:29.04.2020
Language:DE
[2020/18]
Search report(s)International search report - published on:EP03.12.2015
ClassificationIPC:H02J9/00, H02M1/00
[2017/14]
CPC:
H02J9/005 (EP,CN,US); H02J9/007 (EP,CN,US); H02M1/0032 (EP,CN,US);
Y02B70/10 (EP,US); Y02B70/30 (EP); Y04S20/20 (EP)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2017/14]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
TitleGerman:ENERGIEVERSORGUNGSGERÄT MIT VOM AUSGANGSSTROM ABHÄNGIGEN ÜBERGÄNGEN ZWISCHEN BETRIEB UND STAND-BY[2017/14]
English:ELEKTRICAL POWER SUPPLY WITH OUTPUT CURRENT DEPENDENT TRANSITIONS BETWEEN OPERATION AND STAND-BY[2019/48]
French:ALIMENTATION ÉLECTRIQUE AVEC TRANSITION ENTRE L'OPÉRATION ET MODE ÉCO DÉPENDANTE DE COURANT DE SORTIE[2019/48]
Former [2017/14]ENERGY SUPPLY DEVICE HAVING TRANSITIONS BETWEEN OPERATION AND STAND-BY THAT ARE DEPENDENT ON THE OUTPUT CURRENT
Former [2017/14]APPAREIL D'ALIMENTATION EN ÉNERGIE À TRANSITIONS ENTRE LES MODES MARCHE ET ATTENTE DÉPENDANTES DU COURANT DE SORTIE
Entry into regional phase23.12.2016National basic fee paid 
23.12.2016Designation fee(s) paid 
23.12.2016Examination fee paid 
Examination procedure23.12.2016Examination requested  [2017/14]
23.12.2016Date on which the examining division has become responsible
07.04.2017Amendment by applicant (claims and/or description)
03.05.2018Despatch of a communication from the examining division (Time limit: M04)
31.07.2018Reply to a communication from the examining division
11.11.2019Communication of intention to grant the patent
17.02.2020Fee for grant paid
17.02.2020Fee for publishing/printing paid
17.02.2020Receipt of the translation of the claim(s)
Opposition(s)01.02.2021No opposition filed within time limit [2021/14]
Fees paidRenewal fee
31.03.2017Renewal fee patent year 03
06.03.2018Renewal fee patent year 04
19.03.2019Renewal fee patent year 05
24.03.2020Renewal fee patent year 06
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU24.03.2015
AL29.04.2020
CY29.04.2020
CZ29.04.2020
DK29.04.2020
EE29.04.2020
ES29.04.2020
FI29.04.2020
HR29.04.2020
IT29.04.2020
LT29.04.2020
LV29.04.2020
MC29.04.2020
MK29.04.2020
NL29.04.2020
PL29.04.2020
RO29.04.2020
RS29.04.2020
SE29.04.2020
SI29.04.2020
SK29.04.2020
SM29.04.2020
TR29.04.2020
BG29.07.2020
NO29.07.2020
GR30.07.2020
IS29.08.2020
PT31.08.2020
[2024/29]
Former [2024/22]HU24.03.2015
AL29.04.2020
CY29.04.2020
CZ29.04.2020
DK29.04.2020
EE29.04.2020
ES29.04.2020
FI29.04.2020
HR29.04.2020
IT29.04.2020
LT29.04.2020
LV29.04.2020
MC29.04.2020
MK29.04.2020
NL29.04.2020
PL29.04.2020
RO29.04.2020
RS29.04.2020
SE29.04.2020
SI29.04.2020
SK29.04.2020
SM29.04.2020
BG29.07.2020
NO29.07.2020
GR30.07.2020
IS29.08.2020
PT31.08.2020
Former [2023/30]HU24.03.2015
AL29.04.2020
CY29.04.2020
CZ29.04.2020
DK29.04.2020
EE29.04.2020
ES29.04.2020
FI29.04.2020
HR29.04.2020
IT29.04.2020
LT29.04.2020
LV29.04.2020
MC29.04.2020
NL29.04.2020
PL29.04.2020
RO29.04.2020
RS29.04.2020
SE29.04.2020
SI29.04.2020
SK29.04.2020
SM29.04.2020
BG29.07.2020
NO29.07.2020
GR30.07.2020
IS29.08.2020
PT31.08.2020
Former [2023/27]HU24.03.2015
AL29.04.2020
CZ29.04.2020
DK29.04.2020
EE29.04.2020
ES29.04.2020
FI29.04.2020
HR29.04.2020
IT29.04.2020
LT29.04.2020
LV29.04.2020
MC29.04.2020
NL29.04.2020
PL29.04.2020
RO29.04.2020
RS29.04.2020
SE29.04.2020
SI29.04.2020
SK29.04.2020
SM29.04.2020
BG29.07.2020
NO29.07.2020
GR30.07.2020
IS29.08.2020
PT31.08.2020
Former [2021/45]AL29.04.2020
CZ29.04.2020
DK29.04.2020
EE29.04.2020
ES29.04.2020
FI29.04.2020
HR29.04.2020
IT29.04.2020
LT29.04.2020
LV29.04.2020
MC29.04.2020
NL29.04.2020
PL29.04.2020
RO29.04.2020
RS29.04.2020
SE29.04.2020
SI29.04.2020
SK29.04.2020
SM29.04.2020
BG29.07.2020
NO29.07.2020
GR30.07.2020
IS29.08.2020
PT31.08.2020
Former [2021/24]AL29.04.2020
CZ29.04.2020
DK29.04.2020
EE29.04.2020
ES29.04.2020
FI29.04.2020
HR29.04.2020
IT29.04.2020
LT29.04.2020
LV29.04.2020
NL29.04.2020
PL29.04.2020
RO29.04.2020
RS29.04.2020
SE29.04.2020
SI29.04.2020
SK29.04.2020
SM29.04.2020
BG29.07.2020
NO29.07.2020
GR30.07.2020
IS29.08.2020
PT31.08.2020
Former [2021/10]AL29.04.2020
CZ29.04.2020
DK29.04.2020
EE29.04.2020
ES29.04.2020
FI29.04.2020
HR29.04.2020
IT29.04.2020
LT29.04.2020
LV29.04.2020
NL29.04.2020
PL29.04.2020
RO29.04.2020
RS29.04.2020
SE29.04.2020
SK29.04.2020
SM29.04.2020
BG29.07.2020
NO29.07.2020
GR30.07.2020
IS29.08.2020
PT31.08.2020
Former [2021/09]AL29.04.2020
CZ29.04.2020
DK29.04.2020
EE29.04.2020
ES29.04.2020
FI29.04.2020
HR29.04.2020
IT29.04.2020
LT29.04.2020
LV29.04.2020
NL29.04.2020
RO29.04.2020
RS29.04.2020
SE29.04.2020
SM29.04.2020
BG29.07.2020
NO29.07.2020
GR30.07.2020
IS29.08.2020
PT31.08.2020
Former [2021/08]AL29.04.2020
DK29.04.2020
ES29.04.2020
FI29.04.2020
HR29.04.2020
LT29.04.2020
LV29.04.2020
NL29.04.2020
RO29.04.2020
RS29.04.2020
SE29.04.2020
SM29.04.2020
BG29.07.2020
NO29.07.2020
GR30.07.2020
IS29.08.2020
PT31.08.2020
Former [2021/04]AL29.04.2020
FI29.04.2020
HR29.04.2020
LT29.04.2020
LV29.04.2020
NL29.04.2020
RS29.04.2020
SE29.04.2020
BG29.07.2020
NO29.07.2020
GR30.07.2020
IS29.08.2020
PT31.08.2020
Former [2021/01]FI29.04.2020
HR29.04.2020
LT29.04.2020
LV29.04.2020
RS29.04.2020
SE29.04.2020
BG29.07.2020
NO29.07.2020
GR30.07.2020
IS29.08.2020
PT31.08.2020
Former [2020/51]FI29.04.2020
HR29.04.2020
LT29.04.2020
LV29.04.2020
RS29.04.2020
SE29.04.2020
NO29.07.2020
GR30.07.2020
IS29.08.2020
PT31.08.2020
Former [2020/50]FI29.04.2020
HR29.04.2020
LT29.04.2020
LV29.04.2020
SE29.04.2020
NO29.07.2020
GR30.07.2020
IS29.08.2020
PT31.08.2020
Former [2020/48]FI29.04.2020
LT29.04.2020
SE29.04.2020
NO29.07.2020
IS29.08.2020
PT31.08.2020
Former [2020/47]LT29.04.2020
NO29.07.2020
IS29.08.2020
Former [2020/46]IS29.08.2020
Cited inInternational search[I]US6320766  (PARK CHEOL JIN [KR]) [I] 1-15 * figures 3,4 * * column 1, lines 15-21 * * column 2, lines 36-41,60-66 * * column 3, lines 7-62 * * column 4, line 28 - column 5, line 5 * * column 7, line 65 - column 8 *;
 [I]US2004066662  (PARK CHEOL-JIN [KR]) [I] 1-15 * figure 2 * * paragraphs [0002] , [0010] - [0012] - [0014] , [0025] , [0025] *;
 [A]US7064531  (ZINN RAYMOND [US]) [A] 1-15 * abstract * * column 2, lines 1-19 * * column 3, lines 33-43 *;
 [A]US2003067287  (MORGEN JOHANN EGON [DE]) [A] 1-15 * figure 1 * * paragraphs [0005] , [0007] , [0024] - [0028] - [0043] , [0044] *;
 [A]US2009108822  (HOSHINO TAICHI [JP], et al) [A] 1-15 * figures 2-6 * * paragraphs [0022] , [0049] - [0052] - [0084] - [0088] *
ExaminationUS2005046399
 DE202014002223U
 DE112011105015T
by applicantDE19600962
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.