blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3129593

EP3129593 - PRECISION SENSOR FOR DETERMINING MECHANICAL CONSTRAINTS ON A CUTTING TOOL OF A TUNNEL CUTTING MACHINE [Right-click to bookmark this link]
Former [2017/07]HIGH-PRECISION SENSORS FOR DETECING A MECHANICAL LOAD OF A MINING TOOL OF A TUNNEL BORING MACHINE
[2018/52]
StatusNo opposition filed within time limit
Status updated on  10.04.2020
Database last updated on 03.09.2024
FormerThe patent has been granted
Status updated on  03.05.2019
FormerGrant of patent is intended
Status updated on  31.01.2019
FormerRequest for examination was made
Status updated on  13.01.2017
FormerThe international publication has been made
Status updated on  19.12.2016
Most recent event   Tooltip08.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 10.08.2022  [2022/32]
Applicant(s)For all designated states
Montanuniversität Leoben
Franz-Josef-Str. 18
8700 Leoben / AT
For all designated states
Herrenknecht AG
Schlehenweg 2
77963 Schwanau / DE
For all designated states
B+ G Betontechnologie + Materialbewirtschaftung AG
Dorfstrasse 10
3073 Gümligen / CH
[2017/07]
Inventor(s)01 / BARWART, Stefan
Fischerauergasse 22/1
A-8700 Leoben / AT
02 / GALLER, Robert
Baumschulgasse 6
A-8600 Bruck an der Mur / AT
 [2017/10]
Former [2017/07]01 / BARWART, Stefan
Voerdernbergerstrasse 7C6
A-8700 Leoben / AT
02 / GALLER, Robert
Baumschulgasse 6
A-8600 Bruck an der Mur / AT
Representative(s)RACKETTE Patentanwälte PartG mbB
Postfach 13 10
79013 Freiburg / DE
[2019/23]
Former [2017/07]RACKETTE Patentanwälte PartG mbB
Kaiser-Joseph-Strasse 179
79098 Freiburg / DE
Application number, filing date15713516.102.04.2015
[2017/07]
WO2015EP57361
Priority number, dateDE20141010501408.04.2014         Original published format: DE102014105014
[2017/07]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report
No.:WO2015155124
Date:15.10.2015
Language:DE
[2015/41]
Type: A1 Application with search report 
No.:EP3129593
Date:15.02.2017
Language:DE
The application published by WIPO in one of the EPO official languages on 15.10.2015 takes the place of the publication of the European patent application.
[2017/07]
Type: B1 Patent specification 
No.:EP3129593
Date:05.06.2019
Language:DE
[2019/23]
Search report(s)International search report - published on:EP15.10.2015
ClassificationIPC:E21D9/10, E21D9/11, E21D9/00
[2018/52]
CPC:
E21D9/003 (EP,CN,RU,US); E21D9/104 (RU,US); E21D9/11 (RU,US);
E21D9/112 (US)
Former IPC [2017/07]E21D9/00
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2017/07]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
TitleGerman:HOCHPRÄZISE SENSORIK ZUM ERMITTELN EINER MECHANISCHEN BELASTUNG EINES ABBAUWERKZEUGS EINER TUNNELBOHRMASCHINE[2017/07]
English:PRECISION SENSOR FOR DETERMINING MECHANICAL CONSTRAINTS ON A CUTTING TOOL OF A TUNNEL CUTTING MACHINE[2018/52]
French:CAPTEUR DE PRÉCISION POUR DÉTERMINER UNE CONTRAINTE MÉCANIQUE SUR UN OUTIL E COUPE D'UN TUNNELIER[2018/52]
Former [2017/07]HIGH-PRECISION SENSORS FOR DETECING A MECHANICAL LOAD OF A MINING TOOL OF A TUNNEL BORING MACHINE
Former [2017/07]SYSTÈME DE DÉTECTION DE HAUTE PRÉCISION POUR DÉTERMINER UNE CHARGE MÉCANIQUE SUR UN OUTIL D'ABATTAGE D'UN TUNNELIER
Entry into regional phase17.10.2016National basic fee paid 
17.10.2016Designation fee(s) paid 
17.10.2016Examination fee paid 
Examination procedure17.10.2016Examination requested  [2017/07]
17.10.2016Date on which the examining division has become responsible
08.06.2017Amendment by applicant (claims and/or description)
01.02.2019Communication of intention to grant the patent
25.04.2019Fee for grant paid
25.04.2019Fee for publishing/printing paid
25.04.2019Receipt of the translation of the claim(s)
Opposition(s)06.03.2020No opposition filed within time limit [2020/20]
Fees paidRenewal fee
03.03.2017Renewal fee patent year 03
05.03.2018Renewal fee patent year 04
22.03.2019Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU02.04.2015
AL05.06.2019
CY05.06.2019
CZ05.06.2019
DK05.06.2019
EE05.06.2019
FI05.06.2019
HR05.06.2019
LT05.06.2019
LV05.06.2019
MC05.06.2019
MK05.06.2019
MT05.06.2019
NL05.06.2019
PL05.06.2019
RO05.06.2019
RS05.06.2019
SE05.06.2019
SI05.06.2019
SK05.06.2019
SM05.06.2019
TR05.06.2019
BG05.09.2019
NO05.09.2019
GR06.09.2019
IS05.10.2019
PT07.10.2019
[2022/32]
Former [2022/28]HU02.04.2015
AL05.06.2019
CY05.06.2019
CZ05.06.2019
DK05.06.2019
EE05.06.2019
FI05.06.2019
HR05.06.2019
LT05.06.2019
LV05.06.2019
MC05.06.2019
MT05.06.2019
NL05.06.2019
PL05.06.2019
RO05.06.2019
RS05.06.2019
SE05.06.2019
SI05.06.2019
SK05.06.2019
SM05.06.2019
TR05.06.2019
BG05.09.2019
NO05.09.2019
GR06.09.2019
IS05.10.2019
PT07.10.2019
Former [2020/52]AL05.06.2019
CZ05.06.2019
DK05.06.2019
EE05.06.2019
FI05.06.2019
HR05.06.2019
LT05.06.2019
LV05.06.2019
MC05.06.2019
NL05.06.2019
PL05.06.2019
RO05.06.2019
RS05.06.2019
SE05.06.2019
SI05.06.2019
SK05.06.2019
SM05.06.2019
TR05.06.2019
BG05.09.2019
NO05.09.2019
GR06.09.2019
IS05.10.2019
PT07.10.2019
Former [2020/25]AL05.06.2019
CZ05.06.2019
DK05.06.2019
EE05.06.2019
FI05.06.2019
HR05.06.2019
LT05.06.2019
LV05.06.2019
NL05.06.2019
PL05.06.2019
RO05.06.2019
RS05.06.2019
SE05.06.2019
SI05.06.2019
SK05.06.2019
SM05.06.2019
TR05.06.2019
BG05.09.2019
NO05.09.2019
GR06.09.2019
IS05.10.2019
PT07.10.2019
Former [2020/22]AL05.06.2019
CZ05.06.2019
DK05.06.2019
EE05.06.2019
FI05.06.2019
HR05.06.2019
LT05.06.2019
LV05.06.2019
NL05.06.2019
RO05.06.2019
RS05.06.2019
SE05.06.2019
SK05.06.2019
SM05.06.2019
TR05.06.2019
BG05.09.2019
NO05.09.2019
GR06.09.2019
IS05.10.2019
PT07.10.2019
Former [2020/17]AL05.06.2019
CZ05.06.2019
EE05.06.2019
FI05.06.2019
HR05.06.2019
LT05.06.2019
LV05.06.2019
NL05.06.2019
RO05.06.2019
RS05.06.2019
SE05.06.2019
SK05.06.2019
SM05.06.2019
TR05.06.2019
BG05.09.2019
NO05.09.2019
GR06.09.2019
IS05.10.2019
PT07.10.2019
Former [2020/13]AL05.06.2019
CZ05.06.2019
EE05.06.2019
FI05.06.2019
HR05.06.2019
LT05.06.2019
LV05.06.2019
NL05.06.2019
RO05.06.2019
RS05.06.2019
SE05.06.2019
SK05.06.2019
SM05.06.2019
BG05.09.2019
NO05.09.2019
GR06.09.2019
IS05.10.2019
PT07.10.2019
Former [2020/12]AL05.06.2019
CZ05.06.2019
EE05.06.2019
FI05.06.2019
HR05.06.2019
LT05.06.2019
LV05.06.2019
NL05.06.2019
RO05.06.2019
RS05.06.2019
SE05.06.2019
SK05.06.2019
BG05.09.2019
NO05.09.2019
GR06.09.2019
IS05.10.2019
PT07.10.2019
Former [2020/11]AL05.06.2019
CZ05.06.2019
EE05.06.2019
FI05.06.2019
HR05.06.2019
LT05.06.2019
LV05.06.2019
NL05.06.2019
RO05.06.2019
RS05.06.2019
SE05.06.2019
SK05.06.2019
BG05.09.2019
NO05.09.2019
GR06.09.2019
PT07.10.2019
Former [2020/10]AL05.06.2019
CZ05.06.2019
FI05.06.2019
HR05.06.2019
LT05.06.2019
LV05.06.2019
NL05.06.2019
RO05.06.2019
RS05.06.2019
SE05.06.2019
BG05.09.2019
NO05.09.2019
GR06.09.2019
PT07.10.2019
Former [2020/09]AL05.06.2019
CZ05.06.2019
FI05.06.2019
HR05.06.2019
LT05.06.2019
LV05.06.2019
NL05.06.2019
RS05.06.2019
SE05.06.2019
BG05.09.2019
NO05.09.2019
GR06.09.2019
Former [2020/07]AL05.06.2019
FI05.06.2019
HR05.06.2019
LT05.06.2019
LV05.06.2019
NL05.06.2019
RS05.06.2019
SE05.06.2019
BG05.09.2019
NO05.09.2019
GR06.09.2019
Former [2019/51]AL05.06.2019
FI05.06.2019
HR05.06.2019
LT05.06.2019
LV05.06.2019
RS05.06.2019
SE05.06.2019
BG05.09.2019
NO05.09.2019
GR06.09.2019
Former [2019/50]AL05.06.2019
FI05.06.2019
HR05.06.2019
LT05.06.2019
LV05.06.2019
RS05.06.2019
SE05.06.2019
NO05.09.2019
GR06.09.2019
Former [2019/49]AL05.06.2019
FI05.06.2019
HR05.06.2019
LT05.06.2019
SE05.06.2019
NO05.09.2019
Former [2019/48]FI05.06.2019
LT05.06.2019
SE05.06.2019
NO05.09.2019
Former [2019/47]FI05.06.2019
LT05.06.2019
NO05.09.2019
Cited inInternational search[Y]GB1518359  (STRAINSTALL LTD);
 [Y]EP0344496  (MANNESMANN KIENZLE GMBH [DE]);
 [Y]WO9118184  (Z C MINES PTY LTD [AU]);
 [YD]DE10030099  (BUNDESREP DEUTSCHLAND [DE]);
 [Y]WO03087537  (STARLOY CORP [JP], et al);
 [A]US2009297273  (LINDBERGH LEIF R [US], et al);
 [XD]DE202012103593U  (MONTANUNIV LEOBEN [AT])
by applicantDE10030099
 DE202012103593U
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.