blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3129317

EP3129317 - PORTABLE POWER DRIVEN SYSTEM COMPRISING A ROPE GRAB ARRANGEMENT [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  22.01.2021
Database last updated on 11.09.2024
FormerThe patent has been granted
Status updated on  14.02.2020
FormerGrant of patent is intended
Status updated on  15.10.2019
FormerExamination is in progress
Status updated on  13.04.2018
FormerRequest for examination was made
Status updated on  13.01.2017
FormerThe international publication has been made
Status updated on  19.12.2016
Most recent event   Tooltip08.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 10.08.2022  [2022/32]
Applicant(s)For all designated states
Actsafe Systems AB
Sagbäcksvägen 13
437 31 Lindome / SE
[2020/12]
Former [2017/07]For all designated states
Actsafe Systems AB
Sagbäcksvägen 13
437 31 Lindome / SE
Inventor(s)01 / BOULLIAT, Claude
7 Rue Thiers
F-38000 Grenoble / FR
 [2017/07]
Representative(s)Kransell & Wennborg KB
P.O. Box 27834
115 93 Stockholm / SE
[2017/07]
Application number, filing date15714204.331.03.2015
[2017/07]
WO2015EP57125
Priority number, dateEP2014016372207.04.2014         Original published format: EP 14163722
[2017/07]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2015155082
Date:15.10.2015
Language:EN
[2015/41]
Type: A1 Application with search report 
No.:EP3129317
Date:15.02.2017
Language:EN
The application published by WIPO in one of the EPO official languages on 15.10.2015 takes the place of the publication of the European patent application.
[2017/07]
Type: B1 Patent specification 
No.:EP3129317
Date:18.03.2020
Language:EN
[2020/12]
Search report(s)International search report - published on:EP15.10.2015
ClassificationIPC:B66D1/74, A62B1/10
[2017/07]
CPC:
B66D1/7415 (EP,CN,US); A62B1/10 (EP,CN,US); B66D1/7489 (EP,CN,US);
B66D2700/0141 (US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2017/07]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
TitleGerman:TRAGBARES KRAFTBETRIEBENES SYSTEM MIT EINER KABELGREIFVORRICHTUNG[2018/17]
English:PORTABLE POWER DRIVEN SYSTEM COMPRISING A ROPE GRAB ARRANGEMENT[2017/07]
French:SYSTÈME MOTORISÉ PORTATIF AVEC UN DISPOSITIF DE SAISIE D'UN CABLE[2018/17]
Former [2017/07]TRAGBARES KRAFTBETRIEBENES SYSTEM MIT EINER SEILGREIFANORDNUNG
Former [2017/07]SYSTÈME PORTABLE À ENTRAÎNEMENT MÉCANIQUE COMPRENANT UN AGENCEMENT DE GRAPPIN À CÂBLE
Entry into regional phase23.08.2016National basic fee paid 
23.08.2016Designation fee(s) paid 
23.08.2016Examination fee paid 
Examination procedure23.08.2016Examination requested  [2017/07]
23.08.2016Date on which the examining division has become responsible
15.05.2017Amendment by applicant (claims and/or description)
13.04.2018Despatch of a communication from the examining division (Time limit: M06)
22.10.2018Reply to a communication from the examining division
04.02.2019Despatch of a communication from the examining division (Time limit: M06)
14.08.2019Reply to a communication from the examining division
16.10.2019Communication of intention to grant the patent
05.02.2020Fee for grant paid
05.02.2020Fee for publishing/printing paid
05.02.2020Receipt of the translation of the claim(s)
Opposition(s)21.12.2020No opposition filed within time limit [2021/08]
Fees paidRenewal fee
16.02.2017Renewal fee patent year 03
20.02.2018Renewal fee patent year 04
22.02.2019Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU31.03.2015
AL18.03.2020
AT18.03.2020
CY18.03.2020
CZ18.03.2020
EE18.03.2020
ES18.03.2020
FI18.03.2020
HR18.03.2020
IT18.03.2020
LT18.03.2020
LV18.03.2020
MC18.03.2020
MK18.03.2020
MT18.03.2020
NL18.03.2020
PL18.03.2020
RO18.03.2020
RS18.03.2020
SI18.03.2020
SK18.03.2020
SM18.03.2020
TR18.03.2020
BE31.03.2020
CH31.03.2020
IE31.03.2020
LI31.03.2020
LU31.03.2020
BG18.06.2020
NO18.06.2020
GR19.06.2020
IS18.07.2020
PT12.08.2020
[2022/31]
Former [2022/30]HU31.03.2015
AL18.03.2020
AT18.03.2020
CY18.03.2020
CZ18.03.2020
EE18.03.2020
ES18.03.2020
FI18.03.2020
HR18.03.2020
IT18.03.2020
LT18.03.2020
LV18.03.2020
MC18.03.2020
MT18.03.2020
NL18.03.2020
PL18.03.2020
RO18.03.2020
RS18.03.2020
SI18.03.2020
SK18.03.2020
SM18.03.2020
TR18.03.2020
BE31.03.2020
CH31.03.2020
IE31.03.2020
LI31.03.2020
LU31.03.2020
BG18.06.2020
NO18.06.2020
GR19.06.2020
IS18.07.2020
PT12.08.2020
Former [2022/27]HU31.03.2015
AT18.03.2020
CY18.03.2020
CZ18.03.2020
EE18.03.2020
ES18.03.2020
FI18.03.2020
HR18.03.2020
IT18.03.2020
LT18.03.2020
LV18.03.2020
MC18.03.2020
MT18.03.2020
NL18.03.2020
PL18.03.2020
RO18.03.2020
RS18.03.2020
SI18.03.2020
SK18.03.2020
SM18.03.2020
TR18.03.2020
BE31.03.2020
CH31.03.2020
IE31.03.2020
LI31.03.2020
LU31.03.2020
BG18.06.2020
NO18.06.2020
GR19.06.2020
IS18.07.2020
PT12.08.2020
Former [2021/24]AT18.03.2020
CZ18.03.2020
EE18.03.2020
ES18.03.2020
FI18.03.2020
HR18.03.2020
IT18.03.2020
LT18.03.2020
LV18.03.2020
MC18.03.2020
NL18.03.2020
PL18.03.2020
RO18.03.2020
RS18.03.2020
SI18.03.2020
SK18.03.2020
SM18.03.2020
BE31.03.2020
CH31.03.2020
IE31.03.2020
LI31.03.2020
LU31.03.2020
BG18.06.2020
NO18.06.2020
GR19.06.2020
IS18.07.2020
PT12.08.2020
Former [2021/10]AT18.03.2020
CZ18.03.2020
EE18.03.2020
ES18.03.2020
FI18.03.2020
HR18.03.2020
IT18.03.2020
LT18.03.2020
LV18.03.2020
MC18.03.2020
NL18.03.2020
PL18.03.2020
RO18.03.2020
RS18.03.2020
SK18.03.2020
SM18.03.2020
BE31.03.2020
CH31.03.2020
IE31.03.2020
LI31.03.2020
LU31.03.2020
BG18.06.2020
NO18.06.2020
GR19.06.2020
IS18.07.2020
PT12.08.2020
Former [2021/09]AT18.03.2020
CZ18.03.2020
EE18.03.2020
ES18.03.2020
FI18.03.2020
HR18.03.2020
IT18.03.2020
LT18.03.2020
LV18.03.2020
MC18.03.2020
NL18.03.2020
RO18.03.2020
RS18.03.2020
SK18.03.2020
SM18.03.2020
CH31.03.2020
IE31.03.2020
LI31.03.2020
LU31.03.2020
BG18.06.2020
NO18.06.2020
GR19.06.2020
IS18.07.2020
PT12.08.2020
Former [2021/08]CZ18.03.2020
EE18.03.2020
ES18.03.2020
FI18.03.2020
HR18.03.2020
LT18.03.2020
LV18.03.2020
MC18.03.2020
NL18.03.2020
RO18.03.2020
RS18.03.2020
SK18.03.2020
SM18.03.2020
CH31.03.2020
IE31.03.2020
LI31.03.2020
LU31.03.2020
BG18.06.2020
NO18.06.2020
GR19.06.2020
IS18.07.2020
PT12.08.2020
Former [2021/07]CZ18.03.2020
EE18.03.2020
FI18.03.2020
HR18.03.2020
LT18.03.2020
LV18.03.2020
MC18.03.2020
NL18.03.2020
RO18.03.2020
RS18.03.2020
SK18.03.2020
SM18.03.2020
CH31.03.2020
IE31.03.2020
LI31.03.2020
LU31.03.2020
BG18.06.2020
NO18.06.2020
GR19.06.2020
IS18.07.2020
PT12.08.2020
Former [2021/04]CZ18.03.2020
EE18.03.2020
FI18.03.2020
HR18.03.2020
LT18.03.2020
LV18.03.2020
MC18.03.2020
NL18.03.2020
RO18.03.2020
RS18.03.2020
SK18.03.2020
SM18.03.2020
LU31.03.2020
BG18.06.2020
NO18.06.2020
GR19.06.2020
IS18.07.2020
PT12.08.2020
Former [2020/50]CZ18.03.2020
EE18.03.2020
FI18.03.2020
HR18.03.2020
LT18.03.2020
LV18.03.2020
NL18.03.2020
RO18.03.2020
RS18.03.2020
SK18.03.2020
SM18.03.2020
BG18.06.2020
NO18.06.2020
GR19.06.2020
IS18.07.2020
PT12.08.2020
Former [2020/49]CZ18.03.2020
FI18.03.2020
HR18.03.2020
LT18.03.2020
LV18.03.2020
NL18.03.2020
RO18.03.2020
RS18.03.2020
SK18.03.2020
SM18.03.2020
BG18.06.2020
NO18.06.2020
GR19.06.2020
IS18.07.2020
PT12.08.2020
Former [2020/48]FI18.03.2020
HR18.03.2020
LT18.03.2020
LV18.03.2020
NL18.03.2020
RO18.03.2020
RS18.03.2020
SM18.03.2020
BG18.06.2020
NO18.06.2020
GR19.06.2020
IS18.07.2020
PT12.08.2020
Former [2020/47]FI18.03.2020
HR18.03.2020
LT18.03.2020
LV18.03.2020
NL18.03.2020
RS18.03.2020
BG18.06.2020
NO18.06.2020
GR19.06.2020
IS18.07.2020
Former [2020/46]FI18.03.2020
HR18.03.2020
LV18.03.2020
NL18.03.2020
RS18.03.2020
BG18.06.2020
NO18.06.2020
GR19.06.2020
IS18.07.2020
Former [2020/45]FI18.03.2020
HR18.03.2020
LV18.03.2020
NL18.03.2020
RS18.03.2020
BG18.06.2020
NO18.06.2020
GR19.06.2020
Former [2020/39]FI18.03.2020
HR18.03.2020
LV18.03.2020
RS18.03.2020
BG18.06.2020
NO18.06.2020
GR19.06.2020
Former [2020/38]FI18.03.2020
HR18.03.2020
LV18.03.2020
RS18.03.2020
NO18.06.2020
GR19.06.2020
Former [2020/37]FI18.03.2020
HR18.03.2020
LV18.03.2020
RS18.03.2020
NO18.06.2020
Former [2020/35]FI18.03.2020
NO18.06.2020
Cited inInternational search[Y]US3375725  (MATHISON ROBERT V) [Y] 1-5,7-14 * figure - * * column 1, line 29 - line 40 * * column 2, line 43 - column 3, line 59 * * column 4, line 30 - column 5, line 41 *;
 [YA]CA1009644  (KAUFER CARL) [Y] 9 * figure 1 * [A] 1;
 [YA]FR2632374  (SECALT [LU]) [Y] 9 * figure 9 * [A] 1;
 [AD]WO9924122  (ACT SAFE AB [SE], et al) [AD] 1,11 * abstract ** figure - *;
 [YA]WO2007103035  (ATLAS DEVICES LLC [US], et al) [Y] 11-14 * page 5, line 21 - line 23 * * page 7, line 28 - page 9, line 24 * * page 11, line 24 - line 32 * * figures 1, 3, 4, 8 * [A] 1;
 [Y]WO2008106489  (ATLAS DEVICES LLC [US], et al) [Y] 1-5,7-14 * abstract * * figures 12-18 * * page 15, line 20 - page 20, line 29 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.