EP3132173 - COUPLING DEVICE PROVIDING ELECTRICAL CONTINUITY BETWEEN TUBES [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 10.05.2021 Database last updated on 11.05.2024 | |
Former | The patent has been granted Status updated on 29.05.2020 | ||
Former | Grant of patent is intended Status updated on 16.01.2020 | ||
Former | Examination is in progress Status updated on 22.06.2018 | ||
Former | Request for examination was made Status updated on 20.01.2017 | ||
Former | The international publication has been made Status updated on 26.12.2016 | Most recent event Tooltip | 27.04.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 29.05.2024 [2024/22] | Applicant(s) | For all designated states Parker Hannifin Manufacturing France SAS 17 rue des Buchillons ZI du Mont Blanc Ville la Grand 74112 Annemasse / FR | [2017/08] | Inventor(s) | 01 /
LE QUERE, Philippe 1 Allée du Champ Doret F-35830 Betton / FR | [2017/08] | Representative(s) | Lavialle, Bruno François Stéphane, et al Cabinet Boettcher 5 rue de Vienne 75008 Paris / FR | [N/P] |
Former [2017/08] | Lavialle, Bruno François Stéphane, et al Cabinet Boettcher 16, rue Médéric 75017 Paris / FR | Application number, filing date | 15715288.5 | 14.04.2015 | [2017/08] | WO2015EP58064 | Priority number, date | FR20140053331 | 14.04.2014 Original published format: FR 1453331 | [2017/08] | Filing language | FR | Procedural language | FR | Publication | Type: | A1 Application with search report | No.: | WO2015158708 | Date: | 22.10.2015 | Language: | FR | [2015/42] | Type: | A1 Application with search report | No.: | EP3132173 | Date: | 22.02.2017 | Language: | FR | The application published by WIPO in one of the EPO official languages on 22.10.2015 takes the place of the publication of the European patent application. | [2017/08] | Type: | B1 Patent specification | No.: | EP3132173 | Date: | 01.07.2020 | Language: | FR | [2020/27] | Search report(s) | International search report - published on: | EP | 22.10.2015 | Classification | IPC: | F16L25/01, F16L37/091 | [2017/08] | CPC: |
F16L25/01 (EP,CN,US);
H01R4/60 (US);
F16L37/0915 (EP,US);
F16L37/0925 (CN)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/08] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | Title | German: | KUPPLUNGSVORRICHTUNG ZUR BEREITSTELLUNG VON ELEKTRISCHER KONTINUITÄT ZWISCHEN ROHREN | [2017/08] | English: | COUPLING DEVICE PROVIDING ELECTRICAL CONTINUITY BETWEEN TUBES | [2017/08] | French: | DISPOSITIF DE RACCORDEMENT ASSURANT UNE CONTINUITÉ ÉLECTRIQUE ENTRE TUBES | [2017/08] | Entry into regional phase | 23.09.2016 | National basic fee paid | 23.09.2016 | Designation fee(s) paid | 23.09.2016 | Examination fee paid | Examination procedure | 23.09.2016 | Examination requested [2017/08] | 23.09.2016 | Date on which the examining division has become responsible | 23.05.2017 | Amendment by applicant (claims and/or description) | 25.06.2018 | Despatch of a communication from the examining division (Time limit: M06) | 04.01.2019 | Reply to a communication from the examining division | 18.04.2019 | Despatch of a communication from the examining division (Time limit: M04) | 02.08.2019 | Reply to a communication from the examining division | 17.01.2020 | Communication of intention to grant the patent | 26.05.2020 | Fee for grant paid | 26.05.2020 | Fee for publishing/printing paid | 26.05.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 06.04.2021 | No opposition filed within time limit [2021/23] | Fees paid | Renewal fee | 30.03.2017 | Renewal fee patent year 03 | 28.03.2018 | Renewal fee patent year 04 | 26.03.2019 | Renewal fee patent year 05 | 30.03.2020 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 14.04.2015 | AL | 01.07.2020 | AT | 01.07.2020 | CY | 01.07.2020 | CZ | 01.07.2020 | DK | 01.07.2020 | EE | 01.07.2020 | ES | 01.07.2020 | FI | 01.07.2020 | HR | 01.07.2020 | IT | 01.07.2020 | LT | 01.07.2020 | LV | 01.07.2020 | MC | 01.07.2020 | MK | 01.07.2020 | NL | 01.07.2020 | PL | 01.07.2020 | RO | 01.07.2020 | RS | 01.07.2020 | SE | 01.07.2020 | SI | 01.07.2020 | SK | 01.07.2020 | SM | 01.07.2020 | BG | 01.10.2020 | NO | 01.10.2020 | GR | 02.10.2020 | IS | 01.11.2020 | PT | 02.11.2020 | [2024/22] |
Former [2023/30] | HU | 14.04.2015 | |
AL | 01.07.2020 | ||
AT | 01.07.2020 | ||
CY | 01.07.2020 | ||
CZ | 01.07.2020 | ||
DK | 01.07.2020 | ||
EE | 01.07.2020 | ||
ES | 01.07.2020 | ||
FI | 01.07.2020 | ||
HR | 01.07.2020 | ||
IT | 01.07.2020 | ||
LT | 01.07.2020 | ||
LV | 01.07.2020 | ||
MC | 01.07.2020 | ||
NL | 01.07.2020 | ||
PL | 01.07.2020 | ||
RO | 01.07.2020 | ||
RS | 01.07.2020 | ||
SE | 01.07.2020 | ||
SI | 01.07.2020 | ||
SK | 01.07.2020 | ||
SM | 01.07.2020 | ||
BG | 01.10.2020 | ||
NO | 01.10.2020 | ||
GR | 02.10.2020 | ||
IS | 01.11.2020 | ||
PT | 02.11.2020 | ||
Former [2023/27] | HU | 14.04.2015 | |
AL | 01.07.2020 | ||
AT | 01.07.2020 | ||
CZ | 01.07.2020 | ||
DK | 01.07.2020 | ||
EE | 01.07.2020 | ||
ES | 01.07.2020 | ||
FI | 01.07.2020 | ||
HR | 01.07.2020 | ||
IT | 01.07.2020 | ||
LT | 01.07.2020 | ||
LV | 01.07.2020 | ||
MC | 01.07.2020 | ||
NL | 01.07.2020 | ||
PL | 01.07.2020 | ||
RO | 01.07.2020 | ||
RS | 01.07.2020 | ||
SE | 01.07.2020 | ||
SI | 01.07.2020 | ||
SK | 01.07.2020 | ||
SM | 01.07.2020 | ||
BG | 01.10.2020 | ||
NO | 01.10.2020 | ||
GR | 02.10.2020 | ||
IS | 01.11.2020 | ||
PT | 02.11.2020 | ||
Former [2022/23] | AL | 01.07.2020 | |
AT | 01.07.2020 | ||
CZ | 01.07.2020 | ||
DK | 01.07.2020 | ||
EE | 01.07.2020 | ||
ES | 01.07.2020 | ||
FI | 01.07.2020 | ||
HR | 01.07.2020 | ||
IT | 01.07.2020 | ||
LT | 01.07.2020 | ||
LV | 01.07.2020 | ||
MC | 01.07.2020 | ||
NL | 01.07.2020 | ||
PL | 01.07.2020 | ||
RO | 01.07.2020 | ||
RS | 01.07.2020 | ||
SE | 01.07.2020 | ||
SI | 01.07.2020 | ||
SK | 01.07.2020 | ||
SM | 01.07.2020 | ||
BG | 01.10.2020 | ||
NO | 01.10.2020 | ||
GR | 02.10.2020 | ||
IS | 01.11.2020 | ||
PT | 02.11.2020 | ||
Former [2022/10] | AL | 01.07.2020 | |
AT | 01.07.2020 | ||
CZ | 01.07.2020 | ||
DK | 01.07.2020 | ||
EE | 01.07.2020 | ||
ES | 01.07.2020 | ||
FI | 01.07.2020 | ||
HR | 01.07.2020 | ||
IT | 01.07.2020 | ||
LT | 01.07.2020 | ||
LV | 01.07.2020 | ||
MC | 01.07.2020 | ||
NL | 01.07.2020 | ||
PL | 01.07.2020 | ||
RO | 01.07.2020 | ||
RS | 01.07.2020 | ||
SE | 01.07.2020 | ||
SI | 01.07.2020 | ||
SK | 01.07.2020 | ||
SM | 01.07.2020 | ||
BG | 01.10.2020 | ||
NO | 01.10.2020 | ||
GR | 02.10.2020 | ||
PT | 02.11.2020 | ||
Former [2021/50] | AL | 01.07.2020 | |
AT | 01.07.2020 | ||
CZ | 01.07.2020 | ||
DK | 01.07.2020 | ||
EE | 01.07.2020 | ||
ES | 01.07.2020 | ||
FI | 01.07.2020 | ||
HR | 01.07.2020 | ||
IT | 01.07.2020 | ||
LT | 01.07.2020 | ||
LV | 01.07.2020 | ||
MC | 01.07.2020 | ||
NL | 01.07.2020 | ||
PL | 01.07.2020 | ||
RO | 01.07.2020 | ||
RS | 01.07.2020 | ||
SE | 01.07.2020 | ||
SI | 01.07.2020 | ||
SK | 01.07.2020 | ||
SM | 01.07.2020 | ||
BG | 01.10.2020 | ||
NO | 01.10.2020 | ||
GR | 02.10.2020 | ||
IS | 01.11.2020 | ||
PT | 02.11.2020 | ||
Former [2021/36] | AL | 01.07.2020 | |
AT | 01.07.2020 | ||
CZ | 01.07.2020 | ||
DK | 01.07.2020 | ||
EE | 01.07.2020 | ||
ES | 01.07.2020 | ||
FI | 01.07.2020 | ||
HR | 01.07.2020 | ||
IT | 01.07.2020 | ||
LT | 01.07.2020 | ||
LV | 01.07.2020 | ||
NL | 01.07.2020 | ||
PL | 01.07.2020 | ||
RO | 01.07.2020 | ||
RS | 01.07.2020 | ||
SE | 01.07.2020 | ||
SI | 01.07.2020 | ||
SK | 01.07.2020 | ||
SM | 01.07.2020 | ||
BG | 01.10.2020 | ||
NO | 01.10.2020 | ||
GR | 02.10.2020 | ||
IS | 01.11.2020 | ||
PT | 02.11.2020 | ||
Former [2021/28] | AL | 01.07.2020 | |
AT | 01.07.2020 | ||
CZ | 01.07.2020 | ||
DK | 01.07.2020 | ||
EE | 01.07.2020 | ||
ES | 01.07.2020 | ||
FI | 01.07.2020 | ||
HR | 01.07.2020 | ||
IT | 01.07.2020 | ||
LT | 01.07.2020 | ||
LV | 01.07.2020 | ||
NL | 01.07.2020 | ||
PL | 01.07.2020 | ||
RO | 01.07.2020 | ||
RS | 01.07.2020 | ||
SE | 01.07.2020 | ||
SK | 01.07.2020 | ||
SM | 01.07.2020 | ||
BG | 01.10.2020 | ||
NO | 01.10.2020 | ||
GR | 02.10.2020 | ||
IS | 01.11.2020 | ||
PT | 02.11.2020 | ||
Former [2021/25] | AL | 01.07.2020 | |
AT | 01.07.2020 | ||
CZ | 01.07.2020 | ||
DK | 01.07.2020 | ||
EE | 01.07.2020 | ||
ES | 01.07.2020 | ||
FI | 01.07.2020 | ||
HR | 01.07.2020 | ||
IT | 01.07.2020 | ||
LT | 01.07.2020 | ||
LV | 01.07.2020 | ||
NL | 01.07.2020 | ||
PL | 01.07.2020 | ||
RO | 01.07.2020 | ||
RS | 01.07.2020 | ||
SE | 01.07.2020 | ||
SM | 01.07.2020 | ||
BG | 01.10.2020 | ||
NO | 01.10.2020 | ||
GR | 02.10.2020 | ||
IS | 01.11.2020 | ||
PT | 02.11.2020 | ||
Former [2021/22] | AT | 01.07.2020 | |
CZ | 01.07.2020 | ||
DK | 01.07.2020 | ||
EE | 01.07.2020 | ||
ES | 01.07.2020 | ||
FI | 01.07.2020 | ||
HR | 01.07.2020 | ||
IT | 01.07.2020 | ||
LT | 01.07.2020 | ||
LV | 01.07.2020 | ||
NL | 01.07.2020 | ||
PL | 01.07.2020 | ||
RO | 01.07.2020 | ||
RS | 01.07.2020 | ||
SE | 01.07.2020 | ||
SM | 01.07.2020 | ||
BG | 01.10.2020 | ||
NO | 01.10.2020 | ||
GR | 02.10.2020 | ||
IS | 01.11.2020 | ||
PT | 02.11.2020 | ||
Former [2021/20] | AT | 01.07.2020 | |
CZ | 01.07.2020 | ||
DK | 01.07.2020 | ||
ES | 01.07.2020 | ||
FI | 01.07.2020 | ||
HR | 01.07.2020 | ||
IT | 01.07.2020 | ||
LT | 01.07.2020 | ||
LV | 01.07.2020 | ||
NL | 01.07.2020 | ||
PL | 01.07.2020 | ||
RS | 01.07.2020 | ||
SE | 01.07.2020 | ||
BG | 01.10.2020 | ||
NO | 01.10.2020 | ||
GR | 02.10.2020 | ||
IS | 01.11.2020 | ||
PT | 02.11.2020 | ||
Former [2021/17] | AT | 01.07.2020 | |
CZ | 01.07.2020 | ||
ES | 01.07.2020 | ||
FI | 01.07.2020 | ||
HR | 01.07.2020 | ||
LT | 01.07.2020 | ||
LV | 01.07.2020 | ||
NL | 01.07.2020 | ||
PL | 01.07.2020 | ||
RS | 01.07.2020 | ||
SE | 01.07.2020 | ||
BG | 01.10.2020 | ||
NO | 01.10.2020 | ||
GR | 02.10.2020 | ||
IS | 01.11.2020 | ||
PT | 02.11.2020 | ||
Former [2021/11] | AT | 01.07.2020 | |
CZ | 01.07.2020 | ||
ES | 01.07.2020 | ||
FI | 01.07.2020 | ||
HR | 01.07.2020 | ||
LT | 01.07.2020 | ||
LV | 01.07.2020 | ||
PL | 01.07.2020 | ||
RS | 01.07.2020 | ||
SE | 01.07.2020 | ||
BG | 01.10.2020 | ||
NO | 01.10.2020 | ||
GR | 02.10.2020 | ||
IS | 01.11.2020 | ||
PT | 02.11.2020 | ||
Former [2021/09] | AT | 01.07.2020 | |
CZ | 01.07.2020 | ||
ES | 01.07.2020 | ||
FI | 01.07.2020 | ||
LT | 01.07.2020 | ||
SE | 01.07.2020 | ||
BG | 01.10.2020 | ||
NO | 01.10.2020 | ||
GR | 02.10.2020 | ||
PT | 02.11.2020 | ||
Former [2021/08] | ES | 01.07.2020 | |
FI | 01.07.2020 | ||
LT | 01.07.2020 | ||
SE | 01.07.2020 | ||
BG | 01.10.2020 | ||
NO | 01.10.2020 | ||
PT | 02.11.2020 | ||
Former [2021/07] | FI | 01.07.2020 | |
LT | 01.07.2020 | ||
BG | 01.10.2020 | ||
NO | 01.10.2020 | ||
Former [2021/01] | BG | 01.10.2020 | Cited in | International search | [XAI]US4346428 (GALE EDWIN J) [X] 1,3,11 * column 3, line 31 - column 4, line 30; figures 1-4 * * column 4, line 58 - column 5, line 10 * [A] 4,8-10,12,13 [I] 6,7; | [A]US4659870 (JONES CONRAD D [GB]) [A] 1-13 * column 3, lines 9-57; figures 1-4 *; | [A]GB2204189 (STANTON PLC) [A] 1-13 * abstract *; | [A]DE4124968 (DEHN & SOEHNE [DE]) [A] 1-13 * column 3, line 25 - column 5, line 23; figures 1-3 *; | [A]EP1936251 (SNC [KR]) [A] 1-13* abstract *; | [XAI]US2009096209 (ZILCH THOMAS [US]) [X] 1,2,5,11 * paragraphs [0036] - [0038]; figure 7 * [A] 4,8-10,12,13 [I] 6,7; | [A]US2010025079 (FLYNN WILLIAM T [US]) [A] 1-13 * paragraphs [0008] - [0014]; figures 2-6 * | Examination | WO2015089592 |