blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3134581

EP3134581 - METHOD AND SOIL-STABILIZING MEANS [Right-click to bookmark this link]
Former [2017/09]METHOD AND SOIL-STABILIZING MEANS FOR PERMANENTLY STABILIZING FROST-EXPOSED FINE AND MIXED MINERAL SOILS FOR USE AS HIGH-LOAD-BEARING AND FROST-PROOF FOUNDATION, BASE, BEDDING AND FILLING LAYERS IN BUILDING AND ROAD CONSTRUCTION AND IN EARTHWORKS AND CIVIL ENGINEERING
[2018/03]
StatusNo opposition filed within time limit
Status updated on  22.03.2019
Database last updated on 19.10.2024
FormerThe patent has been granted
Status updated on  13.04.2018
FormerGrant of patent is intended
Status updated on  03.01.2018
FormerRequest for examination was made
Status updated on  27.01.2017
FormerThe international publication has been made
Status updated on  01.11.2016
Most recent event   Tooltip01.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 03.08.2022  [2022/31]
Applicant(s)For all designated states
Mikkelsen, Terje
Dybwadsgate 3
0367 Oslo / NO
[2017/09]
Inventor(s)01 / see applicant
...
 [2017/09]
Representative(s)Riebling, Peter
Patentanwalt
Postfach 31 60
88113 Lindau / DE
[N/P]
Former [2017/09]Riebling, Peter
Patentanwalt Postfach 31 60
88113 Lindau / DE
Application number, filing date15720257.328.03.2015
[2017/09]
WO2015EP00669
Priority number, dateDE2014100493605.04.2014         Original published format: DE102014004936
[2017/09]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report
No.:WO2015149924
Date:08.10.2015
Language:DE
[2015/40]
Type: A1 Application with search report 
No.:EP3134581
Date:01.03.2017
Language:DE
The application published by WIPO in one of the EPO official languages on 08.10.2015 takes the place of the publication of the European patent application.
[2017/09]
Type: B1 Patent specification 
No.:EP3134581
Date:16.05.2018
Language:DE
[2018/20]
Search report(s)International search report - published on:EP08.10.2015
ClassificationIPC:E02D3/12, E02D3/00
[2017/09]
CPC:
E02D3/00 (EP); E02D3/126 (EP)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2017/09]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
TitleGerman:VERFAHREN UND BODENSTABILISIERUNGSMITTEL[2018/03]
English:METHOD AND SOIL-STABILIZING MEANS[2018/03]
French:PROCÉDÉ ET AGENT DE STABILISATION DES SOLS[2018/03]
Former [2017/09]VERFAHREN UND BODENSTABILISIERUNGSMITTEL ZUR DAUERHAFTEN BODENVERFESTIGUNG VON FROSTGEFÄHRDETEN FEIN- UND GEMISCHTKÖRNIGEN MINERALBÖDEN ZUR VERWENDUNG ALS HOCHTRAGFÄHIGE UND FROSTSICHERE GRÜNDUNGS-, TRAG-, BETTUNGS- UND VERFÜLLSCHICHTEN IM HOCHBAU, IM STRASSEN- UND WEGEBAU UND IM ERD- UND TIEFBAU
Former [2017/09]METHOD AND SOIL-STABILIZING MEANS FOR PERMANENTLY STABILIZING FROST-EXPOSED FINE AND MIXED MINERAL SOILS FOR USE AS HIGH-LOAD-BEARING AND FROST-PROOF FOUNDATION, BASE, BEDDING AND FILLING LAYERS IN BUILDING AND ROAD CONSTRUCTION AND IN EARTHWORKS AND CIVIL ENGINEERING
Former [2017/09]PROCÉDÉ ET AGENT DE STABILISATION DES SOLS PERMETTANT LA STABILISATION DURABLE DE SOLS MINÉRAUX À GRAINS FINS ET À GRAINS MIXTES EXPOSÉS AU GEL ET DESTINÉS À ÊTRE UTILISÉS COMME COUCHES DE FONDATION, DE SUPPORT, DE POSE ET DE REMPLISSAGE À CAPACITÉ PORTANTE ÉLEVÉE ET RÉSISTANTES AU GEL DANS LA CONSTRUCTION IMMOBILIÈRE, DANS LA CONSTRUCTION DE ROUTES ET DE CHEMINS ET DANS LES TRAVAUX DE TERRASSEMENT ET LES TRAVAUX PUBLICS
Entry into regional phase13.01.2017National basic fee paid 
25.10.2016Designation fee(s) paid 
13.01.2017Examination fee paid 
Examination procedure25.10.2016Date on which the examining division has become responsible
deletedDeletion: Application deemed to be withdrawn, date of legal effect  [2017/09]
09.01.2017Despatch of communication that the application is deemed to be withdrawn, reason: filing fee / search fee not paid in time  [2017/09]
13.01.2017Examination requested  [2017/09]
27.07.2017Amendment by applicant (claims and/or description)
04.01.2018Communication of intention to grant the patent
21.02.2018Fee for grant paid
21.02.2018Fee for publishing/printing paid
03.04.2018Receipt of the translation of the claim(s)
Opposition(s)19.02.2019No opposition filed within time limit [2019/17]
Request for further processing for:The application is deemed to be withdrawn due to non-payment of the filing fee
13.01.2017Request for further processing filed
13.01.2017Full payment received (date of receipt of payment)
Request granted
01.02.2017Decision despatched
The application is deemed to be withdrawn due to non-payment of the examination fee
13.01.2017Request for further processing filed
13.01.2017Full payment received (date of receipt of payment)
Request granted
01.02.2017Decision despatched
13.01.2017Request for further processing filed
13.01.2017Full payment received (date of receipt of payment)
Request granted
01.02.2017Decision despatched
Fees paidRenewal fee
30.03.2017Renewal fee patent year 03
28.03.2018Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU28.03.2015
AL16.05.2018
CY16.05.2018
CZ16.05.2018
DK16.05.2018
EE16.05.2018
FI16.05.2018
HR16.05.2018
IT16.05.2018
LT16.05.2018
LV16.05.2018
MC16.05.2018
MK16.05.2018
MT16.05.2018
NL16.05.2018
RS16.05.2018
SE16.05.2018
SI16.05.2018
SK16.05.2018
SM16.05.2018
BG16.08.2018
GR17.08.2018
IS16.09.2018
PT17.09.2018
[2022/31]
Former [2021/32]HU28.03.2015
AL16.05.2018
CY16.05.2018
CZ16.05.2018
DK16.05.2018
EE16.05.2018
FI16.05.2018
HR16.05.2018
IT16.05.2018
LT16.05.2018
LV16.05.2018
MC16.05.2018
MT16.05.2018
NL16.05.2018
RS16.05.2018
SE16.05.2018
SI16.05.2018
SK16.05.2018
SM16.05.2018
BG16.08.2018
GR17.08.2018
IS16.09.2018
PT17.09.2018
Former [2021/31]AL16.05.2018
CY16.05.2018
CZ16.05.2018
DK16.05.2018
EE16.05.2018
FI16.05.2018
HR16.05.2018
IT16.05.2018
LT16.05.2018
LV16.05.2018
MC16.05.2018
MT16.05.2018
NL16.05.2018
RS16.05.2018
SE16.05.2018
SI16.05.2018
SK16.05.2018
SM16.05.2018
BG16.08.2018
GR17.08.2018
IS16.09.2018
PT17.09.2018
Former [2021/26]AL16.05.2018
CY16.05.2018
CZ16.05.2018
DK16.05.2018
EE16.05.2018
FI16.05.2018
HR16.05.2018
IT16.05.2018
LT16.05.2018
LV16.05.2018
MC16.05.2018
MT16.05.2018
NL16.05.2018
RS16.05.2018
SE16.05.2018
SI16.05.2018
SK16.05.2018
SM16.05.2018
BG16.08.2018
GR17.08.2018
PT17.09.2018
Former [2020/29]AL16.05.2018
CZ16.05.2018
DK16.05.2018
EE16.05.2018
FI16.05.2018
HR16.05.2018
IT16.05.2018
LT16.05.2018
LV16.05.2018
MC16.05.2018
MT16.05.2018
NL16.05.2018
RS16.05.2018
SE16.05.2018
SI16.05.2018
SK16.05.2018
SM16.05.2018
BG16.08.2018
GR17.08.2018
PT17.09.2018
Former [2019/51]AL16.05.2018
CZ16.05.2018
DK16.05.2018
EE16.05.2018
FI16.05.2018
HR16.05.2018
IT16.05.2018
LT16.05.2018
LV16.05.2018
MC16.05.2018
NL16.05.2018
RS16.05.2018
SE16.05.2018
SI16.05.2018
SK16.05.2018
SM16.05.2018
BG16.08.2018
GR17.08.2018
Former [2019/46]CZ16.05.2018
DK16.05.2018
EE16.05.2018
FI16.05.2018
HR16.05.2018
IT16.05.2018
LT16.05.2018
LV16.05.2018
MC16.05.2018
NL16.05.2018
RS16.05.2018
SE16.05.2018
SI16.05.2018
SK16.05.2018
SM16.05.2018
BG16.08.2018
GR17.08.2018
Former [2019/26]CZ16.05.2018
DK16.05.2018
EE16.05.2018
FI16.05.2018
HR16.05.2018
IT16.05.2018
LT16.05.2018
LV16.05.2018
NL16.05.2018
RS16.05.2018
SE16.05.2018
SI16.05.2018
SK16.05.2018
SM16.05.2018
BG16.08.2018
GR17.08.2018
Former [2019/12]CZ16.05.2018
DK16.05.2018
EE16.05.2018
FI16.05.2018
HR16.05.2018
IT16.05.2018
LT16.05.2018
LV16.05.2018
NL16.05.2018
RS16.05.2018
SE16.05.2018
SK16.05.2018
SM16.05.2018
BG16.08.2018
GR17.08.2018
Former [2019/10]CZ16.05.2018
DK16.05.2018
EE16.05.2018
FI16.05.2018
HR16.05.2018
LT16.05.2018
LV16.05.2018
NL16.05.2018
RS16.05.2018
SE16.05.2018
SK16.05.2018
BG16.08.2018
GR17.08.2018
Former [2019/09]DK16.05.2018
EE16.05.2018
FI16.05.2018
HR16.05.2018
LT16.05.2018
LV16.05.2018
NL16.05.2018
RS16.05.2018
SE16.05.2018
BG16.08.2018
GR17.08.2018
Former [2019/08]DK16.05.2018
FI16.05.2018
HR16.05.2018
LT16.05.2018
LV16.05.2018
NL16.05.2018
RS16.05.2018
SE16.05.2018
BG16.08.2018
GR17.08.2018
Former [2018/52]FI16.05.2018
HR16.05.2018
LT16.05.2018
LV16.05.2018
NL16.05.2018
RS16.05.2018
SE16.05.2018
BG16.08.2018
GR17.08.2018
Former [2018/51]FI16.05.2018
HR16.05.2018
LT16.05.2018
LV16.05.2018
RS16.05.2018
SE16.05.2018
BG16.08.2018
Former [2018/50]FI16.05.2018
HR16.05.2018
LT16.05.2018
SE16.05.2018
BG16.08.2018
Former [2018/49]FI16.05.2018
LT16.05.2018
SE16.05.2018
BG16.08.2018
Former [2018/47]FI16.05.2018
LT16.05.2018
Cited inInternational search[X]DE2633749  (LATTA JUN) [X] 1-7,11 * page 5 - page 28 *;
 [A]EP0135478  (PLANA ENG AG [CH]) [A] 1* the whole document *;
 [X]DE102004031039  (SILVER CAY WORLDWIDE CORP [BS]) [X] 1-5,11 * page 2, paragraph 1 - page 8, paragraph 1 *;
 [A]WO2005121277  (MUTHER CHRISTOPH [CH]) [A] 1-11 * abstract *
by applicantDE2633749
 DE4428269
 DE19509085
 WO9628505
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.