EP3169515 - FILM FOR AIRBAG APPLICATIONS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 29.10.2021 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 20.11.2020 | ||
Former | Grant of patent is intended Status updated on 10.09.2020 | ||
Former | Examination is in progress Status updated on 24.11.2017 | ||
Former | Request for examination was made Status updated on 21.04.2017 | ||
Former | The international publication has been made Status updated on 09.12.2016 | Most recent event Tooltip | 06.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 09.10.2024 [2024/41] | Applicant(s) | For all designated states Benecke-Kaliko AG Beneckeallee 40 30419 Hannover / DE | [2017/21] | Inventor(s) | 01 /
HÜLSEWEDE, Volker In den Wintergärten 12 73114 Schlat / DE | 02 /
MANI, Joseph Vogelgartenstr. 15 73054 Eislingen / DE | 03 /
MALNER, Thomas Georg Böhringerweg 50 73033 Göppingen / DE | 04 /
BÜHRING, Jürgen Im Winkel 2 30900 Wedemark / DE | [2017/21] | Representative(s) | Kilsch, Armin Ralph Continental Aktiengesellschaft Patente und Lizenzen Postfach 169 30001 Hannover / DE | [2017/21] | Application number, filing date | 15722528.5 | 13.05.2015 | [2017/21] | WO2015EP60573 | Priority number, date | DE201410213974 | 17.07.2014 Original published format: DE102014213974 | [2017/21] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | WO2016008613 | Date: | 21.01.2016 | Language: | DE | [2016/03] | Type: | A1 Application with search report | No.: | EP3169515 | Date: | 24.05.2017 | Language: | DE | The application published by WIPO in one of the EPO official languages on 21.01.2016 takes the place of the publication of the European patent application. | [2017/21] | Type: | B1 Patent specification | No.: | EP3169515 | Date: | 23.12.2020 | Language: | DE | [2020/52] | Search report(s) | International search report - published on: | EP | 21.01.2016 | Classification | IPC: | B32B5/18, B32B27/32, B32B27/08, B32B27/36 | [2017/21] | CPC: |
B32B5/18 (EP,CN,US);
B32B27/065 (US);
B32B27/08 (EP,CN,US);
B32B27/304 (US);
B32B27/32 (EP,CN,US);
B32B27/36 (EP,CN,US);
B32B27/40 (US);
B60R21/215 (US);
B32B2250/02 (US);
B32B2250/24 (US);
B32B2255/102 (US);
B32B2255/26 (US);
B32B2266/0235 (US);
B32B2266/025 (US);
B32B2266/0278 (US);
B32B2307/308 (US);
B32B2571/00 (US);
B32B2605/00 (US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/21] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | Title | German: | FOLIE FÜR AIRBAGANWENDUNGEN | [2017/21] | English: | FILM FOR AIRBAG APPLICATIONS | [2017/21] | French: | FEUILLE POUR APPLICATION AUX SACS GONFLABLES | [2017/21] | Entry into regional phase | 17.02.2017 | National basic fee paid | 17.02.2017 | Designation fee(s) paid | 17.02.2017 | Examination fee paid | Examination procedure | 09.12.2016 | Date on which the examining division has become responsible | 17.02.2017 | Examination requested [2017/21] | 24.08.2017 | Amendment by applicant (claims and/or description) | 24.11.2017 | Despatch of a communication from the examining division (Time limit: M02) | 31.01.2018 | Reply to a communication from the examining division | 19.02.2018 | Despatch of a communication from the examining division (Time limit: M02) | 23.04.2018 | Reply to a communication from the examining division | 11.09.2020 | Communication of intention to grant the patent | 11.11.2020 | Fee for grant paid | 11.11.2020 | Fee for publishing/printing paid | 11.11.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 24.09.2021 | No opposition filed within time limit [2021/48] | Fees paid | Renewal fee | 31.05.2017 | Renewal fee patent year 03 | 01.06.2018 | Renewal fee patent year 04 | 31.05.2019 | Renewal fee patent year 05 | 02.06.2020 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 13.05.2015 | AL | 23.12.2020 | CY | 23.12.2020 | CZ | 23.12.2020 | DK | 23.12.2020 | EE | 23.12.2020 | ES | 23.12.2020 | FI | 23.12.2020 | HR | 23.12.2020 | IT | 23.12.2020 | LT | 23.12.2020 | LV | 23.12.2020 | MC | 23.12.2020 | MK | 23.12.2020 | MT | 23.12.2020 | NL | 23.12.2020 | PL | 23.12.2020 | RO | 23.12.2020 | RS | 23.12.2020 | SE | 23.12.2020 | SI | 23.12.2020 | SK | 23.12.2020 | SM | 23.12.2020 | BG | 23.03.2021 | NO | 23.03.2021 | GR | 24.03.2021 | IS | 23.04.2021 | PT | 23.04.2021 | AT | 13.05.2021 | IE | 13.05.2021 | LU | 13.05.2021 | BE | 31.05.2021 | CH | 31.05.2021 | LI | 31.05.2021 | [2024/41] |
Former [2024/22] | HU | 13.05.2015 | |
AL | 23.12.2020 | ||
CY | 23.12.2020 | ||
CZ | 23.12.2020 | ||
DK | 23.12.2020 | ||
EE | 23.12.2020 | ||
ES | 23.12.2020 | ||
FI | 23.12.2020 | ||
HR | 23.12.2020 | ||
IT | 23.12.2020 | ||
LT | 23.12.2020 | ||
LV | 23.12.2020 | ||
MC | 23.12.2020 | ||
MK | 23.12.2020 | ||
NL | 23.12.2020 | ||
PL | 23.12.2020 | ||
RO | 23.12.2020 | ||
RS | 23.12.2020 | ||
SE | 23.12.2020 | ||
SI | 23.12.2020 | ||
SK | 23.12.2020 | ||
SM | 23.12.2020 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
IS | 23.04.2021 | ||
PT | 23.04.2021 | ||
AT | 13.05.2021 | ||
IE | 13.05.2021 | ||
LU | 13.05.2021 | ||
BE | 31.05.2021 | ||
CH | 31.05.2021 | ||
LI | 31.05.2021 | ||
Former [2023/30] | HU | 13.05.2015 | |
AL | 23.12.2020 | ||
CY | 23.12.2020 | ||
CZ | 23.12.2020 | ||
DK | 23.12.2020 | ||
EE | 23.12.2020 | ||
ES | 23.12.2020 | ||
FI | 23.12.2020 | ||
HR | 23.12.2020 | ||
IT | 23.12.2020 | ||
LT | 23.12.2020 | ||
LV | 23.12.2020 | ||
MC | 23.12.2020 | ||
NL | 23.12.2020 | ||
PL | 23.12.2020 | ||
RO | 23.12.2020 | ||
RS | 23.12.2020 | ||
SE | 23.12.2020 | ||
SI | 23.12.2020 | ||
SK | 23.12.2020 | ||
SM | 23.12.2020 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
IS | 23.04.2021 | ||
PT | 23.04.2021 | ||
AT | 13.05.2021 | ||
IE | 13.05.2021 | ||
LU | 13.05.2021 | ||
BE | 31.05.2021 | ||
CH | 31.05.2021 | ||
LI | 31.05.2021 | ||
Former [2023/28] | HU | 13.05.2015 | |
AL | 23.12.2020 | ||
CZ | 23.12.2020 | ||
DK | 23.12.2020 | ||
EE | 23.12.2020 | ||
ES | 23.12.2020 | ||
FI | 23.12.2020 | ||
HR | 23.12.2020 | ||
IT | 23.12.2020 | ||
LT | 23.12.2020 | ||
LV | 23.12.2020 | ||
MC | 23.12.2020 | ||
NL | 23.12.2020 | ||
PL | 23.12.2020 | ||
RO | 23.12.2020 | ||
RS | 23.12.2020 | ||
SE | 23.12.2020 | ||
SI | 23.12.2020 | ||
SK | 23.12.2020 | ||
SM | 23.12.2020 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
IS | 23.04.2021 | ||
PT | 23.04.2021 | ||
AT | 13.05.2021 | ||
IE | 13.05.2021 | ||
LU | 13.05.2021 | ||
BE | 31.05.2021 | ||
CH | 31.05.2021 | ||
LI | 31.05.2021 | ||
Former [2022/37] | AL | 23.12.2020 | |
CZ | 23.12.2020 | ||
DK | 23.12.2020 | ||
EE | 23.12.2020 | ||
ES | 23.12.2020 | ||
FI | 23.12.2020 | ||
HR | 23.12.2020 | ||
IT | 23.12.2020 | ||
LT | 23.12.2020 | ||
LV | 23.12.2020 | ||
MC | 23.12.2020 | ||
NL | 23.12.2020 | ||
PL | 23.12.2020 | ||
RO | 23.12.2020 | ||
RS | 23.12.2020 | ||
SE | 23.12.2020 | ||
SI | 23.12.2020 | ||
SK | 23.12.2020 | ||
SM | 23.12.2020 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
IS | 23.04.2021 | ||
PT | 23.04.2021 | ||
AT | 13.05.2021 | ||
IE | 13.05.2021 | ||
LU | 13.05.2021 | ||
BE | 31.05.2021 | ||
CH | 31.05.2021 | ||
LI | 31.05.2021 | ||
Former [2022/34] | AL | 23.12.2020 | |
CZ | 23.12.2020 | ||
DK | 23.12.2020 | ||
EE | 23.12.2020 | ||
ES | 23.12.2020 | ||
FI | 23.12.2020 | ||
HR | 23.12.2020 | ||
IT | 23.12.2020 | ||
LT | 23.12.2020 | ||
LV | 23.12.2020 | ||
MC | 23.12.2020 | ||
NL | 23.12.2020 | ||
PL | 23.12.2020 | ||
RO | 23.12.2020 | ||
RS | 23.12.2020 | ||
SE | 23.12.2020 | ||
SI | 23.12.2020 | ||
SK | 23.12.2020 | ||
SM | 23.12.2020 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
IS | 23.04.2021 | ||
PT | 23.04.2021 | ||
IE | 13.05.2021 | ||
LU | 13.05.2021 | ||
BE | 31.05.2021 | ||
CH | 31.05.2021 | ||
LI | 31.05.2021 | ||
Former [2022/23] | AL | 23.12.2020 | |
CZ | 23.12.2020 | ||
DK | 23.12.2020 | ||
EE | 23.12.2020 | ||
ES | 23.12.2020 | ||
FI | 23.12.2020 | ||
HR | 23.12.2020 | ||
IT | 23.12.2020 | ||
LT | 23.12.2020 | ||
LV | 23.12.2020 | ||
MC | 23.12.2020 | ||
NL | 23.12.2020 | ||
PL | 23.12.2020 | ||
RO | 23.12.2020 | ||
RS | 23.12.2020 | ||
SE | 23.12.2020 | ||
SI | 23.12.2020 | ||
SK | 23.12.2020 | ||
SM | 23.12.2020 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
IS | 23.04.2021 | ||
PT | 23.04.2021 | ||
IE | 13.05.2021 | ||
LU | 13.05.2021 | ||
CH | 31.05.2021 | ||
LI | 31.05.2021 | ||
Former [2022/21] | AL | 23.12.2020 | |
CZ | 23.12.2020 | ||
DK | 23.12.2020 | ||
EE | 23.12.2020 | ||
ES | 23.12.2020 | ||
FI | 23.12.2020 | ||
HR | 23.12.2020 | ||
IT | 23.12.2020 | ||
LT | 23.12.2020 | ||
LV | 23.12.2020 | ||
MC | 23.12.2020 | ||
NL | 23.12.2020 | ||
PL | 23.12.2020 | ||
RO | 23.12.2020 | ||
RS | 23.12.2020 | ||
SE | 23.12.2020 | ||
SI | 23.12.2020 | ||
SK | 23.12.2020 | ||
SM | 23.12.2020 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
PT | 23.04.2021 | ||
IE | 13.05.2021 | ||
LU | 13.05.2021 | ||
CH | 31.05.2021 | ||
LI | 31.05.2021 | ||
Former [2022/11] | AL | 23.12.2020 | |
CZ | 23.12.2020 | ||
DK | 23.12.2020 | ||
EE | 23.12.2020 | ||
ES | 23.12.2020 | ||
FI | 23.12.2020 | ||
HR | 23.12.2020 | ||
IT | 23.12.2020 | ||
LT | 23.12.2020 | ||
LV | 23.12.2020 | ||
MC | 23.12.2020 | ||
NL | 23.12.2020 | ||
PL | 23.12.2020 | ||
RO | 23.12.2020 | ||
RS | 23.12.2020 | ||
SE | 23.12.2020 | ||
SI | 23.12.2020 | ||
SK | 23.12.2020 | ||
SM | 23.12.2020 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
PT | 23.04.2021 | ||
LU | 13.05.2021 | ||
CH | 31.05.2021 | ||
LI | 31.05.2021 | ||
Former [2022/10] | AL | 23.12.2020 | |
CZ | 23.12.2020 | ||
DK | 23.12.2020 | ||
EE | 23.12.2020 | ||
ES | 23.12.2020 | ||
FI | 23.12.2020 | ||
HR | 23.12.2020 | ||
IT | 23.12.2020 | ||
LT | 23.12.2020 | ||
LV | 23.12.2020 | ||
MC | 23.12.2020 | ||
NL | 23.12.2020 | ||
PL | 23.12.2020 | ||
RO | 23.12.2020 | ||
RS | 23.12.2020 | ||
SE | 23.12.2020 | ||
SK | 23.12.2020 | ||
SM | 23.12.2020 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
PT | 23.04.2021 | ||
LU | 13.05.2021 | ||
CH | 31.05.2021 | ||
LI | 31.05.2021 | ||
Former [2022/09] | AL | 23.12.2020 | |
CZ | 23.12.2020 | ||
DK | 23.12.2020 | ||
EE | 23.12.2020 | ||
ES | 23.12.2020 | ||
FI | 23.12.2020 | ||
HR | 23.12.2020 | ||
IT | 23.12.2020 | ||
LT | 23.12.2020 | ||
LV | 23.12.2020 | ||
MC | 23.12.2020 | ||
NL | 23.12.2020 | ||
PL | 23.12.2020 | ||
RO | 23.12.2020 | ||
RS | 23.12.2020 | ||
SE | 23.12.2020 | ||
SK | 23.12.2020 | ||
SM | 23.12.2020 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
IS | 23.04.2021 | ||
PT | 23.04.2021 | ||
LU | 13.05.2021 | ||
Former [2022/07] | AL | 23.12.2020 | |
CZ | 23.12.2020 | ||
DK | 23.12.2020 | ||
EE | 23.12.2020 | ||
ES | 23.12.2020 | ||
FI | 23.12.2020 | ||
HR | 23.12.2020 | ||
IT | 23.12.2020 | ||
LT | 23.12.2020 | ||
LV | 23.12.2020 | ||
MC | 23.12.2020 | ||
NL | 23.12.2020 | ||
PL | 23.12.2020 | ||
RO | 23.12.2020 | ||
RS | 23.12.2020 | ||
SE | 23.12.2020 | ||
SK | 23.12.2020 | ||
SM | 23.12.2020 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
IS | 23.04.2021 | ||
PT | 23.04.2021 | ||
Former [2021/51] | AL | 23.12.2020 | |
CZ | 23.12.2020 | ||
DK | 23.12.2020 | ||
EE | 23.12.2020 | ||
ES | 23.12.2020 | ||
FI | 23.12.2020 | ||
HR | 23.12.2020 | ||
IT | 23.12.2020 | ||
LT | 23.12.2020 | ||
LV | 23.12.2020 | ||
NL | 23.12.2020 | ||
PL | 23.12.2020 | ||
RO | 23.12.2020 | ||
RS | 23.12.2020 | ||
SE | 23.12.2020 | ||
SK | 23.12.2020 | ||
SM | 23.12.2020 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
IS | 23.04.2021 | ||
PT | 23.04.2021 | ||
Former [2021/49] | AL | 23.12.2020 | |
CZ | 23.12.2020 | ||
DK | 23.12.2020 | ||
EE | 23.12.2020 | ||
FI | 23.12.2020 | ||
HR | 23.12.2020 | ||
IT | 23.12.2020 | ||
LT | 23.12.2020 | ||
LV | 23.12.2020 | ||
NL | 23.12.2020 | ||
PL | 23.12.2020 | ||
RO | 23.12.2020 | ||
RS | 23.12.2020 | ||
SE | 23.12.2020 | ||
SK | 23.12.2020 | ||
SM | 23.12.2020 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
IS | 23.04.2021 | ||
PT | 23.04.2021 | ||
Former [2021/48] | AL | 23.12.2020 | |
CZ | 23.12.2020 | ||
EE | 23.12.2020 | ||
FI | 23.12.2020 | ||
HR | 23.12.2020 | ||
IT | 23.12.2020 | ||
LT | 23.12.2020 | ||
LV | 23.12.2020 | ||
NL | 23.12.2020 | ||
PL | 23.12.2020 | ||
RO | 23.12.2020 | ||
RS | 23.12.2020 | ||
SE | 23.12.2020 | ||
SK | 23.12.2020 | ||
SM | 23.12.2020 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
IS | 23.04.2021 | ||
PT | 23.04.2021 | ||
Former [2021/45] | AL | 23.12.2020 | |
CZ | 23.12.2020 | ||
EE | 23.12.2020 | ||
FI | 23.12.2020 | ||
HR | 23.12.2020 | ||
LT | 23.12.2020 | ||
LV | 23.12.2020 | ||
NL | 23.12.2020 | ||
PL | 23.12.2020 | ||
RO | 23.12.2020 | ||
RS | 23.12.2020 | ||
SE | 23.12.2020 | ||
SK | 23.12.2020 | ||
SM | 23.12.2020 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
IS | 23.04.2021 | ||
PT | 23.04.2021 | ||
Former [2021/42] | CZ | 23.12.2020 | |
EE | 23.12.2020 | ||
FI | 23.12.2020 | ||
HR | 23.12.2020 | ||
LT | 23.12.2020 | ||
LV | 23.12.2020 | ||
NL | 23.12.2020 | ||
PL | 23.12.2020 | ||
RO | 23.12.2020 | ||
RS | 23.12.2020 | ||
SE | 23.12.2020 | ||
SK | 23.12.2020 | ||
SM | 23.12.2020 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
IS | 23.04.2021 | ||
PT | 23.04.2021 | ||
Former [2021/39] | CZ | 23.12.2020 | |
EE | 23.12.2020 | ||
FI | 23.12.2020 | ||
HR | 23.12.2020 | ||
LT | 23.12.2020 | ||
LV | 23.12.2020 | ||
NL | 23.12.2020 | ||
PL | 23.12.2020 | ||
RO | 23.12.2020 | ||
RS | 23.12.2020 | ||
SE | 23.12.2020 | ||
SK | 23.12.2020 | ||
SM | 23.12.2020 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
PT | 23.04.2021 | ||
Former [2021/36] | CZ | 23.12.2020 | |
EE | 23.12.2020 | ||
FI | 23.12.2020 | ||
HR | 23.12.2020 | ||
LT | 23.12.2020 | ||
LV | 23.12.2020 | ||
NL | 23.12.2020 | ||
RO | 23.12.2020 | ||
RS | 23.12.2020 | ||
SE | 23.12.2020 | ||
SK | 23.12.2020 | ||
SM | 23.12.2020 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
PT | 23.04.2021 | ||
Former [2021/35] | CZ | 23.12.2020 | |
FI | 23.12.2020 | ||
HR | 23.12.2020 | ||
LT | 23.12.2020 | ||
LV | 23.12.2020 | ||
NL | 23.12.2020 | ||
RO | 23.12.2020 | ||
RS | 23.12.2020 | ||
SE | 23.12.2020 | ||
SK | 23.12.2020 | ||
SM | 23.12.2020 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
PT | 23.04.2021 | ||
Former [2021/34] | CZ | 23.12.2020 | |
FI | 23.12.2020 | ||
HR | 23.12.2020 | ||
LT | 23.12.2020 | ||
LV | 23.12.2020 | ||
NL | 23.12.2020 | ||
RS | 23.12.2020 | ||
SE | 23.12.2020 | ||
SM | 23.12.2020 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
PT | 23.04.2021 | ||
Former [2021/33] | FI | 23.12.2020 | |
HR | 23.12.2020 | ||
LT | 23.12.2020 | ||
LV | 23.12.2020 | ||
NL | 23.12.2020 | ||
RS | 23.12.2020 | ||
SE | 23.12.2020 | ||
SM | 23.12.2020 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
PT | 23.04.2021 | ||
Former [2021/32] | FI | 23.12.2020 | |
HR | 23.12.2020 | ||
LV | 23.12.2020 | ||
NL | 23.12.2020 | ||
RS | 23.12.2020 | ||
SE | 23.12.2020 | ||
SM | 23.12.2020 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
Former [2021/30] | FI | 23.12.2020 | |
HR | 23.12.2020 | ||
LV | 23.12.2020 | ||
NL | 23.12.2020 | ||
RS | 23.12.2020 | ||
SE | 23.12.2020 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
Former [2021/28] | FI | 23.12.2020 | |
HR | 23.12.2020 | ||
LV | 23.12.2020 | ||
RS | 23.12.2020 | ||
SE | 23.12.2020 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
Former [2021/23] | FI | 23.12.2020 | |
LV | 23.12.2020 | ||
RS | 23.12.2020 | ||
SE | 23.12.2020 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
Former [2021/22] | FI | 23.12.2020 | |
RS | 23.12.2020 | ||
NO | 23.03.2021 | ||
Former [2021/20] | FI | 23.12.2020 | Cited in | International search | [XI]EP2161125 (BAYER MATERIALSCIENCE AG [DE], et al) [X] 1,13 * claims 1,19 * * paragraph [0038] - paragraph [0041] * [I] 1-14; | [AD]WO2012100880 (BENECKE KALIKO AG [DE], et al) [AD] 1* claim 1 * | Examination | DE10164761 |