EP3289796 - LOW ACCESS PRIORITY CAPABILITY CONTROL [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 14.04.2023 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 06.05.2022 | ||
Former | Grant of patent is intended Status updated on 09.03.2022 | ||
Former | Examination is in progress Status updated on 04.05.2020 | ||
Former | Request for examination was made Status updated on 02.02.2018 | ||
Former | The international publication has been made Status updated on 04.11.2016 | Most recent event Tooltip | 09.02.2024 | Lapse of the patent in a contracting state New state(s): IT | published on 13.03.2024 [2024/11] | Applicant(s) | For all designated states Telefonaktiebolaget LM Ericsson (publ) 164 83 Stockholm / SE | [2022/23] |
Former [2018/10] | For all designated states Telefonaktiebolaget LM Ericsson (publ) 164 83 Stockholm / SE | Inventor(s) | 01 /
CASTRO CASTRO, Fabian Rua Azor, 1 15178 Arillo/Oleiros/ A Coruña / ES | 02 /
FERNANDEZ ALONSO, Susana C/ Ibiza 60 1D 28009 Madrid / ES | [2018/10] | Representative(s) | Zacco Sweden AB P.O. Box 5581 Löjtnantsgatan 21 114 85 Stockholm / SE | [2022/23] |
Former [2018/10] | Hoffmann Eitle Patent- und Rechtsanwälte PartmbB Arabellastraße 30 81925 München / DE | Application number, filing date | 15723153.1 | 29.04.2015 | [2018/10] | WO2015EP59327 | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2016173642 | Date: | 03.11.2016 | Language: | EN | [2016/44] | Type: | A1 Application with search report | No.: | EP3289796 | Date: | 07.03.2018 | Language: | EN | The application published by WIPO in one of the EPO official languages on 03.11.2016 takes the place of the publication of the European patent application. | [2018/10] | Type: | B1 Patent specification | No.: | EP3289796 | Date: | 08.06.2022 | Language: | EN | [2022/23] | Search report(s) | International search report - published on: | EP | 03.11.2016 | Classification | IPC: | H04W28/02, // H04L47/24, H04L67/61 | [2022/12] | CPC: |
H04W28/0215 (EP,US);
H04W76/18 (US);
H04L47/2458 (EP,US);
H04W8/18 (US);
H04L67/61 (EP,US);
H04M15/66 (US);
H04M15/8022 (US)
(-)
|
Former IPC [2018/10] | H04W28/02, H04L29/08, H04L12/833 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/10] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | Title | German: | FÄHIGKEITSSTEUERUNG MIT GERINGER ZUGRIFFSPRIORITÄT | [2018/10] | English: | LOW ACCESS PRIORITY CAPABILITY CONTROL | [2018/10] | French: | COMMANDE DE CAPACITÉ À PRIORITÉ D'ACCÈS BASSE | [2018/10] | Entry into regional phase | 04.10.2017 | National basic fee paid | 04.10.2017 | Designation fee(s) paid | 04.10.2017 | Examination fee paid | Examination procedure | 04.10.2017 | Examination requested [2018/10] | 04.10.2017 | Date on which the examining division has become responsible | 04.06.2018 | Amendment by applicant (claims and/or description) | 08.05.2020 | Despatch of a communication from the examining division (Time limit: M06) | 06.11.2020 | Reply to a communication from the examining division | 24.03.2021 | Despatch of a communication from the examining division (Time limit: M04) | 02.07.2021 | Reply to a communication from the examining division | 10.03.2022 | Communication of intention to grant the patent | 05.04.2022 | Fee for grant paid | 05.04.2022 | Fee for publishing/printing paid | 05.04.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 10.03.2023 | No opposition filed within time limit [2023/20] | Fees paid | Renewal fee | 30.10.2017 | Renewal fee patent year 03 | 27.04.2018 | Renewal fee patent year 04 | 29.04.2019 | Renewal fee patent year 05 | 27.04.2020 | Renewal fee patent year 06 | 27.04.2021 | Renewal fee patent year 07 | 27.04.2022 | Renewal fee patent year 08 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AL | 08.06.2022 | AT | 08.06.2022 | CZ | 08.06.2022 | DK | 08.06.2022 | EE | 08.06.2022 | ES | 08.06.2022 | FI | 08.06.2022 | HR | 08.06.2022 | IT | 08.06.2022 | LT | 08.06.2022 | LV | 08.06.2022 | MC | 08.06.2022 | NL | 08.06.2022 | PL | 08.06.2022 | RO | 08.06.2022 | RS | 08.06.2022 | SE | 08.06.2022 | SI | 08.06.2022 | SK | 08.06.2022 | SM | 08.06.2022 | BG | 08.09.2022 | NO | 08.09.2022 | GR | 09.09.2022 | IS | 08.10.2022 | PT | 10.10.2022 | [2024/11] |
Former [2024/08] | AL | 08.06.2022 | |
AT | 08.06.2022 | ||
CZ | 08.06.2022 | ||
DK | 08.06.2022 | ||
EE | 08.06.2022 | ||
ES | 08.06.2022 | ||
FI | 08.06.2022 | ||
HR | 08.06.2022 | ||
LT | 08.06.2022 | ||
LV | 08.06.2022 | ||
MC | 08.06.2022 | ||
NL | 08.06.2022 | ||
PL | 08.06.2022 | ||
RO | 08.06.2022 | ||
RS | 08.06.2022 | ||
SE | 08.06.2022 | ||
SI | 08.06.2022 | ||
SK | 08.06.2022 | ||
SM | 08.06.2022 | ||
BG | 08.09.2022 | ||
NO | 08.09.2022 | ||
GR | 09.09.2022 | ||
IS | 08.10.2022 | ||
PT | 10.10.2022 | ||
Former [2023/25] | AL | 08.06.2022 | |
AT | 08.06.2022 | ||
CZ | 08.06.2022 | ||
DK | 08.06.2022 | ||
EE | 08.06.2022 | ||
ES | 08.06.2022 | ||
FI | 08.06.2022 | ||
HR | 08.06.2022 | ||
LT | 08.06.2022 | ||
LV | 08.06.2022 | ||
NL | 08.06.2022 | ||
PL | 08.06.2022 | ||
RO | 08.06.2022 | ||
RS | 08.06.2022 | ||
SE | 08.06.2022 | ||
SI | 08.06.2022 | ||
SK | 08.06.2022 | ||
SM | 08.06.2022 | ||
BG | 08.09.2022 | ||
NO | 08.09.2022 | ||
GR | 09.09.2022 | ||
IS | 08.10.2022 | ||
PT | 10.10.2022 | ||
Former [2023/21] | AL | 08.06.2022 | |
AT | 08.06.2022 | ||
CZ | 08.06.2022 | ||
DK | 08.06.2022 | ||
EE | 08.06.2022 | ||
ES | 08.06.2022 | ||
FI | 08.06.2022 | ||
HR | 08.06.2022 | ||
LT | 08.06.2022 | ||
LV | 08.06.2022 | ||
NL | 08.06.2022 | ||
PL | 08.06.2022 | ||
RO | 08.06.2022 | ||
RS | 08.06.2022 | ||
SE | 08.06.2022 | ||
SK | 08.06.2022 | ||
SM | 08.06.2022 | ||
BG | 08.09.2022 | ||
NO | 08.09.2022 | ||
GR | 09.09.2022 | ||
IS | 08.10.2022 | ||
PT | 10.10.2022 | ||
Former [2023/17] | AL | 08.06.2022 | |
AT | 08.06.2022 | ||
CZ | 08.06.2022 | ||
EE | 08.06.2022 | ||
ES | 08.06.2022 | ||
FI | 08.06.2022 | ||
HR | 08.06.2022 | ||
LT | 08.06.2022 | ||
LV | 08.06.2022 | ||
NL | 08.06.2022 | ||
PL | 08.06.2022 | ||
RO | 08.06.2022 | ||
RS | 08.06.2022 | ||
SE | 08.06.2022 | ||
SK | 08.06.2022 | ||
SM | 08.06.2022 | ||
BG | 08.09.2022 | ||
NO | 08.09.2022 | ||
GR | 09.09.2022 | ||
IS | 08.10.2022 | ||
PT | 10.10.2022 | ||
Former [2023/12] | AT | 08.06.2022 | |
CZ | 08.06.2022 | ||
EE | 08.06.2022 | ||
ES | 08.06.2022 | ||
FI | 08.06.2022 | ||
HR | 08.06.2022 | ||
LT | 08.06.2022 | ||
LV | 08.06.2022 | ||
NL | 08.06.2022 | ||
PL | 08.06.2022 | ||
RO | 08.06.2022 | ||
RS | 08.06.2022 | ||
SE | 08.06.2022 | ||
SK | 08.06.2022 | ||
SM | 08.06.2022 | ||
BG | 08.09.2022 | ||
NO | 08.09.2022 | ||
GR | 09.09.2022 | ||
IS | 08.10.2022 | ||
PT | 10.10.2022 | ||
Former [2023/11] | AT | 08.06.2022 | |
CZ | 08.06.2022 | ||
EE | 08.06.2022 | ||
ES | 08.06.2022 | ||
FI | 08.06.2022 | ||
HR | 08.06.2022 | ||
LT | 08.06.2022 | ||
LV | 08.06.2022 | ||
NL | 08.06.2022 | ||
PL | 08.06.2022 | ||
RO | 08.06.2022 | ||
RS | 08.06.2022 | ||
SE | 08.06.2022 | ||
SK | 08.06.2022 | ||
SM | 08.06.2022 | ||
BG | 08.09.2022 | ||
NO | 08.09.2022 | ||
GR | 09.09.2022 | ||
PT | 10.10.2022 | ||
Former [2023/09] | AT | 08.06.2022 | |
CZ | 08.06.2022 | ||
EE | 08.06.2022 | ||
ES | 08.06.2022 | ||
FI | 08.06.2022 | ||
HR | 08.06.2022 | ||
LT | 08.06.2022 | ||
LV | 08.06.2022 | ||
NL | 08.06.2022 | ||
RO | 08.06.2022 | ||
RS | 08.06.2022 | ||
SE | 08.06.2022 | ||
SK | 08.06.2022 | ||
SM | 08.06.2022 | ||
BG | 08.09.2022 | ||
NO | 08.09.2022 | ||
GR | 09.09.2022 | ||
PT | 10.10.2022 | ||
Former [2023/07] | AT | 08.06.2022 | |
ES | 08.06.2022 | ||
FI | 08.06.2022 | ||
HR | 08.06.2022 | ||
LT | 08.06.2022 | ||
LV | 08.06.2022 | ||
NL | 08.06.2022 | ||
RS | 08.06.2022 | ||
SE | 08.06.2022 | ||
BG | 08.09.2022 | ||
NO | 08.09.2022 | ||
GR | 09.09.2022 | ||
Former [2023/02] | ES | 08.06.2022 | |
FI | 08.06.2022 | ||
HR | 08.06.2022 | ||
LT | 08.06.2022 | ||
LV | 08.06.2022 | ||
NL | 08.06.2022 | ||
RS | 08.06.2022 | ||
SE | 08.06.2022 | ||
BG | 08.09.2022 | ||
NO | 08.09.2022 | ||
GR | 09.09.2022 | ||
Former [2022/50] | ES | 08.06.2022 | |
FI | 08.06.2022 | ||
HR | 08.06.2022 | ||
LT | 08.06.2022 | ||
LV | 08.06.2022 | ||
RS | 08.06.2022 | ||
SE | 08.06.2022 | ||
BG | 08.09.2022 | ||
NO | 08.09.2022 | ||
GR | 09.09.2022 | ||
Former [2022/49] | ES | 08.06.2022 | |
FI | 08.06.2022 | ||
HR | 08.06.2022 | ||
LT | 08.06.2022 | ||
LV | 08.06.2022 | ||
SE | 08.06.2022 | ||
BG | 08.09.2022 | ||
NO | 08.09.2022 | ||
GR | 09.09.2022 | ||
Former [2022/47] | ES | 08.06.2022 | |
FI | 08.06.2022 | ||
LT | 08.06.2022 | ||
SE | 08.06.2022 | ||
NO | 08.09.2022 | Cited in | International search | [XI]EP2806605 (SAMSUNG ELECTRONICS CO LTD [KR]) [X] 1,13,15,17,19,31,32 * paragraphs [0001] - [0006] - [0 13] , [0 21] - [0038] - [0 48] , [0 49] , [0 55] , [0 60] , [0 62] - [0066] * [I] 2-12,14,16,18,20-30; | [A] - ERICSSON, "Introduce the Dedicated Core Network (DECOR) feature", vol. SA WG2, no. San José del Cabo, Mexico, (20150413), 3GPP DRAFT; S2-150781_CR23401_DECOR-BASED ON 0651_V3, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/SA2/Docs/, (20150413), XP050942664 [A] 1-32 * page 10, paragraph 4.3.8.3 - page 22, paragraph 5.3.2.1 * | [A] - NTT DOCOMO ET AL, "Introduce the Dedicated Core Network (DECOR) feature", vol. SA WG2, no. San Jose Del Cabo, Mexico; 20150413 - 20150417, (20150413), 3GPP DRAFT; S2-150927_23401_CR_DECOR-V6_DCM_HW, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/SA2/Docs/, (20150413), XP050942808 [A] 1-32 * page 7, paragraph 4.3.8.3 - page 20, paragraph 5.3.2.1 * | [A] - "3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; General Packet Radio Service (GPRS) enhancements for Evolved Universal Terrestrial Radio Access Network (E-UTRAN) access (Release 13)", 3GPP STANDARD; 3GPP TS 23.401, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20150312), vol. SA WG2, no. V13.2.0, pages 1 - 313, XP050927727 [A] 1-32 * page 49, paragraph 4.3.17.2 - page 53, paragraph 4.3.17.4 * * page 95, paragraph 5.3.2.1 - page 107, paragraph 5.3.2.2 * | Examination | US2012224677 | by applicant | WO2013053896 |