EP3145822 - HEAT RESISTANT AND BIAXIALLY STRETCHED BLOW-MOLDED PLASTIC CONTAINER HAVING A BASE MOVABLE TO ACCOMMODATE INTERNAL VACUUM FORCES AND ISSUED FROM A DOUBLE-BLOW PROCESS [Right-click to bookmark this link] | |||
Former [2017/13] | HEAT RESISTANT AND BIAXIALLY STRETCHED BLOW-MOLDED PLASTIC CONTAINER HAVING A BASE MOVABLE TO ACCOMMODATE INTERNAL VACCUM FORCES AND ISSUED FROM A DOUBLE-BLOW PROCESS | ||
[2021/45] | Status | No opposition filed within time limit Status updated on 16.12.2022 Database last updated on 26.06.2024 | |
Former | The patent has been granted Status updated on 07.01.2022 | ||
Former | Grant of patent is intended Status updated on 13.10.2021 | ||
Former | Request for examination was made Status updated on 24.02.2017 | ||
Former | The international publication has been made Status updated on 02.12.2016 | Most recent event Tooltip | 03.05.2024 | Change - lapse in a contracting state State(s) deleted from list of lapses: IT | published on 05.06.2024 [2024/23] | Applicant(s) | For all designated states Plastipak BAWT S.à.r.l. 24, Rue Héierchen 4940 Bascharage / LU | [2018/32] |
Former [2017/13] | For all designated states APPE BENELUX Ringlaan 7 2960 Brecht / BE | Inventor(s) | 01 /
VAN DIJCK, Sam Hinnenboomstraat 12 B-2320 Hoogstraten / BE | 02 /
DESSAINT, Alain Acacialaan 4 B-1910 Kampenhout / BE | 03 /
DECKERS, Jan Vaartkant Links 1 B-2960 Brecht / BE | [2017/13] | Representative(s) | Matkowska, Franck Matkowska & Associés 9, rue Jacques Prévert 59650 Villeneuve d'Ascq / FR | [2017/13] | Application number, filing date | 15724593.7 | 19.05.2015 | [2017/13] | WO2015EP60946 | Priority number, date | EP20140169671 | 23.05.2014 Original published format: EP 14169671 | [2017/13] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2015177112 | Date: | 26.11.2015 | Language: | EN | [2015/47] | Type: | A1 Application with search report | No.: | EP3145822 | Date: | 29.03.2017 | Language: | EN | The application published by WIPO in one of the EPO official languages on 26.11.2015 takes the place of the publication of the European patent application. | [2017/13] | Type: | B1 Patent specification | No.: | EP3145822 | Date: | 09.02.2022 | Language: | EN | [2022/06] | Search report(s) | International search report - published on: | EP | 26.11.2015 | Classification | IPC: | B65D1/02, B65D79/00 | [2017/13] | CPC: |
B29C49/06 (EP,US);
B29C49/18 (EP,CN,US);
B29C49/12 (US);
B29C49/541 (EP,US);
B29C49/642 (EP,CN,US);
B29C49/6472 (EP,CN,US);
B65D1/0276 (EP,CN,US);
B65D79/0081 (EP,CN,US);
B29C2049/023 (EP);
B29C2049/4807 (EP,US);
B29C2049/4848 (EP,US);
B29C49/08 (EP,US);
B29C49/4273 (EP,US);
B29K2067/003 (US);
B29K2995/0016 (US);
B29L2031/7158 (US)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/13] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | Title | German: | HITZEBESTÄNDIGE UND BIAXIAL GEDEHNTE BLASGEFORMTE KUNSTSTOFFBEHÄLTER MIT EINER BASIS, DIE BEWEGLICH IST, UM INTERNE VAKUUMKRÄFTE AUFZUNEHMEN, UND DIE AUS EINEM DOPPELBLASVERFAHREN HERVORGEGANGEN IST | [2017/13] | English: | HEAT RESISTANT AND BIAXIALLY STRETCHED BLOW-MOLDED PLASTIC CONTAINER HAVING A BASE MOVABLE TO ACCOMMODATE INTERNAL VACUUM FORCES AND ISSUED FROM A DOUBLE-BLOW PROCESS | [2021/45] | French: | RÉCIPIENT EN PLASTIQUE MOULÉ PAR SOUFFLAGE ÉTIRÉ BIAXIALEMENT ET RÉSISTANT À LA CHALEUR PRÉSENTANT UNE BASE MOBILE POUR S'ADAPTER À DES FORCES SOUS VIDE INTERNES ET ÉMISE À PARTIR D'UN PROCESSUS À DOUBLE SOUFFLAGE | [2021/45] |
Former [2017/13] | HEAT RESISTANT AND BIAXIALLY STRETCHED BLOW-MOLDED PLASTIC CONTAINER HAVING A BASE MOVABLE TO ACCOMMODATE INTERNAL VACCUM FORCES AND ISSUED FROM A DOUBLE-BLOW PROCESS | ||
Former [2017/13] | CONTENANT EN PLASTIQUE MOULÉ PAR SOUFFLAGE ÉTIRÉ BI-AXIALEMENT ET RÉSISTANT À LA CHALEUR COMPRENANT UNE BASE MOBILE PERMETTANT D'ACCUEILLIR DES FORCES DE VIDE INTERNES ISSU D'UN PROCESSUS DE DOUBLE SOUFFLAGE | Entry into regional phase | 01.12.2016 | National basic fee paid | 01.12.2016 | Designation fee(s) paid | 01.12.2016 | Examination fee paid | Examination procedure | 01.12.2016 | Examination requested [2017/13] | 01.12.2016 | Date on which the examining division has become responsible | 10.07.2017 | Amendment by applicant (claims and/or description) | 14.10.2021 | Communication of intention to grant the patent | 23.12.2021 | Fee for grant paid | 23.12.2021 | Fee for publishing/printing paid | 23.12.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 10.11.2022 | No opposition filed within time limit [2023/03] | Fees paid | Renewal fee | 10.04.2017 | Renewal fee patent year 03 | 06.08.2018 | Renewal fee patent year 04 | 08.05.2019 | Renewal fee patent year 05 | 24.06.2020 | Renewal fee patent year 06 | 26.04.2021 | Renewal fee patent year 07 | Penalty fee | Additional fee for renewal fee | 31.05.2018 | 04   M06   Fee paid on   06.08.2018 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 19.05.2015 | AL | 09.02.2022 | AT | 09.02.2022 | CY | 09.02.2022 | CZ | 09.02.2022 | DK | 09.02.2022 | EE | 09.02.2022 | FI | 09.02.2022 | HR | 09.02.2022 | LT | 09.02.2022 | LV | 09.02.2022 | MC | 09.02.2022 | MK | 09.02.2022 | RO | 09.02.2022 | RS | 09.02.2022 | SE | 09.02.2022 | SI | 09.02.2022 | SK | 09.02.2022 | SM | 09.02.2022 | BG | 09.05.2022 | NO | 09.05.2022 | GR | 10.05.2022 | IE | 19.05.2022 | IS | 09.06.2022 | PT | 09.06.2022 | [2024/23] |
Former [2024/22] | HU | 19.05.2015 | |
AL | 09.02.2022 | ||
AT | 09.02.2022 | ||
CY | 09.02.2022 | ||
CZ | 09.02.2022 | ||
DK | 09.02.2022 | ||
EE | 09.02.2022 | ||
FI | 09.02.2022 | ||
HR | 09.02.2022 | ||
LT | 09.02.2022 | ||
LV | 09.02.2022 | ||
MC | 09.02.2022 | ||
MK | 09.02.2022 | ||
RO | 09.02.2022 | ||
RS | 09.02.2022 | ||
SE | 09.02.2022 | ||
SI | 09.02.2022 | ||
SK | 09.02.2022 | ||
SM | 09.02.2022 | ||
BG | 09.05.2022 | ||
NO | 09.05.2022 | ||
GR | 10.05.2022 | ||
IE | 19.05.2022 | ||
IT | 19.05.2022 | ||
IS | 09.06.2022 | ||
PT | 09.06.2022 | ||
Former [2024/20] | HU | 19.05.2015 | |
AL | 09.02.2022 | ||
AT | 09.02.2022 | ||
CY | 09.02.2022 | ||
CZ | 09.02.2022 | ||
DK | 09.02.2022 | ||
EE | 09.02.2022 | ||
FI | 09.02.2022 | ||
HR | 09.02.2022 | ||
LT | 09.02.2022 | ||
LV | 09.02.2022 | ||
MC | 09.02.2022 | ||
RO | 09.02.2022 | ||
RS | 09.02.2022 | ||
SE | 09.02.2022 | ||
SI | 09.02.2022 | ||
SK | 09.02.2022 | ||
SM | 09.02.2022 | ||
BG | 09.05.2022 | ||
NO | 09.05.2022 | ||
GR | 10.05.2022 | ||
IE | 19.05.2022 | ||
IT | 19.05.2022 | ||
IS | 09.06.2022 | ||
PT | 09.06.2022 | ||
Former [2024/18] | HU | 19.05.2015 | |
AL | 09.02.2022 | ||
AT | 09.02.2022 | ||
CZ | 09.02.2022 | ||
DK | 09.02.2022 | ||
EE | 09.02.2022 | ||
FI | 09.02.2022 | ||
HR | 09.02.2022 | ||
LT | 09.02.2022 | ||
LV | 09.02.2022 | ||
MC | 09.02.2022 | ||
RO | 09.02.2022 | ||
RS | 09.02.2022 | ||
SE | 09.02.2022 | ||
SI | 09.02.2022 | ||
SK | 09.02.2022 | ||
SM | 09.02.2022 | ||
BG | 09.05.2022 | ||
NO | 09.05.2022 | ||
GR | 10.05.2022 | ||
IE | 19.05.2022 | ||
IT | 19.05.2022 | ||
IS | 09.06.2022 | ||
PT | 09.06.2022 | ||
Former [2023/35] | AL | 09.02.2022 | |
AT | 09.02.2022 | ||
CZ | 09.02.2022 | ||
DK | 09.02.2022 | ||
EE | 09.02.2022 | ||
FI | 09.02.2022 | ||
HR | 09.02.2022 | ||
LT | 09.02.2022 | ||
LV | 09.02.2022 | ||
MC | 09.02.2022 | ||
RO | 09.02.2022 | ||
RS | 09.02.2022 | ||
SE | 09.02.2022 | ||
SI | 09.02.2022 | ||
SK | 09.02.2022 | ||
SM | 09.02.2022 | ||
BG | 09.05.2022 | ||
NO | 09.05.2022 | ||
GR | 10.05.2022 | ||
IE | 19.05.2022 | ||
IT | 19.05.2022 | ||
IS | 09.06.2022 | ||
PT | 09.06.2022 | ||
Former [2023/20] | AL | 09.02.2022 | |
AT | 09.02.2022 | ||
CZ | 09.02.2022 | ||
DK | 09.02.2022 | ||
EE | 09.02.2022 | ||
FI | 09.02.2022 | ||
HR | 09.02.2022 | ||
LT | 09.02.2022 | ||
LV | 09.02.2022 | ||
MC | 09.02.2022 | ||
RO | 09.02.2022 | ||
RS | 09.02.2022 | ||
SE | 09.02.2022 | ||
SI | 09.02.2022 | ||
SK | 09.02.2022 | ||
SM | 09.02.2022 | ||
BG | 09.05.2022 | ||
NO | 09.05.2022 | ||
GR | 10.05.2022 | ||
IE | 19.05.2022 | ||
IS | 09.06.2022 | ||
PT | 09.06.2022 | ||
Former [2023/10] | AL | 09.02.2022 | |
AT | 09.02.2022 | ||
CZ | 09.02.2022 | ||
DK | 09.02.2022 | ||
EE | 09.02.2022 | ||
FI | 09.02.2022 | ||
HR | 09.02.2022 | ||
LT | 09.02.2022 | ||
LV | 09.02.2022 | ||
MC | 09.02.2022 | ||
RO | 09.02.2022 | ||
RS | 09.02.2022 | ||
SE | 09.02.2022 | ||
SI | 09.02.2022 | ||
SK | 09.02.2022 | ||
SM | 09.02.2022 | ||
BG | 09.05.2022 | ||
NO | 09.05.2022 | ||
GR | 10.05.2022 | ||
IS | 09.06.2022 | ||
PT | 09.06.2022 | ||
Former [2023/06] | AL | 09.02.2022 | |
AT | 09.02.2022 | ||
CZ | 09.02.2022 | ||
DK | 09.02.2022 | ||
EE | 09.02.2022 | ||
FI | 09.02.2022 | ||
HR | 09.02.2022 | ||
LT | 09.02.2022 | ||
LV | 09.02.2022 | ||
MC | 09.02.2022 | ||
RO | 09.02.2022 | ||
RS | 09.02.2022 | ||
SE | 09.02.2022 | ||
SK | 09.02.2022 | ||
SM | 09.02.2022 | ||
BG | 09.05.2022 | ||
NO | 09.05.2022 | ||
GR | 10.05.2022 | ||
IS | 09.06.2022 | ||
PT | 09.06.2022 | ||
Former [2023/01] | AL | 09.02.2022 | |
AT | 09.02.2022 | ||
CZ | 09.02.2022 | ||
DK | 09.02.2022 | ||
EE | 09.02.2022 | ||
FI | 09.02.2022 | ||
HR | 09.02.2022 | ||
LT | 09.02.2022 | ||
LV | 09.02.2022 | ||
RO | 09.02.2022 | ||
RS | 09.02.2022 | ||
SE | 09.02.2022 | ||
SK | 09.02.2022 | ||
SM | 09.02.2022 | ||
BG | 09.05.2022 | ||
NO | 09.05.2022 | ||
GR | 10.05.2022 | ||
IS | 09.06.2022 | ||
PT | 09.06.2022 | ||
Former [2022/49] | AT | 09.02.2022 | |
CZ | 09.02.2022 | ||
DK | 09.02.2022 | ||
EE | 09.02.2022 | ||
FI | 09.02.2022 | ||
HR | 09.02.2022 | ||
LT | 09.02.2022 | ||
LV | 09.02.2022 | ||
RO | 09.02.2022 | ||
RS | 09.02.2022 | ||
SE | 09.02.2022 | ||
SK | 09.02.2022 | ||
SM | 09.02.2022 | ||
BG | 09.05.2022 | ||
NO | 09.05.2022 | ||
GR | 10.05.2022 | ||
IS | 09.06.2022 | ||
PT | 09.06.2022 | ||
Former [2022/48] | AT | 09.02.2022 | |
CZ | 09.02.2022 | ||
DK | 09.02.2022 | ||
EE | 09.02.2022 | ||
FI | 09.02.2022 | ||
HR | 09.02.2022 | ||
LT | 09.02.2022 | ||
LV | 09.02.2022 | ||
RO | 09.02.2022 | ||
RS | 09.02.2022 | ||
SE | 09.02.2022 | ||
SM | 09.02.2022 | ||
BG | 09.05.2022 | ||
NO | 09.05.2022 | ||
GR | 10.05.2022 | ||
IS | 09.06.2022 | ||
PT | 09.06.2022 | ||
Former [2022/47] | AT | 09.02.2022 | |
DK | 09.02.2022 | ||
FI | 09.02.2022 | ||
HR | 09.02.2022 | ||
LT | 09.02.2022 | ||
LV | 09.02.2022 | ||
RO | 09.02.2022 | ||
RS | 09.02.2022 | ||
SE | 09.02.2022 | ||
SM | 09.02.2022 | ||
BG | 09.05.2022 | ||
NO | 09.05.2022 | ||
GR | 10.05.2022 | ||
IS | 09.06.2022 | ||
PT | 09.06.2022 | ||
Former [2022/46] | AT | 09.02.2022 | |
DK | 09.02.2022 | ||
FI | 09.02.2022 | ||
HR | 09.02.2022 | ||
LT | 09.02.2022 | ||
LV | 09.02.2022 | ||
RS | 09.02.2022 | ||
SE | 09.02.2022 | ||
BG | 09.05.2022 | ||
NO | 09.05.2022 | ||
GR | 10.05.2022 | ||
IS | 09.06.2022 | ||
PT | 09.06.2022 | ||
Former [2022/42] | AT | 09.02.2022 | |
FI | 09.02.2022 | ||
HR | 09.02.2022 | ||
LT | 09.02.2022 | ||
LV | 09.02.2022 | ||
RS | 09.02.2022 | ||
SE | 09.02.2022 | ||
BG | 09.05.2022 | ||
NO | 09.05.2022 | ||
GR | 10.05.2022 | ||
IS | 09.06.2022 | ||
PT | 09.06.2022 | ||
Former [2022/39] | AT | 09.02.2022 | |
FI | 09.02.2022 | ||
HR | 09.02.2022 | ||
LT | 09.02.2022 | ||
LV | 09.02.2022 | ||
RS | 09.02.2022 | ||
SE | 09.02.2022 | ||
BG | 09.05.2022 | ||
NO | 09.05.2022 | ||
GR | 10.05.2022 | ||
PT | 09.06.2022 | ||
Former [2022/36] | AT | 09.02.2022 | |
HR | 09.02.2022 | ||
LT | 09.02.2022 | ||
LV | 09.02.2022 | ||
RS | 09.02.2022 | ||
SE | 09.02.2022 | ||
BG | 09.05.2022 | ||
NO | 09.05.2022 | ||
GR | 10.05.2022 | ||
PT | 09.06.2022 | ||
Former [2022/35] | HR | 09.02.2022 | |
LT | 09.02.2022 | ||
RS | 09.02.2022 | ||
SE | 09.02.2022 | ||
BG | 09.05.2022 | ||
NO | 09.05.2022 | ||
PT | 09.06.2022 | ||
Former [2022/34] | LT | 09.02.2022 | |
NO | 09.05.2022 | ||
PT | 09.06.2022 | ||
Former [2022/33] | LT | 09.02.2022 | |
NO | 09.05.2022 | Cited in | International search | [A]US4318882 (AGRAWAL PURUSHOTTAM D, et al) [A] 1-23 * abstract * * column 15, line 53 - line 54 *; | [A]EP0559103 (NISSEI ASB MACHINE CO LTD [JP]) [A] 1-23 * abstract *; | [A]FR2975332 (SIDEL PARTICIPATIONS [FR]) [A] 11-23 * the whole document *; | [A]WO2013033544 (AMCOR LTD [AU], et al) [A] 1-23 * paragraph [0057]; figure - *; | [A]US2014061211 (PATCHEAK TERRY D [US], et al) [A] 1-23* paragraph [0089]; figure - *; | [A]US2014069937 (MELROSE DAVID [NZ], et al) [A] 1-23 * abstract * |