EP3210116 - QUEUE HANDLING [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 30.04.2021 Database last updated on 31.05.2024 | |
Former | The patent has been granted Status updated on 22.05.2020 | ||
Former | Grant of patent is intended Status updated on 07.01.2020 | ||
Former | Examination is in progress Status updated on 11.03.2019 | ||
Former | Request for examination was made Status updated on 28.07.2017 | ||
Former | The international publication has been made Status updated on 25.11.2016 | Most recent event Tooltip | 27.04.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 29.05.2024 [2024/22] | Applicant(s) | For all designated states Huawei Technologies Co., Ltd. Huawei Administration Building Bantian Longgang District Shenzhen, Guangdong 518129 / CN | [2020/26] |
Former [2017/35] | For all designated states Huawei Technologies Co., Ltd. Huawei Administration Building Bantian Longgang District Shenzhen, Guangdong 518129 / CN | Inventor(s) | 01 /
LOWE, Christopher, Kevan Huawei Administration Building Bantian, Longgang District, Shenzhen, Guangdong 518129 / CN | 02 /
WENHAM, Steven, James Huawei Administration Building Bantian, Longgang District, Shenzhen, Guangdong 218129 / CN | 03 /
BUSH, James Huawei Administration Building Bantian, Longgang District Shenzhen, Guangdong 518129 / CN | [2020/26] |
Former [2017/35] | 01 /
LOWE, Christopher, Kevan c/o Huawei Technologies Duesseldorf GmbH Riesstrasse 25 80992 Munich / DE | ||
02 /
WENHAM, Steven, James c/o Huawei Technologies Duesseldorf GmbH Riesstrasse 25 80992 Munich / DE | |||
03 /
BUSH, James c/o Huawei Technologies Duesseldorf GmbH Riesstrasse 25 80992 Munich / DE | Representative(s) | Gill Jennings & Every LLP The Broadgate Tower 20 Primrose Street London EC2A 2ES / GB | [2020/26] |
Former [2017/35] | Kreuz, Georg Maria Huawei Technologies Duesseldorf GmbH Riesstrasse 8 80992 München / DE | Application number, filing date | 15725271.9 | 15.05.2015 | [2017/35] | WO2015EP60804 | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2016184486 | Date: | 24.11.2016 | Language: | EN | [2016/47] | Type: | A1 Application with search report | No.: | EP3210116 | Date: | 30.08.2017 | Language: | EN | The application published by WIPO in one of the EPO official languages on 24.11.2016 takes the place of the publication of the European patent application. | [2017/35] | Type: | B1 Patent specification | No.: | EP3210116 | Date: | 24.06.2020 | Language: | EN | [2020/26] | Search report(s) | International search report - published on: | EP | 24.11.2016 | Classification | IPC: | G06F9/54, H04L12/863, H04W4/00, H04W88/16, H04L12/803, H04W4/60 | [2020/01] | CPC: |
H04L47/621 (EP);
G06F9/546 (EP);
H04L47/125 (EP);
H04L47/6255 (EP);
H04W4/60 (EP);
G06F2209/548 (EP);
H04W4/70 (EP)
(-)
|
Former IPC [2017/35] | G06F9/54, H04L12/863, H04W4/00, H04W88/16 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/35] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | Title | German: | HANDHABUNG VON WARTESCHLANGEN | [2017/35] | English: | QUEUE HANDLING | [2017/35] | French: | GESTION DE FILE D'ATTENTE | [2017/35] | Entry into regional phase | 23.05.2017 | National basic fee paid | 23.05.2017 | Designation fee(s) paid | 23.05.2017 | Examination fee paid | Examination procedure | 23.05.2017 | Examination requested [2017/35] | 23.05.2017 | Date on which the examining division has become responsible | 04.12.2017 | Amendment by applicant (claims and/or description) | 14.03.2019 | Despatch of a communication from the examining division (Time limit: M04) | 01.07.2019 | Reply to a communication from the examining division | 08.01.2020 | Communication of intention to grant the patent | 19.03.2020 | Fee for grant paid | 19.03.2020 | Fee for publishing/printing paid | 15.05.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 25.03.2021 | No opposition filed within time limit [2021/22] | Fees paid | Renewal fee | 23.05.2017 | Renewal fee patent year 03 | 31.05.2018 | Renewal fee patent year 04 | 31.05.2019 | Renewal fee patent year 05 | 23.03.2020 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 15.05.2015 | AL | 24.06.2020 | AT | 24.06.2020 | CY | 24.06.2020 | CZ | 24.06.2020 | DK | 24.06.2020 | EE | 24.06.2020 | ES | 24.06.2020 | FI | 24.06.2020 | HR | 24.06.2020 | IT | 24.06.2020 | LT | 24.06.2020 | LV | 24.06.2020 | MC | 24.06.2020 | MK | 24.06.2020 | NL | 24.06.2020 | PL | 24.06.2020 | RO | 24.06.2020 | RS | 24.06.2020 | SE | 24.06.2020 | SI | 24.06.2020 | SK | 24.06.2020 | SM | 24.06.2020 | BG | 24.09.2020 | NO | 24.09.2020 | GR | 25.09.2020 | IS | 24.10.2020 | PT | 26.10.2020 | [2024/22] |
Former [2023/30] | HU | 15.05.2015 | |
AL | 24.06.2020 | ||
AT | 24.06.2020 | ||
CY | 24.06.2020 | ||
CZ | 24.06.2020 | ||
DK | 24.06.2020 | ||
EE | 24.06.2020 | ||
ES | 24.06.2020 | ||
FI | 24.06.2020 | ||
HR | 24.06.2020 | ||
IT | 24.06.2020 | ||
LT | 24.06.2020 | ||
LV | 24.06.2020 | ||
MC | 24.06.2020 | ||
NL | 24.06.2020 | ||
PL | 24.06.2020 | ||
RO | 24.06.2020 | ||
RS | 24.06.2020 | ||
SE | 24.06.2020 | ||
SI | 24.06.2020 | ||
SK | 24.06.2020 | ||
SM | 24.06.2020 | ||
BG | 24.09.2020 | ||
NO | 24.09.2020 | ||
GR | 25.09.2020 | ||
IS | 24.10.2020 | ||
PT | 26.10.2020 | ||
Former [2023/28] | HU | 15.05.2015 | |
AL | 24.06.2020 | ||
AT | 24.06.2020 | ||
CZ | 24.06.2020 | ||
DK | 24.06.2020 | ||
EE | 24.06.2020 | ||
ES | 24.06.2020 | ||
FI | 24.06.2020 | ||
HR | 24.06.2020 | ||
IT | 24.06.2020 | ||
LT | 24.06.2020 | ||
LV | 24.06.2020 | ||
MC | 24.06.2020 | ||
NL | 24.06.2020 | ||
PL | 24.06.2020 | ||
RO | 24.06.2020 | ||
RS | 24.06.2020 | ||
SE | 24.06.2020 | ||
SI | 24.06.2020 | ||
SK | 24.06.2020 | ||
SM | 24.06.2020 | ||
BG | 24.09.2020 | ||
NO | 24.09.2020 | ||
GR | 25.09.2020 | ||
IS | 24.10.2020 | ||
PT | 26.10.2020 | ||
Former [2022/07] | AL | 24.06.2020 | |
AT | 24.06.2020 | ||
CZ | 24.06.2020 | ||
DK | 24.06.2020 | ||
EE | 24.06.2020 | ||
ES | 24.06.2020 | ||
FI | 24.06.2020 | ||
HR | 24.06.2020 | ||
IT | 24.06.2020 | ||
LT | 24.06.2020 | ||
LV | 24.06.2020 | ||
MC | 24.06.2020 | ||
NL | 24.06.2020 | ||
PL | 24.06.2020 | ||
RO | 24.06.2020 | ||
RS | 24.06.2020 | ||
SE | 24.06.2020 | ||
SI | 24.06.2020 | ||
SK | 24.06.2020 | ||
SM | 24.06.2020 | ||
BG | 24.09.2020 | ||
NO | 24.09.2020 | ||
GR | 25.09.2020 | ||
IS | 24.10.2020 | ||
PT | 26.10.2020 | ||
Former [2021/36] | AL | 24.06.2020 | |
AT | 24.06.2020 | ||
CZ | 24.06.2020 | ||
DK | 24.06.2020 | ||
EE | 24.06.2020 | ||
ES | 24.06.2020 | ||
FI | 24.06.2020 | ||
HR | 24.06.2020 | ||
IT | 24.06.2020 | ||
LT | 24.06.2020 | ||
LV | 24.06.2020 | ||
NL | 24.06.2020 | ||
PL | 24.06.2020 | ||
RO | 24.06.2020 | ||
RS | 24.06.2020 | ||
SE | 24.06.2020 | ||
SI | 24.06.2020 | ||
SK | 24.06.2020 | ||
SM | 24.06.2020 | ||
BG | 24.09.2020 | ||
NO | 24.09.2020 | ||
GR | 25.09.2020 | ||
IS | 24.10.2020 | ||
PT | 26.10.2020 | ||
Former [2021/21] | AL | 24.06.2020 | |
AT | 24.06.2020 | ||
CZ | 24.06.2020 | ||
DK | 24.06.2020 | ||
EE | 24.06.2020 | ||
ES | 24.06.2020 | ||
FI | 24.06.2020 | ||
HR | 24.06.2020 | ||
IT | 24.06.2020 | ||
LT | 24.06.2020 | ||
LV | 24.06.2020 | ||
NL | 24.06.2020 | ||
PL | 24.06.2020 | ||
RO | 24.06.2020 | ||
RS | 24.06.2020 | ||
SE | 24.06.2020 | ||
SK | 24.06.2020 | ||
SM | 24.06.2020 | ||
BG | 24.09.2020 | ||
NO | 24.09.2020 | ||
GR | 25.09.2020 | ||
IS | 24.10.2020 | ||
PT | 26.10.2020 | ||
Former [2021/10] | AL | 24.06.2020 | |
AT | 24.06.2020 | ||
CZ | 24.06.2020 | ||
EE | 24.06.2020 | ||
ES | 24.06.2020 | ||
FI | 24.06.2020 | ||
HR | 24.06.2020 | ||
IT | 24.06.2020 | ||
LT | 24.06.2020 | ||
LV | 24.06.2020 | ||
NL | 24.06.2020 | ||
PL | 24.06.2020 | ||
RO | 24.06.2020 | ||
RS | 24.06.2020 | ||
SE | 24.06.2020 | ||
SK | 24.06.2020 | ||
SM | 24.06.2020 | ||
BG | 24.09.2020 | ||
NO | 24.09.2020 | ||
GR | 25.09.2020 | ||
IS | 24.10.2020 | ||
PT | 26.10.2020 | ||
Former [2021/09] | AL | 24.06.2020 | |
AT | 24.06.2020 | ||
CZ | 24.06.2020 | ||
EE | 24.06.2020 | ||
ES | 24.06.2020 | ||
FI | 24.06.2020 | ||
HR | 24.06.2020 | ||
IT | 24.06.2020 | ||
LT | 24.06.2020 | ||
LV | 24.06.2020 | ||
NL | 24.06.2020 | ||
RO | 24.06.2020 | ||
RS | 24.06.2020 | ||
SE | 24.06.2020 | ||
SM | 24.06.2020 | ||
BG | 24.09.2020 | ||
NO | 24.09.2020 | ||
GR | 25.09.2020 | ||
PT | 26.10.2020 | ||
Former [2021/04] | AL | 24.06.2020 | |
FI | 24.06.2020 | ||
HR | 24.06.2020 | ||
LT | 24.06.2020 | ||
LV | 24.06.2020 | ||
NL | 24.06.2020 | ||
RS | 24.06.2020 | ||
SE | 24.06.2020 | ||
BG | 24.09.2020 | ||
NO | 24.09.2020 | ||
GR | 25.09.2020 | ||
Former [2021/01] | FI | 24.06.2020 | |
HR | 24.06.2020 | ||
LT | 24.06.2020 | ||
LV | 24.06.2020 | ||
RS | 24.06.2020 | ||
SE | 24.06.2020 | ||
BG | 24.09.2020 | ||
NO | 24.09.2020 | ||
GR | 25.09.2020 | ||
Former [2020/51] | FI | 24.06.2020 | |
HR | 24.06.2020 | ||
LT | 24.06.2020 | ||
LV | 24.06.2020 | ||
RS | 24.06.2020 | ||
SE | 24.06.2020 | ||
NO | 24.09.2020 | ||
GR | 25.09.2020 | ||
Former [2020/50] | FI | 24.06.2020 | |
HR | 24.06.2020 | ||
LT | 24.06.2020 | ||
LV | 24.06.2020 | ||
SE | 24.06.2020 | ||
NO | 24.09.2020 | ||
GR | 25.09.2020 | ||
Former [2020/48] | FI | 24.06.2020 | |
LT | 24.06.2020 | ||
SE | 24.06.2020 | ||
NO | 24.09.2020 | ||
Former [2020/47] | LT | 24.06.2020 | |
NO | 24.09.2020 | Cited in | International search | [A] - LINDE H ET AL, "Sensor and actuator networks - A service gateway for networked sensor systems", IEEE PERVASIVE COMPUTING, IEEE SERVICE CENTER, LOS ALAMITOS, CA, US, (20040101), vol. 3, no. 1, ISSN 1536-1268, pages 66 - 74, XP011108157 [A] 1-11 * figures 3,4 * | [XI] - LUIS GARCÉS-ERICE ET AL, "A flexible and scalable message broker for sensor network integration", PROCEEDINGS OF THE FOURTH INTERNATIONAL ICST CONFERENCE ON COMMUNICATION SYSTEM SOFTWARE AND MIDDLEWARE, COMSWARE '09, New York, New York, USA, (20090101), doi:10.1145/1621890.1621896, ISBN 978-1-60558-353-2, page 1, XP055236137 [X] 1,11 * Last paragraph; page 2, column left * * sections 3.2.1 and 3.2.2; page 5 * [I] 2-10 DOI: http://dx.doi.org/10.1145/1621890.1621896 | Examination | - JIAN FENG ET AL, "An optimum gateway discovery and selection mechanism in WSN and mobile cellular network integration", 2013 8TH INTERNATIONAL CONFERENCE ON COMMUNICATIONS AND NETWORKING IN CHINA (CHINACOM), IEEE, (20130814), doi:10.1109/CHINACOM.2013.6694644, pages 483 - 487, XP032546784 DOI: http://dx.doi.org/10.1109/ChinaCom.2013.6694644 |