EP3152842 - MODULAR ANTENNA SYSTEM [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 10.07.2020 Database last updated on 27.07.2024 | |
Former | The patent has been granted Status updated on 12.07.2019 | ||
Former | Grant of patent is intended Status updated on 05.07.2019 | ||
Former | Request for examination was made Status updated on 05.06.2019 | ||
Former | Grant of patent is intended Status updated on 05.02.2019 | ||
Former | Request for examination was made Status updated on 10.03.2017 | ||
Former | The international publication has been made Status updated on 09.12.2016 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states Xilinx, Inc. 2100 Logic Drive San Jose, California 95124 / US | [2020/14] |
Former [2017/15] | For all designated states Airrays GmbH Kramergasse 4 01067 Dresden / DE | Inventor(s) | 01 /
AUE, Volker Kamenzer Str. 47 01099 Dresden / DE | 02 /
GRIEGER, Michael Nordstrasse 30 01099 Dresden / DE | 03 /
FEHSKE, Albrecht Helgolandstrasse 7 01097 Dresden / DE | [2017/15] | Representative(s) | Lippert Stachow Patentanwälte Rechtsanwälte Partnerschaft mbB Krenkelstraße 3 01309 Dresden / DE | [2019/33] |
Former [2017/15] | Lippert Stachow Patentanwälte Rechtsanwälte Partnerschaft mbB Krenkelstrasse 3 01309 Dresden / DE | Application number, filing date | 15726615.6 | 04.06.2015 | [2017/15] | WO2015EP62491 | Priority number, date | EP20140001916 | 04.06.2014 Original published format: EP 14001916 | DE201410118539 | 12.12.2014 Original published format: DE102014118539 | DE201410118529 | 12.12.2014 Original published format: DE102014118529 | [2017/15] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2015185680 | Date: | 10.12.2015 | Language: | EN | [2015/49] | Type: | A1 Application with search report | No.: | EP3152842 | Date: | 12.04.2017 | Language: | EN | The application published by WIPO in one of the EPO official languages on 10.12.2015 takes the place of the publication of the European patent application. | [2017/15] | Type: | B1 Patent specification | No.: | EP3152842 | Date: | 14.08.2019 | Language: | EN | [2019/33] | Type: | B8 Corrected title page of specification | No.: | EP3152842 | Date: | 08.04.2020 | [2020/15] | Search report(s) | International search report - published on: | EP | 10.12.2015 | Classification | IPC: | H04B1/40, H04B1/04, H04B7/02, H04B7/06, H01Q1/24, H01Q19/00, H01Q21/00, H01Q21/26, H01Q21/24, H03F3/24, H01Q21/06 | [2019/04] | CPC: |
H01Q21/0025 (EP,CN,US);
H01Q1/246 (EP,CN,US);
H01Q19/00 (US);
H01Q21/061 (EP,CN,US);
H01Q21/24 (US);
H03F3/24 (EP,US);
H04B1/40 (EP,CN,US);
H04B17/12 (EP,US);
H04B2001/0408 (US);
H04B7/0617 (EP,US)
(-)
|
Former IPC [2017/15] | H04B1/40, H04B7/02, H04B7/06 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/15] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | Title | German: | MODULARES ANTENNENSYSTEM | [2017/15] | English: | MODULAR ANTENNA SYSTEM | [2017/15] | French: | SYSTÈME D'ANTENNE MODULAIRE | [2017/15] | Entry into regional phase | 09.12.2016 | National basic fee paid | 09.12.2016 | Designation fee(s) paid | 09.12.2016 | Examination fee paid | Examination procedure | 09.12.2016 | Examination requested [2017/15] | 09.12.2016 | Date on which the examining division has become responsible | 07.07.2017 | Amendment by applicant (claims and/or description) | 06.02.2019 | Communication of intention to grant the patent | 03.06.2019 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 03.06.2019 | Fee for grant paid | 03.06.2019 | Fee for publishing/printing paid | 05.07.2019 | Information about intention to grant a patent | 05.07.2019 | Receipt of the translation of the claim(s) | Opposition(s) | 03.06.2020 | No opposition filed within time limit [2020/33] | Fees paid | Renewal fee | 29.06.2017 | Renewal fee patent year 03 | 27.06.2018 | Renewal fee patent year 04 | 03.06.2019 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 04.06.2015 | AL | 14.08.2019 | AT | 14.08.2019 | CY | 14.08.2019 | CZ | 14.08.2019 | DK | 14.08.2019 | EE | 14.08.2019 | ES | 14.08.2019 | FI | 14.08.2019 | HR | 14.08.2019 | IT | 14.08.2019 | LT | 14.08.2019 | LV | 14.08.2019 | MC | 14.08.2019 | MK | 14.08.2019 | MT | 14.08.2019 | NL | 14.08.2019 | PL | 14.08.2019 | RO | 14.08.2019 | RS | 14.08.2019 | SE | 14.08.2019 | SI | 14.08.2019 | SK | 14.08.2019 | SM | 14.08.2019 | TR | 14.08.2019 | BG | 14.11.2019 | NO | 14.11.2019 | GR | 15.11.2019 | IS | 14.12.2019 | PT | 16.12.2019 | [2022/32] |
Former [2022/28] | HU | 04.06.2015 | |
AL | 14.08.2019 | ||
AT | 14.08.2019 | ||
CY | 14.08.2019 | ||
CZ | 14.08.2019 | ||
DK | 14.08.2019 | ||
EE | 14.08.2019 | ||
ES | 14.08.2019 | ||
FI | 14.08.2019 | ||
HR | 14.08.2019 | ||
IT | 14.08.2019 | ||
LT | 14.08.2019 | ||
LV | 14.08.2019 | ||
MC | 14.08.2019 | ||
MT | 14.08.2019 | ||
NL | 14.08.2019 | ||
PL | 14.08.2019 | ||
RO | 14.08.2019 | ||
RS | 14.08.2019 | ||
SE | 14.08.2019 | ||
SI | 14.08.2019 | ||
SK | 14.08.2019 | ||
SM | 14.08.2019 | ||
TR | 14.08.2019 | ||
BG | 14.11.2019 | ||
NO | 14.11.2019 | ||
GR | 15.11.2019 | ||
IS | 14.12.2019 | ||
PT | 16.12.2019 | ||
Former [2021/12] | AL | 14.08.2019 | |
AT | 14.08.2019 | ||
CZ | 14.08.2019 | ||
DK | 14.08.2019 | ||
EE | 14.08.2019 | ||
ES | 14.08.2019 | ||
FI | 14.08.2019 | ||
HR | 14.08.2019 | ||
IT | 14.08.2019 | ||
LT | 14.08.2019 | ||
LV | 14.08.2019 | ||
MC | 14.08.2019 | ||
NL | 14.08.2019 | ||
PL | 14.08.2019 | ||
RO | 14.08.2019 | ||
RS | 14.08.2019 | ||
SE | 14.08.2019 | ||
SI | 14.08.2019 | ||
SK | 14.08.2019 | ||
SM | 14.08.2019 | ||
TR | 14.08.2019 | ||
BG | 14.11.2019 | ||
NO | 14.11.2019 | ||
GR | 15.11.2019 | ||
IS | 14.12.2019 | ||
PT | 16.12.2019 | ||
Former [2020/37] | AL | 14.08.2019 | |
AT | 14.08.2019 | ||
CZ | 14.08.2019 | ||
DK | 14.08.2019 | ||
EE | 14.08.2019 | ||
ES | 14.08.2019 | ||
FI | 14.08.2019 | ||
HR | 14.08.2019 | ||
IT | 14.08.2019 | ||
LT | 14.08.2019 | ||
LV | 14.08.2019 | ||
NL | 14.08.2019 | ||
PL | 14.08.2019 | ||
RO | 14.08.2019 | ||
RS | 14.08.2019 | ||
SE | 14.08.2019 | ||
SI | 14.08.2019 | ||
SK | 14.08.2019 | ||
SM | 14.08.2019 | ||
TR | 14.08.2019 | ||
BG | 14.11.2019 | ||
NO | 14.11.2019 | ||
GR | 15.11.2019 | ||
IS | 14.12.2019 | ||
PT | 16.12.2019 | ||
Former [2020/36] | AL | 14.08.2019 | |
AT | 14.08.2019 | ||
CZ | 14.08.2019 | ||
DK | 14.08.2019 | ||
EE | 14.08.2019 | ||
ES | 14.08.2019 | ||
FI | 14.08.2019 | ||
HR | 14.08.2019 | ||
IT | 14.08.2019 | ||
LT | 14.08.2019 | ||
LV | 14.08.2019 | ||
NL | 14.08.2019 | ||
PL | 14.08.2019 | ||
RO | 14.08.2019 | ||
RS | 14.08.2019 | ||
SE | 14.08.2019 | ||
SK | 14.08.2019 | ||
SM | 14.08.2019 | ||
TR | 14.08.2019 | ||
BG | 14.11.2019 | ||
NO | 14.11.2019 | ||
GR | 15.11.2019 | ||
IS | 14.12.2019 | ||
PT | 16.12.2019 | ||
Former [2020/27] | AL | 14.08.2019 | |
AT | 14.08.2019 | ||
CZ | 14.08.2019 | ||
DK | 14.08.2019 | ||
EE | 14.08.2019 | ||
ES | 14.08.2019 | ||
FI | 14.08.2019 | ||
HR | 14.08.2019 | ||
IT | 14.08.2019 | ||
LT | 14.08.2019 | ||
LV | 14.08.2019 | ||
NL | 14.08.2019 | ||
PL | 14.08.2019 | ||
RO | 14.08.2019 | ||
RS | 14.08.2019 | ||
SE | 14.08.2019 | ||
SK | 14.08.2019 | ||
SM | 14.08.2019 | ||
TR | 14.08.2019 | ||
BG | 14.11.2019 | ||
NO | 14.11.2019 | ||
GR | 15.11.2019 | ||
PT | 16.12.2019 | ||
IS | 24.02.2020 | ||
Former [2020/25] | AL | 14.08.2019 | |
AT | 14.08.2019 | ||
CZ | 14.08.2019 | ||
DK | 14.08.2019 | ||
EE | 14.08.2019 | ||
ES | 14.08.2019 | ||
FI | 14.08.2019 | ||
HR | 14.08.2019 | ||
IT | 14.08.2019 | ||
LT | 14.08.2019 | ||
LV | 14.08.2019 | ||
NL | 14.08.2019 | ||
PL | 14.08.2019 | ||
RO | 14.08.2019 | ||
RS | 14.08.2019 | ||
SE | 14.08.2019 | ||
SK | 14.08.2019 | ||
TR | 14.08.2019 | ||
BG | 14.11.2019 | ||
NO | 14.11.2019 | ||
GR | 15.11.2019 | ||
PT | 16.12.2019 | ||
IS | 24.02.2020 | ||
Former [2020/24] | AL | 14.08.2019 | |
AT | 14.08.2019 | ||
DK | 14.08.2019 | ||
EE | 14.08.2019 | ||
ES | 14.08.2019 | ||
FI | 14.08.2019 | ||
HR | 14.08.2019 | ||
IT | 14.08.2019 | ||
LT | 14.08.2019 | ||
LV | 14.08.2019 | ||
NL | 14.08.2019 | ||
PL | 14.08.2019 | ||
RO | 14.08.2019 | ||
RS | 14.08.2019 | ||
SE | 14.08.2019 | ||
TR | 14.08.2019 | ||
BG | 14.11.2019 | ||
NO | 14.11.2019 | ||
GR | 15.11.2019 | ||
PT | 16.12.2019 | ||
IS | 24.02.2020 | ||
Former [2020/23] | AL | 14.08.2019 | |
AT | 14.08.2019 | ||
DK | 14.08.2019 | ||
EE | 14.08.2019 | ||
ES | 14.08.2019 | ||
FI | 14.08.2019 | ||
HR | 14.08.2019 | ||
IT | 14.08.2019 | ||
LT | 14.08.2019 | ||
LV | 14.08.2019 | ||
NL | 14.08.2019 | ||
PL | 14.08.2019 | ||
RO | 14.08.2019 | ||
RS | 14.08.2019 | ||
SE | 14.08.2019 | ||
TR | 14.08.2019 | ||
BG | 14.11.2019 | ||
NO | 14.11.2019 | ||
GR | 15.11.2019 | ||
IS | 14.12.2019 | ||
PT | 16.12.2019 | ||
Former [2020/22] | AL | 14.08.2019 | |
DK | 14.08.2019 | ||
EE | 14.08.2019 | ||
ES | 14.08.2019 | ||
FI | 14.08.2019 | ||
HR | 14.08.2019 | ||
LT | 14.08.2019 | ||
LV | 14.08.2019 | ||
NL | 14.08.2019 | ||
RS | 14.08.2019 | ||
SE | 14.08.2019 | ||
TR | 14.08.2019 | ||
BG | 14.11.2019 | ||
NO | 14.11.2019 | ||
GR | 15.11.2019 | ||
IS | 14.12.2019 | ||
PT | 16.12.2019 | ||
Former [2020/17] | AL | 14.08.2019 | |
ES | 14.08.2019 | ||
FI | 14.08.2019 | ||
HR | 14.08.2019 | ||
LT | 14.08.2019 | ||
LV | 14.08.2019 | ||
NL | 14.08.2019 | ||
RS | 14.08.2019 | ||
SE | 14.08.2019 | ||
TR | 14.08.2019 | ||
BG | 14.11.2019 | ||
NO | 14.11.2019 | ||
GR | 15.11.2019 | ||
IS | 14.12.2019 | ||
PT | 16.12.2019 | ||
Former [2020/15] | AL | 14.08.2019 | |
ES | 14.08.2019 | ||
FI | 14.08.2019 | ||
HR | 14.08.2019 | ||
LT | 14.08.2019 | ||
LV | 14.08.2019 | ||
NL | 14.08.2019 | ||
RS | 14.08.2019 | ||
SE | 14.08.2019 | ||
BG | 14.11.2019 | ||
NO | 14.11.2019 | ||
GR | 15.11.2019 | ||
IS | 14.12.2019 | ||
PT | 16.12.2019 | ||
Former [2020/12] | ES | 14.08.2019 | |
FI | 14.08.2019 | ||
HR | 14.08.2019 | ||
LT | 14.08.2019 | ||
LV | 14.08.2019 | ||
NL | 14.08.2019 | ||
RS | 14.08.2019 | ||
SE | 14.08.2019 | ||
BG | 14.11.2019 | ||
NO | 14.11.2019 | ||
GR | 15.11.2019 | ||
IS | 14.12.2019 | ||
PT | 16.12.2019 | ||
Former [2020/11] | ES | 14.08.2019 | |
FI | 14.08.2019 | ||
HR | 14.08.2019 | ||
LT | 14.08.2019 | ||
LV | 14.08.2019 | ||
NL | 14.08.2019 | ||
RS | 14.08.2019 | ||
SE | 14.08.2019 | ||
BG | 14.11.2019 | ||
NO | 14.11.2019 | ||
GR | 15.11.2019 | ||
PT | 16.12.2019 | ||
Former [2020/10] | FI | 14.08.2019 | |
LT | 14.08.2019 | ||
NL | 14.08.2019 | ||
SE | 14.08.2019 | ||
BG | 14.11.2019 | ||
NO | 14.11.2019 | ||
PT | 16.12.2019 | ||
Former [2020/09] | FI | 14.08.2019 | |
LT | 14.08.2019 | ||
NL | 14.08.2019 | ||
NO | 14.11.2019 | ||
Former [2020/08] | LT | 14.08.2019 | |
NO | 14.11.2019 | Cited in | International search | [Y]US2002126062 (MATTHEWS PETER G [US]) [Y] 12* paragraph [0024] - paragraph [0028] *; | [Y]US2009245228 (OSTERLING JACOB KRISTIAN [SE]) [Y] 8 * paragraph [0031] - paragraph [0046] *; | [XYI]WO2010075865 (TELECOM ITALIA SPA [IT], et al) [X] 1-4,6,7,10,13 * page 12, line 20 - page 14, line 30; figures 3-5 * * page 16, line 16 - line 19 * * page 18, line 1 - page 19, line 2 * * page 24, line 22 - line 24 * [Y] 1-16 [I] 5,15; | [Y]EP2485562 (FUJITSU LTD [JP]) [Y] 1-16 * paragraph [0018] - paragraph [0021]; figure 5 *; | [Y]US2013120191 (ZHANG ZHAN [CN], et al) [Y] 11 * paragraph [0050] - paragraph [0051] *; | [Y] - "CPRI Specification V2.0 (2004-10-01)", INTERNET CITATION, (200410), URL: http://www.cpri.online/, (20051215), XP002359217 [Y] 1-16 * page 37, paragraph 4.2.9 - page 40, paragraph 4.2.9.3 * |