EP3158543 - METHOD FOR DETECTING A VIEWING ANGLE DEPENDENT FEATURE OF A DOCUMENT [Right-click to bookmark this link] | |||
Former [2017/17] | METHOD FOR DETECTING A VIEWING-ANGLE-DEPENDENT FEATURE OF A DOCUMENT | ||
[2021/29] | Status | No opposition filed within time limit Status updated on 19.08.2022 Database last updated on 26.07.2024 | |
Former | The patent has been granted Status updated on 10.09.2021 | ||
Former | Grant of patent is intended Status updated on 12.07.2021 | ||
Former | Examination is in progress Status updated on 05.10.2018 | ||
Former | Request for examination was made Status updated on 24.03.2017 | ||
Former | The international publication has been made Status updated on 09.01.2017 | Most recent event Tooltip | 27.04.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 29.05.2024 [2024/22] | Applicant(s) | For all designated states Bundesdruckerei GmbH Kommandantenstraße 18 10969 Berlin / DE | [2017/17] | Inventor(s) | 01 /
HARTL, Andreas Hüttenbrennergasse 17/P/4 A-8010 Graz / AT | 02 /
SCHMALSTIEG, Dieter Ursprungweg 146 A-8045 Graz / AT | 03 /
DRESSEL, Olaf Straße der Gemeinschaft 25B 14641 Wustermark / DE | [2017/17] | Representative(s) | Patentship Patentanwaltsgesellschaft mbH Paul-Gerhardt-Allee 50 81245 München / DE | [N/P] |
Former [2021/41] | Patentship Patentanwaltsgesellschaft mbH Elsenheimerstraße 65 80687 München / DE | ||
Former [2017/17] | Patentship Patentanwaltsgesellschaft mbH Elsenheimerstaße 65 80687 München / DE | Application number, filing date | 15728835.8 | 10.06.2015 | [2017/17] | WO2015EP62943 | Priority number, date | DE201410108492 | 17.06.2014 Original published format: DE102014108492 | [2017/17] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | WO2015193152 | Date: | 23.12.2015 | Language: | DE | [2015/51] | Type: | A1 Application with search report | No.: | EP3158543 | Date: | 26.04.2017 | Language: | DE | The application published by WIPO in one of the EPO official languages on 23.12.2015 takes the place of the publication of the European patent application. | [2017/17] | Type: | B1 Patent specification | No.: | EP3158543 | Date: | 13.10.2021 | Language: | DE | [2021/41] | Search report(s) | International search report - published on: | EP | 23.12.2015 | Classification | IPC: | G07D7/00, G07D7/20 | [2021/29] | CPC: |
G07D7/2008 (EP);
G07D7/0032 (EP)
|
Former IPC [2017/17] | G07D7/12, G07D7/20 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/17] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | Title | German: | VERFAHREN ZUM DETEKTIEREN EINES BLICKWINKELABHÄNGIGEN MERKMALS EINES DOKUMENTES | [2017/17] | English: | METHOD FOR DETECTING A VIEWING ANGLE DEPENDENT FEATURE OF A DOCUMENT | [2021/29] | French: | PROCÉDÉ POUR LA DÉTECTION D'UNE CARACTÉRISTIQUE DÉPENDANT DE L'ANGLE D'OBSERVATION | [2021/31] |
Former [2017/17] | METHOD FOR DETECTING A VIEWING-ANGLE-DEPENDENT FEATURE OF A DOCUMENT | ||
Former [2017/17] | PROCÉDÉ DE DÉTECTION D'UNE CARACTÉRISTIQUE D'UN DOCUMENT, DÉPENDANT DE L'ANGLE DE VUE | Entry into regional phase | 09.01.2017 | National basic fee paid | 09.01.2017 | Designation fee(s) paid | 09.01.2017 | Examination fee paid | Examination procedure | 09.01.2017 | Amendment by applicant (claims and/or description) | 09.01.2017 | Examination requested [2017/17] | 09.01.2017 | Date on which the examining division has become responsible | 09.10.2018 | Despatch of a communication from the examining division (Time limit: M04) | 31.01.2019 | Reply to a communication from the examining division | 15.06.2021 | Cancellation of oral proceeding that was planned for 17.06.2021 | 17.06.2021 | Date of oral proceedings (cancelled) | 13.07.2021 | Communication of intention to grant the patent | 07.09.2021 | Fee for grant paid | 07.09.2021 | Fee for publishing/printing paid | 07.09.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 14.07.2022 | No opposition filed within time limit [2022/38] | Fees paid | Renewal fee | 29.06.2017 | Renewal fee patent year 03 | 28.06.2018 | Renewal fee patent year 04 | 25.06.2019 | Renewal fee patent year 05 | 23.06.2020 | Renewal fee patent year 06 | 23.06.2021 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 10.06.2015 | AL | 13.10.2021 | CY | 13.10.2021 | CZ | 13.10.2021 | DK | 13.10.2021 | EE | 13.10.2021 | ES | 13.10.2021 | FI | 13.10.2021 | HR | 13.10.2021 | IT | 13.10.2021 | LT | 13.10.2021 | LV | 13.10.2021 | MC | 13.10.2021 | MK | 13.10.2021 | NL | 13.10.2021 | PL | 13.10.2021 | RO | 13.10.2021 | RS | 13.10.2021 | SE | 13.10.2021 | SI | 13.10.2021 | SK | 13.10.2021 | SM | 13.10.2021 | BG | 13.01.2022 | NO | 13.01.2022 | GR | 14.01.2022 | IS | 13.02.2022 | PT | 14.02.2022 | AT | 10.06.2022 | IE | 10.06.2022 | LU | 10.06.2022 | BE | 30.06.2022 | CH | 30.06.2022 | LI | 30.06.2022 | [2024/22] |
Former [2024/20] | HU | 10.06.2015 | |
AL | 13.10.2021 | ||
CY | 13.10.2021 | ||
CZ | 13.10.2021 | ||
DK | 13.10.2021 | ||
EE | 13.10.2021 | ||
ES | 13.10.2021 | ||
FI | 13.10.2021 | ||
HR | 13.10.2021 | ||
IT | 13.10.2021 | ||
LT | 13.10.2021 | ||
LV | 13.10.2021 | ||
MC | 13.10.2021 | ||
NL | 13.10.2021 | ||
PL | 13.10.2021 | ||
RO | 13.10.2021 | ||
RS | 13.10.2021 | ||
SE | 13.10.2021 | ||
SI | 13.10.2021 | ||
SK | 13.10.2021 | ||
SM | 13.10.2021 | ||
BG | 13.01.2022 | ||
NO | 13.01.2022 | ||
GR | 14.01.2022 | ||
IS | 13.02.2022 | ||
PT | 14.02.2022 | ||
AT | 10.06.2022 | ||
IE | 10.06.2022 | ||
LU | 10.06.2022 | ||
BE | 30.06.2022 | ||
CH | 30.06.2022 | ||
LI | 30.06.2022 | ||
Former [2024/18] | HU | 10.06.2015 | |
AL | 13.10.2021 | ||
CZ | 13.10.2021 | ||
DK | 13.10.2021 | ||
EE | 13.10.2021 | ||
ES | 13.10.2021 | ||
FI | 13.10.2021 | ||
HR | 13.10.2021 | ||
IT | 13.10.2021 | ||
LT | 13.10.2021 | ||
LV | 13.10.2021 | ||
MC | 13.10.2021 | ||
NL | 13.10.2021 | ||
PL | 13.10.2021 | ||
RO | 13.10.2021 | ||
RS | 13.10.2021 | ||
SE | 13.10.2021 | ||
SI | 13.10.2021 | ||
SK | 13.10.2021 | ||
SM | 13.10.2021 | ||
BG | 13.01.2022 | ||
NO | 13.01.2022 | ||
GR | 14.01.2022 | ||
IS | 13.02.2022 | ||
PT | 14.02.2022 | ||
AT | 10.06.2022 | ||
IE | 10.06.2022 | ||
LU | 10.06.2022 | ||
BE | 30.06.2022 | ||
CH | 30.06.2022 | ||
LI | 30.06.2022 | ||
Former [2023/48] | AL | 13.10.2021 | |
CZ | 13.10.2021 | ||
DK | 13.10.2021 | ||
EE | 13.10.2021 | ||
ES | 13.10.2021 | ||
FI | 13.10.2021 | ||
HR | 13.10.2021 | ||
IT | 13.10.2021 | ||
LT | 13.10.2021 | ||
LV | 13.10.2021 | ||
MC | 13.10.2021 | ||
NL | 13.10.2021 | ||
PL | 13.10.2021 | ||
RO | 13.10.2021 | ||
RS | 13.10.2021 | ||
SE | 13.10.2021 | ||
SI | 13.10.2021 | ||
SK | 13.10.2021 | ||
SM | 13.10.2021 | ||
BG | 13.01.2022 | ||
NO | 13.01.2022 | ||
GR | 14.01.2022 | ||
IS | 13.02.2022 | ||
PT | 14.02.2022 | ||
AT | 10.06.2022 | ||
IE | 10.06.2022 | ||
LU | 10.06.2022 | ||
BE | 30.06.2022 | ||
CH | 30.06.2022 | ||
LI | 30.06.2022 | ||
Former [2023/25] | AL | 13.10.2021 | |
CZ | 13.10.2021 | ||
DK | 13.10.2021 | ||
EE | 13.10.2021 | ||
ES | 13.10.2021 | ||
FI | 13.10.2021 | ||
HR | 13.10.2021 | ||
IT | 13.10.2021 | ||
LT | 13.10.2021 | ||
LV | 13.10.2021 | ||
MC | 13.10.2021 | ||
NL | 13.10.2021 | ||
PL | 13.10.2021 | ||
RO | 13.10.2021 | ||
RS | 13.10.2021 | ||
SE | 13.10.2021 | ||
SI | 13.10.2021 | ||
SK | 13.10.2021 | ||
SM | 13.10.2021 | ||
BG | 13.01.2022 | ||
NO | 13.01.2022 | ||
GR | 14.01.2022 | ||
IS | 13.02.2022 | ||
PT | 14.02.2022 | ||
IE | 10.06.2022 | ||
LU | 10.06.2022 | ||
BE | 30.06.2022 | ||
CH | 30.06.2022 | ||
LI | 30.06.2022 | ||
Former [2023/21] | AL | 13.10.2021 | |
CZ | 13.10.2021 | ||
DK | 13.10.2021 | ||
EE | 13.10.2021 | ||
ES | 13.10.2021 | ||
FI | 13.10.2021 | ||
HR | 13.10.2021 | ||
LT | 13.10.2021 | ||
LV | 13.10.2021 | ||
MC | 13.10.2021 | ||
NL | 13.10.2021 | ||
PL | 13.10.2021 | ||
RO | 13.10.2021 | ||
RS | 13.10.2021 | ||
SE | 13.10.2021 | ||
SI | 13.10.2021 | ||
SK | 13.10.2021 | ||
SM | 13.10.2021 | ||
BG | 13.01.2022 | ||
NO | 13.01.2022 | ||
GR | 14.01.2022 | ||
IS | 13.02.2022 | ||
PT | 14.02.2022 | ||
IE | 10.06.2022 | ||
LU | 10.06.2022 | ||
CH | 30.06.2022 | ||
LI | 30.06.2022 | ||
Former [2023/20] | AL | 13.10.2021 | |
CZ | 13.10.2021 | ||
DK | 13.10.2021 | ||
EE | 13.10.2021 | ||
ES | 13.10.2021 | ||
FI | 13.10.2021 | ||
HR | 13.10.2021 | ||
LT | 13.10.2021 | ||
LV | 13.10.2021 | ||
MC | 13.10.2021 | ||
NL | 13.10.2021 | ||
PL | 13.10.2021 | ||
RO | 13.10.2021 | ||
RS | 13.10.2021 | ||
SE | 13.10.2021 | ||
SI | 13.10.2021 | ||
SK | 13.10.2021 | ||
SM | 13.10.2021 | ||
BG | 13.01.2022 | ||
NO | 13.01.2022 | ||
GR | 14.01.2022 | ||
IS | 13.02.2022 | ||
PT | 14.02.2022 | ||
IE | 10.06.2022 | ||
Former [2023/08] | AL | 13.10.2021 | |
CZ | 13.10.2021 | ||
DK | 13.10.2021 | ||
EE | 13.10.2021 | ||
ES | 13.10.2021 | ||
FI | 13.10.2021 | ||
HR | 13.10.2021 | ||
LT | 13.10.2021 | ||
LV | 13.10.2021 | ||
MC | 13.10.2021 | ||
NL | 13.10.2021 | ||
PL | 13.10.2021 | ||
RO | 13.10.2021 | ||
RS | 13.10.2021 | ||
SE | 13.10.2021 | ||
SI | 13.10.2021 | ||
SK | 13.10.2021 | ||
SM | 13.10.2021 | ||
BG | 13.01.2022 | ||
NO | 13.01.2022 | ||
GR | 14.01.2022 | ||
IS | 13.02.2022 | ||
PT | 14.02.2022 | ||
Former [2023/01] | AL | 13.10.2021 | |
CZ | 13.10.2021 | ||
DK | 13.10.2021 | ||
EE | 13.10.2021 | ||
ES | 13.10.2021 | ||
FI | 13.10.2021 | ||
HR | 13.10.2021 | ||
LT | 13.10.2021 | ||
LV | 13.10.2021 | ||
NL | 13.10.2021 | ||
PL | 13.10.2021 | ||
RO | 13.10.2021 | ||
RS | 13.10.2021 | ||
SE | 13.10.2021 | ||
SI | 13.10.2021 | ||
SK | 13.10.2021 | ||
SM | 13.10.2021 | ||
BG | 13.01.2022 | ||
NO | 13.01.2022 | ||
GR | 14.01.2022 | ||
IS | 13.02.2022 | ||
PT | 14.02.2022 | ||
Former [2022/49] | AL | 13.10.2021 | |
CZ | 13.10.2021 | ||
DK | 13.10.2021 | ||
EE | 13.10.2021 | ||
ES | 13.10.2021 | ||
FI | 13.10.2021 | ||
HR | 13.10.2021 | ||
LT | 13.10.2021 | ||
LV | 13.10.2021 | ||
NL | 13.10.2021 | ||
PL | 13.10.2021 | ||
RO | 13.10.2021 | ||
RS | 13.10.2021 | ||
SE | 13.10.2021 | ||
SK | 13.10.2021 | ||
SM | 13.10.2021 | ||
BG | 13.01.2022 | ||
NO | 13.01.2022 | ||
GR | 14.01.2022 | ||
IS | 13.02.2022 | ||
PT | 14.02.2022 | ||
Former [2022/35] | CZ | 13.10.2021 | |
DK | 13.10.2021 | ||
EE | 13.10.2021 | ||
ES | 13.10.2021 | ||
FI | 13.10.2021 | ||
HR | 13.10.2021 | ||
LT | 13.10.2021 | ||
LV | 13.10.2021 | ||
NL | 13.10.2021 | ||
PL | 13.10.2021 | ||
RO | 13.10.2021 | ||
RS | 13.10.2021 | ||
SE | 13.10.2021 | ||
SK | 13.10.2021 | ||
SM | 13.10.2021 | ||
BG | 13.01.2022 | ||
NO | 13.01.2022 | ||
GR | 14.01.2022 | ||
IS | 13.02.2022 | ||
PT | 14.02.2022 | ||
Former [2022/34] | EE | 13.10.2021 | |
ES | 13.10.2021 | ||
FI | 13.10.2021 | ||
HR | 13.10.2021 | ||
LT | 13.10.2021 | ||
LV | 13.10.2021 | ||
NL | 13.10.2021 | ||
PL | 13.10.2021 | ||
RO | 13.10.2021 | ||
RS | 13.10.2021 | ||
SE | 13.10.2021 | ||
SM | 13.10.2021 | ||
BG | 13.01.2022 | ||
NO | 13.01.2022 | ||
GR | 14.01.2022 | ||
IS | 13.02.2022 | ||
PT | 14.02.2022 | ||
Former [2022/33] | ES | 13.10.2021 | |
FI | 13.10.2021 | ||
HR | 13.10.2021 | ||
LT | 13.10.2021 | ||
LV | 13.10.2021 | ||
NL | 13.10.2021 | ||
PL | 13.10.2021 | ||
RS | 13.10.2021 | ||
SE | 13.10.2021 | ||
SM | 13.10.2021 | ||
BG | 13.01.2022 | ||
NO | 13.01.2022 | ||
GR | 14.01.2022 | ||
IS | 13.02.2022 | ||
PT | 14.02.2022 | ||
Former [2022/25] | ES | 13.10.2021 | |
FI | 13.10.2021 | ||
HR | 13.10.2021 | ||
LT | 13.10.2021 | ||
LV | 13.10.2021 | ||
NL | 13.10.2021 | ||
PL | 13.10.2021 | ||
RS | 13.10.2021 | ||
SE | 13.10.2021 | ||
BG | 13.01.2022 | ||
NO | 13.01.2022 | ||
GR | 14.01.2022 | ||
IS | 13.02.2022 | ||
PT | 14.02.2022 | ||
Former [2022/24] | ES | 13.10.2021 | |
FI | 13.10.2021 | ||
HR | 13.10.2021 | ||
LT | 13.10.2021 | ||
LV | 13.10.2021 | ||
NL | 13.10.2021 | ||
PL | 13.10.2021 | ||
RS | 13.10.2021 | ||
SE | 13.10.2021 | ||
BG | 13.01.2022 | ||
GR | 14.01.2022 | ||
IS | 13.02.2022 | ||
PT | 14.02.2022 | ||
Former [2022/23] | ES | 13.10.2021 | |
FI | 13.10.2021 | ||
HR | 13.10.2021 | ||
LT | 13.10.2021 | ||
LV | 13.10.2021 | ||
PL | 13.10.2021 | ||
RS | 13.10.2021 | ||
BG | 13.01.2022 | ||
PT | 14.02.2022 | ||
Former [2022/22] | FI | 13.10.2021 | |
LT | 13.10.2021 | ||
RS | 13.10.2021 | ||
BG | 13.01.2022 | ||
Former [2022/21] | RS | 13.10.2021 | |
BG | 13.01.2022 | ||
Former [2022/19] | BG | 13.01.2022 | Cited in | International search | [XI]US2009154813 (BAXTER NICHOLAS [GB], et al) [X] 1,11-15 * paragraphs [0003] , [0011] - [0014] * * paragraphs [0018] , [0 29] - [0034] * * figures 4-7 * [I] 2-10; | [I]US2012163666 (RHOADS GEOFFREY B [US], et al) [I] 1-15 * paragraphs [0051] , [0056] , [0076] * * paragraphs [0077] , [0 83] - [0085] * * paragraphs [0096] - [0099] - [0106] * * paragraphs [0111] - [0113] - [0149] *; | [I]WO9201975 (D A H T FOUNDATION [NL]) [I] 1-15 * page 1, line 3 - page 4, line 10 *; | [I]US2005129282 (O'DOHERTY PHELIM A [IE], et al) [I] 1-15 * paragraphs [0016] , [0029] - [0032] * * paragraphs [0043] , [0044] , [0049] * * paragraphs [0060] , [0061] * * figures 1-3 *; | [A]WO2010116279 (LATENT IMAGE TECHNOLOGY LTD [IL], et al) [A] 11,12 * abstract * * page 1, line 15 - line 18 * * page 2, line 5 - line 6 * * page 7, line 27 - page 8, line 8 * * page 9, line 16 - line 25 * * page 14, line 28 - page 15, line 22 * | [A] - BROWN L G, "A SURVEY OF IMAGE REGISTRATION TECHNIQUES", ACM COMPUTING SURVEYS, ACM, NEW YORK, NY, US, US, (19921201), vol. 24, no. 4, doi:10.1145/146370.146374, ISSN 0360-0300, pages 325 - 376, XP000561460 [A] 3,7 * abstract * * page 326, column 1 - page 327, column 1 * DOI: http://dx.doi.org/10.1145/146370.146374 |