blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3161885

EP3161885 - PROCESS FOR MAKING CATHODE MATERIALS FOR LITHIUM ION BATTERIES [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  25.03.2022
Database last updated on 26.06.2024
FormerThe patent has been granted
Status updated on  16.04.2021
FormerGrant of patent is intended
Status updated on  11.01.2021
FormerExamination is in progress
Status updated on  03.04.2019
FormerRequest for examination was made
Status updated on  31.03.2017
FormerThe international publication has been made
Status updated on  22.11.2016
Most recent event   Tooltip14.06.2024Lapse of the patent in a contracting state
New state(s): TR
published on 17.07.2024 [2024/29]
Applicant(s)For all designated states
BASF SE
Carl-Bosch-Strasse 38
67056 Ludwigshafen am Rhein / DE
[2017/18]
Inventor(s)01 / VOLKOV, Aleksei
Erbgasse 10
67065 Ludwigshafen / DE
02 / LAMPERT, Jordan
1215 W 10th Street
Cleveland, Ohio 44113 / US
03 / RYLL, Thomas Michael
Johannes-Brahms-Strasse 4f
68542 Heddesheim / DE
04 / SHIN, Ji-Yong
Beethovenstrasse 12
68165 Mannheim / DE
05 / HOELZLE, Markus
Weinstrasse Süd 6h
67281 Kirchheim / DE
06 / EDER, Michael
Haardtblick 14
67319 Wattenheim / DE
 [2017/18]
Representative(s)BASF IP Association
BASF SE
G-FLP-C006
67056 Ludwigshafen / DE
[2017/18]
Application number, filing date15729856.319.06.2015
[2017/18]
WO2015EP63797
Priority number, dateEP2014017499130.06.2014         Original published format: EP 14174991
[2017/18]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2016000982
Date:07.01.2016
Language:EN
[2016/01]
Type: A1 Application with search report 
No.:EP3161885
Date:03.05.2017
Language:EN
The application published by WIPO in one of the EPO official languages on 07.01.2016 takes the place of the publication of the European patent application.
[2017/18]
Type: B1 Patent specification 
No.:EP3161885
Date:19.05.2021
Language:EN
[2021/20]
Search report(s)International search report - published on:EP07.01.2016
ClassificationIPC:H01M4/131, H01M4/505, H01M4/525, H01M10/0567, H01M10/42, C01G53/00, // H01M10/052
[2020/51]
CPC:
H01M4/525 (EP,CN,KR,US); C01G53/50 (EP,CN,KR,US); C01G53/006 (EP,US);
H01M10/0525 (KR,US); H01M10/0567 (EP,CN,KR,US); H01M10/4235 (EP,CN,KR,US);
H01M4/131 (EP,CN,KR,US); H01M4/485 (KR); H01M4/505 (EP,KR,US);
C01P2002/50 (US); C01P2002/88 (EP,CN,US); C01P2004/32 (EP,US);
C01P2004/51 (EP,CN,US); C01P2004/54 (EP,US); C01P2004/61 (EP,CN,KR,US);
C01P2006/12 (EP,CN,US); C01P2006/40 (EP,KR,US); H01M10/052 (EP,CN,US);
H01M2004/028 (US); H01M2300/0025 (EP,CN,KR,US); Y02E60/10 (EP) (-)
Former IPC [2017/18]H01M4/131, H01M4/525, C01G53/00, H01M10/0567
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2017/18]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
TitleGerman:VERFAHREN ZUR HERSTELLUNG VON KATHODENMATERIAL FÜR LITHIUMIONENBATTERIEN[2020/51]
English:PROCESS FOR MAKING CATHODE MATERIALS FOR LITHIUM ION BATTERIES[2017/18]
French:PROCÉDÉ DE FABRICATION DE MATÉRIAUX DE CATHODE POUR BATTERIES AU LITHIUM-ION[2020/51]
Former [2017/18]VERFAHREN ZUR HERSTELLUNG VON KATHODENMATERIAL FÜR LITHIUM-IONEN-BATTERIEN
Former [2017/18]PROCÉDÉ DE FABRICATION DE MATÉRIAUX CATHODIQUES POUR BATTERIES AU LITHIUM-ION
Entry into regional phase30.01.2017National basic fee paid 
30.01.2017Designation fee(s) paid 
30.01.2017Examination fee paid 
Examination procedure08.10.2015Request for preliminary examination filed
International Preliminary Examining Authority: EP
22.11.2016Amendment by applicant (claims and/or description)
22.11.2016Date on which the examining division has become responsible
30.01.2017Examination requested  [2017/18]
05.04.2019Despatch of a communication from the examining division (Time limit: M04)
14.06.2019Reply to a communication from the examining division
04.08.2020Despatch of a communication from the examining division (Time limit: M04)
24.09.2020Reply to a communication from the examining division
12.01.2021Communication of intention to grant the patent
09.04.2021Fee for grant paid
09.04.2021Fee for publishing/printing paid
09.04.2021Receipt of the translation of the claim(s)
Opposition(s)22.02.2022No opposition filed within time limit [2022/17]
Fees paidRenewal fee
30.06.2017Renewal fee patent year 03
02.07.2018Renewal fee patent year 04
08.07.2019Renewal fee patent year 05
30.06.2020Renewal fee patent year 06
Penalty fee
Additional fee for renewal fee
30.06.201905   M06   Fee paid on   02.01.2020
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU19.06.2015
AL19.05.2021
AT19.05.2021
CY19.05.2021
CZ19.05.2021
DK19.05.2021
EE19.05.2021
ES19.05.2021
HR19.05.2021
IT19.05.2021
LT19.05.2021
LV19.05.2021
MC19.05.2021
MK19.05.2021
NL19.05.2021
RO19.05.2021
RS19.05.2021
SI19.05.2021
SK19.05.2021
SM19.05.2021
TR19.05.2021
IE19.06.2021
LU19.06.2021
BE30.06.2021
CH30.06.2021
LI30.06.2021
FR19.07.2021
BG19.08.2021
GB19.08.2021
NO19.08.2021
GR20.08.2021
IS19.09.2021
PT20.09.2021
[2024/29]
Former [2024/22]HU19.06.2015
AL19.05.2021
AT19.05.2021
CY19.05.2021
CZ19.05.2021
DK19.05.2021
EE19.05.2021
ES19.05.2021
HR19.05.2021
IT19.05.2021
LT19.05.2021
LV19.05.2021
MC19.05.2021
MK19.05.2021
NL19.05.2021
RO19.05.2021
RS19.05.2021
SI19.05.2021
SK19.05.2021
SM19.05.2021
IE19.06.2021
LU19.06.2021
BE30.06.2021
CH30.06.2021
LI30.06.2021
FR19.07.2021
BG19.08.2021
GB19.08.2021
NO19.08.2021
GR20.08.2021
IS19.09.2021
PT20.09.2021
Former [2023/30]HU19.06.2015
AL19.05.2021
AT19.05.2021
CY19.05.2021
CZ19.05.2021
DK19.05.2021
EE19.05.2021
ES19.05.2021
HR19.05.2021
IT19.05.2021
LT19.05.2021
LV19.05.2021
MC19.05.2021
NL19.05.2021
RO19.05.2021
RS19.05.2021
SI19.05.2021
SK19.05.2021
SM19.05.2021
IE19.06.2021
LU19.06.2021
BE30.06.2021
CH30.06.2021
LI30.06.2021
FR19.07.2021
BG19.08.2021
GB19.08.2021
NO19.08.2021
GR20.08.2021
IS19.09.2021
PT20.09.2021
Former [2023/27]HU19.06.2015
AL19.05.2021
AT19.05.2021
CZ19.05.2021
DK19.05.2021
EE19.05.2021
ES19.05.2021
HR19.05.2021
IT19.05.2021
LT19.05.2021
LV19.05.2021
MC19.05.2021
NL19.05.2021
RO19.05.2021
RS19.05.2021
SI19.05.2021
SK19.05.2021
SM19.05.2021
IE19.06.2021
LU19.06.2021
BE30.06.2021
CH30.06.2021
LI30.06.2021
FR19.07.2021
BG19.08.2021
GB19.08.2021
NO19.08.2021
GR20.08.2021
IS19.09.2021
PT20.09.2021
Former [2022/36]AL19.05.2021
AT19.05.2021
CZ19.05.2021
DK19.05.2021
EE19.05.2021
ES19.05.2021
HR19.05.2021
IT19.05.2021
LT19.05.2021
LV19.05.2021
MC19.05.2021
NL19.05.2021
RO19.05.2021
RS19.05.2021
SI19.05.2021
SK19.05.2021
SM19.05.2021
IE19.06.2021
LU19.06.2021
BE30.06.2021
CH30.06.2021
LI30.06.2021
FR19.07.2021
BG19.08.2021
GB19.08.2021
NO19.08.2021
GR20.08.2021
IS19.09.2021
PT20.09.2021
Former [2022/35]AL19.05.2021
AT19.05.2021
CZ19.05.2021
DK19.05.2021
EE19.05.2021
ES19.05.2021
HR19.05.2021
LT19.05.2021
LV19.05.2021
MC19.05.2021
NL19.05.2021
RO19.05.2021
RS19.05.2021
SI19.05.2021
SK19.05.2021
SM19.05.2021
IE19.06.2021
LU19.06.2021
BE30.06.2021
CH30.06.2021
LI30.06.2021
FR19.07.2021
BG19.08.2021
GB19.08.2021
NO19.08.2021
GR20.08.2021
IS19.09.2021
PT20.09.2021
Former [2022/34]AL19.05.2021
AT19.05.2021
CZ19.05.2021
DK19.05.2021
EE19.05.2021
ES19.05.2021
HR19.05.2021
LT19.05.2021
LV19.05.2021
MC19.05.2021
NL19.05.2021
RO19.05.2021
RS19.05.2021
SI19.05.2021
SK19.05.2021
SM19.05.2021
IE19.06.2021
LU19.06.2021
BE30.06.2021
CH30.06.2021
LI30.06.2021
FR19.07.2021
BG19.08.2021
NO19.08.2021
GR20.08.2021
IS19.09.2021
PT20.09.2021
Former [2022/29]AL19.05.2021
AT19.05.2021
CZ19.05.2021
DK19.05.2021
EE19.05.2021
ES19.05.2021
HR19.05.2021
LT19.05.2021
LV19.05.2021
MC19.05.2021
NL19.05.2021
RO19.05.2021
RS19.05.2021
SI19.05.2021
SK19.05.2021
SM19.05.2021
IE19.06.2021
LU19.06.2021
CH30.06.2021
LI30.06.2021
FR19.07.2021
BG19.08.2021
NO19.08.2021
GR20.08.2021
IS19.09.2021
PT20.09.2021
Former [2022/26]AL19.05.2021
AT19.05.2021
CZ19.05.2021
DK19.05.2021
EE19.05.2021
ES19.05.2021
HR19.05.2021
LT19.05.2021
LV19.05.2021
MC19.05.2021
NL19.05.2021
RO19.05.2021
RS19.05.2021
SK19.05.2021
SM19.05.2021
IE19.06.2021
LU19.06.2021
CH30.06.2021
LI30.06.2021
FR19.07.2021
BG19.08.2021
NO19.08.2021
GR20.08.2021
IS19.09.2021
PT20.09.2021
Former [2022/23]AT19.05.2021
CZ19.05.2021
DK19.05.2021
EE19.05.2021
ES19.05.2021
HR19.05.2021
LT19.05.2021
LV19.05.2021
MC19.05.2021
NL19.05.2021
RO19.05.2021
RS19.05.2021
SK19.05.2021
SM19.05.2021
IE19.06.2021
LU19.06.2021
CH30.06.2021
LI30.06.2021
FR19.07.2021
BG19.08.2021
NO19.08.2021
GR20.08.2021
IS19.09.2021
PT20.09.2021
Former [2022/21]AT19.05.2021
CZ19.05.2021
DK19.05.2021
EE19.05.2021
ES19.05.2021
HR19.05.2021
LT19.05.2021
LV19.05.2021
MC19.05.2021
NL19.05.2021
RO19.05.2021
RS19.05.2021
SK19.05.2021
SM19.05.2021
IE19.06.2021
LU19.06.2021
CH30.06.2021
LI30.06.2021
BG19.08.2021
NO19.08.2021
GR20.08.2021
PT20.09.2021
IS22.12.2021
Former [2022/18]AT19.05.2021
CZ19.05.2021
DK19.05.2021
EE19.05.2021
ES19.05.2021
HR19.05.2021
LT19.05.2021
LV19.05.2021
MC19.05.2021
NL19.05.2021
RO19.05.2021
RS19.05.2021
SK19.05.2021
SM19.05.2021
LU19.06.2021
BG19.08.2021
NO19.08.2021
GR20.08.2021
PT20.09.2021
IS22.12.2021
Former [2022/10]AT19.05.2021
CZ19.05.2021
DK19.05.2021
EE19.05.2021
ES19.05.2021
HR19.05.2021
LT19.05.2021
LV19.05.2021
NL19.05.2021
RO19.05.2021
RS19.05.2021
SK19.05.2021
SM19.05.2021
BG19.08.2021
NO19.08.2021
GR20.08.2021
PT20.09.2021
IS22.12.2021
Former [2022/09]AT19.05.2021
CZ19.05.2021
DK19.05.2021
ES19.05.2021
HR19.05.2021
LT19.05.2021
LV19.05.2021
NL19.05.2021
RO19.05.2021
RS19.05.2021
SK19.05.2021
SM19.05.2021
BG19.08.2021
NO19.08.2021
GR20.08.2021
IS19.09.2021
PT20.09.2021
Former [2022/08]AT19.05.2021
CZ19.05.2021
DK19.05.2021
ES19.05.2021
HR19.05.2021
LT19.05.2021
LV19.05.2021
NL19.05.2021
RS19.05.2021
SM19.05.2021
BG19.08.2021
NO19.08.2021
GR20.08.2021
IS19.09.2021
PT20.09.2021
Former [2022/07]AT19.05.2021
ES19.05.2021
HR19.05.2021
LT19.05.2021
LV19.05.2021
NL19.05.2021
RS19.05.2021
SM19.05.2021
BG19.08.2021
NO19.08.2021
GR20.08.2021
IS19.09.2021
PT20.09.2021
Former [2022/04]AT19.05.2021
ES19.05.2021
HR19.05.2021
LT19.05.2021
LV19.05.2021
NL19.05.2021
RS19.05.2021
BG19.08.2021
NO19.08.2021
GR20.08.2021
IS19.09.2021
PT20.09.2021
Former [2021/51]AT19.05.2021
ES19.05.2021
HR19.05.2021
LT19.05.2021
LV19.05.2021
RS19.05.2021
BG19.08.2021
NO19.08.2021
GR20.08.2021
IS19.09.2021
PT20.09.2021
Former [2021/50]AT19.05.2021
HR19.05.2021
LT19.05.2021
LV19.05.2021
BG19.08.2021
NO19.08.2021
GR20.08.2021
PT20.09.2021
Former [2021/49]AT19.05.2021
HR19.05.2021
LT19.05.2021
LV19.05.2021
BG19.08.2021
NO19.08.2021
GR20.08.2021
Former [2021/47]AT19.05.2021
LT19.05.2021
BG19.08.2021
Former [2021/46]AT19.05.2021
LT19.05.2021
Cited inInternational search[Y]JPH11317232  (MITSUBISHI CHEM CORP) [Y] 12 * paragraphs [0009] - [0015] *;
 [IAY]JP2006202647  (HITACHI MAXELL) [I] 6-10 * paragraphs [0009] , [0 17] , [0 20] , [0 22] - [0024] - [0 18] , [0 43] - [0048] - [0 77] - [0080] * [A] 1-5 [Y] 12;
 [I]  - L. CROGUENNEC ET AL, "Effect of Aluminum Substitution on the Structure, Electrochemical Performance and Thermal Stability of Li1+x(Ni0.40Mn0.40Co0.20-zAlz)1-xO2", JOURNAL OF THE ELECTROCHEMICAL SOCIETY, (20110101), vol. 158, no. 6, doi:10.1149/1.3571479, ISSN 0013-4651, page A664, XP055205387 [I] 6-11 * sections Experimental, Results and Discussion *

DOI:   http://dx.doi.org/10.1149/1.3571479
 [A]  - KINSON C. KAM ET AL, "Aliovalent titanium substitution in layered mixed Li Ni-Mn-Co oxides for lithium battery applications", JOURNAL OF MATERIALS CHEMISTRY, (20110121), vol. 21, no. 27, doi:10.1039/c0jm04193a, ISSN 0959-9428, page 9991, XP055141876 [A] 1-12 * page 9991; table 1 *

DOI:   http://dx.doi.org/10.1039/c0jm04193a
    [ ] - Kinson C. Kam ET AL, "Electronic Supplementary Information for Aliovalent Titanium Substitution on Layered Mixed Ni-Mn-Co Oxides for Lithium-ion Battery Applications", Journal of Materials Chemistry, (20110121), pages 1 - 3, URL: http://www.rsc.org/suppdata/jm/c0/c0jm04193a/c0jm04193a.pdf, (20140923), XP055142001 [ ] * pages 2-3 *
ExaminationUS2005008563
 JP2007091573
 US2008248391
 CN103682319
 WO2014051089
 US2015243984
 EP3020084
 EP3047531
    - ZHOU F ET AL, "The effect of Al substitution on the reactivity of delithiated LiNi1/3Mn1/3Co(1/3-z)AlzO2 with non-aqueous electrolyte", ELECTROCHEMISTRY COMMUNICATIONS, ELSEVIER, AMSTERDAM, NL, vol. 10, no. 8, doi:10.1016/J.ELECOM.2008.05.036, ISSN 1388-2481, (20080801), pages 1168 - 1171, (20080527), XP023183072

DOI:   http://dx.doi.org/10.1016/j.elecom.2008.05.036
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.