blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3167014

EP3167014 - TWO-COMPONENT PAINT COMPOSITION AND MULTILAYER COATING FORMATION METHOD USING THIS [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  19.02.2021
Database last updated on 13.09.2024
FormerThe patent has been granted
Status updated on  13.03.2020
FormerGrant of patent is intended
Status updated on  14.07.2019
FormerRequest for examination was made
Status updated on  18.04.2017
FormerThe international publication has been made
Status updated on  20.01.2017
Most recent event   Tooltip08.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 10.08.2022  [2022/32]
Applicant(s)For all designated states
BASF Coatings GmbH
Glasuritstrasse 1
48165 Münster / DE
[2017/20]
Inventor(s)01 / TSUNODA, Takeshi
296 Shimokurata-cho
Totsuka-ku
Yokohama 244-0815 / JP
 [2017/20]
Representative(s)BASF IP Association
BASF SE
G-FLP-C006
67056 Ludwigshafen / DE
[2017/20]
Application number, filing date15730982.403.06.2015
[2017/20]
WO2015EP62418
Priority number, dateJP2014014092808.07.2014         Original published format: JP 2014140928
[2017/20]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2016005115
Date:14.01.2016
Language:EN
[2016/02]
Type: A1 Application with search report 
No.:EP3167014
Date:17.05.2017
Language:EN
The application published by WIPO in one of the EPO official languages on 14.01.2016 takes the place of the publication of the European patent application.
[2017/20]
Type: B1 Patent specification 
No.:EP3167014
Date:15.04.2020
Language:EN
[2020/16]
Search report(s)International search report - published on:EP14.01.2016
ClassificationIPC:C09D4/06, C08F220/20, C09D133/06, C09D183/00
[2017/20]
CPC:
C09D133/066 (EP,CN,KR,RU,US); B05D7/532 (RU,US); C09D4/06 (EP,CN,KR,RU,US);
B05D3/0254 (KR); B05D7/24 (KR); B05D7/56 (RU,US);
C08F220/20 (EP,CN,KR,RU,US); C08G77/442 (EP,CN,KR,RU,US); C08K5/3435 (RU,US);
C08K5/3475 (RU,US); C09D143/04 (RU,US); C09D183/00 (EP,RU,US);
C09D183/10 (EP,CN,RU,US); C09D7/63 (EP,RU,US); C08J3/241 (US);
C08J3/243 (US) (-)
C-Set:
C09D133/066, C08L43/04 (US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2017/20]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
TitleGerman:ZWEIKOMPONENTIGE FARBZUSAMMENSETZUNG UND FORMUNGSVERFAHREN EINER MEHRSCHICHTIGEN BESCHICHTUNG DAMIT[2017/20]
English:TWO-COMPONENT PAINT COMPOSITION AND MULTILAYER COATING FORMATION METHOD USING THIS[2017/20]
French:COMPOSITION DE PEINTURE À DEUX COMPOSANTS ET PROCÉDÉ DE FORMATION D'UN REVÊTEMENT MULTICOUCHE L'UTILISANT[2017/20]
Entry into regional phase08.02.2017National basic fee paid 
08.02.2017Designation fee(s) paid 
08.02.2017Examination fee paid 
Examination procedure19.01.2017Date on which the examining division has become responsible
08.02.2017Examination requested  [2017/20]
17.07.2017Amendment by applicant (claims and/or description)
15.07.2019Communication of intention to grant the patent
08.10.2019Fee for grant paid
08.10.2019Fee for publishing/printing paid
08.10.2019Receipt of the translation of the claim(s)
Opposition(s)18.01.2021No opposition filed within time limit [2021/12]
Fees paidRenewal fee
30.06.2017Renewal fee patent year 03
02.07.2018Renewal fee patent year 04
08.07.2019Renewal fee patent year 05
Penalty fee
Additional fee for renewal fee
30.06.201905   M06   Fee paid on   02.01.2020
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU03.06.2015
AL15.04.2020
AT15.04.2020
CY15.04.2020
CZ15.04.2020
DK15.04.2020
EE15.04.2020
ES15.04.2020
FI15.04.2020
HR15.04.2020
IT15.04.2020
LT15.04.2020
LV15.04.2020
MC15.04.2020
MK15.04.2020
MT15.04.2020
NL15.04.2020
PL15.04.2020
RO15.04.2020
RS15.04.2020
SE15.04.2020
SI15.04.2020
SK15.04.2020
SM15.04.2020
TR15.04.2020
IE03.06.2020
LU03.06.2020
FR15.06.2020
BE30.06.2020
CH30.06.2020
LI30.06.2020
BG15.07.2020
GB15.07.2020
NO15.07.2020
GR16.07.2020
IS15.08.2020
PT17.08.2020
[2022/32]
Former [2022/27]HU03.06.2015
AL15.04.2020
AT15.04.2020
CY15.04.2020
CZ15.04.2020
DK15.04.2020
EE15.04.2020
ES15.04.2020
FI15.04.2020
HR15.04.2020
IT15.04.2020
LT15.04.2020
LV15.04.2020
MC15.04.2020
MT15.04.2020
NL15.04.2020
PL15.04.2020
RO15.04.2020
RS15.04.2020
SE15.04.2020
SI15.04.2020
SK15.04.2020
SM15.04.2020
TR15.04.2020
IE03.06.2020
LU03.06.2020
FR15.06.2020
BE30.06.2020
CH30.06.2020
LI30.06.2020
BG15.07.2020
GB15.07.2020
NO15.07.2020
GR16.07.2020
IS15.08.2020
PT17.08.2020
Former [2021/23]AL15.04.2020
AT15.04.2020
CZ15.04.2020
DK15.04.2020
EE15.04.2020
ES15.04.2020
FI15.04.2020
HR15.04.2020
IT15.04.2020
LT15.04.2020
LV15.04.2020
MC15.04.2020
NL15.04.2020
PL15.04.2020
RO15.04.2020
RS15.04.2020
SE15.04.2020
SI15.04.2020
SK15.04.2020
SM15.04.2020
IE03.06.2020
LU03.06.2020
FR15.06.2020
BE30.06.2020
CH30.06.2020
LI30.06.2020
BG15.07.2020
GB15.07.2020
NO15.07.2020
GR16.07.2020
IS15.08.2020
PT17.08.2020
Former [2021/22]AL15.04.2020
AT15.04.2020
CZ15.04.2020
DK15.04.2020
EE15.04.2020
ES15.04.2020
FI15.04.2020
HR15.04.2020
IT15.04.2020
LT15.04.2020
LV15.04.2020
MC15.04.2020
NL15.04.2020
PL15.04.2020
RO15.04.2020
RS15.04.2020
SE15.04.2020
SK15.04.2020
SM15.04.2020
IE03.06.2020
LU03.06.2020
CH30.06.2020
LI30.06.2020
BG15.07.2020
GB15.07.2020
NO15.07.2020
GR16.07.2020
IS15.08.2020
PT17.08.2020
Former [2021/20]AL15.04.2020
AT15.04.2020
CZ15.04.2020
DK15.04.2020
EE15.04.2020
ES15.04.2020
FI15.04.2020
HR15.04.2020
IT15.04.2020
LT15.04.2020
LV15.04.2020
MC15.04.2020
NL15.04.2020
PL15.04.2020
RO15.04.2020
RS15.04.2020
SE15.04.2020
SK15.04.2020
SM15.04.2020
IE03.06.2020
LU03.06.2020
CH30.06.2020
LI30.06.2020
BG15.07.2020
NO15.07.2020
GR16.07.2020
IS15.08.2020
PT17.08.2020
Former [2021/15]AL15.04.2020
AT15.04.2020
CZ15.04.2020
DK15.04.2020
EE15.04.2020
ES15.04.2020
FI15.04.2020
HR15.04.2020
IT15.04.2020
LT15.04.2020
LV15.04.2020
MC15.04.2020
NL15.04.2020
PL15.04.2020
RO15.04.2020
RS15.04.2020
SE15.04.2020
SK15.04.2020
SM15.04.2020
LU03.06.2020
BG15.07.2020
NO15.07.2020
GR16.07.2020
IS15.08.2020
PT17.08.2020
Former [2021/10]AL15.04.2020
AT15.04.2020
CZ15.04.2020
DK15.04.2020
EE15.04.2020
ES15.04.2020
FI15.04.2020
HR15.04.2020
IT15.04.2020
LT15.04.2020
LV15.04.2020
MC15.04.2020
NL15.04.2020
PL15.04.2020
RO15.04.2020
RS15.04.2020
SE15.04.2020
SK15.04.2020
SM15.04.2020
BG15.07.2020
NO15.07.2020
GR16.07.2020
IS15.08.2020
PT17.08.2020
Former [2021/09]AL15.04.2020
AT15.04.2020
CZ15.04.2020
DK15.04.2020
EE15.04.2020
ES15.04.2020
FI15.04.2020
HR15.04.2020
IT15.04.2020
LT15.04.2020
LV15.04.2020
MC15.04.2020
NL15.04.2020
RO15.04.2020
RS15.04.2020
SE15.04.2020
SM15.04.2020
BG15.07.2020
NO15.07.2020
GR16.07.2020
IS15.08.2020
PT17.08.2020
Former [2021/08]AL15.04.2020
DK15.04.2020
ES15.04.2020
FI15.04.2020
HR15.04.2020
LT15.04.2020
LV15.04.2020
NL15.04.2020
RO15.04.2020
RS15.04.2020
SE15.04.2020
SM15.04.2020
BG15.07.2020
NO15.07.2020
GR16.07.2020
IS15.08.2020
PT17.08.2020
Former [2021/04]AL15.04.2020
FI15.04.2020
HR15.04.2020
LT15.04.2020
LV15.04.2020
NL15.04.2020
RS15.04.2020
SE15.04.2020
BG15.07.2020
NO15.07.2020
GR16.07.2020
IS15.08.2020
PT17.08.2020
Former [2021/01]FI15.04.2020
HR15.04.2020
LT15.04.2020
LV15.04.2020
NL15.04.2020
RS15.04.2020
SE15.04.2020
BG15.07.2020
NO15.07.2020
GR16.07.2020
IS15.08.2020
PT17.08.2020
Former [2020/51]FI15.04.2020
HR15.04.2020
LT15.04.2020
LV15.04.2020
NL15.04.2020
RS15.04.2020
SE15.04.2020
NO15.07.2020
GR16.07.2020
IS15.08.2020
PT17.08.2020
Former [2020/50]FI15.04.2020
HR15.04.2020
LT15.04.2020
LV15.04.2020
NL15.04.2020
SE15.04.2020
NO15.07.2020
GR16.07.2020
IS15.08.2020
PT17.08.2020
Former [2020/48]FI15.04.2020
LT15.04.2020
NL15.04.2020
SE15.04.2020
NO15.07.2020
IS15.08.2020
PT17.08.2020
Former [2020/47]LT15.04.2020
NO15.07.2020
IS15.08.2020
Former [2020/46]IS15.08.2020
Cited inInternational search[Y]US2002016418  (MARUYAMA TSUTOMU [JP], et al);
 [Y]WO2009024351  (BASF COATINGS JAPAN LTD [JP], et al);
 [Y]GB2479075  (KANSAI PAINT CO LTD [JP]);
 [Y]US2013136865  (GROENEWOLT MATTHIJS [DE], et al);
 [Y]US2014037851  (GROENEWOLT MATTHIJS [DE], et al)
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.