blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3155779

EP3155779 - COMPRESSED PREAMBLE FOR A WIRELESS COMMUNICATION SYSTEM [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  21.08.2020
Database last updated on 03.10.2024
FormerThe patent has been granted
Status updated on  13.09.2019
FormerGrant of patent is intended
Status updated on  21.05.2019
FormerExamination is in progress
Status updated on  24.08.2018
FormerRequest for examination was made
Status updated on  20.03.2017
FormerThe international publication has been made
Status updated on  12.12.2016
Most recent event   Tooltip08.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 10.08.2022  [2022/32]
Applicant(s)For all designated states
Marvell World Trade Ltd.
L'Horizon
Gunsite Road
Brittons Hill
St. Michael 14027 / BB
[2017/16]
Inventor(s)01 / SRINIVASA, Sudhir
358 Calado Avenue
Campbell, CA 95008 / US
02 / HUANG, Jie
6168 Meridian Avenue
San Jose, CA 95120 / US
03 / ZHANG, Hongyuan
4707 Paseo Padre Parkway
Fremont, CA 94555 / US
04 / ZHENG, Xiayu
1189 Fargate Circle
San Jose, CA 95131 / US
05 / CAO, Rui
4397 Nicolet Avenue
Fremont, CA 94536 / US
06 / XU, Mingguang
3434 Vistaview Drive
San Jose, CA 95132 / US
 [2017/16]
Representative(s)Grünecker Patent- und Rechtsanwälte PartG mbB
Leopoldstraße 4
80802 München / DE
[2017/16]
Application number, filing date15731212.511.06.2015
[2017/16]
WO2015US35403
Priority number, dateUS201462010787P11.06.2014         Original published format: US 201462010787 P
US201462027525P22.07.2014         Original published format: US 201462027525 P
US201462034502P07.08.2014         Original published format: US 201462034502 P
US201462041858P26.08.2014         Original published format: US 201462041858 P
US201462051089P16.09.2014         Original published format: US 201462051089 P
US201462087083P03.12.2014         Original published format: US 201462087083 P
US201462094825P19.12.2014         Original published format: US 201462094825 P
US201562148456P16.04.2015         Original published format: US 201562148456 P
US201562168652P29.05.2015         Original published format: US 201562168652 P
[2017/16]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2015191903
Date:17.12.2015
Language:EN
[2015/50]
Type: A1 Application with search report 
No.:EP3155779
Date:19.04.2017
Language:EN
The application published by WIPO in one of the EPO official languages on 17.12.2015 takes the place of the publication of the European patent application.
[2017/16]
Type: B1 Patent specification 
No.:EP3155779
Date:16.10.2019
Language:EN
[2019/42]
Search report(s)International search report - published on:EP17.12.2015
ClassificationIPC:H04L27/26
[2017/16]
CPC:
H04L27/2602 (EP,CN,US); H04L27/26025 (EP,CN,KR,US); H04B7/066 (KR,US);
H04L1/0008 (KR); H04L1/0009 (KR,US); H04L1/0057 (KR,US);
H04L27/2605 (KR,US); H04L27/2613 (KR); H04L27/2627 (EP,CN,KR,US);
H04L27/2628 (KR); H04L27/2634 (EP,CN,KR,US); H04L5/0007 (KR,US);
H04L5/0046 (KR,US); H04L27/2603 (EP,CN,US); H04L27/26035 (EP,CN,US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2017/16]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
TitleGerman:KOMPRIMIERTE PRÄAMBEL FÜR EIN DRAHTLOSES KOMMUNIKATIONSSYSTEM[2019/24]
English:COMPRESSED PREAMBLE FOR A WIRELESS COMMUNICATION SYSTEM[2017/16]
French:PREAMBULE COMPRIME POUR UN SYSTEME DE COMMUNICATION SANS FIL[2019/25]
Former [2017/16]KOMPRIMIERTE PRÄAMBEL FÜR EIN DRAHTLOSKOMMUNIKATIONSSYSTEM
Former [2017/16]PRÉAMBULE COMPRESSÉ POUR UN SYSTÈME DE COMMUNICATION SANS FIL
Entry into regional phase12.12.2016National basic fee paid 
12.12.2016Designation fee(s) paid 
12.12.2016Examination fee paid 
Examination procedure12.12.2016Examination requested  [2017/16]
12.12.2016Date on which the examining division has become responsible
28.07.2017Amendment by applicant (claims and/or description)
24.08.2018Despatch of a communication from the examining division (Time limit: M04)
21.12.2018Reply to a communication from the examining division
22.05.2019Communication of intention to grant the patent
05.09.2019Fee for grant paid
05.09.2019Fee for publishing/printing paid
05.09.2019Receipt of the translation of the claim(s)
Opposition(s)17.07.2020No opposition filed within time limit [2020/39]
Fees paidRenewal fee
27.06.2017Renewal fee patent year 03
27.06.2018Renewal fee patent year 04
27.06.2019Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU11.06.2015
AL16.10.2019
AT16.10.2019
CY16.10.2019
CZ16.10.2019
DK16.10.2019
EE16.10.2019
ES16.10.2019
FI16.10.2019
HR16.10.2019
IT16.10.2019
LT16.10.2019
LV16.10.2019
MC16.10.2019
MK16.10.2019
MT16.10.2019
NL16.10.2019
PL16.10.2019
RO16.10.2019
RS16.10.2019
SE16.10.2019
SI16.10.2019
SK16.10.2019
SM16.10.2019
TR16.10.2019
BG16.01.2020
NO16.01.2020
GR17.01.2020
IS16.02.2020
PT17.02.2020
IE11.06.2020
LU11.06.2020
BE30.06.2020
CH30.06.2020
LI30.06.2020
[2022/32]
Former [2022/27]HU11.06.2015
AL16.10.2019
AT16.10.2019
CY16.10.2019
CZ16.10.2019
DK16.10.2019
EE16.10.2019
ES16.10.2019
FI16.10.2019
HR16.10.2019
IT16.10.2019
LT16.10.2019
LV16.10.2019
MC16.10.2019
MT16.10.2019
NL16.10.2019
PL16.10.2019
RO16.10.2019
RS16.10.2019
SE16.10.2019
SI16.10.2019
SK16.10.2019
SM16.10.2019
TR16.10.2019
BG16.01.2020
NO16.01.2020
GR17.01.2020
IS16.02.2020
PT17.02.2020
IE11.06.2020
LU11.06.2020
BE30.06.2020
CH30.06.2020
LI30.06.2020
Former [2021/24]AL16.10.2019
AT16.10.2019
CZ16.10.2019
DK16.10.2019
EE16.10.2019
ES16.10.2019
FI16.10.2019
HR16.10.2019
IT16.10.2019
LT16.10.2019
LV16.10.2019
MC16.10.2019
NL16.10.2019
PL16.10.2019
RO16.10.2019
RS16.10.2019
SE16.10.2019
SI16.10.2019
SK16.10.2019
SM16.10.2019
BG16.01.2020
NO16.01.2020
GR17.01.2020
IS16.02.2020
PT17.02.2020
IE11.06.2020
LU11.06.2020
BE30.06.2020
CH30.06.2020
LI30.06.2020
Former [2021/20]AL16.10.2019
AT16.10.2019
CZ16.10.2019
DK16.10.2019
EE16.10.2019
ES16.10.2019
FI16.10.2019
HR16.10.2019
IT16.10.2019
LT16.10.2019
LV16.10.2019
MC16.10.2019
NL16.10.2019
PL16.10.2019
RO16.10.2019
RS16.10.2019
SE16.10.2019
SI16.10.2019
SK16.10.2019
SM16.10.2019
BG16.01.2020
NO16.01.2020
GR17.01.2020
IS16.02.2020
PT17.02.2020
IE11.06.2020
LU11.06.2020
CH30.06.2020
LI30.06.2020
Former [2021/15]AL16.10.2019
AT16.10.2019
CZ16.10.2019
DK16.10.2019
EE16.10.2019
ES16.10.2019
FI16.10.2019
HR16.10.2019
IT16.10.2019
LT16.10.2019
LV16.10.2019
MC16.10.2019
NL16.10.2019
PL16.10.2019
RO16.10.2019
RS16.10.2019
SE16.10.2019
SI16.10.2019
SK16.10.2019
SM16.10.2019
BG16.01.2020
NO16.01.2020
GR17.01.2020
IS16.02.2020
PT17.02.2020
LU11.06.2020
Former [2021/12]AL16.10.2019
AT16.10.2019
CZ16.10.2019
DK16.10.2019
EE16.10.2019
ES16.10.2019
FI16.10.2019
HR16.10.2019
IT16.10.2019
LT16.10.2019
LV16.10.2019
MC16.10.2019
NL16.10.2019
PL16.10.2019
RO16.10.2019
RS16.10.2019
SE16.10.2019
SI16.10.2019
SK16.10.2019
SM16.10.2019
BG16.01.2020
NO16.01.2020
GR17.01.2020
IS16.02.2020
PT17.02.2020
Former [2020/51]AL16.10.2019
AT16.10.2019
CZ16.10.2019
DK16.10.2019
EE16.10.2019
ES16.10.2019
FI16.10.2019
HR16.10.2019
IT16.10.2019
LT16.10.2019
LV16.10.2019
NL16.10.2019
PL16.10.2019
RO16.10.2019
RS16.10.2019
SE16.10.2019
SI16.10.2019
SK16.10.2019
SM16.10.2019
BG16.01.2020
NO16.01.2020
GR17.01.2020
IS16.02.2020
PT17.02.2020
Former [2020/38]AL16.10.2019
AT16.10.2019
CZ16.10.2019
DK16.10.2019
EE16.10.2019
ES16.10.2019
FI16.10.2019
HR16.10.2019
IT16.10.2019
LT16.10.2019
LV16.10.2019
NL16.10.2019
PL16.10.2019
RO16.10.2019
RS16.10.2019
SE16.10.2019
SK16.10.2019
SM16.10.2019
BG16.01.2020
NO16.01.2020
GR17.01.2020
IS16.02.2020
PT17.02.2020
Former [2020/37]AL16.10.2019
AT16.10.2019
CZ16.10.2019
DK16.10.2019
EE16.10.2019
ES16.10.2019
FI16.10.2019
HR16.10.2019
LT16.10.2019
LV16.10.2019
NL16.10.2019
PL16.10.2019
RO16.10.2019
RS16.10.2019
SE16.10.2019
SK16.10.2019
SM16.10.2019
BG16.01.2020
NO16.01.2020
GR17.01.2020
IS16.02.2020
PT17.02.2020
Former [2020/36]AL16.10.2019
AT16.10.2019
CZ16.10.2019
DK16.10.2019
EE16.10.2019
ES16.10.2019
FI16.10.2019
HR16.10.2019
LT16.10.2019
LV16.10.2019
NL16.10.2019
PL16.10.2019
RO16.10.2019
RS16.10.2019
SE16.10.2019
BG16.01.2020
NO16.01.2020
GR17.01.2020
IS16.02.2020
PT17.02.2020
Former [2020/35]AL16.10.2019
AT16.10.2019
CZ16.10.2019
ES16.10.2019
FI16.10.2019
HR16.10.2019
LT16.10.2019
LV16.10.2019
NL16.10.2019
PL16.10.2019
RO16.10.2019
RS16.10.2019
SE16.10.2019
BG16.01.2020
NO16.01.2020
GR17.01.2020
PT17.02.2020
IS24.02.2020
Former [2020/34]AL16.10.2019
AT16.10.2019
ES16.10.2019
FI16.10.2019
HR16.10.2019
LT16.10.2019
LV16.10.2019
NL16.10.2019
PL16.10.2019
RS16.10.2019
SE16.10.2019
BG16.01.2020
NO16.01.2020
GR17.01.2020
PT17.02.2020
IS24.02.2020
Former [2020/32]AL16.10.2019
AT16.10.2019
FI16.10.2019
HR16.10.2019
LT16.10.2019
LV16.10.2019
NL16.10.2019
PL16.10.2019
RS16.10.2019
SE16.10.2019
BG16.01.2020
NO16.01.2020
GR17.01.2020
PT17.02.2020
IS24.02.2020
Former [2020/25]AT16.10.2019
FI16.10.2019
HR16.10.2019
LT16.10.2019
LV16.10.2019
NL16.10.2019
PL16.10.2019
RS16.10.2019
SE16.10.2019
BG16.01.2020
NO16.01.2020
GR17.01.2020
PT17.02.2020
IS24.02.2020
Former [2020/24]AT16.10.2019
FI16.10.2019
LT16.10.2019
LV16.10.2019
NL16.10.2019
PL16.10.2019
SE16.10.2019
BG16.01.2020
NO16.01.2020
GR17.01.2020
PT17.02.2020
IS24.02.2020
Former [2020/23]AT16.10.2019
FI16.10.2019
LT16.10.2019
LV16.10.2019
NL16.10.2019
PL16.10.2019
SE16.10.2019
BG16.01.2020
NO16.01.2020
GR17.01.2020
PT17.02.2020
Former [2020/22]FI16.10.2019
LT16.10.2019
NL16.10.2019
SE16.10.2019
BG16.01.2020
NO16.01.2020
PT17.02.2020
Former [2020/21]NL16.10.2019
NO16.01.2020
Former [2020/20]NL16.10.2019
Cited inInternational search[XI]US2012320889  (ZHANG HONGYUAN [US], et al) [X] 1,5,7,11 * figure 8 * * paragraph [0094] * [I] 2-4,6,8-10,12-21;
 [I]  - JINYOUNG CHUN ET AL, "Legacy Support on HEW frame structure", INTERNET CITATION, (20130916), pages 1 - 8, URL: https://mentor.ieee.org/802.11/dcn/13/11-13-1057-00-0hew-legacy-support-on-hew-frame-structure.pptx, (20140821), XP002728788 [I] 1-21 * page 6 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.