EP3152406 - METHOD FOR DIMENSIONING A TURBOMACHINE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 05.07.2019 Database last updated on 17.07.2024 | |
Former | The patent has been granted Status updated on 27.07.2018 | ||
Former | Grant of patent is intended Status updated on 22.03.2018 | ||
Former | Request for examination was made Status updated on 10.03.2017 | ||
Former | The international publication has been made Status updated on 18.11.2016 | Most recent event Tooltip | 01.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 03.08.2022 [2022/31] | Applicant(s) | For all designated states SAFRAN AIRCRAFT ENGINES 2 boulevard du Général Martial Valin 75015 Paris / FR | For all designated states Ecole Centrale de Lyon 36, avenue Guy de Collongue 69130 Ecully / FR | For all designated states Centre National de la Recherche Scientifique (CNRS) 3, rue Michel Ange 75016 Paris / FR | For all designated states Ecole Nationale d'Ingénieurs de Saint-Etienne 58, rue Jean Parot 42100 Saint-Etienne / FR | [2018/35] |
Former [2017/15] | For all designated states SAFRAN AIRCRAFT ENGINES 2 boulevard du Général Martial Valin 75015 Paris / FR | ||
For all designated states Ecole Centrale de Lyon 36, avenue Guy de Collongue 69130 Ecully / FR | |||
For all designated states Centre National de la Recherche Scientifique (CNRS) 3, Rue Michel Ange 75016 Paris / FR | |||
For all designated states Ecole Nationale d'Ingénieurs de Saint Etienne 58 Rue Jean Parot 42100 Saint Etienne / FR | Inventor(s) | 01 /
PARENT, Marie-Océane c/o SNECMA 2 Boulevard du Général Martial Valin F-75015 Paris / FR | 02 /
CHEVILLOT, Fabrice, Joël, Luc c/o SNECMA 2 Boulevard du Général Martial Valin F-75015 Paris / FR | 03 /
THOUVEREZ, Fabrice, Hugues, Jean, Pierre 27 Chemin de la Vernique F-69160 Tassin-la-Demi-Lune / FR | [2017/15] | Representative(s) | Regimbeau 20, rue de Chazelles 75847 Paris Cedex 17 / FR | [2017/15] | Application number, filing date | 15732841.0 | 03.06.2015 | [2017/15] | WO2015FR51466 | Priority number, date | FR20140055190 | 06.06.2014 Original published format: FR 1455190 | [2017/15] | Filing language | FR | Procedural language | FR | Publication | Type: | A1 Application with search report | No.: | WO2015185857 | Date: | 10.12.2015 | Language: | FR | [2015/49] | Type: | A1 Application with search report | No.: | EP3152406 | Date: | 12.04.2017 | Language: | FR | The application published by WIPO in one of the EPO official languages on 10.12.2015 takes the place of the publication of the European patent application. | [2017/15] | Type: | B1 Patent specification | No.: | EP3152406 | Date: | 29.08.2018 | Language: | FR | [2018/35] | Search report(s) | International search report - published on: | EP | 10.12.2015 | Classification | IPC: | F01D11/14 | [2017/15] | CPC: |
F01D11/14 (EP,CN,RU,US);
G06F30/17 (CN);
G01B21/04 (RU,US);
G01B21/22 (RU,US);
F05D2260/81 (EP,CN,US);
G01B21/24 (US);
G01B21/32 (US)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/15] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | Title | German: | VERFAHREN ZUR DIMENSIONIERUNG EINER TURBOMASCHINE | [2017/15] | English: | METHOD FOR DIMENSIONING A TURBOMACHINE | [2017/15] | French: | PROCÉDÉ DE DIMENSIONNEMENT D'UNE TURBOMACHINE | [2017/15] | Entry into regional phase | 05.01.2017 | National basic fee paid | 05.01.2017 | Designation fee(s) paid | 05.01.2017 | Examination fee paid | Examination procedure | 05.01.2017 | Examination requested [2017/15] | 05.01.2017 | Date on which the examining division has become responsible | 20.03.2018 | Communication of intention to grant the patent | 19.07.2018 | Fee for grant paid | 19.07.2018 | Fee for publishing/printing paid | 19.07.2018 | Receipt of the translation of the claim(s) | Opposition(s) | 31.05.2019 | No opposition filed within time limit [2019/32] | Fees paid | Renewal fee | 22.06.2017 | Renewal fee patent year 03 | 22.06.2018 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 03.06.2015 | AL | 29.08.2018 | AT | 29.08.2018 | CY | 29.08.2018 | CZ | 29.08.2018 | DK | 29.08.2018 | EE | 29.08.2018 | ES | 29.08.2018 | FI | 29.08.2018 | HR | 29.08.2018 | LT | 29.08.2018 | LV | 29.08.2018 | MC | 29.08.2018 | MK | 29.08.2018 | MT | 29.08.2018 | NL | 29.08.2018 | PL | 29.08.2018 | RO | 29.08.2018 | RS | 29.08.2018 | SI | 29.08.2018 | SK | 29.08.2018 | SM | 29.08.2018 | TR | 29.08.2018 | BG | 29.11.2018 | NO | 29.11.2018 | GR | 30.11.2018 | IS | 29.12.2018 | PT | 29.12.2018 | [2022/31] |
Former [2021/34] | HU | 03.06.2015 | |
AL | 29.08.2018 | ||
AT | 29.08.2018 | ||
CY | 29.08.2018 | ||
CZ | 29.08.2018 | ||
DK | 29.08.2018 | ||
EE | 29.08.2018 | ||
ES | 29.08.2018 | ||
FI | 29.08.2018 | ||
HR | 29.08.2018 | ||
LT | 29.08.2018 | ||
LV | 29.08.2018 | ||
MC | 29.08.2018 | ||
MT | 29.08.2018 | ||
NL | 29.08.2018 | ||
PL | 29.08.2018 | ||
RO | 29.08.2018 | ||
RS | 29.08.2018 | ||
SI | 29.08.2018 | ||
SK | 29.08.2018 | ||
SM | 29.08.2018 | ||
TR | 29.08.2018 | ||
BG | 29.11.2018 | ||
NO | 29.11.2018 | ||
GR | 30.11.2018 | ||
IS | 29.12.2018 | ||
PT | 29.12.2018 | ||
Former [2021/32] | HU | 03.06.2015 | |
AL | 29.08.2018 | ||
AT | 29.08.2018 | ||
CY | 29.08.2018 | ||
CZ | 29.08.2018 | ||
DK | 29.08.2018 | ||
EE | 29.08.2018 | ||
ES | 29.08.2018 | ||
FI | 29.08.2018 | ||
HR | 29.08.2018 | ||
LT | 29.08.2018 | ||
LV | 29.08.2018 | ||
MC | 29.08.2018 | ||
NL | 29.08.2018 | ||
PL | 29.08.2018 | ||
RO | 29.08.2018 | ||
RS | 29.08.2018 | ||
SI | 29.08.2018 | ||
SK | 29.08.2018 | ||
SM | 29.08.2018 | ||
TR | 29.08.2018 | ||
BG | 29.11.2018 | ||
NO | 29.11.2018 | ||
GR | 30.11.2018 | ||
IS | 29.12.2018 | ||
PT | 29.12.2018 | ||
Former [2021/26] | AL | 29.08.2018 | |
AT | 29.08.2018 | ||
CY | 29.08.2018 | ||
CZ | 29.08.2018 | ||
DK | 29.08.2018 | ||
EE | 29.08.2018 | ||
ES | 29.08.2018 | ||
FI | 29.08.2018 | ||
HR | 29.08.2018 | ||
LT | 29.08.2018 | ||
LV | 29.08.2018 | ||
MC | 29.08.2018 | ||
NL | 29.08.2018 | ||
PL | 29.08.2018 | ||
RO | 29.08.2018 | ||
RS | 29.08.2018 | ||
SI | 29.08.2018 | ||
SK | 29.08.2018 | ||
SM | 29.08.2018 | ||
TR | 29.08.2018 | ||
BG | 29.11.2018 | ||
NO | 29.11.2018 | ||
GR | 30.11.2018 | ||
IS | 29.12.2018 | ||
PT | 29.12.2018 | ||
Former [2020/29] | AL | 29.08.2018 | |
AT | 29.08.2018 | ||
CZ | 29.08.2018 | ||
DK | 29.08.2018 | ||
EE | 29.08.2018 | ||
ES | 29.08.2018 | ||
FI | 29.08.2018 | ||
HR | 29.08.2018 | ||
LT | 29.08.2018 | ||
LV | 29.08.2018 | ||
MC | 29.08.2018 | ||
NL | 29.08.2018 | ||
PL | 29.08.2018 | ||
RO | 29.08.2018 | ||
RS | 29.08.2018 | ||
SI | 29.08.2018 | ||
SK | 29.08.2018 | ||
SM | 29.08.2018 | ||
TR | 29.08.2018 | ||
BG | 29.11.2018 | ||
NO | 29.11.2018 | ||
GR | 30.11.2018 | ||
IS | 29.12.2018 | ||
PT | 29.12.2018 | ||
Former [2020/17] | AL | 29.08.2018 | |
AT | 29.08.2018 | ||
CZ | 29.08.2018 | ||
DK | 29.08.2018 | ||
EE | 29.08.2018 | ||
ES | 29.08.2018 | ||
FI | 29.08.2018 | ||
HR | 29.08.2018 | ||
LT | 29.08.2018 | ||
LV | 29.08.2018 | ||
MC | 29.08.2018 | ||
NL | 29.08.2018 | ||
PL | 29.08.2018 | ||
RO | 29.08.2018 | ||
RS | 29.08.2018 | ||
SI | 29.08.2018 | ||
SK | 29.08.2018 | ||
SM | 29.08.2018 | ||
TR | 29.08.2018 | ||
BG | 29.11.2018 | ||
NO | 29.11.2018 | ||
GR | 30.11.2018 | ||
IS | 29.12.2018 | ||
Former [2020/09] | AL | 29.08.2018 | |
AT | 29.08.2018 | ||
CZ | 29.08.2018 | ||
DK | 29.08.2018 | ||
EE | 29.08.2018 | ||
ES | 29.08.2018 | ||
FI | 29.08.2018 | ||
HR | 29.08.2018 | ||
LT | 29.08.2018 | ||
LV | 29.08.2018 | ||
MC | 29.08.2018 | ||
NL | 29.08.2018 | ||
PL | 29.08.2018 | ||
RO | 29.08.2018 | ||
RS | 29.08.2018 | ||
SI | 29.08.2018 | ||
SK | 29.08.2018 | ||
SM | 29.08.2018 | ||
BG | 29.11.2018 | ||
NO | 29.11.2018 | ||
GR | 30.11.2018 | ||
IS | 29.12.2018 | ||
Former [2019/37] | AL | 29.08.2018 | |
AT | 29.08.2018 | ||
CZ | 29.08.2018 | ||
DK | 29.08.2018 | ||
EE | 29.08.2018 | ||
ES | 29.08.2018 | ||
FI | 29.08.2018 | ||
HR | 29.08.2018 | ||
LT | 29.08.2018 | ||
LV | 29.08.2018 | ||
NL | 29.08.2018 | ||
PL | 29.08.2018 | ||
RO | 29.08.2018 | ||
RS | 29.08.2018 | ||
SI | 29.08.2018 | ||
SK | 29.08.2018 | ||
SM | 29.08.2018 | ||
BG | 29.11.2018 | ||
NO | 29.11.2018 | ||
GR | 30.11.2018 | ||
IS | 29.12.2018 | ||
Former [2019/26] | AL | 29.08.2018 | |
AT | 29.08.2018 | ||
CZ | 29.08.2018 | ||
DK | 29.08.2018 | ||
EE | 29.08.2018 | ||
ES | 29.08.2018 | ||
FI | 29.08.2018 | ||
HR | 29.08.2018 | ||
LT | 29.08.2018 | ||
LV | 29.08.2018 | ||
NL | 29.08.2018 | ||
PL | 29.08.2018 | ||
RO | 29.08.2018 | ||
RS | 29.08.2018 | ||
SK | 29.08.2018 | ||
SM | 29.08.2018 | ||
BG | 29.11.2018 | ||
NO | 29.11.2018 | ||
GR | 30.11.2018 | ||
IS | 29.12.2018 | ||
Former [2019/23] | AL | 29.08.2018 | |
AT | 29.08.2018 | ||
CZ | 29.08.2018 | ||
EE | 29.08.2018 | ||
ES | 29.08.2018 | ||
FI | 29.08.2018 | ||
HR | 29.08.2018 | ||
LT | 29.08.2018 | ||
LV | 29.08.2018 | ||
NL | 29.08.2018 | ||
PL | 29.08.2018 | ||
RO | 29.08.2018 | ||
RS | 29.08.2018 | ||
SK | 29.08.2018 | ||
BG | 29.11.2018 | ||
NO | 29.11.2018 | ||
GR | 30.11.2018 | ||
IS | 29.12.2018 | ||
Former [2019/22] | AL | 29.08.2018 | |
CZ | 29.08.2018 | ||
FI | 29.08.2018 | ||
HR | 29.08.2018 | ||
LT | 29.08.2018 | ||
LV | 29.08.2018 | ||
NL | 29.08.2018 | ||
PL | 29.08.2018 | ||
RO | 29.08.2018 | ||
RS | 29.08.2018 | ||
BG | 29.11.2018 | ||
NO | 29.11.2018 | ||
GR | 30.11.2018 | ||
IS | 29.12.2018 | ||
Former [2019/12] | AL | 29.08.2018 | |
FI | 29.08.2018 | ||
HR | 29.08.2018 | ||
LT | 29.08.2018 | ||
LV | 29.08.2018 | ||
NL | 29.08.2018 | ||
RS | 29.08.2018 | ||
BG | 29.11.2018 | ||
NO | 29.11.2018 | ||
GR | 30.11.2018 | ||
IS | 29.12.2018 | ||
Former [2019/11] | FI | 29.08.2018 | |
HR | 29.08.2018 | ||
LT | 29.08.2018 | ||
NL | 29.08.2018 | ||
RS | 29.08.2018 | ||
BG | 29.11.2018 | ||
NO | 29.11.2018 | ||
GR | 30.11.2018 | ||
IS | 29.12.2018 | ||
Former [2019/09] | FI | 29.08.2018 | |
LT | 29.08.2018 | ||
NL | 29.08.2018 | ||
NO | 29.11.2018 | ||
IS | 29.12.2018 | ||
Former [2019/08] | FI | 29.08.2018 | |
LT | 29.08.2018 | ||
NO | 29.11.2018 | ||
IS | 29.12.2018 | ||
Former [2019/07] | LT | 29.08.2018 | Cited in | International search | [A]DE10352790 (MTU AERO ENGINES GMBH [DE]); | [A]EP1890009 (UNITED TECHNOLOGIES CORP [US]); | [A]GB2483061 (ROLLS ROYCE PLC [GB]) |