EP3152336 - COLD ROLLED AND HOT DIP COATED STEEL SHEET, PRODUCTION METHOD AND USE [Right-click to bookmark this link] | |||
Former [2017/15] | HIGH STRENGTH MULTIPHASE STEEL, PRODUCTION METHOD AND USE | ||
[2018/38] | Status | No opposition filed within time limit Status updated on 27.12.2019 Database last updated on 30.07.2024 | |
Former | The patent has been granted Status updated on 18.01.2019 | ||
Former | Grant of patent is intended Status updated on 06.09.2018 | ||
Former | Examination is in progress Status updated on 28.12.2017 | ||
Former | Request for examination was made Status updated on 10.03.2017 | ||
Former | The international publication has been made Status updated on 06.12.2016 | Most recent event Tooltip | 01.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 03.08.2022 [2022/31] | Applicant(s) | For all designated states Arcelormittal 24-26 Boulevard d'Avranches 1160 Luxembourg / LU | [2017/15] | Inventor(s) | 01 /
FAN, Dongwei 3001 E. Columbus Drive East Chicago, IN 46315-2939 / US | 02 /
JUN, Hyun Jo 3001 E. Columbus Drive East Chicago, IN 46315-2939 / US | 03 /
ROTOLE, John A. 3001 E. Columbus Drive East Chicago, IN 46315-2939 / US | [2017/15] | Representative(s) | Lavoix 2, place d'Estienne d'Orves 75441 Paris Cedex 09 / FR | [2017/15] | Application number, filing date | 15734438.3 | 03.06.2015 | [2017/15] | WO2015IB00819 | Priority number, date | WO2014IB00991 | 06.06.2014 Original published format: PCT/IB2014/000991 | [2017/15] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2015185975 | Date: | 10.12.2015 | Language: | EN | [2015/49] | Type: | A1 Application with search report | No.: | EP3152336 | Date: | 12.04.2017 | Language: | EN | The application published by WIPO in one of the EPO official languages on 10.12.2015 takes the place of the publication of the European patent application. | [2017/15] | Type: | B1 Patent specification | No.: | EP3152336 | Date: | 20.02.2019 | Language: | EN | [2019/08] | Search report(s) | International search report - published on: | EP | 10.12.2015 | Classification | IPC: | C23C2/02, C23C2/06, C23C2/12, C23C2/28, C23C2/40, C21D8/02, C21D9/46, C22C38/00, C22C38/02, C22C38/04, C22C38/06, C22C38/08, C22C38/12, C22C38/14, C22C38/22, C22C38/24, C22C38/26, C22C38/28, C22C38/32, C22C38/38, B32B15/01 | [2018/38] | CPC: |
C21D9/46 (EP,KR,RU,US);
C21D8/02 (RU);
C22C38/38 (EP,CN,KR,US);
B32B15/013 (EP,US);
C21D8/0205 (EP,US);
C21D8/0226 (EP,CN,US);
C21D8/0236 (EP,CN,US);
C21D8/0247 (CN);
C21D8/0273 (EP,US);
C21D8/0278 (EP,KR,US);
C22C38/00 (EP,RU,US);
C22C38/001 (EP,CN,US);
C22C38/002 (EP,US);
C22C38/02 (EP,CN,US);
C22C38/04 (EP,US);
C22C38/06 (EP,CN,US);
C22C38/08 (EP,US);
C22C38/12 (EP,US);
C22C38/14 (EP,US);
C22C38/22 (EP,CN,KR,US);
C22C38/24 (EP,CN,US);
C22C38/26 (EP,CN,KR,US);
C22C38/28 (EP,CN,KR,US);
C22C38/32 (EP,CN,US);
C23C2/00 (EP,RU,US);
C23C2/02 (EP,CN,RU,US);
C23C2/0222 (EP,CN,RU,US);
C23C2/0224 (EP,CN,KR,RU,US);
C23C2/024 (EP,KR,US);
C23C2/06 (EP,KR,US);
C23C2/12 (EP,KR,US);
C23C2/28 (EP,US);
C23C2/29 (EP,US);
C23C2/40 (EP,KR,US);
C21D2211/002 (EP,CN,US);
C21D2211/005 (EP,CN,US);
|
Former IPC [2017/15] | C21D8/02, C23C2/02, C21D9/46, C22C38/00, C22C38/02, C22C38/06, C22C38/12, C22C38/14, C22C38/26, C22C38/28, C22C38/32, C22C38/38, B32B15/01, C23C2/06 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/15] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | 06.12.2016 | Title | German: | KALT GEWALZTES UND FEUERBESCHICHTETES STAHLBLECH UND DESSEN HERSTELLUNGSVERFAHREN UND VERWENDUNG | [2018/38] | English: | COLD ROLLED AND HOT DIP COATED STEEL SHEET, PRODUCTION METHOD AND USE | [2018/38] | French: | TÔLE D'ACIER LAMINÉE À FROID ET REVÊTUE PAR IMMERSION À CHAUD, PROCÉDÉ DE FABRICATION ET UTILISATION | [2018/38] |
Former [2017/15] | HOCHFESTER MEHRPHASENSTAHL, HERSTELLUNGSVERFAHREN UND VERWENDUNG | ||
Former [2017/15] | HIGH STRENGTH MULTIPHASE STEEL, PRODUCTION METHOD AND USE | ||
Former [2017/15] | ACIER MULTIPHASE A HAUTE RESISTANCE, PROCEDE DE FABRICATION ET UTILISATION DE CELUI-CI | Entry into regional phase | 06.12.2016 | National basic fee paid | 06.12.2016 | Designation fee(s) paid | 06.12.2016 | Examination fee paid | Examination procedure | 23.03.2016 | Request for preliminary examination filed International Preliminary Examining Authority: EP | 06.12.2016 | Amendment by applicant (claims and/or description) | 06.12.2016 | Examination requested [2017/15] | 06.12.2016 | Date on which the examining division has become responsible | 21.12.2017 | Despatch of a communication from the examining division (Time limit: M06) | 24.04.2018 | Reply to a communication from the examining division | 07.09.2018 | Communication of intention to grant the patent | 04.01.2019 | Fee for grant paid | 04.01.2019 | Fee for publishing/printing paid | 04.01.2019 | Receipt of the translation of the claim(s) | Opposition(s) | 21.11.2019 | No opposition filed within time limit [2020/05] | Fees paid | Renewal fee | 22.06.2017 | Renewal fee patent year 03 | 22.06.2018 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AL | 20.02.2019 | CY | 20.02.2019 | DK | 20.02.2019 | EE | 20.02.2019 | HR | 20.02.2019 | LT | 20.02.2019 | LV | 20.02.2019 | MC | 20.02.2019 | MK | 20.02.2019 | MT | 20.02.2019 | RS | 20.02.2019 | SI | 20.02.2019 | SM | 20.02.2019 | BG | 20.05.2019 | NO | 20.05.2019 | GR | 21.05.2019 | IE | 03.06.2019 | LU | 03.06.2019 | IS | 20.06.2019 | PT | 20.06.2019 | CH | 30.06.2019 | LI | 30.06.2019 | [2022/31] |
Former [2021/34] | AL | 20.02.2019 | |
CY | 20.02.2019 | ||
DK | 20.02.2019 | ||
EE | 20.02.2019 | ||
HR | 20.02.2019 | ||
LT | 20.02.2019 | ||
LV | 20.02.2019 | ||
MC | 20.02.2019 | ||
MT | 20.02.2019 | ||
RS | 20.02.2019 | ||
SI | 20.02.2019 | ||
SM | 20.02.2019 | ||
BG | 20.05.2019 | ||
NO | 20.05.2019 | ||
GR | 21.05.2019 | ||
IE | 03.06.2019 | ||
LU | 03.06.2019 | ||
IS | 20.06.2019 | ||
PT | 20.06.2019 | ||
CH | 30.06.2019 | ||
LI | 30.06.2019 | ||
Former [2021/26] | AL | 20.02.2019 | |
CY | 20.02.2019 | ||
DK | 20.02.2019 | ||
EE | 20.02.2019 | ||
HR | 20.02.2019 | ||
LT | 20.02.2019 | ||
LV | 20.02.2019 | ||
MC | 20.02.2019 | ||
RS | 20.02.2019 | ||
SI | 20.02.2019 | ||
SM | 20.02.2019 | ||
BG | 20.05.2019 | ||
NO | 20.05.2019 | ||
GR | 21.05.2019 | ||
IE | 03.06.2019 | ||
LU | 03.06.2019 | ||
IS | 20.06.2019 | ||
PT | 20.06.2019 | ||
CH | 30.06.2019 | ||
LI | 30.06.2019 | ||
Former [2020/25] | AL | 20.02.2019 | |
DK | 20.02.2019 | ||
EE | 20.02.2019 | ||
HR | 20.02.2019 | ||
LT | 20.02.2019 | ||
LV | 20.02.2019 | ||
MC | 20.02.2019 | ||
RS | 20.02.2019 | ||
SI | 20.02.2019 | ||
SM | 20.02.2019 | ||
BG | 20.05.2019 | ||
NO | 20.05.2019 | ||
GR | 21.05.2019 | ||
IE | 03.06.2019 | ||
LU | 03.06.2019 | ||
IS | 20.06.2019 | ||
PT | 20.06.2019 | ||
CH | 30.06.2019 | ||
LI | 30.06.2019 | ||
Former [2020/21] | AL | 20.02.2019 | |
DK | 20.02.2019 | ||
EE | 20.02.2019 | ||
HR | 20.02.2019 | ||
LT | 20.02.2019 | ||
LV | 20.02.2019 | ||
MC | 20.02.2019 | ||
RS | 20.02.2019 | ||
SI | 20.02.2019 | ||
SM | 20.02.2019 | ||
BG | 20.05.2019 | ||
NO | 20.05.2019 | ||
GR | 21.05.2019 | ||
IE | 03.06.2019 | ||
IS | 20.06.2019 | ||
PT | 20.06.2019 | ||
Former [2020/13] | AL | 20.02.2019 | |
DK | 20.02.2019 | ||
EE | 20.02.2019 | ||
HR | 20.02.2019 | ||
LT | 20.02.2019 | ||
LV | 20.02.2019 | ||
MC | 20.02.2019 | ||
RS | 20.02.2019 | ||
SI | 20.02.2019 | ||
SM | 20.02.2019 | ||
BG | 20.05.2019 | ||
NO | 20.05.2019 | ||
GR | 21.05.2019 | ||
IS | 20.06.2019 | ||
PT | 20.06.2019 | ||
Former [2020/09] | AL | 20.02.2019 | |
DK | 20.02.2019 | ||
EE | 20.02.2019 | ||
HR | 20.02.2019 | ||
LT | 20.02.2019 | ||
LV | 20.02.2019 | ||
MC | 20.02.2019 | ||
RS | 20.02.2019 | ||
SM | 20.02.2019 | ||
BG | 20.05.2019 | ||
NO | 20.05.2019 | ||
GR | 21.05.2019 | ||
IS | 20.06.2019 | ||
PT | 20.06.2019 | ||
Former [2019/52] | AL | 20.02.2019 | |
DK | 20.02.2019 | ||
EE | 20.02.2019 | ||
HR | 20.02.2019 | ||
LT | 20.02.2019 | ||
LV | 20.02.2019 | ||
RS | 20.02.2019 | ||
SM | 20.02.2019 | ||
BG | 20.05.2019 | ||
NO | 20.05.2019 | ||
GR | 21.05.2019 | ||
IS | 20.06.2019 | ||
PT | 20.06.2019 | ||
Former [2019/49] | AL | 20.02.2019 | |
DK | 20.02.2019 | ||
EE | 20.02.2019 | ||
HR | 20.02.2019 | ||
LT | 20.02.2019 | ||
LV | 20.02.2019 | ||
RS | 20.02.2019 | ||
BG | 20.05.2019 | ||
NO | 20.05.2019 | ||
GR | 21.05.2019 | ||
IS | 20.06.2019 | ||
PT | 20.06.2019 | ||
Former [2019/48] | DK | 20.02.2019 | |
HR | 20.02.2019 | ||
LT | 20.02.2019 | ||
LV | 20.02.2019 | ||
RS | 20.02.2019 | ||
BG | 20.05.2019 | ||
NO | 20.05.2019 | ||
GR | 21.05.2019 | ||
IS | 20.06.2019 | ||
PT | 20.06.2019 | ||
Former [2019/39] | HR | 20.02.2019 | |
LT | 20.02.2019 | ||
LV | 20.02.2019 | ||
RS | 20.02.2019 | ||
BG | 20.05.2019 | ||
NO | 20.05.2019 | ||
GR | 21.05.2019 | ||
IS | 20.06.2019 | ||
PT | 20.06.2019 | ||
Former [2019/38] | LT | 20.02.2019 | |
BG | 20.05.2019 | ||
NO | 20.05.2019 | ||
GR | 21.05.2019 | ||
PT | 20.06.2019 | ||
Former [2019/37] | LT | 20.02.2019 | |
NO | 20.05.2019 | ||
GR | 21.05.2019 | ||
PT | 20.06.2019 | ||
Former [2019/33] | LT | 20.02.2019 | |
NO | 20.05.2019 | ||
PT | 20.06.2019 | Cited in | International search | [A]JP2005105367 (NIPPON STEEL CORP); | [A]JP2009242816 (JFE STEEL CORP); | [XI]EP2578718 (JFE STEEL CORP [JP]); | [A]JP5376090B | Examination | JP2005105367 | JP2009242816 | EP2256224 | EP2426230 | WO2012091310 | DE102011051731 | EP2578718 | JP5376090B | by applicant | WO2012153016 | US2013008570 |