EP3094836 - METHOD AND SYSTEM FOR CONTROL OF TEMPERATURE OF A EXHAUST AFTERTREATMENT SYSTEM [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 28.08.2020 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 20.09.2019 | ||
Former | Grant of patent is intended Status updated on 05.09.2019 | ||
Former | Request for examination was made Status updated on 12.07.2019 | ||
Former | Grant of patent is intended Status updated on 03.04.2019 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states Scania CV AB 151 87 Södertälje / SE | [2016/47] | Inventor(s) | 01 /
ROOS, Fredrik Mickelsbergsvägen 334 S-141 71 Segeltorp / SE | 02 /
RAMIC, Elvedin Riavägen 16 S-647 52 Åkers Styckebruk / SE | [2016/47] | Representative(s) | Scania CV AB Patents, GP 117kv 151 87 Södertälje / SE | [2016/47] | Application number, filing date | 15736969.5 | 13.01.2015 | [2016/47] | WO2015SE50017 | Priority number, date | SE20140050031 | 15.01.2014 Original published format: SE 1450031 | [2016/47] | Filing language | SV | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2015108472 | Date: | 23.07.2015 | Language: | EN | [2015/29] | Type: | A1 Application with search report | No.: | EP3094836 | Date: | 23.11.2016 | Language: | EN | The application published by WIPO in one of the EPO official languages on 23.07.2015 takes the place of the publication of the European patent application. | [2016/47] | Type: | B1 Patent specification | No.: | EP3094836 | Date: | 23.10.2019 | Language: | EN | [2019/43] | Search report(s) | International search report - published on: | SE | 23.07.2015 | (Supplementary) European search report - dispatched on: | EP | 13.09.2017 | Classification | IPC: | F01N3/00, B60W10/184, B60W10/198, F01N9/00, // B60W50/00 | [2017/41] | CPC: |
B60W30/18136 (EP,KR,US);
F01N3/0235 (SE);
F01N9/00 (KR,SE);
B60W10/06 (EP,KR,US);
B60W10/11 (EP,US);
B60W10/184 (EP,KR,US);
B60W10/196 (EP,KR,SE,US);
B60W10/198 (EP,KR,SE,US);
F01N11/002 (US);
F02D41/0235 (KR);
B60W2050/0094 (EP,US);
B60W2510/068 (SE,US);
B60W2710/0694 (EP,US);
B60W2710/10 (US);
B60W2710/1005 (EP,US);
B60W2710/18 (EP,US);
F01N2900/1404 (SE);
F01N2900/1602 (SE);
Y02T10/40 (EP,KR,SE,US)
(-)
|
Former IPC [2016/47] | F01N3/00, B60W10/184, B60W10/198, F01N9/00 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/47] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | VERFAHREN UND SYSTEM ZUR STEUERUNG DER TEMPERATUR EINES ABGASNACHBEHANDLUNGSSYSTEMS | [2016/47] | English: | METHOD AND SYSTEM FOR CONTROL OF TEMPERATURE OF A EXHAUST AFTERTREATMENT SYSTEM | [2016/47] | French: | PROCÉDÉ ET SYSTÈME POUR LE CONTRÔLE DE LA TEMPÉRATURE D'UN SYSTÈME DE TRAITEMENT POSTCOMBUSTION DES GAZ D'ÉCHAPPEMENT | [2016/47] | Entry into regional phase | 16.08.2016 | National basic fee paid | 16.08.2016 | Search fee paid | 16.08.2016 | Designation fee(s) paid | 16.08.2016 | Examination fee paid | Examination procedure | 16.08.2016 | Examination requested [2016/47] | 26.03.2018 | Amendment by applicant (claims and/or description) | 04.04.2019 | Communication of intention to grant the patent | 05.07.2019 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 06.09.2019 | Communication of intention to grant the patent | 16.09.2019 | Fee for grant paid | 16.09.2019 | Fee for publishing/printing paid | 16.09.2019 | Receipt of the translation of the claim(s) | Opposition(s) | 24.07.2020 | No opposition filed within time limit [2020/40] | Fees paid | Renewal fee | 11.01.2017 | Renewal fee patent year 03 | 15.01.2018 | Renewal fee patent year 04 | 15.01.2019 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 13.01.2015 | AL | 23.10.2019 | AT | 23.10.2019 | CY | 23.10.2019 | CZ | 23.10.2019 | DK | 23.10.2019 | EE | 23.10.2019 | ES | 23.10.2019 | FI | 23.10.2019 | HR | 23.10.2019 | LT | 23.10.2019 | LV | 23.10.2019 | MC | 23.10.2019 | MK | 23.10.2019 | MT | 23.10.2019 | NL | 23.10.2019 | PL | 23.10.2019 | RO | 23.10.2019 | RS | 23.10.2019 | SE | 23.10.2019 | SI | 23.10.2019 | SK | 23.10.2019 | SM | 23.10.2019 | TR | 23.10.2019 | IE | 13.01.2020 | LU | 13.01.2020 | BG | 23.01.2020 | NO | 23.01.2020 | GR | 24.01.2020 | CH | 31.01.2020 | LI | 31.01.2020 | IS | 23.02.2020 | PT | 24.02.2020 | [2022/32] |
Former [2022/27] | HU | 13.01.2015 | |
AL | 23.10.2019 | ||
AT | 23.10.2019 | ||
CY | 23.10.2019 | ||
CZ | 23.10.2019 | ||
DK | 23.10.2019 | ||
EE | 23.10.2019 | ||
ES | 23.10.2019 | ||
FI | 23.10.2019 | ||
HR | 23.10.2019 | ||
LT | 23.10.2019 | ||
LV | 23.10.2019 | ||
MC | 23.10.2019 | ||
MT | 23.10.2019 | ||
NL | 23.10.2019 | ||
PL | 23.10.2019 | ||
RO | 23.10.2019 | ||
RS | 23.10.2019 | ||
SE | 23.10.2019 | ||
SI | 23.10.2019 | ||
SK | 23.10.2019 | ||
SM | 23.10.2019 | ||
TR | 23.10.2019 | ||
IE | 13.01.2020 | ||
LU | 13.01.2020 | ||
BG | 23.01.2020 | ||
NO | 23.01.2020 | ||
GR | 24.01.2020 | ||
CH | 31.01.2020 | ||
LI | 31.01.2020 | ||
IS | 23.02.2020 | ||
PT | 24.02.2020 | ||
Former [2021/08] | AL | 23.10.2019 | |
AT | 23.10.2019 | ||
CZ | 23.10.2019 | ||
DK | 23.10.2019 | ||
EE | 23.10.2019 | ||
ES | 23.10.2019 | ||
FI | 23.10.2019 | ||
HR | 23.10.2019 | ||
LT | 23.10.2019 | ||
LV | 23.10.2019 | ||
MC | 23.10.2019 | ||
NL | 23.10.2019 | ||
PL | 23.10.2019 | ||
RO | 23.10.2019 | ||
RS | 23.10.2019 | ||
SE | 23.10.2019 | ||
SI | 23.10.2019 | ||
SK | 23.10.2019 | ||
SM | 23.10.2019 | ||
IE | 13.01.2020 | ||
LU | 13.01.2020 | ||
BG | 23.01.2020 | ||
NO | 23.01.2020 | ||
GR | 24.01.2020 | ||
CH | 31.01.2020 | ||
LI | 31.01.2020 | ||
IS | 23.02.2020 | ||
PT | 24.02.2020 | ||
Former [2020/51] | AL | 23.10.2019 | |
AT | 23.10.2019 | ||
CZ | 23.10.2019 | ||
DK | 23.10.2019 | ||
EE | 23.10.2019 | ||
ES | 23.10.2019 | ||
FI | 23.10.2019 | ||
HR | 23.10.2019 | ||
LT | 23.10.2019 | ||
LV | 23.10.2019 | ||
MC | 23.10.2019 | ||
NL | 23.10.2019 | ||
PL | 23.10.2019 | ||
RO | 23.10.2019 | ||
RS | 23.10.2019 | ||
SE | 23.10.2019 | ||
SI | 23.10.2019 | ||
SK | 23.10.2019 | ||
SM | 23.10.2019 | ||
LU | 13.01.2020 | ||
BG | 23.01.2020 | ||
NO | 23.01.2020 | ||
GR | 24.01.2020 | ||
CH | 31.01.2020 | ||
LI | 31.01.2020 | ||
IS | 23.02.2020 | ||
PT | 24.02.2020 | ||
Former [2020/46] | AL | 23.10.2019 | |
CZ | 23.10.2019 | ||
DK | 23.10.2019 | ||
EE | 23.10.2019 | ||
ES | 23.10.2019 | ||
FI | 23.10.2019 | ||
HR | 23.10.2019 | ||
LT | 23.10.2019 | ||
LV | 23.10.2019 | ||
MC | 23.10.2019 | ||
NL | 23.10.2019 | ||
PL | 23.10.2019 | ||
RO | 23.10.2019 | ||
RS | 23.10.2019 | ||
SE | 23.10.2019 | ||
SK | 23.10.2019 | ||
SM | 23.10.2019 | ||
LU | 13.01.2020 | ||
BG | 23.01.2020 | ||
NO | 23.01.2020 | ||
GR | 24.01.2020 | ||
IS | 23.02.2020 | ||
PT | 24.02.2020 | ||
Former [2020/39] | AL | 23.10.2019 | |
CZ | 23.10.2019 | ||
DK | 23.10.2019 | ||
EE | 23.10.2019 | ||
ES | 23.10.2019 | ||
FI | 23.10.2019 | ||
HR | 23.10.2019 | ||
LT | 23.10.2019 | ||
LV | 23.10.2019 | ||
MC | 23.10.2019 | ||
NL | 23.10.2019 | ||
PL | 23.10.2019 | ||
RO | 23.10.2019 | ||
RS | 23.10.2019 | ||
SE | 23.10.2019 | ||
SK | 23.10.2019 | ||
SM | 23.10.2019 | ||
BG | 23.01.2020 | ||
NO | 23.01.2020 | ||
GR | 24.01.2020 | ||
IS | 23.02.2020 | ||
PT | 24.02.2020 | ||
Former [2020/37] | AL | 23.10.2019 | |
CZ | 23.10.2019 | ||
DK | 23.10.2019 | ||
EE | 23.10.2019 | ||
ES | 23.10.2019 | ||
FI | 23.10.2019 | ||
HR | 23.10.2019 | ||
LT | 23.10.2019 | ||
LV | 23.10.2019 | ||
NL | 23.10.2019 | ||
PL | 23.10.2019 | ||
RO | 23.10.2019 | ||
RS | 23.10.2019 | ||
SE | 23.10.2019 | ||
SK | 23.10.2019 | ||
SM | 23.10.2019 | ||
BG | 23.01.2020 | ||
NO | 23.01.2020 | ||
GR | 24.01.2020 | ||
IS | 23.02.2020 | ||
PT | 24.02.2020 | ||
Former [2020/36] | AL | 23.10.2019 | |
CZ | 23.10.2019 | ||
DK | 23.10.2019 | ||
EE | 23.10.2019 | ||
ES | 23.10.2019 | ||
FI | 23.10.2019 | ||
HR | 23.10.2019 | ||
LT | 23.10.2019 | ||
LV | 23.10.2019 | ||
NL | 23.10.2019 | ||
PL | 23.10.2019 | ||
RO | 23.10.2019 | ||
RS | 23.10.2019 | ||
SE | 23.10.2019 | ||
BG | 23.01.2020 | ||
NO | 23.01.2020 | ||
GR | 24.01.2020 | ||
IS | 23.02.2020 | ||
PT | 24.02.2020 | ||
Former [2020/35] | AL | 23.10.2019 | |
CZ | 23.10.2019 | ||
ES | 23.10.2019 | ||
FI | 23.10.2019 | ||
HR | 23.10.2019 | ||
LT | 23.10.2019 | ||
LV | 23.10.2019 | ||
NL | 23.10.2019 | ||
PL | 23.10.2019 | ||
RO | 23.10.2019 | ||
RS | 23.10.2019 | ||
SE | 23.10.2019 | ||
BG | 23.01.2020 | ||
NO | 23.01.2020 | ||
GR | 24.01.2020 | ||
IS | 24.02.2020 | ||
PT | 24.02.2020 | ||
Former [2020/34] | AL | 23.10.2019 | |
ES | 23.10.2019 | ||
FI | 23.10.2019 | ||
HR | 23.10.2019 | ||
LT | 23.10.2019 | ||
LV | 23.10.2019 | ||
NL | 23.10.2019 | ||
PL | 23.10.2019 | ||
RS | 23.10.2019 | ||
SE | 23.10.2019 | ||
BG | 23.01.2020 | ||
NO | 23.01.2020 | ||
GR | 24.01.2020 | ||
IS | 24.02.2020 | ||
PT | 24.02.2020 | ||
Former [2020/32] | AL | 23.10.2019 | |
FI | 23.10.2019 | ||
HR | 23.10.2019 | ||
LT | 23.10.2019 | ||
LV | 23.10.2019 | ||
NL | 23.10.2019 | ||
PL | 23.10.2019 | ||
RS | 23.10.2019 | ||
SE | 23.10.2019 | ||
BG | 23.01.2020 | ||
NO | 23.01.2020 | ||
GR | 24.01.2020 | ||
IS | 24.02.2020 | ||
PT | 24.02.2020 | ||
Former [2020/25] | FI | 23.10.2019 | |
HR | 23.10.2019 | ||
LT | 23.10.2019 | ||
LV | 23.10.2019 | ||
NL | 23.10.2019 | ||
PL | 23.10.2019 | ||
RS | 23.10.2019 | ||
SE | 23.10.2019 | ||
BG | 23.01.2020 | ||
NO | 23.01.2020 | ||
GR | 24.01.2020 | ||
IS | 24.02.2020 | ||
PT | 24.02.2020 | ||
Former [2020/24] | FI | 23.10.2019 | |
LT | 23.10.2019 | ||
LV | 23.10.2019 | ||
NL | 23.10.2019 | ||
PL | 23.10.2019 | ||
SE | 23.10.2019 | ||
BG | 23.01.2020 | ||
NO | 23.01.2020 | ||
GR | 24.01.2020 | ||
IS | 24.02.2020 | ||
PT | 24.02.2020 | ||
Former [2020/23] | FI | 23.10.2019 | |
LT | 23.10.2019 | ||
LV | 23.10.2019 | ||
NL | 23.10.2019 | ||
PL | 23.10.2019 | ||
SE | 23.10.2019 | ||
BG | 23.01.2020 | ||
NO | 23.01.2020 | ||
GR | 24.01.2020 | ||
PT | 24.02.2020 | ||
Former [2020/22] | FI | 23.10.2019 | |
LT | 23.10.2019 | ||
NL | 23.10.2019 | ||
SE | 23.10.2019 | ||
BG | 23.01.2020 | ||
NO | 23.01.2020 | ||
PT | 24.02.2020 | ||
Former [2020/21] | NL | 23.10.2019 | |
NO | 23.01.2020 | ||
Former [2020/20] | NL | 23.10.2019 | Documents cited: | Search | [A]JPH0848234 (AKEBONO BRAKE IND) [A] 1,25-27 * figures 4,5 * * paragraphs [0026] - [0034] *; | [A]WO2010059108 (SCANIA CV ABP [SE], et al) [A] 1,25-27 * figure 1 ** the whole document *; | [A]WO2010110700 (VOLVO LASTVAGNAR AB [SE], et al) [A] 1,25-27 * figures 1,2 * * claims 1-3 * * the whole document * | International search | [A]WO2004108467 (VOLVO LASTVAGNAR AB [SE], et al); | [A]US2008010987 (BENZ MICHAEL [DE], et al); | [A]WO2010110700 (VOLVO LASTVAGNAR AB [SE], et al); | [A]WO2013066242 (SCANIA CV AB [SE], et al); | [AP]WO2014051496 (SCANIA CV AB [SE]) |