blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3096568

EP3096568 - USER TERMINAL, RADIO BASE STATION, AND RADIO COMMUNICATION METHOD [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  03.04.2021
Database last updated on 06.07.2024
FormerThe patent has been granted
Status updated on  24.04.2020
FormerGrant of patent is intended
Status updated on  17.04.2020
FormerExamination is in progress
Status updated on  10.04.2020
FormerGrant of patent is intended
Status updated on  07.01.2020
FormerExamination is in progress
Status updated on  09.02.2018
Most recent event   Tooltip27.04.2024Lapse of the patent in a contracting state
New state(s): MK
published on 29.05.2024  [2024/22]
Applicant(s)For all designated states
NTT DOCOMO, INC.
11-1, Nagatacho 2-chome
Chiyoda-ku
Tokyo 100-6150 / JP
[2016/47]
Inventor(s)01 / TAKEDA, Kazuki
c/o Intellectual Property Department
NTT DOCOMO, INC.
Sanno Park Tower
11-1, Nagatacho 2-chome, Chiyoda-ku
Tokyo 100-6150 / JP
02 / UCHINO, Tooru
c/o Intellectual Property Department
NTT DOCOMO, INC.
Sanno Park Tower
11-1, Nagatacho 2-chome, Chiyoda-ku
Tokyo 100-6150 / JP
03 / NAGATA, Satoshi
c/o Intellectual Property Department
NTT DOCOMO, INC.
Sanno Park Tower
11-1, Nagatacho 2-chome, Chiyoda-ku
Tokyo 100-6150 / JP
04 / KIYOSHIMA, Kohei
c/o Intellectual Property Department
NTT DOCOMO, INC.
Sanno Park Tower
11-1, Nagatacho 2-chome, Chiyoda-ku
Tokyo 100-6150 / JP
 [2016/47]
Representative(s)Hoffmann Eitle
Patent- und Rechtsanwälte PartmbB
Arabellastraße 30
81925 München / DE
[2016/47]
Application number, filing date15737872.013.01.2015
[2016/47]
WO2015JP50572
Priority number, dateJP2014000418214.01.2014         Original published format: JP 2014004182
[2016/47]
Filing languageJA
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2015108009
Date:23.07.2015
Language:JA
[2015/29]
Type: A1 Application with search report 
No.:EP3096568
Date:23.11.2016
Language:EN
[2016/47]
Type: B1 Patent specification 
No.:EP3096568
Date:27.05.2020
Language:EN
[2020/22]
Search report(s)International search report - published on:JP23.07.2015
(Supplementary) European search report - dispatched on:EP30.06.2017
ClassificationIPC:H04W52/06, H04W52/08, H04W52/18, H04W52/24, H04W28/06, H04W72/04
[2017/31]
CPC:
H04W52/248 (EP,US); H04W52/06 (EP,US); H04W52/08 (EP,US);
H04W52/146 (EP,US); H04W52/228 (EP,US); H04W72/0446 (US);
H04W72/0473 (US); H04W72/21 (US) (-)
Former IPC [2016/47]H04W52/18, H04W28/06, H04W72/04
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2016/47]
Extension statesBANot yet paid
MENot yet paid
TitleGerman:BENUTZERENDGERÄT, FUNKBASISSTATION UND FUNKKOMMUNIKATIONSVERFAHREN[2016/47]
English:USER TERMINAL, RADIO BASE STATION, AND RADIO COMMUNICATION METHOD[2016/47]
French:TERMINAL D'UTILISATEUR, STATION DE BASE RADIO, ET PROCÉDÉ DE COMMUNICATION RADIO[2016/47]
Entry into regional phase29.07.2016Translation filed 
29.07.2016National basic fee paid 
29.07.2016Search fee paid 
29.07.2016Designation fee(s) paid 
29.07.2016Examination fee paid 
Examination procedure29.07.2016Examination requested  [2016/47]
06.11.2017Amendment by applicant (claims and/or description)
07.02.2018Despatch of a communication from the examining division (Time limit: M04)
18.04.2018Reply to a communication from the examining division
08.01.2020Communication of intention to grant the patent
08.04.2020Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO
08.04.2020Fee for grant paid
08.04.2020Fee for publishing/printing paid
16.04.2020Information about intention to grant a patent
16.04.2020Receipt of the translation of the claim(s)
Opposition(s)02.03.2021No opposition filed within time limit [2021/18]
Fees paidRenewal fee
26.01.2017Renewal fee patent year 03
23.01.2018Renewal fee patent year 04
22.01.2019Renewal fee patent year 05
21.01.2020Renewal fee patent year 06
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipAL27.05.2020
AT27.05.2020
CY27.05.2020
CZ27.05.2020
DK27.05.2020
EE27.05.2020
ES27.05.2020
FI27.05.2020
HR27.05.2020
LT27.05.2020
LV27.05.2020
MC27.05.2020
MK27.05.2020
NL27.05.2020
PL27.05.2020
RO27.05.2020
RS27.05.2020
SE27.05.2020
SI27.05.2020
SK27.05.2020
SM27.05.2020
BG27.08.2020
NO27.08.2020
GR28.08.2020
IS27.09.2020
PT28.09.2020
IE13.01.2021
LU13.01.2021
BE31.01.2021
CH31.01.2021
FR31.01.2021
LI31.01.2021
[2024/22]
Former [2023/30]AL27.05.2020
AT27.05.2020
CY27.05.2020
CZ27.05.2020
DK27.05.2020
EE27.05.2020
ES27.05.2020
FI27.05.2020
HR27.05.2020
LT27.05.2020
LV27.05.2020
MC27.05.2020
NL27.05.2020
PL27.05.2020
RO27.05.2020
RS27.05.2020
SE27.05.2020
SI27.05.2020
SK27.05.2020
SM27.05.2020
BG27.08.2020
NO27.08.2020
GR28.08.2020
IS27.09.2020
PT28.09.2020
IE13.01.2021
LU13.01.2021
BE31.01.2021
CH31.01.2021
FR31.01.2021
LI31.01.2021
Former [2022/33]AL27.05.2020
AT27.05.2020
CZ27.05.2020
DK27.05.2020
EE27.05.2020
ES27.05.2020
FI27.05.2020
HR27.05.2020
LT27.05.2020
LV27.05.2020
MC27.05.2020
NL27.05.2020
PL27.05.2020
RO27.05.2020
RS27.05.2020
SE27.05.2020
SI27.05.2020
SK27.05.2020
SM27.05.2020
BG27.08.2020
NO27.08.2020
GR28.08.2020
IS27.09.2020
PT28.09.2020
IE13.01.2021
LU13.01.2021
BE31.01.2021
CH31.01.2021
FR31.01.2021
LI31.01.2021
Former [2022/07]AL27.05.2020
AT27.05.2020
CZ27.05.2020
DK27.05.2020
EE27.05.2020
ES27.05.2020
FI27.05.2020
HR27.05.2020
LT27.05.2020
LV27.05.2020
MC27.05.2020
NL27.05.2020
PL27.05.2020
RO27.05.2020
RS27.05.2020
SE27.05.2020
SI27.05.2020
SK27.05.2020
SM27.05.2020
BG27.08.2020
NO27.08.2020
GR28.08.2020
IS27.09.2020
PT28.09.2020
IE13.01.2021
LU13.01.2021
CH31.01.2021
FR31.01.2021
LI31.01.2021
Former [2021/52]AL27.05.2020
AT27.05.2020
CZ27.05.2020
DK27.05.2020
EE27.05.2020
ES27.05.2020
FI27.05.2020
HR27.05.2020
LT27.05.2020
LV27.05.2020
MC27.05.2020
NL27.05.2020
PL27.05.2020
RO27.05.2020
RS27.05.2020
SE27.05.2020
SI27.05.2020
SK27.05.2020
SM27.05.2020
BG27.08.2020
NO27.08.2020
GR28.08.2020
IS27.09.2020
PT28.09.2020
LU13.01.2021
CH31.01.2021
FR31.01.2021
LI31.01.2021
Former [2021/48]AL27.05.2020
AT27.05.2020
CZ27.05.2020
DK27.05.2020
EE27.05.2020
ES27.05.2020
FI27.05.2020
HR27.05.2020
LT27.05.2020
LV27.05.2020
MC27.05.2020
NL27.05.2020
PL27.05.2020
RO27.05.2020
RS27.05.2020
SE27.05.2020
SI27.05.2020
SK27.05.2020
SM27.05.2020
BG27.08.2020
NO27.08.2020
GR28.08.2020
IS27.09.2020
PT28.09.2020
LU13.01.2021
FR31.01.2021
Former [2021/43]AL27.05.2020
AT27.05.2020
CZ27.05.2020
DK27.05.2020
EE27.05.2020
ES27.05.2020
FI27.05.2020
HR27.05.2020
LT27.05.2020
LV27.05.2020
MC27.05.2020
NL27.05.2020
PL27.05.2020
RO27.05.2020
RS27.05.2020
SE27.05.2020
SI27.05.2020
SK27.05.2020
SM27.05.2020
BG27.08.2020
NO27.08.2020
GR28.08.2020
IS27.09.2020
PT28.09.2020
LU13.01.2021
Former [2021/40]AL27.05.2020
AT27.05.2020
CZ27.05.2020
DK27.05.2020
EE27.05.2020
ES27.05.2020
FI27.05.2020
HR27.05.2020
LT27.05.2020
LV27.05.2020
MC27.05.2020
NL27.05.2020
PL27.05.2020
RO27.05.2020
RS27.05.2020
SE27.05.2020
SI27.05.2020
SK27.05.2020
SM27.05.2020
BG27.08.2020
NO27.08.2020
GR28.08.2020
IS27.09.2020
PT28.09.2020
Former [2021/24]AL27.05.2020
AT27.05.2020
CZ27.05.2020
DK27.05.2020
EE27.05.2020
ES27.05.2020
FI27.05.2020
HR27.05.2020
LT27.05.2020
LV27.05.2020
NL27.05.2020
PL27.05.2020
RO27.05.2020
RS27.05.2020
SE27.05.2020
SI27.05.2020
SK27.05.2020
SM27.05.2020
BG27.08.2020
NO27.08.2020
GR28.08.2020
IS27.09.2020
PT28.09.2020
Former [2021/10]AL27.05.2020
AT27.05.2020
CZ27.05.2020
DK27.05.2020
EE27.05.2020
ES27.05.2020
FI27.05.2020
HR27.05.2020
LT27.05.2020
LV27.05.2020
NL27.05.2020
PL27.05.2020
RO27.05.2020
RS27.05.2020
SE27.05.2020
SK27.05.2020
SM27.05.2020
BG27.08.2020
NO27.08.2020
GR28.08.2020
IS27.09.2020
PT28.09.2020
Former [2021/09]AL27.05.2020
AT27.05.2020
CZ27.05.2020
DK27.05.2020
EE27.05.2020
ES27.05.2020
FI27.05.2020
HR27.05.2020
LT27.05.2020
LV27.05.2020
NL27.05.2020
RO27.05.2020
RS27.05.2020
SE27.05.2020
SM27.05.2020
BG27.08.2020
NO27.08.2020
GR28.08.2020
IS27.09.2020
PT28.09.2020
Former [2021/08]AL27.05.2020
DK27.05.2020
ES27.05.2020
FI27.05.2020
HR27.05.2020
LT27.05.2020
LV27.05.2020
NL27.05.2020
RO27.05.2020
RS27.05.2020
SE27.05.2020
SM27.05.2020
BG27.08.2020
NO27.08.2020
GR28.08.2020
IS27.09.2020
PT28.09.2020
Former [2021/04]AL27.05.2020
FI27.05.2020
HR27.05.2020
LT27.05.2020
LV27.05.2020
NL27.05.2020
RS27.05.2020
SE27.05.2020
BG27.08.2020
NO27.08.2020
GR28.08.2020
IS27.09.2020
PT28.09.2020
Former [2021/01]FI27.05.2020
HR27.05.2020
LT27.05.2020
LV27.05.2020
RS27.05.2020
SE27.05.2020
BG27.08.2020
NO27.08.2020
GR28.08.2020
IS27.09.2020
PT28.09.2020
Former [2020/51]FI27.05.2020
HR27.05.2020
LT27.05.2020
LV27.05.2020
RS27.05.2020
SE27.05.2020
NO27.08.2020
GR28.08.2020
IS27.09.2020
PT28.09.2020
Former [2020/50]FI27.05.2020
HR27.05.2020
LT27.05.2020
LV27.05.2020
SE27.05.2020
NO27.08.2020
GR28.08.2020
IS27.09.2020
PT28.09.2020
Former [2020/48]FI27.05.2020
LT27.05.2020
SE27.05.2020
NO27.08.2020
IS27.09.2020
PT28.09.2020
Former [2020/47]LT27.05.2020
NO27.08.2020
IS27.09.2020
Former [2020/46]IS27.09.2020
Documents cited:Search[Y]WO2013168791  (SHARP KK [JP]) [Y] 1,3-6,8,9 * abstract *;
 EP2849504  [ ] (SHARP KK [JP]) [ ] * paragraph [0014] - paragraph [0017] * * paragraph [0104] - paragraph [0134] * * paragraph [0228] - paragraph [0230] ** paragraph [0327] - paragraph [0333] *;
 [XAY]  - SAMSUNG, "Power Control for eIMTA", vol. RAN WG1, no. Chicago, USA; 20130415 - 20130419, (20130405), 3GPP DRAFT; R1-131007 EIMTA PC, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/tsg_ran/WG1_RL1/TSGR1_72b/Docs/, (20130405), XP050696713 [X] 7 * pages 1,2 * [A] 2,10 [Y] 1,3-6,8,9
 [XY]  - "Agenda item: 6.2.1.1.1", vol. RAN WG1, no. San Francisco, USA; 20131111 - 20131115, (20131116), 3GPP DRAFT; R1-135942 WF ON UPLINK POWER CONTROL IN TDD EIMTA, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/tsg_ran/WG1_RL1/TSGR1_75/Docs/, (20131116), XP050751381 [X] 7 * page 1 * [Y] 1,3-6,8,9
 [XY]  - INTERDIGITAL COMMUNICATIONS, "eIMTA PHR", vol. RAN WG2, no. San Francisco, US; 20131111 - 20131115, (20131113), 3GPP DRAFT; R2-134230_EIMTA_PHR, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/RAN/RAN2/Docs/, (20131113), XP050736977 [X] 7 * sections 1,2 * [Y] 1,3-6,8,9
 [XY]  - MEDIATEK INC, "RAN2 Impact of Supporting eIMTA", vol. RAN WG2, no. San Francisco, USA; 20131111 - 20131115, (20131113), 3GPP DRAFT; R2-134068 DISC RAN2 IMPACT OF SUPPORTING EIMTA, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/RAN/RAN2/Docs/, (20131113), XP050736871 [X] 7 * section 2.2 * [Y] 1,3-6,8,9
 [XY]  - QUALCOMM INCORPORATED, "Configurable UL TPC accumulation", vol. RAN WG1, no. San Francisco, USA; 20131111 - 20131115, (20131113), 3GPP DRAFT; R1-135287 CONFIGURABLE UL TPC ACCUMULATION, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/RAN/RAN1/Docs/, (20131113), XP050734981 [X] 7 * the whole document * [Y] 1,3-6,8,9
 [Y]  - "3GPP TS 36.213 V11.5.0", 3GPP; Technical Specification Group Radio Access Network; Evolved Universal Terrestrial Radio Access (E-UTRA); Physical layer procedures (Release 11), (20131201), pages 1 - 182, URL: http://www.etsi.org/deliver/etsi_ts/136200_136299/136213/11.05.00_60/ts_136213v110500p.pdf, (20150915), XP055213328 [Y] 1,3-6,8,9 * page 12 - page 19 *
 [Y]  - EDITOR (MOTOROLA MOBILITY), "Additional clarifications/corrections for introducing Rel-11 features", vol. RAN WG1, no. St Julian; 20130128 - 20130201, (20130224), 3GPP DRAFT; R1-130836 - 36.213 CR0404 (REL-11, F), 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/tsg_ran/WG1_RL1/TSGR1_72/Docs/, (20130224), XP050696666 [Y] 1,3-6,8,9 * page 6 - page 10 *
 [Y]  - "Generation Partnership Project; Technical Specification Group Radio Access Network; Evolved Universal Terrestrial Radio Access (E-UTRA); Physical layer procedures (Release 11)", (20121218), 3GPP DRAFT; DRAFT36213-B10, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/tsg_ran/WG1_RL1/DRAFT/, (20121218), XP050660948 [Y] 1,3-6,8,9 * page 10 - page 18 *
International search[XE]WO2015005461  (SHARP KK [JP]);
 [Y]  - SAMSUNG, "Power Control for eIMTA", 3GPP TSG RAN WG1 #72BIS RL-131007, (20130415), XP050696713
 [Y]  - "3rd Generation Partnership Project, Technical Specification Group Radio Access Network ; Evolved Universal Terrestrial Radio Access (E- UTRA); Physical layer procedures (Release 11)", 3GPP TS 36.213 V11.5.0, (201312), pages 12 - 19, XP055213328
by applicant   - 3RD GENERATION PARTNERSHIP PROJECT, "Evolved Universal Terrestrial Radio Access (E-UTRA), Physical Layer Procedures", 3GPP TS 36. 213 VLL. 3. 0
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.