blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3169262

EP3169262 - PULSED LIGHT THERAPY ASSEMBLY [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  02.10.2020
Database last updated on 26.07.2024
FormerThe patent has been granted
Status updated on  25.10.2019
FormerGrant of patent is intended
Status updated on  07.07.2019
FormerExamination is in progress
Status updated on  19.01.2018
FormerRequest for examination was made
Status updated on  21.04.2017
FormerThe international publication has been made
Status updated on  16.01.2017
Most recent event   Tooltip08.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 10.08.2022  [2022/32]
Applicant(s)For all designated states
Eurofeedback
ZI de la Petite Montagne Sud
3 rue de l'Aubrac CE 1714
91017 Evry Cedex / FR
[N/P]
Former [2017/21]For all designated states
Eurofeedback
ZI de la Petite Montagne Sud, 3 rue de l'Aubrac CE 1714
91017 Evry Cedex / FR
Inventor(s)01 / SAFRAOUI, Georges
8 rue de Villejust La Poitevine
F-91140 Villejust / FR
 [2017/21]
Representative(s)Cabinet Nony
11 rue Saint-Georges
75009 Paris / FR
[N/P]
Former [2017/21]Nony
11 rue Saint-Georges
75009 Paris / FR
Application number, filing date15738647.516.07.2015
[2017/21]
WO2015EP66343
Priority number, dateFR2014005696818.07.2014         Original published format: FR 1456968
[2017/21]
Filing languageFR
Procedural languageFR
PublicationType: A1 Application with search report
No.:WO2016009008
Date:21.01.2016
Language:FR
[2016/03]
Type: A1 Application with search report 
No.:EP3169262
Date:24.05.2017
Language:FR
The application published by WIPO in one of the EPO official languages on 21.01.2016 takes the place of the publication of the European patent application.
[2017/21]
Type: B1 Patent specification 
No.:EP3169262
Date:27.11.2019
Language:FR
[2019/48]
Search report(s)International search report - published on:EP21.01.2016
ClassificationIPC:A61B18/20
[2017/21]
CPC:
A61B18/203 (EP); A61B2018/00476 (EP); A61B2018/1807 (EP)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2017/21]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
TitleGerman:PULSLICHTTHERAPIEANORDNUNG[2017/21]
English:PULSED LIGHT THERAPY ASSEMBLY[2017/21]
French:ENSEMBLE DE TRAITEMENT À LUMIÈRE PULSÉE[2017/21]
Entry into regional phase20.02.2017National basic fee paid 
20.02.2017Designation fee(s) paid 
20.02.2017Examination fee paid 
Examination procedure16.01.2017Date on which the examining division has become responsible
20.02.2017Examination requested  [2017/21]
17.08.2017Amendment by applicant (claims and/or description)
18.01.2018Despatch of a communication from the examining division (Time limit: M04)
17.05.2018Reply to a communication from the examining division
14.06.2018Despatch of a communication from the examining division (Time limit: M04)
08.10.2018Reply to a communication from the examining division
08.07.2019Communication of intention to grant the patent
18.10.2019Fee for grant paid
18.10.2019Fee for publishing/printing paid
18.10.2019Receipt of the translation of the claim(s)
Opposition(s)28.08.2020No opposition filed within time limit [2020/45]
Fees paidRenewal fee
31.07.2017Renewal fee patent year 03
31.07.2018Renewal fee patent year 04
31.07.2019Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU16.07.2015
AL27.11.2019
CZ27.11.2019
DK27.11.2019
EE27.11.2019
FI27.11.2019
LT27.11.2019
LV27.11.2019
MC27.11.2019
MK27.11.2019
MT27.11.2019
NL27.11.2019
PL27.11.2019
RO27.11.2019
RS27.11.2019
SE27.11.2019
SI27.11.2019
SK27.11.2019
SM27.11.2019
TR27.11.2019
BG27.02.2020
NO27.02.2020
GR28.02.2020
IS27.03.2020
PT19.04.2020
GB16.07.2020
IE16.07.2020
LU16.07.2020
BE31.07.2020
[2022/32]
Former [2022/27]HU16.07.2015
AL27.11.2019
CZ27.11.2019
DK27.11.2019
EE27.11.2019
FI27.11.2019
LT27.11.2019
LV27.11.2019
MC27.11.2019
MT27.11.2019
NL27.11.2019
PL27.11.2019
RO27.11.2019
RS27.11.2019
SE27.11.2019
SI27.11.2019
SK27.11.2019
SM27.11.2019
TR27.11.2019
BG27.02.2020
NO27.02.2020
GR28.02.2020
IS27.03.2020
PT19.04.2020
GB16.07.2020
IE16.07.2020
LU16.07.2020
BE31.07.2020
Former [2021/37]AL27.11.2019
CZ27.11.2019
DK27.11.2019
EE27.11.2019
FI27.11.2019
LT27.11.2019
LV27.11.2019
MC27.11.2019
NL27.11.2019
PL27.11.2019
RO27.11.2019
RS27.11.2019
SE27.11.2019
SI27.11.2019
SK27.11.2019
SM27.11.2019
BG27.02.2020
NO27.02.2020
GR28.02.2020
IS27.03.2020
PT19.04.2020
GB16.07.2020
IE16.07.2020
LU16.07.2020
BE31.07.2020
Former [2021/24]AL27.11.2019
CZ27.11.2019
DK27.11.2019
EE27.11.2019
FI27.11.2019
LT27.11.2019
LV27.11.2019
MC27.11.2019
NL27.11.2019
PL27.11.2019
RO27.11.2019
RS27.11.2019
SE27.11.2019
SI27.11.2019
SK27.11.2019
SM27.11.2019
BG27.02.2020
NO27.02.2020
GR28.02.2020
IS27.03.2020
PT19.04.2020
GB16.07.2020
LU16.07.2020
BE31.07.2020
Former [2021/22]AL27.11.2019
CZ27.11.2019
DK27.11.2019
EE27.11.2019
FI27.11.2019
LT27.11.2019
LV27.11.2019
MC27.11.2019
NL27.11.2019
PL27.11.2019
RO27.11.2019
RS27.11.2019
SE27.11.2019
SI27.11.2019
SK27.11.2019
SM27.11.2019
BG27.02.2020
NO27.02.2020
GR28.02.2020
IS27.03.2020
PT19.04.2020
GB16.07.2020
LU16.07.2020
Former [2021/20]AL27.11.2019
CZ27.11.2019
DK27.11.2019
EE27.11.2019
FI27.11.2019
LT27.11.2019
LV27.11.2019
MC27.11.2019
NL27.11.2019
PL27.11.2019
RO27.11.2019
RS27.11.2019
SE27.11.2019
SI27.11.2019
SK27.11.2019
SM27.11.2019
BG27.02.2020
NO27.02.2020
GR28.02.2020
IS27.03.2020
PT19.04.2020
LU16.07.2020
Former [2021/15]AL27.11.2019
CZ27.11.2019
DK27.11.2019
EE27.11.2019
FI27.11.2019
LT27.11.2019
LV27.11.2019
MC27.11.2019
NL27.11.2019
PL27.11.2019
RO27.11.2019
RS27.11.2019
SE27.11.2019
SI27.11.2019
SK27.11.2019
SM27.11.2019
BG27.02.2020
NO27.02.2020
GR28.02.2020
IS27.03.2020
PT19.04.2020
Former [2020/51]AL27.11.2019
CZ27.11.2019
DK27.11.2019
EE27.11.2019
FI27.11.2019
LT27.11.2019
LV27.11.2019
NL27.11.2019
PL27.11.2019
RO27.11.2019
RS27.11.2019
SE27.11.2019
SI27.11.2019
SK27.11.2019
SM27.11.2019
BG27.02.2020
NO27.02.2020
GR28.02.2020
IS27.03.2020
PT19.04.2020
Former [2020/37]AL27.11.2019
CZ27.11.2019
DK27.11.2019
EE27.11.2019
FI27.11.2019
LT27.11.2019
LV27.11.2019
NL27.11.2019
RO27.11.2019
RS27.11.2019
SE27.11.2019
SK27.11.2019
SM27.11.2019
BG27.02.2020
NO27.02.2020
GR28.02.2020
IS27.03.2020
PT19.04.2020
Former [2020/36]AL27.11.2019
CZ27.11.2019
DK27.11.2019
EE27.11.2019
FI27.11.2019
LT27.11.2019
LV27.11.2019
NL27.11.2019
RO27.11.2019
RS27.11.2019
SE27.11.2019
BG27.02.2020
NO27.02.2020
GR28.02.2020
IS27.03.2020
PT19.04.2020
Former [2020/35]AL27.11.2019
CZ27.11.2019
FI27.11.2019
LT27.11.2019
LV27.11.2019
NL27.11.2019
RO27.11.2019
RS27.11.2019
SE27.11.2019
BG27.02.2020
NO27.02.2020
GR28.02.2020
IS27.03.2020
Former [2020/32]AL27.11.2019
FI27.11.2019
LT27.11.2019
LV27.11.2019
NL27.11.2019
RS27.11.2019
SE27.11.2019
BG27.02.2020
NO27.02.2020
GR28.02.2020
IS27.03.2020
Former [2020/26]FI27.11.2019
LT27.11.2019
LV27.11.2019
NL27.11.2019
RS27.11.2019
SE27.11.2019
BG27.02.2020
NO27.02.2020
GR28.02.2020
IS27.03.2020
Former [2020/24]FI27.11.2019
LT27.11.2019
LV27.11.2019
NL27.11.2019
SE27.11.2019
BG27.02.2020
NO27.02.2020
GR28.02.2020
IS27.03.2020
Former [2020/23]FI27.11.2019
LT27.11.2019
LV27.11.2019
NL27.11.2019
SE27.11.2019
BG27.02.2020
NO27.02.2020
GR28.02.2020
Former [2020/22]FI27.11.2019
LT27.11.2019
SE27.11.2019
BG27.02.2020
NO27.02.2020
Former [2020/21]NO27.02.2020
Cited inInternational search[Y]US5683380  (ECKHOUSE SHIMON [IL], et al) [Y] 1-12 * column 2, lines 27-33; figure 4; claims 1, 2, 5 * * column 6, lines 33-42 *;
 [Y]US6612697  (AURELIUS MICHAEL J [US], et al) [Y] 1-3,5-12 * figures 5, 6; claims 1, 6 *;
 [Y]US2005045189  (JAY HARVEY [US]) [Y] 1-3,5,7,8,10-12 * paragraphs [0067] , [0079] , [0096] - [0098] - [ 133] , [ 152] , [0158] *;
 [Y]CN101165543  (FANG MIAO [CN]) [Y] 1-10,12 * figure 1; claims 7, 8 *;
 [Y]US2009248004  (ALTSHULER GREGORY B [US], et al) [Y] 1-5,7,8,10-12 * paragraphs [0165] , [0280] , [0373]; figure 1; claim 30 *;
 [Y]FR2929831  (EUROFEEDBACK SOC PAR ACTIONS S [FR]) [Y] 1-12 * page 2, lines 23-25; figure 1; claims 1-6, 8 *;
 [Y]US2013278893  (LEMAY ERIC [US], et al) [Y] 1-3,5-10,12* figure 3; claims 2, 15 *
ExaminationUS2003193643
 US2004034397
 WO2012118862
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.