EP3317707 - OPTICAL TERMINATION BOX AND ASSEMBLY [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 12.03.2021 Database last updated on 15.06.2024 | |
Former | The patent has been granted Status updated on 03.04.2020 | ||
Former | Grant of patent is intended Status updated on 05.12.2019 | ||
Former | Examination is in progress Status updated on 12.11.2019 | ||
Former | Grant of patent is intended Status updated on 11.07.2019 | ||
Former | Examination is in progress Status updated on 21.12.2018 | ||
Former | Request for examination was made Status updated on 06.04.2018 | ||
Former | The international publication has been made Status updated on 06.01.2017 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states Prysmian S.p.A. Via Chiese, 6 20126 Milano / IT | [2018/19] | Inventor(s) | 01 /
ABBIATI, Fabio c/o Prysmian S.p.A. Viale Sarca 222 20126 Milan / IT | [2018/19] | Representative(s) | Perani & Partners S.p.A. Piazza Armando Diaz, 7 20123 Milano / IT | [2018/19] | Application number, filing date | 15739022.0 | 30.06.2015 | [2018/19] | WO2015IB54914 | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2017001893 | Date: | 05.01.2017 | Language: | EN | [2017/01] | Type: | A1 Application with search report | No.: | EP3317707 | Date: | 09.05.2018 | Language: | EN | The application published by WIPO in one of the EPO official languages on 05.01.2017 takes the place of the publication of the European patent application. | [2018/19] | Type: | B1 Patent specification | No.: | EP3317707 | Date: | 06.05.2020 | Language: | EN | [2020/19] | Search report(s) | International search report - published on: | EP | 05.01.2017 | Classification | IPC: | G02B6/44 | [2018/19] | CPC: |
G02B6/4454 (EP);
G02B6/4441 (EP);
G02B6/4455 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/19] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | Title | German: | OPTISCHE ANSCHLUSSDOSE UND BAUGRUPPE | [2018/19] | English: | OPTICAL TERMINATION BOX AND ASSEMBLY | [2018/19] | French: | BOÎTIER DE RÉPARTITION OPTIQUE ET ENSEMBLE | [2018/19] | Entry into regional phase | 21.12.2017 | National basic fee paid | 21.12.2017 | Designation fee(s) paid | 21.12.2017 | Examination fee paid | Examination procedure | 21.12.2017 | Examination requested [2018/19] | 21.12.2017 | Date on which the examining division has become responsible | 01.08.2018 | Amendment by applicant (claims and/or description) | 19.12.2018 | Despatch of a communication from the examining division (Time limit: M04) | 26.04.2019 | Reply to a communication from the examining division | 12.07.2019 | Communication of intention to grant the patent | 11.11.2019 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 06.12.2019 | Communication of intention to grant the patent | 26.03.2020 | Fee for grant paid | 26.03.2020 | Fee for publishing/printing paid | 26.03.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 09.02.2021 | No opposition filed within time limit [2021/15] | Fees paid | Renewal fee | 21.12.2017 | Renewal fee patent year 03 | 27.06.2018 | Renewal fee patent year 04 | 27.06.2019 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 30.06.2015 | AL | 06.05.2020 | AT | 06.05.2020 | CY | 06.05.2020 | CZ | 06.05.2020 | DK | 06.05.2020 | EE | 06.05.2020 | FI | 06.05.2020 | HR | 06.05.2020 | LT | 06.05.2020 | LV | 06.05.2020 | MC | 06.05.2020 | MK | 06.05.2020 | MT | 06.05.2020 | RO | 06.05.2020 | RS | 06.05.2020 | SE | 06.05.2020 | SI | 06.05.2020 | SK | 06.05.2020 | SM | 06.05.2020 | TR | 06.05.2020 | BE | 30.06.2020 | CH | 30.06.2020 | IE | 30.06.2020 | LI | 30.06.2020 | LU | 30.06.2020 | BG | 06.08.2020 | NO | 06.08.2020 | GR | 07.08.2020 | IS | 06.09.2020 | PT | 07.09.2020 | [2022/32] |
Former [2022/27] | HU | 30.06.2015 | |
AL | 06.05.2020 | ||
AT | 06.05.2020 | ||
CY | 06.05.2020 | ||
CZ | 06.05.2020 | ||
DK | 06.05.2020 | ||
EE | 06.05.2020 | ||
FI | 06.05.2020 | ||
HR | 06.05.2020 | ||
LT | 06.05.2020 | ||
LV | 06.05.2020 | ||
MC | 06.05.2020 | ||
MT | 06.05.2020 | ||
RO | 06.05.2020 | ||
RS | 06.05.2020 | ||
SE | 06.05.2020 | ||
SI | 06.05.2020 | ||
SK | 06.05.2020 | ||
SM | 06.05.2020 | ||
TR | 06.05.2020 | ||
BE | 30.06.2020 | ||
CH | 30.06.2020 | ||
IE | 30.06.2020 | ||
LI | 30.06.2020 | ||
LU | 30.06.2020 | ||
BG | 06.08.2020 | ||
NO | 06.08.2020 | ||
GR | 07.08.2020 | ||
IS | 06.09.2020 | ||
PT | 07.09.2020 | ||
Former [2021/24] | AL | 06.05.2020 | |
AT | 06.05.2020 | ||
CZ | 06.05.2020 | ||
DK | 06.05.2020 | ||
EE | 06.05.2020 | ||
FI | 06.05.2020 | ||
HR | 06.05.2020 | ||
LT | 06.05.2020 | ||
LV | 06.05.2020 | ||
MC | 06.05.2020 | ||
RO | 06.05.2020 | ||
RS | 06.05.2020 | ||
SE | 06.05.2020 | ||
SI | 06.05.2020 | ||
SK | 06.05.2020 | ||
SM | 06.05.2020 | ||
BE | 30.06.2020 | ||
CH | 30.06.2020 | ||
IE | 30.06.2020 | ||
LI | 30.06.2020 | ||
LU | 30.06.2020 | ||
BG | 06.08.2020 | ||
NO | 06.08.2020 | ||
GR | 07.08.2020 | ||
IS | 06.09.2020 | ||
PT | 07.09.2020 | ||
Former [2021/20] | AL | 06.05.2020 | |
AT | 06.05.2020 | ||
CZ | 06.05.2020 | ||
DK | 06.05.2020 | ||
EE | 06.05.2020 | ||
FI | 06.05.2020 | ||
HR | 06.05.2020 | ||
LT | 06.05.2020 | ||
LV | 06.05.2020 | ||
MC | 06.05.2020 | ||
RO | 06.05.2020 | ||
RS | 06.05.2020 | ||
SE | 06.05.2020 | ||
SK | 06.05.2020 | ||
SM | 06.05.2020 | ||
CH | 30.06.2020 | ||
IE | 30.06.2020 | ||
LI | 30.06.2020 | ||
LU | 30.06.2020 | ||
BG | 06.08.2020 | ||
NO | 06.08.2020 | ||
GR | 07.08.2020 | ||
IS | 06.09.2020 | ||
PT | 07.09.2020 | ||
Former [2021/15] | AL | 06.05.2020 | |
AT | 06.05.2020 | ||
CZ | 06.05.2020 | ||
DK | 06.05.2020 | ||
EE | 06.05.2020 | ||
FI | 06.05.2020 | ||
HR | 06.05.2020 | ||
LT | 06.05.2020 | ||
LV | 06.05.2020 | ||
MC | 06.05.2020 | ||
RO | 06.05.2020 | ||
RS | 06.05.2020 | ||
SE | 06.05.2020 | ||
SK | 06.05.2020 | ||
SM | 06.05.2020 | ||
LU | 30.06.2020 | ||
BG | 06.08.2020 | ||
NO | 06.08.2020 | ||
GR | 07.08.2020 | ||
IS | 06.09.2020 | ||
PT | 07.09.2020 | ||
Former [2021/13] | AL | 06.05.2020 | |
AT | 06.05.2020 | ||
CZ | 06.05.2020 | ||
DK | 06.05.2020 | ||
EE | 06.05.2020 | ||
FI | 06.05.2020 | ||
HR | 06.05.2020 | ||
LT | 06.05.2020 | ||
LV | 06.05.2020 | ||
MC | 06.05.2020 | ||
RO | 06.05.2020 | ||
RS | 06.05.2020 | ||
SE | 06.05.2020 | ||
SK | 06.05.2020 | ||
SM | 06.05.2020 | ||
BG | 06.08.2020 | ||
NO | 06.08.2020 | ||
GR | 07.08.2020 | ||
IS | 06.09.2020 | ||
PT | 07.09.2020 | ||
Former [2021/10] | AL | 06.05.2020 | |
AT | 06.05.2020 | ||
CZ | 06.05.2020 | ||
DK | 06.05.2020 | ||
EE | 06.05.2020 | ||
FI | 06.05.2020 | ||
HR | 06.05.2020 | ||
LT | 06.05.2020 | ||
LV | 06.05.2020 | ||
RO | 06.05.2020 | ||
RS | 06.05.2020 | ||
SE | 06.05.2020 | ||
SK | 06.05.2020 | ||
SM | 06.05.2020 | ||
BG | 06.08.2020 | ||
NO | 06.08.2020 | ||
GR | 07.08.2020 | ||
IS | 06.09.2020 | ||
PT | 07.09.2020 | ||
Former [2021/09] | AL | 06.05.2020 | |
AT | 06.05.2020 | ||
CZ | 06.05.2020 | ||
DK | 06.05.2020 | ||
EE | 06.05.2020 | ||
FI | 06.05.2020 | ||
HR | 06.05.2020 | ||
LT | 06.05.2020 | ||
LV | 06.05.2020 | ||
RO | 06.05.2020 | ||
RS | 06.05.2020 | ||
SE | 06.05.2020 | ||
SM | 06.05.2020 | ||
BG | 06.08.2020 | ||
NO | 06.08.2020 | ||
GR | 07.08.2020 | ||
IS | 06.09.2020 | ||
PT | 07.09.2020 | ||
Former [2021/08] | AL | 06.05.2020 | |
DK | 06.05.2020 | ||
FI | 06.05.2020 | ||
HR | 06.05.2020 | ||
LT | 06.05.2020 | ||
LV | 06.05.2020 | ||
RO | 06.05.2020 | ||
RS | 06.05.2020 | ||
SE | 06.05.2020 | ||
SM | 06.05.2020 | ||
BG | 06.08.2020 | ||
NO | 06.08.2020 | ||
GR | 07.08.2020 | ||
IS | 06.09.2020 | ||
PT | 07.09.2020 | ||
Former [2021/04] | AL | 06.05.2020 | |
FI | 06.05.2020 | ||
HR | 06.05.2020 | ||
LT | 06.05.2020 | ||
LV | 06.05.2020 | ||
RS | 06.05.2020 | ||
SE | 06.05.2020 | ||
BG | 06.08.2020 | ||
NO | 06.08.2020 | ||
GR | 07.08.2020 | ||
IS | 06.09.2020 | ||
PT | 07.09.2020 | ||
Former [2021/01] | FI | 06.05.2020 | |
HR | 06.05.2020 | ||
LT | 06.05.2020 | ||
LV | 06.05.2020 | ||
RS | 06.05.2020 | ||
SE | 06.05.2020 | ||
BG | 06.08.2020 | ||
NO | 06.08.2020 | ||
GR | 07.08.2020 | ||
IS | 06.09.2020 | ||
PT | 07.09.2020 | ||
Former [2020/51] | FI | 06.05.2020 | |
HR | 06.05.2020 | ||
LT | 06.05.2020 | ||
LV | 06.05.2020 | ||
RS | 06.05.2020 | ||
SE | 06.05.2020 | ||
NO | 06.08.2020 | ||
GR | 07.08.2020 | ||
IS | 06.09.2020 | ||
PT | 07.09.2020 | ||
Former [2020/50] | FI | 06.05.2020 | |
HR | 06.05.2020 | ||
LT | 06.05.2020 | ||
LV | 06.05.2020 | ||
SE | 06.05.2020 | ||
NO | 06.08.2020 | ||
GR | 07.08.2020 | ||
IS | 06.09.2020 | ||
PT | 07.09.2020 | ||
Former [2020/48] | FI | 06.05.2020 | |
LT | 06.05.2020 | ||
SE | 06.05.2020 | ||
NO | 06.08.2020 | ||
IS | 06.09.2020 | ||
PT | 07.09.2020 | ||
Former [2020/47] | LT | 06.05.2020 | |
NO | 06.08.2020 | ||
IS | 06.09.2020 | ||
Former [2020/46] | IS | 06.09.2020 | Cited in | International search | [A]WO2009120280 (CORNING CABLE SYS LLC [US], et al) [A] 1-15 * abstract ** figures 3-6 *; | [XA]WO2010088202 (ADC TELECOMMUNICATIONS INC [US], et al) [X] 1,2,9,10 * abstract * * figure 7 * [A] 3-8,11-15; | [XA]EP2241915 (ADC TELECOMMUNICATIONS INC [US]) [X] 1,2,9,10 * abstract * * figures 1-8,19-21 * [A] 3-8,11-15; | [XI]US2013209049 (KOWALCZYK SCOTT C [US], et al) [X] 1-5,9-13 * abstract * * paragraphs [0031] - [0041] - [0056] - [0058] - [0062] - [0069] * * figures 2-7,14-17 * [I] 6-8,14,15 | by applicant | WO2011076275 |