EP3167528 - SYSTEM AND METHOD FOR DETERMINING THE SUITABILITY OF A PLURALITY OF ELECTRICAL PRODUCERS AND CONSUMERS WHICH ARE OPERATED IN A NETWORK AS A VIRTUAL POWER PLANT FOR PROVIDING CONTROL POWER [Right-click to bookmark this link] | Status | Opposition rejected Status updated on 10.07.2020 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 28.12.2017 | ||
Former | Grant of patent is intended Status updated on 31.08.2017 | ||
Former | Request for examination was made Status updated on 18.04.2017 | ||
Former | The international publication has been made Status updated on 25.01.2017 | Most recent event Tooltip | 04.12.2020 | Lapse of the patent in a contracting state New state(s): SI | published on 06.01.2021 [2021/01] | Applicant(s) | For all designated states Lichtblick SE Zirkusweg 6 20359 Hamburg / DE | [2017/20] | Inventor(s) | 01 /
STORACE, Stefan c/o Lichtblick SE Zirkusweg 6 20359 Hamburg / DE | 02 /
SCHLUTTER, Jörg c/o Lichtblick SE Zirkusweg 6 20359 Hamburg / DE | 03 /
RUMMENIE, Martin c/o Lichtblick SE Zirkusweg 6 20359 Hamburg / DE | 04 /
ANGENENDT, Hendrik c/o Lichtblick SE Zirkusweg 6 20359 Hamburg / DE | [2017/50] |
Former [2017/20] | 01 /
STORACE, Stefan c/o Lichtblick SE Zirkusweg 6 20359 Hamburg / DE | ||
02 /
SCHLUTTER, Jörg c/o Lichtblick SE Zirkusweg 6 20359 Hamburg / DE | |||
03 /
RUMMENIE, Martin c/o Lichtblick SE Zirkusweg 6 20359 Hamburg / DE | |||
04 /
ANGENENDT, Henrik c/o Lichtblick SE Zirkusweg 6 20359 Hamburg / DE | Representative(s) | Eisenführ Speiser Patentanwälte Rechtsanwälte PartGmbB Johannes-Brahms-Platz 1 20355 Hamburg / DE | [2017/20] | Application number, filing date | 15744119.7 | 07.07.2015 | [2017/20] | WO2015EP01378 | Priority number, date | DE20141009953 | 07.07.2014 Original published format: DE102014009953 | [2017/20] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | WO2016005048 | Date: | 14.01.2016 | Language: | DE | [2016/02] | Type: | A1 Application with search report | No.: | EP3167528 | Date: | 17.05.2017 | Language: | DE | The application published by WIPO in one of the EPO official languages on 14.01.2016 takes the place of the publication of the European patent application. | [2017/20] | Type: | B1 Patent specification | No.: | EP3167528 | Date: | 24.01.2018 | Language: | DE | [2018/04] | Search report(s) | International search report - published on: | EP | 14.01.2016 | Classification | IPC: | H02J3/46, H02J3/38, H02J13/00, H02J3/28 | [2017/34] | CPC: |
H02J3/28 (EP,US);
H02J13/00002 (EP,US);
H02J13/00006 (EP,US);
H02J3/38 (EP,US);
H02J3/381 (EP,US);
H02J3/46 (EP,US);
H02J2300/10 (EP);
H02J2300/20 (EP,US);
H02J2300/22 (EP,US);
H02J2300/24 (EP,US);
H02J2300/28 (EP,US);
Y02B70/30 (EP,US);
Y02B70/3225 (EP);
Y02B90/20 (EP,US);
Y02E10/56 (EP,US);
Y02E10/76 (EP,US);
Y02E40/70 (EP,US);
Y02E60/00 (EP,US);
Y02E70/30 (US);
Y04S10/12 (US);
Y04S10/123 (EP,US);
Y04S10/14 (EP,US);
Y04S10/30 (EP,US);
Y04S20/221 (EP,US);
|
Former IPC [2017/20] | H02J3/38, H02J13/00, H02J3/28 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/20] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | Title | German: | SYSTEM UND VERFAHREN ZUM BESTIMMEN DER EIGNUNG MEHRERER ELEKTRISCHER PRODUZENTEN UND VERBRAUCHER, DIE IN EINEM NETZWERK ALS VIRTUELLES KRAFTWERK BETRIEBEN WERDEN, FÜR DIE ERBRINGUNG VON REGELLEISTUNG | [2017/20] | English: | SYSTEM AND METHOD FOR DETERMINING THE SUITABILITY OF A PLURALITY OF ELECTRICAL PRODUCERS AND CONSUMERS WHICH ARE OPERATED IN A NETWORK AS A VIRTUAL POWER PLANT FOR PROVIDING CONTROL POWER | [2017/20] | French: | SYSTÈME ET PROCÉDÉ POUR DÉTERMINER L'APTITUDE DE PLUSIEURS PRODUCTEURS ET CONSOMMATEURS ÉLECTRIQUES FONCTIONNANT DANS UN RÉSEAU EN TANT QUE CENTRALE ÉLECTRIQUE VIRTUELLE, AFIN DE FOURNIR UNE PUISSANCE DE REGULATION | [2017/20] | Entry into regional phase | 07.02.2017 | National basic fee paid | 07.02.2017 | Designation fee(s) paid | 07.02.2017 | Examination fee paid | Examination procedure | 25.01.2017 | Amendment by applicant (claims and/or description) | 25.01.2017 | Date on which the examining division has become responsible | 07.02.2017 | Examination requested [2017/20] | 31.08.2017 | Communication of intention to grant the patent | 06.12.2017 | Fee for grant paid | 06.12.2017 | Fee for publishing/printing paid | 06.12.2017 | Receipt of the translation of the claim(s) | Opposition(s) | Opponent(s) | 01
24.10.2018
29.10.2018
ADMISSIBLE Siemens Aktiengesellschaft Werner-von-Siemens-Straße 1 80333 München / DE | [2018/49] | 08.11.2018 | Invitation to proprietor to file observations on the notice of opposition | 11.03.2019 | Reply of patent proprietor to notice(s) of opposition | 29.11.2019 | Legal effect of rejection of opposition [2020/33] | 29.11.2019 | Date of oral proceedings | 21.01.2020 | Despatch of minutes of oral proceedings | 21.01.2020 | Date of despatch of rejection of opposition | Fees paid | Renewal fee | 31.07.2017 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 07.07.2015 | AL | 24.01.2018 | CY | 24.01.2018 | CZ | 24.01.2018 | DK | 24.01.2018 | EE | 24.01.2018 | ES | 24.01.2018 | FI | 24.01.2018 | HR | 24.01.2018 | IT | 24.01.2018 | LT | 24.01.2018 | LV | 24.01.2018 | MC | 24.01.2018 | MK | 24.01.2018 | MT | 24.01.2018 | PL | 24.01.2018 | PT | 24.01.2018 | RO | 24.01.2018 | RS | 24.01.2018 | SE | 24.01.2018 | SK | 24.01.2018 | SM | 24.01.2018 | TR | 24.01.2018 | BG | 24.04.2018 | NO | 24.04.2018 | GR | 25.04.2018 | IS | 24.05.2018 | IE | 07.07.2018 | LU | 07.07.2018 | SI | 07.07.2018 | [2021/01] |
Former [2020/31] | HU | 07.07.2015 | |
AL | 24.01.2018 | ||
CY | 24.01.2018 | ||
CZ | 24.01.2018 | ||
DK | 24.01.2018 | ||
EE | 24.01.2018 | ||
ES | 24.01.2018 | ||
FI | 24.01.2018 | ||
HR | 24.01.2018 | ||
IT | 24.01.2018 | ||
LT | 24.01.2018 | ||
LV | 24.01.2018 | ||
MC | 24.01.2018 | ||
MK | 24.01.2018 | ||
MT | 24.01.2018 | ||
PL | 24.01.2018 | ||
PT | 24.01.2018 | ||
RO | 24.01.2018 | ||
RS | 24.01.2018 | ||
SE | 24.01.2018 | ||
SK | 24.01.2018 | ||
SM | 24.01.2018 | ||
TR | 24.01.2018 | ||
BG | 24.04.2018 | ||
NO | 24.04.2018 | ||
GR | 25.04.2018 | ||
IS | 24.05.2018 | ||
IE | 07.07.2018 | ||
LU | 07.07.2018 | ||
Former [2020/30] | HU | 07.07.2015 | |
AL | 24.01.2018 | ||
CY | 24.01.2018 | ||
CZ | 24.01.2018 | ||
DK | 24.01.2018 | ||
EE | 24.01.2018 | ||
ES | 24.01.2018 | ||
FI | 24.01.2018 | ||
HR | 24.01.2018 | ||
IT | 24.01.2018 | ||
LT | 24.01.2018 | ||
LV | 24.01.2018 | ||
MC | 24.01.2018 | ||
MT | 24.01.2018 | ||
PL | 24.01.2018 | ||
PT | 24.01.2018 | ||
RO | 24.01.2018 | ||
RS | 24.01.2018 | ||
SE | 24.01.2018 | ||
SK | 24.01.2018 | ||
SM | 24.01.2018 | ||
TR | 24.01.2018 | ||
BG | 24.04.2018 | ||
NO | 24.04.2018 | ||
GR | 25.04.2018 | ||
IS | 24.05.2018 | ||
IE | 07.07.2018 | ||
LU | 07.07.2018 | ||
Former [2020/28] | AL | 24.01.2018 | |
CY | 24.01.2018 | ||
CZ | 24.01.2018 | ||
DK | 24.01.2018 | ||
EE | 24.01.2018 | ||
ES | 24.01.2018 | ||
FI | 24.01.2018 | ||
HR | 24.01.2018 | ||
IT | 24.01.2018 | ||
LT | 24.01.2018 | ||
LV | 24.01.2018 | ||
MC | 24.01.2018 | ||
MT | 24.01.2018 | ||
PL | 24.01.2018 | ||
PT | 24.01.2018 | ||
RO | 24.01.2018 | ||
RS | 24.01.2018 | ||
SE | 24.01.2018 | ||
SK | 24.01.2018 | ||
SM | 24.01.2018 | ||
TR | 24.01.2018 | ||
BG | 24.04.2018 | ||
NO | 24.04.2018 | ||
GR | 25.04.2018 | ||
IS | 24.05.2018 | ||
IE | 07.07.2018 | ||
LU | 07.07.2018 | ||
Former [2020/16] | AL | 24.01.2018 | |
CY | 24.01.2018 | ||
CZ | 24.01.2018 | ||
DK | 24.01.2018 | ||
EE | 24.01.2018 | ||
ES | 24.01.2018 | ||
FI | 24.01.2018 | ||
HR | 24.01.2018 | ||
IT | 24.01.2018 | ||
LT | 24.01.2018 | ||
LV | 24.01.2018 | ||
MC | 24.01.2018 | ||
MT | 24.01.2018 | ||
PL | 24.01.2018 | ||
RO | 24.01.2018 | ||
RS | 24.01.2018 | ||
SE | 24.01.2018 | ||
SK | 24.01.2018 | ||
SM | 24.01.2018 | ||
TR | 24.01.2018 | ||
BG | 24.04.2018 | ||
NO | 24.04.2018 | ||
GR | 25.04.2018 | ||
IS | 24.05.2018 | ||
IE | 07.07.2018 | ||
LU | 07.07.2018 | ||
Former [2019/19] | AL | 24.01.2018 | |
CY | 24.01.2018 | ||
CZ | 24.01.2018 | ||
DK | 24.01.2018 | ||
EE | 24.01.2018 | ||
ES | 24.01.2018 | ||
FI | 24.01.2018 | ||
HR | 24.01.2018 | ||
IT | 24.01.2018 | ||
LT | 24.01.2018 | ||
LV | 24.01.2018 | ||
MC | 24.01.2018 | ||
MT | 24.01.2018 | ||
PL | 24.01.2018 | ||
RO | 24.01.2018 | ||
RS | 24.01.2018 | ||
SE | 24.01.2018 | ||
SK | 24.01.2018 | ||
SM | 24.01.2018 | ||
BG | 24.04.2018 | ||
NO | 24.04.2018 | ||
GR | 25.04.2018 | ||
IS | 24.05.2018 | ||
IE | 07.07.2018 | ||
LU | 07.07.2018 | ||
Former [2019/17] | AL | 24.01.2018 | |
CY | 24.01.2018 | ||
CZ | 24.01.2018 | ||
DK | 24.01.2018 | ||
EE | 24.01.2018 | ||
ES | 24.01.2018 | ||
FI | 24.01.2018 | ||
HR | 24.01.2018 | ||
IT | 24.01.2018 | ||
LT | 24.01.2018 | ||
LV | 24.01.2018 | ||
MC | 24.01.2018 | ||
MT | 24.01.2018 | ||
PL | 24.01.2018 | ||
RO | 24.01.2018 | ||
RS | 24.01.2018 | ||
SE | 24.01.2018 | ||
SK | 24.01.2018 | ||
SM | 24.01.2018 | ||
BG | 24.04.2018 | ||
NO | 24.04.2018 | ||
GR | 25.04.2018 | ||
IS | 24.05.2018 | ||
LU | 07.07.2018 | ||
Former [2019/15] | AL | 24.01.2018 | |
CY | 24.01.2018 | ||
CZ | 24.01.2018 | ||
DK | 24.01.2018 | ||
EE | 24.01.2018 | ||
ES | 24.01.2018 | ||
FI | 24.01.2018 | ||
HR | 24.01.2018 | ||
IT | 24.01.2018 | ||
LT | 24.01.2018 | ||
LV | 24.01.2018 | ||
MC | 24.01.2018 | ||
MT | 24.01.2018 | ||
PL | 24.01.2018 | ||
RO | 24.01.2018 | ||
RS | 24.01.2018 | ||
SE | 24.01.2018 | ||
SK | 24.01.2018 | ||
SM | 24.01.2018 | ||
BG | 24.04.2018 | ||
NO | 24.04.2018 | ||
GR | 25.04.2018 | ||
IS | 24.05.2018 | ||
Former [2018/52] | AL | 24.01.2018 | |
CY | 24.01.2018 | ||
CZ | 24.01.2018 | ||
DK | 24.01.2018 | ||
EE | 24.01.2018 | ||
ES | 24.01.2018 | ||
FI | 24.01.2018 | ||
HR | 24.01.2018 | ||
IT | 24.01.2018 | ||
LT | 24.01.2018 | ||
LV | 24.01.2018 | ||
MT | 24.01.2018 | ||
PL | 24.01.2018 | ||
RO | 24.01.2018 | ||
RS | 24.01.2018 | ||
SE | 24.01.2018 | ||
SK | 24.01.2018 | ||
SM | 24.01.2018 | ||
BG | 24.04.2018 | ||
NO | 24.04.2018 | ||
GR | 25.04.2018 | ||
IS | 24.05.2018 | ||
Former [2018/51] | AL | 24.01.2018 | |
CY | 24.01.2018 | ||
CZ | 24.01.2018 | ||
DK | 24.01.2018 | ||
EE | 24.01.2018 | ||
ES | 24.01.2018 | ||
FI | 24.01.2018 | ||
HR | 24.01.2018 | ||
IT | 24.01.2018 | ||
LT | 24.01.2018 | ||
LV | 24.01.2018 | ||
MT | 24.01.2018 | ||
PL | 24.01.2018 | ||
RO | 24.01.2018 | ||
RS | 24.01.2018 | ||
SE | 24.01.2018 | ||
SK | 24.01.2018 | ||
BG | 24.04.2018 | ||
NO | 24.04.2018 | ||
GR | 25.04.2018 | ||
IS | 24.05.2018 | ||
Former [2018/50] | AL | 24.01.2018 | |
CY | 24.01.2018 | ||
CZ | 24.01.2018 | ||
EE | 24.01.2018 | ||
ES | 24.01.2018 | ||
FI | 24.01.2018 | ||
HR | 24.01.2018 | ||
IT | 24.01.2018 | ||
LT | 24.01.2018 | ||
LV | 24.01.2018 | ||
MT | 24.01.2018 | ||
PL | 24.01.2018 | ||
RO | 24.01.2018 | ||
RS | 24.01.2018 | ||
SE | 24.01.2018 | ||
SK | 24.01.2018 | ||
BG | 24.04.2018 | ||
NO | 24.04.2018 | ||
GR | 25.04.2018 | ||
IS | 24.05.2018 | ||
Former [2018/47] | AL | 24.01.2018 | |
CY | 24.01.2018 | ||
ES | 24.01.2018 | ||
FI | 24.01.2018 | ||
HR | 24.01.2018 | ||
IT | 24.01.2018 | ||
LT | 24.01.2018 | ||
LV | 24.01.2018 | ||
MT | 24.01.2018 | ||
PL | 24.01.2018 | ||
RS | 24.01.2018 | ||
SE | 24.01.2018 | ||
BG | 24.04.2018 | ||
NO | 24.04.2018 | ||
GR | 25.04.2018 | ||
IS | 24.05.2018 | ||
Former [2018/46] | AL | 24.01.2018 | |
CY | 24.01.2018 | ||
ES | 24.01.2018 | ||
FI | 24.01.2018 | ||
HR | 24.01.2018 | ||
LT | 24.01.2018 | ||
LV | 24.01.2018 | ||
MT | 24.01.2018 | ||
PL | 24.01.2018 | ||
RS | 24.01.2018 | ||
SE | 24.01.2018 | ||
BG | 24.04.2018 | ||
NO | 24.04.2018 | ||
GR | 25.04.2018 | ||
IS | 24.05.2018 | ||
Former [2018/43] | CY | 24.01.2018 | |
ES | 24.01.2018 | ||
FI | 24.01.2018 | ||
HR | 24.01.2018 | ||
LT | 24.01.2018 | ||
LV | 24.01.2018 | ||
MT | 24.01.2018 | ||
PL | 24.01.2018 | ||
RS | 24.01.2018 | ||
SE | 24.01.2018 | ||
BG | 24.04.2018 | ||
NO | 24.04.2018 | ||
GR | 25.04.2018 | ||
IS | 24.05.2018 | ||
Former [2018/40] | CY | 24.01.2018 | |
ES | 24.01.2018 | ||
FI | 24.01.2018 | ||
HR | 24.01.2018 | ||
LT | 24.01.2018 | ||
LV | 24.01.2018 | ||
PL | 24.01.2018 | ||
RS | 24.01.2018 | ||
SE | 24.01.2018 | ||
BG | 24.04.2018 | ||
NO | 24.04.2018 | ||
GR | 25.04.2018 | ||
IS | 24.05.2018 | ||
Former [2018/39] | CY | 24.01.2018 | |
ES | 24.01.2018 | ||
FI | 24.01.2018 | ||
HR | 24.01.2018 | ||
LT | 24.01.2018 | ||
LV | 24.01.2018 | ||
PL | 24.01.2018 | ||
RS | 24.01.2018 | ||
SE | 24.01.2018 | ||
NO | 24.04.2018 | ||
GR | 25.04.2018 | ||
IS | 24.05.2018 | ||
Former [2018/37] | CY | 24.01.2018 | |
ES | 24.01.2018 | ||
FI | 24.01.2018 | ||
HR | 24.01.2018 | ||
LT | 24.01.2018 | ||
PL | 24.01.2018 | ||
NO | 24.04.2018 | ||
GR | 25.04.2018 | ||
Former [2018/36] | CY | 24.01.2018 | |
ES | 24.01.2018 | ||
FI | 24.01.2018 | ||
HR | 24.01.2018 | ||
LT | 24.01.2018 | ||
PL | 24.01.2018 | ||
NO | 24.04.2018 | ||
Former [2018/35] | CY | 24.01.2018 | |
FI | 24.01.2018 | ||
HR | 24.01.2018 | ||
LT | 24.01.2018 | ||
NO | 24.04.2018 | Cited in | International search | [A]US2012029897 (CHERIAN SUNIL [US], et al) [A] 1-10 * abstract * * figure 2 ** paragraphs [0018] - [0026] *; | [X]WO2012168323 (ELECTRICITE DE FRANCE [FR], et al) [X] 1-10 * abstract * * figures 1,2 * * page 5, lines 2-12,14-17 * * page 3, lines 16-21,27-34 * * page 6, lines 1-19,27-29 * * page 8, lines 6-16,19-26 * * page 4, lines 1-9 * * claims 10,11,12 * * page 7, lines 2-4 *; | [I]DE102011055227 (EVONIK DEGUSSA GMBH [DE], et al) [I] 1-10 * abstract * * paragraphs [0082] - [0091] * | Opposition | US2004024494 | US2004030457 | US2008188955 | DE102009040091 | WO2011091857 | US2012029897 | US2012053751 | US8141416 | WO2012138235 | WO2012168323 | US8406934 | DE102011055227 | WO2014090285 | US2014207302 | - WERNER et al., "DECENTRALIZED ENERGY MANAGEMENT SYSTEM FOR EFFICIENCY IMPROVEMENTS OF DISTRIBUTED ENERGY RESOURCES", CIRED 21st International Conference on Electricity Distribution, (20110600), no. Paper 0397, pages 1 - 4, XP055526032 | - Werner et al., "Energy Management for Decentralized Generation", Electrical India, (20061100), vol. 46, no. 11, pages 158 - 166, XP055526041 | - "Virtuelle Kraftwerke im technischen Praxistest", (20130515), URL: http://www.bine.info/themen/news/virtuelle-kraftwerke-im-technischen-praxistest.pdf, XP055526044 | - FUCHS et al., "Systemkonzept zur energieeffizienten Integration von EET und dezentralen KWK-Anlagen in das Verteilnetz", Internationalen Energiewirtschaftstagung (IEWT), (20030212), pages 1 - 9, XP055526054 | - SCHOLTES et al., "Energy Park KonWerl: Energy Management of a Decentralized Supply System. Concept and First Results", First international Conference on the integration of Renewable energy sources and Distributed energy resources, (20041201), XP055526057 | - CH. SCHWAEGERL, "Fahrplanmanagement in Verteilnetzen mit großen Anteilen verteilter Erzeugung", VDE Kongress, Berlin, (20041018), XP055526059 |