EP3106283 - MANUFACTURING METHOD OF SYRINGE BARREL [Right-click to bookmark this link] | |||
Former [2016/51] | SYRINGE BARREL PRODUCTION METHOD | ||
[2018/36] | Status | No opposition filed within time limit Status updated on 19.07.2019 Database last updated on 03.06.2024 | |
Former | The patent has been granted Status updated on 10.08.2018 | ||
Former | Grant of patent is intended Status updated on 03.05.2018 | ||
Former | Request for examination was made Status updated on 18.11.2016 | Most recent event Tooltip | 01.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 03.08.2022 [2022/31] | Applicant(s) | For all designated states Mitsubishi Gas Chemical Company, Inc. 5-2, Marunouchi 2-chome Chiyoda-ku Tokyo 100-8324 / JP | [2016/51] | Inventor(s) | 01 /
ITO, Hisafumi c/o Mitsubishi Gas Chemical Company Inc. Hiratsuka Research Laboratory 6-2 Higashiyawata 5-chome Hiratsuka-shi Kanagawa 254-0016 / JP | 02 /
KASHIBA, Takashi c/o Mitsubishi Gas Chemical Company Inc. Hiratsuka Research Laboratory 6-2 Higashiyawata 5-chome Hiratsuka-shi Kanagawa 254-0016 / JP | [2016/51] | Representative(s) | Hoffmann Eitle Patent- und Rechtsanwälte PartmbB Arabellastraße 30 81925 München / DE | [2016/51] | Application number, filing date | 15746273.0 | 09.02.2015 | [2016/51] | WO2015JP53566 | Priority number, date | JP20140023104 | 10.02.2014 Original published format: JP 2014023104 | JP20140132140 | 27.06.2014 Original published format: JP 2014132140 | [2016/51] | Filing language | JA | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2015119284 | Date: | 13.08.2015 | Language: | JA | [2015/32] | Type: | A1 Application with search report | No.: | EP3106283 | Date: | 21.12.2016 | Language: | EN | [2016/51] | Type: | B1 Patent specification | No.: | EP3106283 | Date: | 12.09.2018 | Language: | EN | [2018/37] | Search report(s) | International search report - published on: | JP | 13.08.2015 | (Supplementary) European search report - dispatched on: | EP | 31.08.2017 | Classification | IPC: | B29C45/17, A61M5/31, B26D7/08, B29C45/38, // B29K23/00, B29L31/00, B29C45/16 | [2018/20] | CPC: |
A61M5/3129 (EP,US);
B29C45/38 (EP,KR,US);
A61M5/31 (US);
A61M5/178 (KR);
B26D3/00 (EP,KR,US);
B26D7/08 (EP,US);
B26D7/086 (EP,KR,US);
B29C45/0025 (EP,KR,US);
A61M2205/02 (EP,US);
A61M2207/00 (EP,US);
B29C2045/0027 (EP,KR,US);
B29C2793/009 (EP,KR,US);
|
Former IPC [2017/40] | B29C45/17, A61M5/178, B26D7/08, B29C45/38, // B29K23/00, B29L31/00, B29C45/16 | ||
Former IPC [2016/51] | B29C45/17, A61M5/178, B26D3/00, B26D7/08, B29C45/27, B29C45/38 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/51] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | SPRITZENZYLINDERHERSTELLUNGSVERFAHREN | [2016/51] | English: | MANUFACTURING METHOD OF SYRINGE BARREL | [2018/36] | French: | PROCÉDÉ DE PRODUCTION D'UN CORPS DE SERINGUE | [2016/51] |
Former [2016/51] | SYRINGE BARREL PRODUCTION METHOD | Entry into regional phase | 19.07.2016 | Translation filed | 19.07.2016 | National basic fee paid | 19.07.2016 | Search fee paid | 19.07.2016 | Designation fee(s) paid | 19.07.2016 | Examination fee paid | Examination procedure | 19.07.2016 | Examination requested [2016/51] | 19.07.2016 | Date on which the examining division has become responsible | 21.09.2017 | Amendment by applicant (claims and/or description) | 04.05.2018 | Communication of intention to grant the patent | 24.07.2018 | Fee for grant paid | 24.07.2018 | Fee for publishing/printing paid | 24.07.2018 | Receipt of the translation of the claim(s) | Opposition(s) | 13.06.2019 | No opposition filed within time limit [2019/34] | Fees paid | Renewal fee | 17.02.2017 | Renewal fee patent year 03 | 21.02.2018 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 09.02.2015 | AL | 12.09.2018 | AT | 12.09.2018 | CY | 12.09.2018 | CZ | 12.09.2018 | DK | 12.09.2018 | EE | 12.09.2018 | ES | 12.09.2018 | FI | 12.09.2018 | HR | 12.09.2018 | IT | 12.09.2018 | LT | 12.09.2018 | LV | 12.09.2018 | MC | 12.09.2018 | MK | 12.09.2018 | NL | 12.09.2018 | PL | 12.09.2018 | RO | 12.09.2018 | RS | 12.09.2018 | SE | 12.09.2018 | SI | 12.09.2018 | SK | 12.09.2018 | SM | 12.09.2018 | TR | 12.09.2018 | BG | 12.12.2018 | NO | 12.12.2018 | GR | 13.12.2018 | IS | 12.01.2019 | PT | 12.01.2019 | IE | 09.02.2019 | LU | 09.02.2019 | MT | 09.02.2019 | BE | 28.02.2019 | CH | 28.02.2019 | LI | 28.02.2019 | [2022/31] |
Former [2021/32] | HU | 09.02.2015 | |
AL | 12.09.2018 | ||
AT | 12.09.2018 | ||
CY | 12.09.2018 | ||
CZ | 12.09.2018 | ||
DK | 12.09.2018 | ||
EE | 12.09.2018 | ||
ES | 12.09.2018 | ||
FI | 12.09.2018 | ||
HR | 12.09.2018 | ||
IT | 12.09.2018 | ||
LT | 12.09.2018 | ||
LV | 12.09.2018 | ||
MC | 12.09.2018 | ||
NL | 12.09.2018 | ||
PL | 12.09.2018 | ||
RO | 12.09.2018 | ||
RS | 12.09.2018 | ||
SE | 12.09.2018 | ||
SI | 12.09.2018 | ||
SK | 12.09.2018 | ||
SM | 12.09.2018 | ||
TR | 12.09.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
IS | 12.01.2019 | ||
PT | 12.01.2019 | ||
IE | 09.02.2019 | ||
LU | 09.02.2019 | ||
MT | 09.02.2019 | ||
BE | 28.02.2019 | ||
CH | 28.02.2019 | ||
LI | 28.02.2019 | ||
Former [2021/26] | AL | 12.09.2018 | |
AT | 12.09.2018 | ||
CY | 12.09.2018 | ||
CZ | 12.09.2018 | ||
DK | 12.09.2018 | ||
EE | 12.09.2018 | ||
ES | 12.09.2018 | ||
FI | 12.09.2018 | ||
HR | 12.09.2018 | ||
IT | 12.09.2018 | ||
LT | 12.09.2018 | ||
LV | 12.09.2018 | ||
MC | 12.09.2018 | ||
NL | 12.09.2018 | ||
PL | 12.09.2018 | ||
RO | 12.09.2018 | ||
RS | 12.09.2018 | ||
SE | 12.09.2018 | ||
SI | 12.09.2018 | ||
SK | 12.09.2018 | ||
SM | 12.09.2018 | ||
TR | 12.09.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
IS | 12.01.2019 | ||
PT | 12.01.2019 | ||
IE | 09.02.2019 | ||
LU | 09.02.2019 | ||
MT | 09.02.2019 | ||
BE | 28.02.2019 | ||
CH | 28.02.2019 | ||
LI | 28.02.2019 | ||
Former [2020/29] | AL | 12.09.2018 | |
AT | 12.09.2018 | ||
CZ | 12.09.2018 | ||
DK | 12.09.2018 | ||
EE | 12.09.2018 | ||
ES | 12.09.2018 | ||
FI | 12.09.2018 | ||
HR | 12.09.2018 | ||
IT | 12.09.2018 | ||
LT | 12.09.2018 | ||
LV | 12.09.2018 | ||
MC | 12.09.2018 | ||
NL | 12.09.2018 | ||
PL | 12.09.2018 | ||
RO | 12.09.2018 | ||
RS | 12.09.2018 | ||
SE | 12.09.2018 | ||
SI | 12.09.2018 | ||
SK | 12.09.2018 | ||
SM | 12.09.2018 | ||
TR | 12.09.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
IS | 12.01.2019 | ||
PT | 12.01.2019 | ||
IE | 09.02.2019 | ||
LU | 09.02.2019 | ||
MT | 09.02.2019 | ||
BE | 28.02.2019 | ||
CH | 28.02.2019 | ||
LI | 28.02.2019 | ||
Former [2020/17] | AL | 12.09.2018 | |
AT | 12.09.2018 | ||
CZ | 12.09.2018 | ||
DK | 12.09.2018 | ||
EE | 12.09.2018 | ||
ES | 12.09.2018 | ||
FI | 12.09.2018 | ||
HR | 12.09.2018 | ||
IT | 12.09.2018 | ||
LT | 12.09.2018 | ||
LV | 12.09.2018 | ||
MC | 12.09.2018 | ||
NL | 12.09.2018 | ||
PL | 12.09.2018 | ||
RO | 12.09.2018 | ||
RS | 12.09.2018 | ||
SE | 12.09.2018 | ||
SI | 12.09.2018 | ||
SK | 12.09.2018 | ||
SM | 12.09.2018 | ||
TR | 12.09.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
IS | 12.01.2019 | ||
PT | 12.01.2019 | ||
IE | 09.02.2019 | ||
LU | 09.02.2019 | ||
BE | 28.02.2019 | ||
CH | 28.02.2019 | ||
LI | 28.02.2019 | ||
Former [2020/12] | AL | 12.09.2018 | |
AT | 12.09.2018 | ||
CZ | 12.09.2018 | ||
DK | 12.09.2018 | ||
EE | 12.09.2018 | ||
ES | 12.09.2018 | ||
FI | 12.09.2018 | ||
HR | 12.09.2018 | ||
IT | 12.09.2018 | ||
LT | 12.09.2018 | ||
LV | 12.09.2018 | ||
MC | 12.09.2018 | ||
NL | 12.09.2018 | ||
PL | 12.09.2018 | ||
RO | 12.09.2018 | ||
RS | 12.09.2018 | ||
SE | 12.09.2018 | ||
SI | 12.09.2018 | ||
SK | 12.09.2018 | ||
SM | 12.09.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
IS | 12.01.2019 | ||
PT | 12.01.2019 | ||
IE | 09.02.2019 | ||
LU | 09.02.2019 | ||
BE | 28.02.2019 | ||
CH | 28.02.2019 | ||
LI | 28.02.2019 | ||
Former [2020/09] | AL | 12.09.2018 | |
AT | 12.09.2018 | ||
CZ | 12.09.2018 | ||
DK | 12.09.2018 | ||
EE | 12.09.2018 | ||
ES | 12.09.2018 | ||
FI | 12.09.2018 | ||
HR | 12.09.2018 | ||
IT | 12.09.2018 | ||
LT | 12.09.2018 | ||
LV | 12.09.2018 | ||
MC | 12.09.2018 | ||
NL | 12.09.2018 | ||
PL | 12.09.2018 | ||
RO | 12.09.2018 | ||
RS | 12.09.2018 | ||
SE | 12.09.2018 | ||
SI | 12.09.2018 | ||
SK | 12.09.2018 | ||
SM | 12.09.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
IS | 12.01.2019 | ||
PT | 12.01.2019 | ||
IE | 09.02.2019 | ||
LU | 09.02.2019 | ||
CH | 28.02.2019 | ||
LI | 28.02.2019 | ||
Former [2020/04] | AL | 12.09.2018 | |
AT | 12.09.2018 | ||
CZ | 12.09.2018 | ||
DK | 12.09.2018 | ||
EE | 12.09.2018 | ||
ES | 12.09.2018 | ||
FI | 12.09.2018 | ||
HR | 12.09.2018 | ||
IT | 12.09.2018 | ||
LT | 12.09.2018 | ||
LV | 12.09.2018 | ||
MC | 12.09.2018 | ||
NL | 12.09.2018 | ||
PL | 12.09.2018 | ||
RO | 12.09.2018 | ||
RS | 12.09.2018 | ||
SE | 12.09.2018 | ||
SI | 12.09.2018 | ||
SK | 12.09.2018 | ||
SM | 12.09.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
IS | 12.01.2019 | ||
PT | 12.01.2019 | ||
LU | 09.02.2019 | ||
CH | 28.02.2019 | ||
LI | 28.02.2019 | ||
Former [2019/47] | AL | 12.09.2018 | |
AT | 12.09.2018 | ||
CZ | 12.09.2018 | ||
DK | 12.09.2018 | ||
EE | 12.09.2018 | ||
ES | 12.09.2018 | ||
FI | 12.09.2018 | ||
HR | 12.09.2018 | ||
IT | 12.09.2018 | ||
LT | 12.09.2018 | ||
LV | 12.09.2018 | ||
MC | 12.09.2018 | ||
NL | 12.09.2018 | ||
PL | 12.09.2018 | ||
RO | 12.09.2018 | ||
RS | 12.09.2018 | ||
SE | 12.09.2018 | ||
SI | 12.09.2018 | ||
SK | 12.09.2018 | ||
SM | 12.09.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
IS | 12.01.2019 | ||
PT | 12.01.2019 | ||
LU | 09.02.2019 | ||
Former [2019/45] | AL | 12.09.2018 | |
AT | 12.09.2018 | ||
CZ | 12.09.2018 | ||
DK | 12.09.2018 | ||
EE | 12.09.2018 | ||
ES | 12.09.2018 | ||
FI | 12.09.2018 | ||
HR | 12.09.2018 | ||
IT | 12.09.2018 | ||
LT | 12.09.2018 | ||
LV | 12.09.2018 | ||
MC | 12.09.2018 | ||
NL | 12.09.2018 | ||
PL | 12.09.2018 | ||
RO | 12.09.2018 | ||
RS | 12.09.2018 | ||
SE | 12.09.2018 | ||
SI | 12.09.2018 | ||
SK | 12.09.2018 | ||
SM | 12.09.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
IS | 12.01.2019 | ||
PT | 12.01.2019 | ||
Former [2019/37] | AL | 12.09.2018 | |
AT | 12.09.2018 | ||
CZ | 12.09.2018 | ||
DK | 12.09.2018 | ||
EE | 12.09.2018 | ||
ES | 12.09.2018 | ||
FI | 12.09.2018 | ||
HR | 12.09.2018 | ||
IT | 12.09.2018 | ||
LT | 12.09.2018 | ||
LV | 12.09.2018 | ||
NL | 12.09.2018 | ||
PL | 12.09.2018 | ||
RO | 12.09.2018 | ||
RS | 12.09.2018 | ||
SE | 12.09.2018 | ||
SI | 12.09.2018 | ||
SK | 12.09.2018 | ||
SM | 12.09.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
IS | 12.01.2019 | ||
PT | 12.01.2019 | ||
Former [2019/34] | AL | 12.09.2018 | |
AT | 12.09.2018 | ||
CZ | 12.09.2018 | ||
DK | 12.09.2018 | ||
EE | 12.09.2018 | ||
ES | 12.09.2018 | ||
FI | 12.09.2018 | ||
HR | 12.09.2018 | ||
IT | 12.09.2018 | ||
LT | 12.09.2018 | ||
LV | 12.09.2018 | ||
NL | 12.09.2018 | ||
PL | 12.09.2018 | ||
RO | 12.09.2018 | ||
RS | 12.09.2018 | ||
SE | 12.09.2018 | ||
SK | 12.09.2018 | ||
SM | 12.09.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
IS | 12.01.2019 | ||
PT | 12.01.2019 | ||
Former [2019/26] | AL | 12.09.2018 | |
AT | 12.09.2018 | ||
CZ | 12.09.2018 | ||
EE | 12.09.2018 | ||
ES | 12.09.2018 | ||
FI | 12.09.2018 | ||
HR | 12.09.2018 | ||
IT | 12.09.2018 | ||
LT | 12.09.2018 | ||
LV | 12.09.2018 | ||
NL | 12.09.2018 | ||
PL | 12.09.2018 | ||
RO | 12.09.2018 | ||
RS | 12.09.2018 | ||
SE | 12.09.2018 | ||
SK | 12.09.2018 | ||
SM | 12.09.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
IS | 12.01.2019 | ||
PT | 12.01.2019 | ||
Former [2019/23] | AL | 12.09.2018 | |
AT | 12.09.2018 | ||
CZ | 12.09.2018 | ||
EE | 12.09.2018 | ||
ES | 12.09.2018 | ||
FI | 12.09.2018 | ||
HR | 12.09.2018 | ||
IT | 12.09.2018 | ||
LT | 12.09.2018 | ||
LV | 12.09.2018 | ||
NL | 12.09.2018 | ||
PL | 12.09.2018 | ||
RO | 12.09.2018 | ||
RS | 12.09.2018 | ||
SE | 12.09.2018 | ||
SK | 12.09.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
IS | 12.01.2019 | ||
Former [2019/22] | AL | 12.09.2018 | |
CZ | 12.09.2018 | ||
FI | 12.09.2018 | ||
HR | 12.09.2018 | ||
IT | 12.09.2018 | ||
LT | 12.09.2018 | ||
LV | 12.09.2018 | ||
NL | 12.09.2018 | ||
PL | 12.09.2018 | ||
RO | 12.09.2018 | ||
RS | 12.09.2018 | ||
SE | 12.09.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
IS | 12.01.2019 | ||
Former [2019/21] | AL | 12.09.2018 | |
FI | 12.09.2018 | ||
HR | 12.09.2018 | ||
IT | 12.09.2018 | ||
LT | 12.09.2018 | ||
LV | 12.09.2018 | ||
NL | 12.09.2018 | ||
RS | 12.09.2018 | ||
SE | 12.09.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
IS | 12.01.2019 | ||
Former [2019/20] | AL | 12.09.2018 | |
FI | 12.09.2018 | ||
HR | 12.09.2018 | ||
LT | 12.09.2018 | ||
LV | 12.09.2018 | ||
NL | 12.09.2018 | ||
RS | 12.09.2018 | ||
SE | 12.09.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
Former [2019/12] | AL | 12.09.2018 | |
FI | 12.09.2018 | ||
HR | 12.09.2018 | ||
LT | 12.09.2018 | ||
LV | 12.09.2018 | ||
RS | 12.09.2018 | ||
SE | 12.09.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
Former [2019/11] | FI | 12.09.2018 | |
HR | 12.09.2018 | ||
LT | 12.09.2018 | ||
RS | 12.09.2018 | ||
SE | 12.09.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
Former [2019/10] | FI | 12.09.2018 | |
LT | 12.09.2018 | ||
RS | 12.09.2018 | ||
SE | 12.09.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
Former [2019/08] | FI | 12.09.2018 | |
LT | 12.09.2018 | ||
NO | 12.12.2018 | ||
Former [2019/07] | LT | 12.09.2018 | Documents cited: | Search | [Y]US4685602 (HAMA TOMIO [JP]) [Y] 1,2,6-8 * abstract * * figures 1-6 * * column 1, lines 11-45 ** column 3, lines 13-54; claim 1 *; | [Y]JP2004229750 (NIPRO CORP) [Y] 1,2,6-8 * abstract * * paragraph [0037] * * figures 1-8 * | International search | [YA]JPS60213499 (HAAMO KK) [Y] 1, 2, 6, 7 * , claims; page 1, lower right column, lines 4 to 11 & US 4685602 A * [A] 3-5, 8; | [A]US4567797 (FOLK DONALD C [US]) [A] 1-8* , entire text (Family: none) *; | [Y]JPS6316916 (TOYOTA MOTOR CORP, et al) [Y] 2, 6, 7 * , claims; page 2, upper right column, lines 3 to 15 (Family: none) *; | [YA]JP2004229750 (NIPRO CORP) [Y] 1, 2, 6, 7 * , claims; paragraphs [0021] to [0027]; drawings & US 2004/0267194 A1 & EP 1442762 A2 & DE 602004005902 D & AT 359841 T * [A] 3-5, 8; | [A]WO2005011954 (COKI ENGINEERING INC [JP], et al) [A] 1-8 * , entire text & US 2008/0271870 A1 & EP 1652649 A1 & AU 2003252391 A *; | [Y]JP2009291901 (TOYOTA MOTOR CORP) [Y] 2, 6, 7 * , paragraph [0006] (Family: none) *; | [YA]JP2012106329 (ADWELDS KK, et al) [Y] 1, 2, 6, 7 * , claims; paragraphs [0006], [0015] to [0017] & US 2013/0152757 A1 & WO 2011/135847 A1 & KR 10-2012-0116999 A & CN 102858504 A * [A] 3-5, 8 |