EP3106537 - METHOD AND DEVICE FOR CONTROLLING AMOUNT OF HOT DIP GALVANIZATION ADHESION [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 14.02.2020 Database last updated on 15.06.2024 | |
Former | The patent has been granted Status updated on 08.03.2019 | ||
Former | Grant of patent is intended Status updated on 16.08.2018 | ||
Former | Examination is in progress Status updated on 09.03.2018 | ||
Former | Request for examination was made Status updated on 18.11.2016 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For:AL
AT
BE
BG
CH
CY
CZ
DE
DK
EE
ES
FI
FR
GB
GR
HR
HU
IE
IS
LI
LT
LU
LV
MC
MK
MT
NL
NO
PL
PT
RO
RS
SE
SI
SK
SM
TR
Primetals Technologies Japan, Ltd. 6-22, Kanonshin-Machi 4-chome, Nishi-ku Hiroshima-shi, Hiroshima 733-8553 / JP | For all designated states Nisshin Steel Co., Ltd. 3-4-1 Marunouchi Chiyoda-ku Tokyo 100-8366 / JP | [2019/10] |
Former [2019/02] | For all designated states Primetals Technologies Japan, Ltd. 6-22, Kanonshin-Machi 4-chome, Nishi-ku Hiroshima-shi, Hiroshima 733-8553 / JP | ||
For all designated states Nisshin Steel Co., Ltd. 3-4-1 Marunouchi Chiyoda-ku Tokyo 100-8366 / JP | |||
Former [2016/51] | For all designated states Primetals Technologies Japan, Ltd. 34-6, Shiba 5-chome Minato-ku Tokyo 108-0014 / JP | ||
For all designated states Nisshin Steel Co., Ltd. 3-4-1 Marunouchi Chiyoda-ku Tokyo 100-8366 / JP | Inventor(s) | 01 /
SUEMORI, Hideaki c/o Primetals Technologies Japan Ltd. Hiroshima Works 6-22 Kan-on-shin-machi 4-chome Nishi-ku Hiroshima-shi Hiroshima 733-8553 / JP | 02 /
TANAKA, Masayoshi c/o Primetals Technologies Japan Ltd. Hiroshima Works 6-22 Kan-on-shin-machi 4-chome Nishi-ku Hiroshima-shi Hiroshima 733-8553 / JP | 03 /
KAKEMIZU, Norikatsu c/o Primetals Technologies Japan Ltd. Hiroshima Works 6-22 Kan-on-shin-machi 4-chome Nishi-ku Hiroshima-shi Hiroshima 733-8553 / JP | 04 /
YAMAMOTO, Takashi c/o NISSHIN STEEL CO. LTD. Toyo Works 962-14 Hojo Saijo-shi Ehime 799-1354 / JP | 05 /
MORISHITA, Hisao c/o NISSHIN STEEL CO. LTD. Toyo Works 962-14 Hojo Saijo-shi Ehime 799-1354 / JP | 06 /
YAMASHITA, Ryuuichi c/o NISSHIN STEEL CO. LTD. Toyo Works 962-14 Hojo Saijo-shi Ehime 799-1354 / JP | [2016/51] | Representative(s) | Strehl Schübel-Hopf & Partner Maximilianstrasse 54 80538 München / DE | [2016/51] | Application number, filing date | 15746290.4 | 10.02.2015 | [2016/51] | WO2015JP53575 | Priority number, date | JP20140023019 | 10.02.2014 Original published format: JP 2014023019 | [2016/51] | Filing language | JA | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2015119286 | Date: | 13.08.2015 | Language: | JA | [2015/32] | Type: | A1 Application with search report | No.: | EP3106537 | Date: | 21.12.2016 | Language: | EN | [2016/51] | Type: | B1 Patent specification | No.: | EP3106537 | Date: | 10.04.2019 | Language: | EN | [2019/15] | Search report(s) | International search report - published on: | JP | 13.08.2015 | (Supplementary) European search report - dispatched on: | EP | 31.07.2017 | Classification | IPC: | G05D5/03 | [2018/33] | CPC: |
C23C2/20 (EP,US);
C23C2/16 (EP,US);
C23C2/51 (EP,US);
C23C2/52 (EP,US);
G05D5/03 (US)
|
Former IPC [2017/35] | C23C2/20, C23C2/14, C23C2/16, C23C2/00 | ||
Former IPC [2016/51] | C23C2/20 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/51] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | VERFAHREN UND VORRICHTUNG ZUR KONTROLLE DES AUSMASSES EINER FEUERVERZINKUNGSHAFTUNG | [2016/51] | English: | METHOD AND DEVICE FOR CONTROLLING AMOUNT OF HOT DIP GALVANIZATION ADHESION | [2016/51] | French: | MÉTHODE ET DISPOSITIF DE RÉGULATION D'UNE QUANTITÉ D'ADHÉSION EN GALVANISATION AU TREMPÉ À CHAUD | [2016/51] | Entry into regional phase | 02.08.2016 | Translation filed | 08.09.2016 | National basic fee paid | 08.09.2016 | Search fee paid | 08.09.2016 | Designation fee(s) paid | 08.09.2016 | Examination fee paid | Examination procedure | 01.08.2016 | Date on which the examining division has become responsible | 08.09.2016 | Examination requested [2016/51] | 31.01.2018 | Amendment by applicant (claims and/or description) | 12.03.2018 | Despatch of a communication from the examining division (Time limit: M04) | 02.07.2018 | Reply to a communication from the examining division | 17.08.2018 | Communication of intention to grant the patent | 17.12.2018 | Fee for grant paid | 17.12.2018 | Fee for publishing/printing paid | 17.12.2018 | Receipt of the translation of the claim(s) | Opposition(s) | 13.01.2020 | No opposition filed within time limit [2020/12] | Fees paid | Renewal fee | 28.02.2017 | Renewal fee patent year 03 | 26.02.2018 | Renewal fee patent year 04 | 27.02.2019 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 10.02.2015 | AL | 10.04.2019 | AT | 10.04.2019 | CY | 10.04.2019 | CZ | 10.04.2019 | DK | 10.04.2019 | EE | 10.04.2019 | ES | 10.04.2019 | FI | 10.04.2019 | HR | 10.04.2019 | LT | 10.04.2019 | LV | 10.04.2019 | MC | 10.04.2019 | MK | 10.04.2019 | MT | 10.04.2019 | NL | 10.04.2019 | PL | 10.04.2019 | RO | 10.04.2019 | RS | 10.04.2019 | SE | 10.04.2019 | SI | 10.04.2019 | SK | 10.04.2019 | SM | 10.04.2019 | BG | 10.07.2019 | NO | 10.07.2019 | GR | 11.07.2019 | IS | 10.08.2019 | PT | 10.09.2019 | [2022/32] |
Former [2022/28] | HU | 10.02.2015 | |
AL | 10.04.2019 | ||
AT | 10.04.2019 | ||
CY | 10.04.2019 | ||
CZ | 10.04.2019 | ||
DK | 10.04.2019 | ||
EE | 10.04.2019 | ||
ES | 10.04.2019 | ||
FI | 10.04.2019 | ||
HR | 10.04.2019 | ||
LT | 10.04.2019 | ||
LV | 10.04.2019 | ||
MC | 10.04.2019 | ||
MT | 10.04.2019 | ||
NL | 10.04.2019 | ||
PL | 10.04.2019 | ||
RO | 10.04.2019 | ||
RS | 10.04.2019 | ||
SE | 10.04.2019 | ||
SI | 10.04.2019 | ||
SK | 10.04.2019 | ||
SM | 10.04.2019 | ||
BG | 10.07.2019 | ||
NO | 10.07.2019 | ||
GR | 11.07.2019 | ||
IS | 10.08.2019 | ||
PT | 10.09.2019 | ||
Former [2020/50] | AL | 10.04.2019 | |
AT | 10.04.2019 | ||
CZ | 10.04.2019 | ||
DK | 10.04.2019 | ||
EE | 10.04.2019 | ||
ES | 10.04.2019 | ||
FI | 10.04.2019 | ||
HR | 10.04.2019 | ||
LT | 10.04.2019 | ||
LV | 10.04.2019 | ||
MC | 10.04.2019 | ||
NL | 10.04.2019 | ||
PL | 10.04.2019 | ||
RO | 10.04.2019 | ||
RS | 10.04.2019 | ||
SE | 10.04.2019 | ||
SI | 10.04.2019 | ||
SK | 10.04.2019 | ||
SM | 10.04.2019 | ||
BG | 10.07.2019 | ||
NO | 10.07.2019 | ||
GR | 11.07.2019 | ||
IS | 10.08.2019 | ||
PT | 10.09.2019 | ||
Former [2020/26] | AL | 10.04.2019 | |
AT | 10.04.2019 | ||
CZ | 10.04.2019 | ||
DK | 10.04.2019 | ||
EE | 10.04.2019 | ||
ES | 10.04.2019 | ||
FI | 10.04.2019 | ||
HR | 10.04.2019 | ||
LT | 10.04.2019 | ||
LV | 10.04.2019 | ||
NL | 10.04.2019 | ||
PL | 10.04.2019 | ||
RO | 10.04.2019 | ||
RS | 10.04.2019 | ||
SE | 10.04.2019 | ||
SI | 10.04.2019 | ||
SK | 10.04.2019 | ||
SM | 10.04.2019 | ||
BG | 10.07.2019 | ||
NO | 10.07.2019 | ||
GR | 11.07.2019 | ||
IS | 10.08.2019 | ||
PT | 10.09.2019 | ||
Former [2020/14] | AL | 10.04.2019 | |
AT | 10.04.2019 | ||
CZ | 10.04.2019 | ||
DK | 10.04.2019 | ||
EE | 10.04.2019 | ||
ES | 10.04.2019 | ||
FI | 10.04.2019 | ||
HR | 10.04.2019 | ||
LT | 10.04.2019 | ||
LV | 10.04.2019 | ||
NL | 10.04.2019 | ||
PL | 10.04.2019 | ||
RO | 10.04.2019 | ||
RS | 10.04.2019 | ||
SE | 10.04.2019 | ||
SK | 10.04.2019 | ||
SM | 10.04.2019 | ||
BG | 10.07.2019 | ||
NO | 10.07.2019 | ||
GR | 11.07.2019 | ||
IS | 10.08.2019 | ||
PT | 10.09.2019 | ||
Former [2020/11] | AL | 10.04.2019 | |
AT | 10.04.2019 | ||
CZ | 10.04.2019 | ||
DK | 10.04.2019 | ||
EE | 10.04.2019 | ||
ES | 10.04.2019 | ||
FI | 10.04.2019 | ||
HR | 10.04.2019 | ||
LT | 10.04.2019 | ||
LV | 10.04.2019 | ||
NL | 10.04.2019 | ||
PL | 10.04.2019 | ||
RO | 10.04.2019 | ||
RS | 10.04.2019 | ||
SE | 10.04.2019 | ||
SK | 10.04.2019 | ||
BG | 10.07.2019 | ||
NO | 10.07.2019 | ||
GR | 11.07.2019 | ||
IS | 10.08.2019 | ||
PT | 10.09.2019 | ||
Former [2020/10] | AL | 10.04.2019 | |
AT | 10.04.2019 | ||
CZ | 10.04.2019 | ||
DK | 10.04.2019 | ||
ES | 10.04.2019 | ||
FI | 10.04.2019 | ||
HR | 10.04.2019 | ||
LT | 10.04.2019 | ||
LV | 10.04.2019 | ||
NL | 10.04.2019 | ||
PL | 10.04.2019 | ||
RO | 10.04.2019 | ||
RS | 10.04.2019 | ||
SE | 10.04.2019 | ||
BG | 10.07.2019 | ||
NO | 10.07.2019 | ||
GR | 11.07.2019 | ||
IS | 10.08.2019 | ||
PT | 10.09.2019 | ||
Former [2020/09] | AL | 10.04.2019 | |
AT | 10.04.2019 | ||
CZ | 10.04.2019 | ||
DK | 10.04.2019 | ||
ES | 10.04.2019 | ||
FI | 10.04.2019 | ||
HR | 10.04.2019 | ||
LT | 10.04.2019 | ||
LV | 10.04.2019 | ||
NL | 10.04.2019 | ||
PL | 10.04.2019 | ||
RS | 10.04.2019 | ||
SE | 10.04.2019 | ||
BG | 10.07.2019 | ||
NO | 10.07.2019 | ||
GR | 11.07.2019 | ||
IS | 10.08.2019 | ||
PT | 10.09.2019 | ||
Former [2020/04] | AL | 10.04.2019 | |
AT | 10.04.2019 | ||
ES | 10.04.2019 | ||
FI | 10.04.2019 | ||
HR | 10.04.2019 | ||
LT | 10.04.2019 | ||
LV | 10.04.2019 | ||
NL | 10.04.2019 | ||
PL | 10.04.2019 | ||
RS | 10.04.2019 | ||
SE | 10.04.2019 | ||
BG | 10.07.2019 | ||
NO | 10.07.2019 | ||
GR | 11.07.2019 | ||
IS | 10.08.2019 | ||
PT | 10.09.2019 | ||
Former [2020/03] | AL | 10.04.2019 | |
AT | 10.04.2019 | ||
ES | 10.04.2019 | ||
FI | 10.04.2019 | ||
HR | 10.04.2019 | ||
LT | 10.04.2019 | ||
LV | 10.04.2019 | ||
NL | 10.04.2019 | ||
PL | 10.04.2019 | ||
RS | 10.04.2019 | ||
SE | 10.04.2019 | ||
BG | 10.07.2019 | ||
NO | 10.07.2019 | ||
GR | 11.07.2019 | ||
PT | 10.09.2019 | ||
Former [2019/52] | AL | 10.04.2019 | |
ES | 10.04.2019 | ||
FI | 10.04.2019 | ||
HR | 10.04.2019 | ||
LT | 10.04.2019 | ||
LV | 10.04.2019 | ||
NL | 10.04.2019 | ||
PL | 10.04.2019 | ||
RS | 10.04.2019 | ||
SE | 10.04.2019 | ||
BG | 10.07.2019 | ||
NO | 10.07.2019 | ||
GR | 11.07.2019 | ||
PT | 10.09.2019 | ||
Former [2019/51] | AL | 10.04.2019 | |
ES | 10.04.2019 | ||
FI | 10.04.2019 | ||
HR | 10.04.2019 | ||
LT | 10.04.2019 | ||
LV | 10.04.2019 | ||
NL | 10.04.2019 | ||
RS | 10.04.2019 | ||
SE | 10.04.2019 | ||
BG | 10.07.2019 | ||
NO | 10.07.2019 | ||
GR | 11.07.2019 | ||
PT | 10.09.2019 | ||
Former [2019/50] | AL | 10.04.2019 | |
ES | 10.04.2019 | ||
FI | 10.04.2019 | ||
HR | 10.04.2019 | ||
LT | 10.04.2019 | ||
LV | 10.04.2019 | ||
NL | 10.04.2019 | ||
RS | 10.04.2019 | ||
SE | 10.04.2019 | ||
NO | 10.07.2019 | ||
GR | 11.07.2019 | ||
PT | 10.09.2019 | ||
Former [2019/49] | AL | 10.04.2019 | |
ES | 10.04.2019 | ||
FI | 10.04.2019 | ||
HR | 10.04.2019 | ||
LT | 10.04.2019 | ||
NL | 10.04.2019 | ||
SE | 10.04.2019 | ||
NO | 10.07.2019 | ||
PT | 10.09.2019 | ||
Former [2019/48] | ES | 10.04.2019 | |
FI | 10.04.2019 | ||
LT | 10.04.2019 | ||
NL | 10.04.2019 | ||
SE | 10.04.2019 | ||
NO | 10.07.2019 | ||
PT | 10.09.2019 | ||
Former [2019/47] | ES | 10.04.2019 | |
FI | 10.04.2019 | ||
LT | 10.04.2019 | ||
NL | 10.04.2019 | ||
NO | 10.07.2019 | ||
Former [2019/44] | NL | 10.04.2019 | Documents cited: | Search | [A]JPH051358 (SUMITOMO METAL IND) [A] 1-9 * paragraph [0001] * * paragraph [0001] - paragraph [0007] * * paragraph [0009] - paragraph [0011] * * paragraph [0013] - paragraph [0016]; figures 1-5; claims 1-6 *; | [A]JPH10273765 (NISSHIN STEEL CO LTD) [A] 1-9 * paragraph [0016] - paragraph [0018] ** paragraph [0039] - paragraph [0046] * | International search | [A]JP2003129207 (KAWATETSU GALVANIZING) [A] 1-9* , entire text; all drawings (Family: none) *; | [A]JP2004339540 (MITSUBISHI HEAVY IND LTD, et al) [A] 1-9 * , entire text; all drawings (Family: none) *; | [A]JP2008133507 (NISSHIN STEEL CO LTD) [A] 1-9 * , entire text; all drawings (Family: none) * |