blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3104549

EP3104549 - HOME APPLIANCE, NETWORK CONNECTION SYSTEM FOR HOME APPLIANCE AND NETWORK CONNECTION METHOD OF HOME APPLIANCE [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  12.02.2021
Database last updated on 05.10.2024
FormerThe patent has been granted
Status updated on  21.02.2020
FormerGrant of patent is intended
Status updated on  14.02.2020
FormerExamination is in progress
Status updated on  05.02.2020
FormerGrant of patent is intended
Status updated on  01.10.2019
FormerExamination is in progress
Status updated on  09.02.2018
FormerRequest for examination was made
Status updated on  11.11.2016
Most recent event   Tooltip06.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 09.10.2024 [2024/41]
Applicant(s)For all designated states
Samsung Electronics Co., Ltd.
129, Samsung-ro
Yeongtong-gu
Suwon-si, Gyeonggi-do 443-742 / KR
[2016/50]
Inventor(s)01 / YANG, Hee Kyung
128-1 Sinwon-ro
Yeongtong-gu
Suwon-si Gyeonggi-do 443-390 / KR
02 / KIM, Se Il
58 Migeumil-ro
Bundang-gu
Seongnam-si Gyeonggi-do 463-743 / KR
 [2016/50]
Representative(s)Gulde & Partner
Patent- und Rechtsanwaltskanzlei mbB
Wallstraße 58/59
10179 Berlin / DE
[2016/50]
Application number, filing date15746422.327.01.2015
[2016/50]
WO2015KR00847
Priority number, dateKR2014001345506.02.2014         Original published format: KR 20140013455
[2016/50]
Filing languageKO
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2015119394
Date:13.08.2015
Language:KO
[2015/32]
Type: A1 Application with search report 
No.:EP3104549
Date:14.12.2016
Language:EN
[2016/50]
Type: B1 Patent specification 
No.:EP3104549
Date:25.03.2020
Language:EN
[2020/13]
Search report(s)International search report - published on:KR13.08.2015
(Supplementary) European search report - dispatched on:EP07.06.2017
ClassificationIPC:H04W76/14, H04L12/12, H04L12/28, H04L29/06, H04W12/06, H04W12/08, H04W60/00, H04W84/18
[2019/39]
CPC:
H04L12/12 (EP,US); G01S17/36 (US); G01S17/931 (US);
G01S7/4915 (US); G01S7/499 (US); H04L12/2807 (US);
H04L63/08 (US); H04L63/10 (US); H04W12/068 (EP,US);
H04W12/069 (EP,US); H04W12/08 (EP,US); H04W60/00 (US);
H04W76/14 (EP,US); H04L2012/285 (US); H04W84/18 (US) (-)
Former IPC [2017/27]H04L9/32, H04L12/12, H04L29/06, H04L12/28, H04W12/06, H04W12/08, H04W60/00, H04W76/02, H04W84/18
Former IPC [2016/50]H04L9/32, H04L12/12
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2016/50]
Extension statesBANot yet paid
MENot yet paid
TitleGerman:HAUSHALTSVORRICHTUNG, NETZWERKVERBINDUNGSSYSTEM FÜR EINE HAUSHALTSVORRICHTUNG UND NETZWERKANSCHLUSSVERFAHREN EINER HAUSHALTSVORRICHTUNG[2016/50]
English:HOME APPLIANCE, NETWORK CONNECTION SYSTEM FOR HOME APPLIANCE AND NETWORK CONNECTION METHOD OF HOME APPLIANCE[2016/50]
French:APPAREIL ÉLECTROMÉNAGER, SYSTÈME DE CONNEXION RÉSEAU POUR UN APPAREIL ÉLECTROMÉNAGER, ET PROCÉDÉ DE CONNEXION RÉSEAU D'UN APPAREIL ÉLECTROMÉNAGER[2016/50]
Entry into regional phase22.07.2016Translation filed 
22.07.2016National basic fee paid 
22.07.2016Search fee paid 
22.07.2016Designation fee(s) paid 
22.07.2016Examination fee paid 
Examination procedure22.07.2016Examination requested  [2016/50]
22.07.2016Date on which the examining division has become responsible
05.10.2017Amendment by applicant (claims and/or description)
09.02.2018Despatch of a communication from the examining division (Time limit: M04)
16.04.2018Observations by third parties
08.06.2018Reply to a communication from the examining division
29.10.2018Despatch of a communication from the examining division (Time limit: M04)
25.02.2019Reply to a communication from the examining division
02.10.2019Communication of intention to grant the patent
30.01.2020Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO
30.01.2020Fee for grant paid
30.01.2020Fee for publishing/printing paid
13.02.2020Information about intention to grant a patent
13.02.2020Receipt of the translation of the claim(s)
Divisional application(s)EP20155321.1  / EP3672148
Opposition(s)12.01.2021No opposition filed within time limit [2021/11]
Fees paidRenewal fee
25.01.2017Renewal fee patent year 03
29.01.2018Renewal fee patent year 04
23.01.2019Renewal fee patent year 05
23.01.2020Renewal fee patent year 06
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU27.01.2015
AT25.03.2020
CY25.03.2020
CZ25.03.2020
DK25.03.2020
EE25.03.2020
ES25.03.2020
FI25.03.2020
HR25.03.2020
IT25.03.2020
LT25.03.2020
LV25.03.2020
MC25.03.2020
MK25.03.2020
MT25.03.2020
NL25.03.2020
PL25.03.2020
RO25.03.2020
RS25.03.2020
SE25.03.2020
SI25.03.2020
SK25.03.2020
SM25.03.2020
BG25.06.2020
NO25.06.2020
GR26.06.2020
IS25.07.2020
PT18.08.2020
[2024/41]
Former [2024/22]HU27.01.2015
AT25.03.2020
CY25.03.2020
CZ25.03.2020
DK25.03.2020
EE25.03.2020
ES25.03.2020
FI25.03.2020
HR25.03.2020
IT25.03.2020
LT25.03.2020
LV25.03.2020
MC25.03.2020
MK25.03.2020
NL25.03.2020
PL25.03.2020
RO25.03.2020
RS25.03.2020
SE25.03.2020
SI25.03.2020
SK25.03.2020
SM25.03.2020
BG25.06.2020
NO25.06.2020
GR26.06.2020
IS25.07.2020
PT18.08.2020
Former [2023/30]HU27.01.2015
AT25.03.2020
CY25.03.2020
CZ25.03.2020
DK25.03.2020
EE25.03.2020
ES25.03.2020
FI25.03.2020
HR25.03.2020
IT25.03.2020
LT25.03.2020
LV25.03.2020
MC25.03.2020
NL25.03.2020
PL25.03.2020
RO25.03.2020
RS25.03.2020
SE25.03.2020
SI25.03.2020
SK25.03.2020
SM25.03.2020
BG25.06.2020
NO25.06.2020
GR26.06.2020
IS25.07.2020
PT18.08.2020
Former [2023/27]HU27.01.2015
AT25.03.2020
CZ25.03.2020
DK25.03.2020
EE25.03.2020
ES25.03.2020
FI25.03.2020
HR25.03.2020
IT25.03.2020
LT25.03.2020
LV25.03.2020
MC25.03.2020
NL25.03.2020
PL25.03.2020
RO25.03.2020
RS25.03.2020
SE25.03.2020
SI25.03.2020
SK25.03.2020
SM25.03.2020
BG25.06.2020
NO25.06.2020
GR26.06.2020
IS25.07.2020
PT18.08.2020
Former [2021/40]AT25.03.2020
CZ25.03.2020
DK25.03.2020
EE25.03.2020
ES25.03.2020
FI25.03.2020
HR25.03.2020
IT25.03.2020
LT25.03.2020
LV25.03.2020
MC25.03.2020
NL25.03.2020
PL25.03.2020
RO25.03.2020
RS25.03.2020
SE25.03.2020
SI25.03.2020
SK25.03.2020
SM25.03.2020
BG25.06.2020
NO25.06.2020
GR26.06.2020
IS25.07.2020
PT18.08.2020
Former [2021/24]AT25.03.2020
CZ25.03.2020
DK25.03.2020
EE25.03.2020
ES25.03.2020
FI25.03.2020
HR25.03.2020
IT25.03.2020
LT25.03.2020
LV25.03.2020
NL25.03.2020
PL25.03.2020
RO25.03.2020
RS25.03.2020
SE25.03.2020
SI25.03.2020
SK25.03.2020
SM25.03.2020
BG25.06.2020
NO25.06.2020
GR26.06.2020
IS25.07.2020
PT18.08.2020
Former [2021/10]AT25.03.2020
CZ25.03.2020
DK25.03.2020
EE25.03.2020
ES25.03.2020
FI25.03.2020
HR25.03.2020
IT25.03.2020
LT25.03.2020
LV25.03.2020
NL25.03.2020
PL25.03.2020
RO25.03.2020
RS25.03.2020
SE25.03.2020
SK25.03.2020
SM25.03.2020
BG25.06.2020
NO25.06.2020
GR26.06.2020
IS25.07.2020
PT18.08.2020
Former [2021/09]AT25.03.2020
CZ25.03.2020
DK25.03.2020
EE25.03.2020
ES25.03.2020
FI25.03.2020
HR25.03.2020
IT25.03.2020
LT25.03.2020
LV25.03.2020
NL25.03.2020
RO25.03.2020
RS25.03.2020
SE25.03.2020
SK25.03.2020
SM25.03.2020
BG25.06.2020
NO25.06.2020
GR26.06.2020
IS25.07.2020
PT18.08.2020
Former [2021/08]CZ25.03.2020
DK25.03.2020
EE25.03.2020
ES25.03.2020
FI25.03.2020
HR25.03.2020
LT25.03.2020
LV25.03.2020
NL25.03.2020
RO25.03.2020
RS25.03.2020
SE25.03.2020
SK25.03.2020
SM25.03.2020
BG25.06.2020
NO25.06.2020
GR26.06.2020
IS25.07.2020
PT18.08.2020
Former [2020/50]CZ25.03.2020
EE25.03.2020
FI25.03.2020
HR25.03.2020
LT25.03.2020
LV25.03.2020
NL25.03.2020
RO25.03.2020
RS25.03.2020
SE25.03.2020
SK25.03.2020
SM25.03.2020
BG25.06.2020
NO25.06.2020
GR26.06.2020
IS25.07.2020
PT18.08.2020
Former [2020/49]CZ25.03.2020
FI25.03.2020
HR25.03.2020
LT25.03.2020
LV25.03.2020
NL25.03.2020
RO25.03.2020
RS25.03.2020
SE25.03.2020
SK25.03.2020
SM25.03.2020
BG25.06.2020
NO25.06.2020
GR26.06.2020
IS25.07.2020
PT18.08.2020
Former [2020/48]FI25.03.2020
HR25.03.2020
LT25.03.2020
LV25.03.2020
NL25.03.2020
RO25.03.2020
RS25.03.2020
SE25.03.2020
SM25.03.2020
BG25.06.2020
NO25.06.2020
GR26.06.2020
IS25.07.2020
PT18.08.2020
Former [2020/47]FI25.03.2020
HR25.03.2020
LT25.03.2020
LV25.03.2020
NL25.03.2020
RS25.03.2020
SE25.03.2020
BG25.06.2020
NO25.06.2020
GR26.06.2020
IS25.07.2020
Former [2020/46]FI25.03.2020
HR25.03.2020
LV25.03.2020
NL25.03.2020
RS25.03.2020
SE25.03.2020
BG25.06.2020
NO25.06.2020
GR26.06.2020
IS25.07.2020
Former [2020/45]FI25.03.2020
HR25.03.2020
LV25.03.2020
NL25.03.2020
RS25.03.2020
SE25.03.2020
BG25.06.2020
NO25.06.2020
GR26.06.2020
Former [2020/39]FI25.03.2020
HR25.03.2020
LV25.03.2020
RS25.03.2020
SE25.03.2020
BG25.06.2020
NO25.06.2020
GR26.06.2020
Former [2020/38]FI25.03.2020
HR25.03.2020
LV25.03.2020
RS25.03.2020
SE25.03.2020
NO25.06.2020
GR26.06.2020
Former [2020/37]FI25.03.2020
HR25.03.2020
LV25.03.2020
RS25.03.2020
SE25.03.2020
NO25.06.2020
Former [2020/35]FI25.03.2020
NO25.06.2020
Documents cited:Search[X]US2005149758  (PARK SUNG-JOON [KR]) [X] 1-20 * abstract * * paragraph [0011] - paragraph [0019] * * paragraph [0022] - paragraph [0027] * * paragraph [0036] - paragraph [0052]; figures 1-5; claims 1-16 *;
 [X]US2007266246  (LEE YUNG-JI [KR], et al) [X] 1-20 * abstract * * paragraph [0010] - paragraph [0017] * * paragraph [0027] - paragraph [0050] * * paragraphs [0052] , [0054] - paragraph [0056] * * paragraphs [0059] , [0063] - paragraph [0072]; figures 2-6; claims 1-4 *;
 [A]US2010205655  (MOKUYA SENICHI [JP]) [A] 1-20 * abstract * * paragraph [0031] - paragraph [0066]; claims 1-6 *;
 [X]WO2012060021  (ERICSSON TELEFON AB L M [SE], et al) [X] 1-20 * abstract * * paragraph [0003] - paragraph [0005] * * paragraph [0008] - paragraph [0010] * * paragraph [0024] - paragraph [0049]; figures 2-5 * * paragraph [0052] - paragraph [0055]; claims 1-15 *;
 [A]EP2498469  (SAMSUNG ELECTRONICS CO LTD [KR]) [A] 1-20 * abstract * * paragraph [0007] - paragraph [0024] * * paragraph [0034] - paragraph [0054] * * paragraph [0057] - paragraph [0088]; claims 1-15 *;
 [X]EP2611079  (SAMSUNG ELECTRONICS CO LTD [KR]) [X] 1-20 * abstract * * paragraphs [0005] , [0007] - paragraph [0013] * * paragraph [0018] - paragraph [0022] * * paragraph [0036] - paragraph [0043]; figure 1 * * paragraph [0048] - paragraph [0058]; figure 3 * * paragraph [0062] - paragraph [0066]; figure 4 * * paragraph [0069] - paragraph [0072] * * paragraph [0073] - paragraph [0080]; figure 5; claims 1-15 *;
 [A]  - GEON-WOO KIM ETRI KOREA, "Proposal for revised draft Recommendation X.homesec-4: Authorization framework for home network", ITU-T DRAFT ; STUDY PERIOD 2005-2008, INTERNATIONAL TELECOMMUNICATION UNION, GENEVA ; CH, (20080905), vol. 9/17, pages 1 - 30, XP017548387 [A] 1-20 * paragraph [0006] - paragraph [0013] * * paragraph [Annex A] - paragraph [Appendix II] *
International search[A]JP2004355396  (NTT COMM KK) [A] 1-29* See paragraphs [0024]-[0087]; and figures 1-4. *;
 [A]US2006251256  (ASOKAN NADARAJAH [FI], et al) [A] 1-29 * See paragraphs [0023]-[0040]; and figures 3, 4. *;
 [A]US2010205655  (MOKUYA SENICHI [JP]) [A] 1-29 * See paragraphs [0030]-[0046]; and figures 1A-3. *;
 [A]JP2013085050  (HITACHI CONSUMER ELECTRONICS) [A] 1-29 * See paragraphs [0015]-[0057]; and figures 1-8. *;
 [X]KR20130080487  (SAMSUNG ELECTRONICS CO LTD [KR]) [X] 1-29 * See paragraphs [0031]-[0068]; and figures 1-4. *
otherEP1309127
 WO2013015656
 EP2611079
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.