| EP3178267 - TIMING ALIGNMENT PROCEDURES FOR DUAL PUCCH [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 12.02.2021 Database last updated on 11.04.2026 | |
| Former | The patent has been granted Status updated on 06.03.2020 | ||
| Former | Grant of patent is intended Status updated on 23.10.2019 | ||
| Former | Examination is in progress Status updated on 01.04.2019 | ||
| Former | Request for examination was made Status updated on 12.05.2017 | ||
| Former | The international publication has been made Status updated on 13.01.2017 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states Qualcomm Incorporated 5775 Morehouse Drive San Diego, CA 92121-1714 / US | [2017/24] | Inventor(s) | 01 /
VAJAPEYAM, Madhavan Srinivasan 5775 Morehouse Drive San Diego, California 92121-1714 / US | 02 /
CHEN, Wanshi 5775 Morehouse Drive San Diego, California 92121-1714 / US | 03 /
DAMNJANOVIC, Jelena 5775 Morehouse Drive San Diego, California 92121-1714 / US | 04 /
GAAL, Peter 5775 Morehouse Drive San Diego, California 92121-1714 / US | [2017/24] | Representative(s) | Bardehle Pagenberg Partnerschaft mbB Patentanwälte Rechtsanwälte Prinzregentenplatz 7 81675 München / DE | [N/P] |
| Former [2017/24] | Wegner, Hans Bardehle Pagenberg Partnerschaft mbB Patentanwälte, Rechtsanwälte Prinzregentenplatz 7 81675 München / DE | Application number, filing date | 15751221.1 | 05.08.2015 | [2017/24] | WO2015US43787 | Priority number, date | US201462033593P | 05.08.2014 Original published format: US 201462033593 P | US201514818107 | 04.08.2015 Original published format: US201514818107 | [2017/24] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2016022668 | Date: | 11.02.2016 | Language: | EN | [2016/06] | Type: | A1 Application with search report | No.: | EP3178267 | Date: | 14.06.2017 | Language: | EN | The application published by WIPO in one of the EPO official languages on 11.02.2016 takes the place of the publication of the European patent application. | [2017/24] | Type: | B1 Patent specification | No.: | EP3178267 | Date: | 08.04.2020 | Language: | EN | [2020/15] | Search report(s) | International search report - published on: | EP | 11.02.2016 | Classification | IPC: | H04W56/00 | [2017/24] | CPC: |
H04W56/0005 (EP,CN,KR,US);
H04W56/0045 (EP,CN,KR,US);
H04W74/004 (KR,US);
H04W76/15 (EP,KR,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/24] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | Title | German: | ZEITLICHE ANPASSUNGSMETHODE FÜR DUALE PHYSIKALISCHE AUFWÄRTS KONTROLLKANÄLE (PUCCH) | [2019/47] | English: | TIMING ALIGNMENT PROCEDURES FOR DUAL PUCCH | [2017/24] | French: | PROCÉDÉ D'ALIGNEMENT TEMPOREL DE CANAL DE COMMANDE DE LIAISON MONTANTE PHYSIQUE (PUCCH) | [2019/38] |
| Former [2017/24] | ZEITANPASSUNGSVERFAHREN FÜR DUAL-PUCCH | ||
| Former [2017/24] | PROCÉDURES D'ALIGNEMENT DE TEMPORISATION POUR UN PUCCH DOUBLE | Entry into regional phase | 13.01.2017 | National basic fee paid | 13.01.2017 | Designation fee(s) paid | 13.01.2017 | Examination fee paid | Examination procedure | 13.01.2017 | Examination requested [2017/24] | 13.01.2017 | Date on which the examining division has become responsible | 22.09.2017 | Amendment by applicant (claims and/or description) | 04.04.2019 | Despatch of a communication from the examining division (Time limit: M04) | 01.08.2019 | Reply to a communication from the examining division | 24.10.2019 | Communication of intention to grant the patent | 02.03.2020 | Fee for grant paid | 02.03.2020 | Fee for publishing/printing paid | 02.03.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 12.01.2021 | No opposition filed within time limit [2021/11] | Fees paid | Renewal fee | 05.07.2017 | Renewal fee patent year 03 | 10.08.2018 | Renewal fee patent year 04 | 08.08.2019 | Renewal fee patent year 05 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 05.08.2015 | AL | 08.04.2020 | AT | 08.04.2020 | CY | 08.04.2020 | CZ | 08.04.2020 | DK | 08.04.2020 | EE | 08.04.2020 | ES | 08.04.2020 | FI | 08.04.2020 | HR | 08.04.2020 | IT | 08.04.2020 | LT | 08.04.2020 | LV | 08.04.2020 | MC | 08.04.2020 | MK | 08.04.2020 | MT | 08.04.2020 | NL | 08.04.2020 | PL | 08.04.2020 | RO | 08.04.2020 | RS | 08.04.2020 | SE | 08.04.2020 | SI | 08.04.2020 | SK | 08.04.2020 | SM | 08.04.2020 | TR | 08.04.2020 | BG | 08.07.2020 | NO | 08.07.2020 | GR | 09.07.2020 | IE | 05.08.2020 | LU | 05.08.2020 | IS | 08.08.2020 | PT | 17.08.2020 | BE | 31.08.2020 | CH | 31.08.2020 | LI | 31.08.2020 | [2022/32] |
| Former [2022/27] | HU | 05.08.2015 | |
| AL | 08.04.2020 | ||
| AT | 08.04.2020 | ||
| CY | 08.04.2020 | ||
| CZ | 08.04.2020 | ||
| DK | 08.04.2020 | ||
| EE | 08.04.2020 | ||
| ES | 08.04.2020 | ||
| FI | 08.04.2020 | ||
| HR | 08.04.2020 | ||
| IT | 08.04.2020 | ||
| LT | 08.04.2020 | ||
| LV | 08.04.2020 | ||
| MC | 08.04.2020 | ||
| MT | 08.04.2020 | ||
| NL | 08.04.2020 | ||
| PL | 08.04.2020 | ||
| RO | 08.04.2020 | ||
| RS | 08.04.2020 | ||
| SE | 08.04.2020 | ||
| SI | 08.04.2020 | ||
| SK | 08.04.2020 | ||
| SM | 08.04.2020 | ||
| TR | 08.04.2020 | ||
| BG | 08.07.2020 | ||
| NO | 08.07.2020 | ||
| GR | 09.07.2020 | ||
| IE | 05.08.2020 | ||
| LU | 05.08.2020 | ||
| IS | 08.08.2020 | ||
| PT | 17.08.2020 | ||
| BE | 31.08.2020 | ||
| CH | 31.08.2020 | ||
| LI | 31.08.2020 | ||
| Former [2021/37] | AL | 08.04.2020 | |
| AT | 08.04.2020 | ||
| CZ | 08.04.2020 | ||
| DK | 08.04.2020 | ||
| EE | 08.04.2020 | ||
| ES | 08.04.2020 | ||
| FI | 08.04.2020 | ||
| HR | 08.04.2020 | ||
| IT | 08.04.2020 | ||
| LT | 08.04.2020 | ||
| LV | 08.04.2020 | ||
| MC | 08.04.2020 | ||
| NL | 08.04.2020 | ||
| PL | 08.04.2020 | ||
| RO | 08.04.2020 | ||
| RS | 08.04.2020 | ||
| SE | 08.04.2020 | ||
| SI | 08.04.2020 | ||
| SK | 08.04.2020 | ||
| SM | 08.04.2020 | ||
| BG | 08.07.2020 | ||
| NO | 08.07.2020 | ||
| GR | 09.07.2020 | ||
| IE | 05.08.2020 | ||
| LU | 05.08.2020 | ||
| IS | 08.08.2020 | ||
| PT | 17.08.2020 | ||
| BE | 31.08.2020 | ||
| CH | 31.08.2020 | ||
| LI | 31.08.2020 | ||
| Former [2021/36] | AL | 08.04.2020 | |
| AT | 08.04.2020 | ||
| CZ | 08.04.2020 | ||
| DK | 08.04.2020 | ||
| EE | 08.04.2020 | ||
| ES | 08.04.2020 | ||
| FI | 08.04.2020 | ||
| HR | 08.04.2020 | ||
| IT | 08.04.2020 | ||
| LT | 08.04.2020 | ||
| LV | 08.04.2020 | ||
| MC | 08.04.2020 | ||
| NL | 08.04.2020 | ||
| PL | 08.04.2020 | ||
| RO | 08.04.2020 | ||
| RS | 08.04.2020 | ||
| SE | 08.04.2020 | ||
| SI | 08.04.2020 | ||
| SK | 08.04.2020 | ||
| SM | 08.04.2020 | ||
| BG | 08.07.2020 | ||
| NO | 08.07.2020 | ||
| GR | 09.07.2020 | ||
| LU | 05.08.2020 | ||
| IS | 08.08.2020 | ||
| PT | 17.08.2020 | ||
| BE | 31.08.2020 | ||
| CH | 31.08.2020 | ||
| LI | 31.08.2020 | ||
| Former [2021/24] | AL | 08.04.2020 | |
| AT | 08.04.2020 | ||
| CZ | 08.04.2020 | ||
| DK | 08.04.2020 | ||
| EE | 08.04.2020 | ||
| ES | 08.04.2020 | ||
| FI | 08.04.2020 | ||
| HR | 08.04.2020 | ||
| IT | 08.04.2020 | ||
| LT | 08.04.2020 | ||
| LV | 08.04.2020 | ||
| MC | 08.04.2020 | ||
| NL | 08.04.2020 | ||
| PL | 08.04.2020 | ||
| RO | 08.04.2020 | ||
| RS | 08.04.2020 | ||
| SE | 08.04.2020 | ||
| SI | 08.04.2020 | ||
| SK | 08.04.2020 | ||
| SM | 08.04.2020 | ||
| BG | 08.07.2020 | ||
| NO | 08.07.2020 | ||
| GR | 09.07.2020 | ||
| LU | 05.08.2020 | ||
| IS | 08.08.2020 | ||
| PT | 17.08.2020 | ||
| CH | 31.08.2020 | ||
| LI | 31.08.2020 | ||
| Former [2021/20] | AL | 08.04.2020 | |
| AT | 08.04.2020 | ||
| CZ | 08.04.2020 | ||
| DK | 08.04.2020 | ||
| EE | 08.04.2020 | ||
| ES | 08.04.2020 | ||
| FI | 08.04.2020 | ||
| HR | 08.04.2020 | ||
| IT | 08.04.2020 | ||
| LT | 08.04.2020 | ||
| LV | 08.04.2020 | ||
| MC | 08.04.2020 | ||
| NL | 08.04.2020 | ||
| PL | 08.04.2020 | ||
| RO | 08.04.2020 | ||
| RS | 08.04.2020 | ||
| SE | 08.04.2020 | ||
| SK | 08.04.2020 | ||
| SM | 08.04.2020 | ||
| BG | 08.07.2020 | ||
| NO | 08.07.2020 | ||
| GR | 09.07.2020 | ||
| LU | 05.08.2020 | ||
| IS | 08.08.2020 | ||
| PT | 17.08.2020 | ||
| CH | 31.08.2020 | ||
| LI | 31.08.2020 | ||
| Former [2021/18] | AL | 08.04.2020 | |
| AT | 08.04.2020 | ||
| CZ | 08.04.2020 | ||
| DK | 08.04.2020 | ||
| EE | 08.04.2020 | ||
| ES | 08.04.2020 | ||
| FI | 08.04.2020 | ||
| HR | 08.04.2020 | ||
| IT | 08.04.2020 | ||
| LT | 08.04.2020 | ||
| LV | 08.04.2020 | ||
| MC | 08.04.2020 | ||
| NL | 08.04.2020 | ||
| PL | 08.04.2020 | ||
| RO | 08.04.2020 | ||
| RS | 08.04.2020 | ||
| SE | 08.04.2020 | ||
| SK | 08.04.2020 | ||
| SM | 08.04.2020 | ||
| BG | 08.07.2020 | ||
| NO | 08.07.2020 | ||
| GR | 09.07.2020 | ||
| IS | 08.08.2020 | ||
| PT | 17.08.2020 | ||
| Former [2021/10] | AL | 08.04.2020 | |
| AT | 08.04.2020 | ||
| CZ | 08.04.2020 | ||
| DK | 08.04.2020 | ||
| EE | 08.04.2020 | ||
| ES | 08.04.2020 | ||
| FI | 08.04.2020 | ||
| HR | 08.04.2020 | ||
| IT | 08.04.2020 | ||
| LT | 08.04.2020 | ||
| LV | 08.04.2020 | ||
| NL | 08.04.2020 | ||
| PL | 08.04.2020 | ||
| RO | 08.04.2020 | ||
| RS | 08.04.2020 | ||
| SE | 08.04.2020 | ||
| SK | 08.04.2020 | ||
| SM | 08.04.2020 | ||
| BG | 08.07.2020 | ||
| NO | 08.07.2020 | ||
| GR | 09.07.2020 | ||
| IS | 08.08.2020 | ||
| PT | 17.08.2020 | ||
| Former [2021/09] | AL | 08.04.2020 | |
| AT | 08.04.2020 | ||
| CZ | 08.04.2020 | ||
| DK | 08.04.2020 | ||
| EE | 08.04.2020 | ||
| ES | 08.04.2020 | ||
| FI | 08.04.2020 | ||
| HR | 08.04.2020 | ||
| IT | 08.04.2020 | ||
| LT | 08.04.2020 | ||
| LV | 08.04.2020 | ||
| NL | 08.04.2020 | ||
| RO | 08.04.2020 | ||
| RS | 08.04.2020 | ||
| SE | 08.04.2020 | ||
| SM | 08.04.2020 | ||
| BG | 08.07.2020 | ||
| NO | 08.07.2020 | ||
| GR | 09.07.2020 | ||
| IS | 08.08.2020 | ||
| PT | 17.08.2020 | ||
| Former [2021/08] | AL | 08.04.2020 | |
| DK | 08.04.2020 | ||
| ES | 08.04.2020 | ||
| FI | 08.04.2020 | ||
| HR | 08.04.2020 | ||
| LT | 08.04.2020 | ||
| LV | 08.04.2020 | ||
| NL | 08.04.2020 | ||
| RO | 08.04.2020 | ||
| RS | 08.04.2020 | ||
| SE | 08.04.2020 | ||
| SM | 08.04.2020 | ||
| BG | 08.07.2020 | ||
| NO | 08.07.2020 | ||
| GR | 09.07.2020 | ||
| IS | 08.08.2020 | ||
| PT | 17.08.2020 | ||
| Former [2021/04] | AL | 08.04.2020 | |
| FI | 08.04.2020 | ||
| HR | 08.04.2020 | ||
| LT | 08.04.2020 | ||
| LV | 08.04.2020 | ||
| NL | 08.04.2020 | ||
| RS | 08.04.2020 | ||
| SE | 08.04.2020 | ||
| BG | 08.07.2020 | ||
| NO | 08.07.2020 | ||
| GR | 09.07.2020 | ||
| IS | 08.08.2020 | ||
| PT | 17.08.2020 | ||
| Former [2021/01] | FI | 08.04.2020 | |
| HR | 08.04.2020 | ||
| LT | 08.04.2020 | ||
| LV | 08.04.2020 | ||
| NL | 08.04.2020 | ||
| RS | 08.04.2020 | ||
| SE | 08.04.2020 | ||
| BG | 08.07.2020 | ||
| NO | 08.07.2020 | ||
| GR | 09.07.2020 | ||
| IS | 08.08.2020 | ||
| PT | 17.08.2020 | ||
| Former [2020/51] | FI | 08.04.2020 | |
| HR | 08.04.2020 | ||
| LT | 08.04.2020 | ||
| LV | 08.04.2020 | ||
| NL | 08.04.2020 | ||
| RS | 08.04.2020 | ||
| SE | 08.04.2020 | ||
| NO | 08.07.2020 | ||
| GR | 09.07.2020 | ||
| IS | 08.08.2020 | ||
| PT | 17.08.2020 | ||
| Former [2020/50] | FI | 08.04.2020 | |
| HR | 08.04.2020 | ||
| LT | 08.04.2020 | ||
| LV | 08.04.2020 | ||
| NL | 08.04.2020 | ||
| SE | 08.04.2020 | ||
| NO | 08.07.2020 | ||
| GR | 09.07.2020 | ||
| IS | 08.08.2020 | ||
| PT | 17.08.2020 | ||
| Former [2020/48] | FI | 08.04.2020 | |
| LT | 08.04.2020 | ||
| NL | 08.04.2020 | ||
| SE | 08.04.2020 | ||
| NO | 08.07.2020 | ||
| IS | 08.08.2020 | ||
| PT | 17.08.2020 | ||
| Former [2020/47] | LT | 08.04.2020 | |
| NO | 08.07.2020 | ||
| IS | 08.08.2020 | ||
| Former [2020/46] | IS | 08.08.2020 | Cited in | International search | [Y] US2013114574 (NG BOON LOONG et al.) [Y] 1-30 * paragraphs [0043] - [0049] - [0 65] - [0128]; figures 7-14 * | [Y] US2014119304 (LI MING-CHE et al.) [Y] 1-30 * paragraphs [0036] - [0052] * | [Y] WO2013169048 (SAMSUNG ELECTRONICS CO LTD et al.) [Y] 1-30 * abstract * | [Y] EP2849359 (SAMSUNG ELECTRONICS CO LTD et al.) * paragraphs [0028] - [0067] * | [Y] MEDIATEK INC: "TDM UL transmission for TDD-FDD DL CA-capable UE with single transmitter", vol. RAN WG1, no. Prague, CZ; 20140210 - 20140214, 1 February 2014 (2014-02-01), XP050751885, Retrieved from the Internet | [Y] TSG RAN WG1: "LS on the support of PUCCH on two serving cells in CA", vol. RAN WG1, no. Seoul, Korea; 20140519 - 20140523, 27 May 2014 (2014-05-27), XP050815189, Retrieved from the Internet | [Y] ERICSSON: "Time alignment for Dual Connectivity", vol. RAN WG2, no. Valencia, Spain; 20140331 - 20140404, 22 March 2014 (2014-03-22), XP050792407, Retrieved from the Internet |