| EP3186325 - SEMI-TRANSPARENT SEPARATING FILM FOR UV-SENSITIVE PRESSURE-SENSITIVE ADHESIVES [Right-click to bookmark this link] | |||
| Former [2017/27] | SEMI-TRANSPARENT SEPARATING FILM FOR UV-SENSITIVE ADHESIVES | ||
| [2020/10] | Status | Patent maintained as amended Status updated on 07.07.2023 Database last updated on 18.03.2026 | |
| Former | The patent has been granted Status updated on 01.05.2020 | ||
| Former | Grant of patent is intended Status updated on 18.02.2020 | ||
| Former | Examination is in progress Status updated on 18.10.2019 | ||
| Former | Request for examination was made Status updated on 02.06.2017 | ||
| Former | The international publication has been made Status updated on 21.03.2017 | Most recent event Tooltip | 07.07.2023 | Patent maintained (B2 publication) | published on 09.08.2023 [2023/32] | Applicant(s) | For all designated states Sika Technology AG Zugerstrasse 50 6340 Baar / CH | [2017/27] | Inventor(s) | 01 /
HÜBSCHER, Peter Hubelstrasse 26 CH-6012 Obernau / CH | [2017/27] | Representative(s) | Sika Patent Attorneys C/o Sika Technology AG Corp. IP Dept. Tüffenwies 16 8048 Zürich / CH | [N/P] |
| Former [2017/27] | Sika Patent Attorneys c/o Sika Technology AG Corp. IP Dept. Tüffenwies 16 Postfach 8048 Zürich / CH | Application number, filing date | 15753063.5 | 24.08.2015 | [2017/27] | WO2015EP69376 | Priority number, date | EP20140182521 | 27.08.2014 Original published format: EP 14182521 | [2017/27] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | WO2016030338 | Date: | 03.03.2016 | Language: | DE | [2016/09] | Type: | A1 Application with search report | No.: | EP3186325 | Date: | 05.07.2017 | Language: | DE | The application published by WIPO in one of the EPO official languages on 03.03.2016 takes the place of the publication of the European patent application. | [2017/27] | Type: | B1 Patent specification | No.: | EP3186325 | Date: | 03.06.2020 | Language: | DE | [2020/23] | Type: | B2 New European patent specification | No.: | EP3186325 | Date: | 09.08.2023 | Language: | DE | [2023/32] | Search report(s) | International search report - published on: | EP | 03.03.2016 | Classification | IPC: | C09J7/40 | [2020/10] | CPC: |
C09J7/405 (EP,CN,US);
C09J11/06 (US);
B32B27/20 (US);
B32B27/32 (US);
B32B7/12 (US);
C09J11/04 (US);
B32B2307/73 (US);
B32B2309/105 (US);
C08K2003/2241 (US);
C08K3/22 (US);
C08K5/32 (US);
C09J2301/302 (EP,CN,US);
C09J2301/312 (EP,CN,US);
C09J2423/006 (EP,CN,US);
C09J2423/045 (US);
|
| Former IPC [2017/27] | C09J7/02, E02D31/02 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/27] | Title | German: | HALBTRANSPARENTE TRENNFOLIE FÜR UV-EMPFINDLICHE HAFTKLEBSTOFFE | [2017/27] | English: | SEMI-TRANSPARENT SEPARATING FILM FOR UV-SENSITIVE PRESSURE-SENSITIVE ADHESIVES | [2020/10] | French: | FEUILLE DE SÉPARATION SEMI-TRANSPARENTE POUR DES ADHÉSIFS AUTOCOLLANTS SENSIBLES AUX UV | [2020/10] |
| Former [2017/27] | SEMI-TRANSPARENT SEPARATING FILM FOR UV-SENSITIVE ADHESIVES | ||
| Former [2017/27] | FILM DE SÉPARATION SEMI-TRANSPARENTE POUR ADHÉSIFS SENSIBLES AUX UV | Entry into regional phase | 27.03.2017 | National basic fee paid | 27.03.2017 | Designation fee(s) paid | 27.03.2017 | Examination fee paid | Examination procedure | 21.03.2017 | Date on which the examining division has become responsible | 27.03.2017 | Examination requested [2017/27] | 05.10.2017 | Amendment by applicant (claims and/or description) | 17.10.2019 | Despatch of a communication from the examining division (Time limit: M02) | 06.11.2019 | Reply to a communication from the examining division | 21.01.2020 | Despatch of a communication from the examining division (Time limit: M02) | 22.01.2020 | Reply to a communication from the examining division | 19.02.2020 | Communication of intention to grant the patent | 27.04.2020 | Receipt of the translation of the claim(s) | 28.04.2020 | Fee for grant paid | 28.04.2020 | Fee for publishing/printing paid | Opposition(s) | Opponent(s) | 01
02.03.2021
21.11.2022
WITHDRAWN Loparex Germany GmbH & Co. KG Zweibrückenstraße 15-25 91301 Forchheim / DE Opponent's representative Bülle, Jan Kutzenberger Wolff & Partner Waidmarkt 11 50676 Köln / DE | [2022/52] |
| Former [2021/14] | |||
| Opponent(s) | 01
02.03.2021
04.03.2021
ADMISSIBLE Loparex Germany GmbH & Co. KG Zweibrückenstraße 15-25 91301 Forchheim / DE Opponent's representative Bülle, Jan Kutzenberger Wolff & Partner Waidmarkt 11 50676 Köln / DE | 16.03.2021 | Invitation to proprietor to file observations on the notice of opposition | 15.07.2021 | Reply of patent proprietor to notice(s) of opposition | 29.11.2022 | Cancellation of oral proceeding that was planned for 01.12.2022 | 01.12.2022 | Date of oral proceedings | 20.01.2023 | Despatch of interlocutory decision in opposition | 30.01.2023 | Legal effect of interlocutory decision in opposition | 10.05.2023 | Despatch of communication that the patent will be maintained as amended | 29.06.2023 | Fee for printing new specification paid | Fees paid | Renewal fee | 31.08.2017 | Renewal fee patent year 03 | 31.08.2018 | Renewal fee patent year 04 | 02.09.2019 | Renewal fee patent year 05 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 24.08.2015 | AL | 03.06.2020 | CY | 03.06.2020 | CZ | 03.06.2020 | DK | 03.06.2020 | EE | 03.06.2020 | FI | 03.06.2020 | HR | 03.06.2020 | LT | 03.06.2020 | LV | 03.06.2020 | MC | 03.06.2020 | MK | 03.06.2020 | MT | 03.06.2020 | PL | 03.06.2020 | RO | 03.06.2020 | RS | 03.06.2020 | SE | 03.06.2020 | SI | 03.06.2020 | SK | 03.06.2020 | SM | 03.06.2020 | TR | 03.06.2020 | AT | 24.08.2020 | IE | 24.08.2020 | LU | 24.08.2020 | BE | 31.08.2020 | CH | 31.08.2020 | LI | 31.08.2020 | BG | 03.09.2020 | GB | 03.09.2020 | NO | 03.09.2020 | GR | 04.09.2020 | IS | 03.10.2020 | PT | 06.10.2020 | [2022/32] |
| Former [2022/27] | HU | 24.08.2015 | |
| AL | 03.06.2020 | ||
| CY | 03.06.2020 | ||
| CZ | 03.06.2020 | ||
| DK | 03.06.2020 | ||
| EE | 03.06.2020 | ||
| FI | 03.06.2020 | ||
| HR | 03.06.2020 | ||
| LT | 03.06.2020 | ||
| LV | 03.06.2020 | ||
| MC | 03.06.2020 | ||
| MT | 03.06.2020 | ||
| PL | 03.06.2020 | ||
| RO | 03.06.2020 | ||
| RS | 03.06.2020 | ||
| SE | 03.06.2020 | ||
| SI | 03.06.2020 | ||
| SK | 03.06.2020 | ||
| SM | 03.06.2020 | ||
| TR | 03.06.2020 | ||
| AT | 24.08.2020 | ||
| IE | 24.08.2020 | ||
| LU | 24.08.2020 | ||
| BE | 31.08.2020 | ||
| CH | 31.08.2020 | ||
| LI | 31.08.2020 | ||
| BG | 03.09.2020 | ||
| GB | 03.09.2020 | ||
| NO | 03.09.2020 | ||
| GR | 04.09.2020 | ||
| IS | 03.10.2020 | ||
| PT | 06.10.2020 | ||
| Former [2021/47] | AL | 03.06.2020 | |
| CZ | 03.06.2020 | ||
| DK | 03.06.2020 | ||
| EE | 03.06.2020 | ||
| FI | 03.06.2020 | ||
| HR | 03.06.2020 | ||
| LT | 03.06.2020 | ||
| LV | 03.06.2020 | ||
| MC | 03.06.2020 | ||
| PL | 03.06.2020 | ||
| RO | 03.06.2020 | ||
| RS | 03.06.2020 | ||
| SE | 03.06.2020 | ||
| SI | 03.06.2020 | ||
| SK | 03.06.2020 | ||
| SM | 03.06.2020 | ||
| AT | 24.08.2020 | ||
| IE | 24.08.2020 | ||
| LU | 24.08.2020 | ||
| BE | 31.08.2020 | ||
| CH | 31.08.2020 | ||
| LI | 31.08.2020 | ||
| BG | 03.09.2020 | ||
| GB | 03.09.2020 | ||
| NO | 03.09.2020 | ||
| GR | 04.09.2020 | ||
| IS | 03.10.2020 | ||
| PT | 06.10.2020 | ||
| Former [2021/38] | AL | 03.06.2020 | |
| CZ | 03.06.2020 | ||
| DK | 03.06.2020 | ||
| EE | 03.06.2020 | ||
| FI | 03.06.2020 | ||
| HR | 03.06.2020 | ||
| LT | 03.06.2020 | ||
| LV | 03.06.2020 | ||
| MC | 03.06.2020 | ||
| PL | 03.06.2020 | ||
| RO | 03.06.2020 | ||
| RS | 03.06.2020 | ||
| SE | 03.06.2020 | ||
| SI | 03.06.2020 | ||
| SK | 03.06.2020 | ||
| SM | 03.06.2020 | ||
| IE | 24.08.2020 | ||
| LU | 24.08.2020 | ||
| BE | 31.08.2020 | ||
| CH | 31.08.2020 | ||
| LI | 31.08.2020 | ||
| BG | 03.09.2020 | ||
| GB | 03.09.2020 | ||
| NO | 03.09.2020 | ||
| GR | 04.09.2020 | ||
| IS | 03.10.2020 | ||
| PT | 06.10.2020 | ||
| Former [2021/37] | AL | 03.06.2020 | |
| CZ | 03.06.2020 | ||
| DK | 03.06.2020 | ||
| EE | 03.06.2020 | ||
| FI | 03.06.2020 | ||
| HR | 03.06.2020 | ||
| LT | 03.06.2020 | ||
| LV | 03.06.2020 | ||
| MC | 03.06.2020 | ||
| PL | 03.06.2020 | ||
| RO | 03.06.2020 | ||
| RS | 03.06.2020 | ||
| SE | 03.06.2020 | ||
| SI | 03.06.2020 | ||
| SK | 03.06.2020 | ||
| SM | 03.06.2020 | ||
| IE | 24.08.2020 | ||
| LU | 24.08.2020 | ||
| BE | 31.08.2020 | ||
| CH | 31.08.2020 | ||
| LI | 31.08.2020 | ||
| BG | 03.09.2020 | ||
| NO | 03.09.2020 | ||
| GR | 04.09.2020 | ||
| IS | 03.10.2020 | ||
| PT | 06.10.2020 | ||
| Former [2021/36] | AL | 03.06.2020 | |
| CZ | 03.06.2020 | ||
| DK | 03.06.2020 | ||
| EE | 03.06.2020 | ||
| FI | 03.06.2020 | ||
| HR | 03.06.2020 | ||
| LT | 03.06.2020 | ||
| LV | 03.06.2020 | ||
| MC | 03.06.2020 | ||
| PL | 03.06.2020 | ||
| RO | 03.06.2020 | ||
| RS | 03.06.2020 | ||
| SE | 03.06.2020 | ||
| SI | 03.06.2020 | ||
| SK | 03.06.2020 | ||
| SM | 03.06.2020 | ||
| LU | 24.08.2020 | ||
| BE | 31.08.2020 | ||
| CH | 31.08.2020 | ||
| LI | 31.08.2020 | ||
| BG | 03.09.2020 | ||
| NO | 03.09.2020 | ||
| GR | 04.09.2020 | ||
| IS | 03.10.2020 | ||
| PT | 06.10.2020 | ||
| Former [2021/24] | AL | 03.06.2020 | |
| CZ | 03.06.2020 | ||
| DK | 03.06.2020 | ||
| EE | 03.06.2020 | ||
| FI | 03.06.2020 | ||
| HR | 03.06.2020 | ||
| LT | 03.06.2020 | ||
| LV | 03.06.2020 | ||
| MC | 03.06.2020 | ||
| PL | 03.06.2020 | ||
| RO | 03.06.2020 | ||
| RS | 03.06.2020 | ||
| SE | 03.06.2020 | ||
| SI | 03.06.2020 | ||
| SK | 03.06.2020 | ||
| SM | 03.06.2020 | ||
| LU | 24.08.2020 | ||
| CH | 31.08.2020 | ||
| LI | 31.08.2020 | ||
| BG | 03.09.2020 | ||
| NO | 03.09.2020 | ||
| GR | 04.09.2020 | ||
| IS | 03.10.2020 | ||
| PT | 06.10.2020 | ||
| Former [2021/20] | AL | 03.06.2020 | |
| CZ | 03.06.2020 | ||
| DK | 03.06.2020 | ||
| EE | 03.06.2020 | ||
| FI | 03.06.2020 | ||
| HR | 03.06.2020 | ||
| LT | 03.06.2020 | ||
| LV | 03.06.2020 | ||
| MC | 03.06.2020 | ||
| PL | 03.06.2020 | ||
| RO | 03.06.2020 | ||
| RS | 03.06.2020 | ||
| SE | 03.06.2020 | ||
| SK | 03.06.2020 | ||
| SM | 03.06.2020 | ||
| LU | 24.08.2020 | ||
| CH | 31.08.2020 | ||
| LI | 31.08.2020 | ||
| BG | 03.09.2020 | ||
| NO | 03.09.2020 | ||
| GR | 04.09.2020 | ||
| IS | 03.10.2020 | ||
| PT | 06.10.2020 | ||
| Former [2021/18] | AL | 03.06.2020 | |
| CZ | 03.06.2020 | ||
| EE | 03.06.2020 | ||
| FI | 03.06.2020 | ||
| HR | 03.06.2020 | ||
| LT | 03.06.2020 | ||
| LV | 03.06.2020 | ||
| MC | 03.06.2020 | ||
| PL | 03.06.2020 | ||
| RO | 03.06.2020 | ||
| RS | 03.06.2020 | ||
| SE | 03.06.2020 | ||
| SK | 03.06.2020 | ||
| SM | 03.06.2020 | ||
| BG | 03.09.2020 | ||
| NO | 03.09.2020 | ||
| GR | 04.09.2020 | ||
| IS | 03.10.2020 | ||
| PT | 06.10.2020 | ||
| Former [2021/10] | AL | 03.06.2020 | |
| CZ | 03.06.2020 | ||
| EE | 03.06.2020 | ||
| FI | 03.06.2020 | ||
| HR | 03.06.2020 | ||
| LT | 03.06.2020 | ||
| LV | 03.06.2020 | ||
| PL | 03.06.2020 | ||
| RO | 03.06.2020 | ||
| RS | 03.06.2020 | ||
| SE | 03.06.2020 | ||
| SK | 03.06.2020 | ||
| SM | 03.06.2020 | ||
| BG | 03.09.2020 | ||
| NO | 03.09.2020 | ||
| GR | 04.09.2020 | ||
| IS | 03.10.2020 | ||
| PT | 06.10.2020 | ||
| Former [2021/09] | AL | 03.06.2020 | |
| CZ | 03.06.2020 | ||
| EE | 03.06.2020 | ||
| FI | 03.06.2020 | ||
| HR | 03.06.2020 | ||
| LT | 03.06.2020 | ||
| LV | 03.06.2020 | ||
| RO | 03.06.2020 | ||
| RS | 03.06.2020 | ||
| SE | 03.06.2020 | ||
| SM | 03.06.2020 | ||
| BG | 03.09.2020 | ||
| NO | 03.09.2020 | ||
| GR | 04.09.2020 | ||
| PT | 06.10.2020 | ||
| Former [2021/04] | AL | 03.06.2020 | |
| FI | 03.06.2020 | ||
| HR | 03.06.2020 | ||
| LT | 03.06.2020 | ||
| LV | 03.06.2020 | ||
| RS | 03.06.2020 | ||
| SE | 03.06.2020 | ||
| BG | 03.09.2020 | ||
| NO | 03.09.2020 | ||
| GR | 04.09.2020 | ||
| Former [2021/01] | FI | 03.06.2020 | |
| HR | 03.06.2020 | ||
| LT | 03.06.2020 | ||
| LV | 03.06.2020 | ||
| RS | 03.06.2020 | ||
| SE | 03.06.2020 | ||
| BG | 03.09.2020 | ||
| NO | 03.09.2020 | ||
| GR | 04.09.2020 | ||
| Former [2020/51] | FI | 03.06.2020 | |
| HR | 03.06.2020 | ||
| LT | 03.06.2020 | ||
| LV | 03.06.2020 | ||
| RS | 03.06.2020 | ||
| SE | 03.06.2020 | ||
| NO | 03.09.2020 | ||
| GR | 04.09.2020 | ||
| Former [2020/50] | FI | 03.06.2020 | |
| HR | 03.06.2020 | ||
| LT | 03.06.2020 | ||
| LV | 03.06.2020 | ||
| SE | 03.06.2020 | ||
| NO | 03.09.2020 | ||
| GR | 04.09.2020 | ||
| Former [2020/48] | FI | 03.06.2020 | |
| LT | 03.06.2020 | ||
| SE | 03.06.2020 | ||
| NO | 03.09.2020 | ||
| Former [2020/47] | LT | 03.06.2020 | |
| NO | 03.09.2020 | Cited in | International search | [XY] DE102009041841 (HUHTAMAKI FORCHHEIM et al.) [X] 1-7 * abstract * * claims 1-7,22 *[Y] 8-15 | [XY] EP1582555 (GRAFE COLOR BATCH GMBH et al.) [X] 1,2,5-7 * abstract * * paragraphs [0018] , [0026] - paragraphs [0028] , [0060]; claims 1-3 *[Y] 8-15 | [XY] EP0501239 (GOODRICH CO B F et al.) [X] 1,2,5-7 * page 8, line 37 - line 43 * * page 12, line 45 - page 13, line 30; claims 1,2,6,9-11 *[Y] 8-15 | [Y] EP0810253 [Y] 8-15 * abstract * * column 2, line 54 - column 3, line 28; claim 1 * | Opposition | DE102009041841 | EP1582555 | WO0027914 | US6986923 | EP2647664 | DE102009006936 | DE102009041841 | ANONYMOUS: "Mogat Bauwerks Abdichtung", MOGAT BAUWERKS ABDICHTUNG, 1 January 2007 (2007-01-01), XP055976590 * ; und * | ANONYMOUS: "Der schnellste Weg zu Ihren Abdichtungsprodukten der KSTER-Vertriebsweg ", DIE GRNEN SEITEN DER ABDICHTUNG, 1 January 2011 (2011-01-01), XP055976592 |