EP3193820 - HAIR CARE COMPOSITION COMPRISING POLYDIMETHYLSILOXANE POLYMER EMULSION [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 30.11.2018 Database last updated on 15.06.2024 | |
Former | The patent has been granted Status updated on 28.12.2017 | ||
Former | Grant of patent is intended Status updated on 30.10.2017 | ||
Former | Request for examination was made Status updated on 23.06.2017 | ||
Former | The international publication has been made Status updated on 15.02.2017 | Most recent event Tooltip | 04.12.2020 | Lapse of the patent in a contracting state New state(s): SI | published on 06.01.2021 [2021/01] | Applicant(s) | For:CY
GB
IE
MT
Unilever PLC Unilever House 100 Victoria Embankment London, Greater London EC4Y 0DY / GB | For:AL
AT
BE
BG
CH
CZ
DE
DK
EE
ES
FI
FR
GR
HR
HU
IS
IT
LI
LT
LU
LV
MC
MK
NL
NO
PL
PT
RO
RS
SE
SI
SK
SM
TR
Unilever N.V. Weena 455 3013 AL Rotterdam / NL | [2017/30] | Inventor(s) | 01 /
AVERY, Andrew, Richard Unilever R&D Port Sunlight Quarry Road East Bebington Wirral Merseyside CH63 3JW / GB | [2017/30] | Representative(s) | James, Helen Sarah Unilever Patent Group Bronland 14 6708 WH Wageningen / NL | [N/P] |
Former [2017/30] | James, Helen Sarah Unilever PLC Unilever Patent Group Colworth House, Sharnbrook Bedford Bedfordshire MK44 1LQ / GB | Application number, filing date | 15754228.3 | 26.08.2015 | [2017/30] | WO2015EP69540 | Priority number, date | EP20140184731 | 15.09.2014 Original published format: EP 14184731 | [2017/30] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2016041748 | Date: | 24.03.2016 | Language: | EN | [2016/12] | Type: | A1 Application with search report | No.: | EP3193820 | Date: | 26.07.2017 | Language: | EN | The application published by WIPO in one of the EPO official languages on 24.03.2016 takes the place of the publication of the European patent application. | [2017/30] | Type: | B1 Patent specification | No.: | EP3193820 | Date: | 24.01.2018 | Language: | EN | [2018/04] | Search report(s) | International search report - published on: | EP | 24.03.2016 | Classification | IPC: | A61K8/04 | [2017/44] | CPC: |
A61K8/31 (EP,US);
A61K8/898 (US);
A61K8/0295 (EP,US);
A61K8/042 (EP,US);
A61K8/06 (US);
A61K8/342 (US);
A61K8/442 (US);
A61K8/891 (EP,US);
A61Q5/12 (EP,US);
A61K8/416 (EP,US)
(-)
|
Former IPC [2017/30] | A61K8/31, A61Q5/12, A61K8/891, A61K8/02 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/30] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | Title | German: | HAARPFLEGEZUSAMMENSETZUNG MIT POLYDIMETHYLSILOXAN-POLYMEREMULSION | [2017/30] | English: | HAIR CARE COMPOSITION COMPRISING POLYDIMETHYLSILOXANE POLYMER EMULSION | [2017/30] | French: | COMPOSITION DE SOIN CAPILLAIRE COMPRENANT UNE ÉMULSION DE POLYMÈRE POLYDIMÉTHYLSILOXANE | [2017/44] |
Former [2017/30] | COMPOSITION DE SOIN CAPILLAIRE COMPORTANT UNE ÉMULSION DE POLYMÈRE DE POLYDIMÉTHYLSILOXANE | Entry into regional phase | 15.02.2017 | National basic fee paid | 15.02.2017 | Designation fee(s) paid | 15.02.2017 | Examination fee paid | Examination procedure | 15.07.2016 | Request for preliminary examination filed International Preliminary Examining Authority: EP | 15.02.2017 | Examination requested [2017/30] | 15.02.2017 | Date on which the examining division has become responsible | 31.10.2017 | Communication of intention to grant the patent | 04.12.2017 | Fee for grant paid | 04.12.2017 | Fee for publishing/printing paid | 04.12.2017 | Receipt of the translation of the claim(s) | Opposition(s) | 25.10.2018 | No opposition filed within time limit [2019/01] | Fees paid | Renewal fee | 22.08.2017 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 26.08.2015 | AL | 24.01.2018 | AT | 24.01.2018 | CY | 24.01.2018 | CZ | 24.01.2018 | DK | 24.01.2018 | EE | 24.01.2018 | ES | 24.01.2018 | FI | 24.01.2018 | HR | 24.01.2018 | LT | 24.01.2018 | LV | 24.01.2018 | MC | 24.01.2018 | MK | 24.01.2018 | NL | 24.01.2018 | PL | 24.01.2018 | PT | 24.01.2018 | RO | 24.01.2018 | RS | 24.01.2018 | SE | 24.01.2018 | SK | 24.01.2018 | SM | 24.01.2018 | TR | 24.01.2018 | BG | 24.04.2018 | NO | 24.04.2018 | GR | 25.04.2018 | IS | 24.05.2018 | IE | 26.08.2018 | LU | 26.08.2018 | MT | 26.08.2018 | SI | 26.08.2018 | BE | 31.08.2018 | CH | 31.08.2018 | LI | 31.08.2018 | [2021/01] |
Former [2020/31] | HU | 26.08.2015 | |
AL | 24.01.2018 | ||
AT | 24.01.2018 | ||
CY | 24.01.2018 | ||
CZ | 24.01.2018 | ||
DK | 24.01.2018 | ||
EE | 24.01.2018 | ||
ES | 24.01.2018 | ||
FI | 24.01.2018 | ||
HR | 24.01.2018 | ||
LT | 24.01.2018 | ||
LV | 24.01.2018 | ||
MC | 24.01.2018 | ||
MK | 24.01.2018 | ||
NL | 24.01.2018 | ||
PL | 24.01.2018 | ||
PT | 24.01.2018 | ||
RO | 24.01.2018 | ||
RS | 24.01.2018 | ||
SE | 24.01.2018 | ||
SK | 24.01.2018 | ||
SM | 24.01.2018 | ||
TR | 24.01.2018 | ||
BG | 24.04.2018 | ||
NO | 24.04.2018 | ||
GR | 25.04.2018 | ||
IS | 24.05.2018 | ||
IE | 26.08.2018 | ||
LU | 26.08.2018 | ||
MT | 26.08.2018 | ||
BE | 31.08.2018 | ||
CH | 31.08.2018 | ||
LI | 31.08.2018 | ||
Former [2020/30] | HU | 26.08.2015 | |
AL | 24.01.2018 | ||
AT | 24.01.2018 | ||
CY | 24.01.2018 | ||
CZ | 24.01.2018 | ||
DK | 24.01.2018 | ||
EE | 24.01.2018 | ||
ES | 24.01.2018 | ||
FI | 24.01.2018 | ||
HR | 24.01.2018 | ||
LT | 24.01.2018 | ||
LV | 24.01.2018 | ||
MC | 24.01.2018 | ||
NL | 24.01.2018 | ||
PL | 24.01.2018 | ||
PT | 24.01.2018 | ||
RO | 24.01.2018 | ||
RS | 24.01.2018 | ||
SE | 24.01.2018 | ||
SK | 24.01.2018 | ||
SM | 24.01.2018 | ||
TR | 24.01.2018 | ||
BG | 24.04.2018 | ||
NO | 24.04.2018 | ||
GR | 25.04.2018 | ||
IS | 24.05.2018 | ||
IE | 26.08.2018 | ||
LU | 26.08.2018 | ||
MT | 26.08.2018 | ||
BE | 31.08.2018 | ||
CH | 31.08.2018 | ||
LI | 31.08.2018 | ||
Former [2020/28] | AL | 24.01.2018 | |
AT | 24.01.2018 | ||
CY | 24.01.2018 | ||
CZ | 24.01.2018 | ||
DK | 24.01.2018 | ||
EE | 24.01.2018 | ||
ES | 24.01.2018 | ||
FI | 24.01.2018 | ||
HR | 24.01.2018 | ||
LT | 24.01.2018 | ||
LV | 24.01.2018 | ||
MC | 24.01.2018 | ||
NL | 24.01.2018 | ||
PL | 24.01.2018 | ||
PT | 24.01.2018 | ||
RO | 24.01.2018 | ||
RS | 24.01.2018 | ||
SE | 24.01.2018 | ||
SK | 24.01.2018 | ||
SM | 24.01.2018 | ||
TR | 24.01.2018 | ||
BG | 24.04.2018 | ||
NO | 24.04.2018 | ||
GR | 25.04.2018 | ||
IS | 24.05.2018 | ||
LU | 26.08.2018 | ||
MT | 26.08.2018 | ||
BE | 31.08.2018 | ||
CH | 31.08.2018 | ||
LI | 31.08.2018 | ||
Former [2020/16] | AL | 24.01.2018 | |
AT | 24.01.2018 | ||
CY | 24.01.2018 | ||
CZ | 24.01.2018 | ||
DK | 24.01.2018 | ||
EE | 24.01.2018 | ||
ES | 24.01.2018 | ||
FI | 24.01.2018 | ||
HR | 24.01.2018 | ||
LT | 24.01.2018 | ||
LV | 24.01.2018 | ||
MC | 24.01.2018 | ||
NL | 24.01.2018 | ||
PL | 24.01.2018 | ||
RO | 24.01.2018 | ||
RS | 24.01.2018 | ||
SE | 24.01.2018 | ||
SK | 24.01.2018 | ||
SM | 24.01.2018 | ||
TR | 24.01.2018 | ||
BG | 24.04.2018 | ||
NO | 24.04.2018 | ||
GR | 25.04.2018 | ||
IS | 24.05.2018 | ||
LU | 26.08.2018 | ||
MT | 26.08.2018 | ||
BE | 31.08.2018 | ||
CH | 31.08.2018 | ||
LI | 31.08.2018 | ||
Former [2020/08] | AL | 24.01.2018 | |
AT | 24.01.2018 | ||
CY | 24.01.2018 | ||
CZ | 24.01.2018 | ||
DK | 24.01.2018 | ||
EE | 24.01.2018 | ||
ES | 24.01.2018 | ||
FI | 24.01.2018 | ||
HR | 24.01.2018 | ||
LT | 24.01.2018 | ||
LV | 24.01.2018 | ||
MC | 24.01.2018 | ||
NL | 24.01.2018 | ||
PL | 24.01.2018 | ||
RO | 24.01.2018 | ||
RS | 24.01.2018 | ||
SE | 24.01.2018 | ||
SK | 24.01.2018 | ||
SM | 24.01.2018 | ||
BG | 24.04.2018 | ||
NO | 24.04.2018 | ||
GR | 25.04.2018 | ||
IS | 24.05.2018 | ||
LU | 26.08.2018 | ||
MT | 26.08.2018 | ||
BE | 31.08.2018 | ||
CH | 31.08.2018 | ||
LI | 31.08.2018 | ||
Former [2019/38] | AL | 24.01.2018 | |
AT | 24.01.2018 | ||
CY | 24.01.2018 | ||
CZ | 24.01.2018 | ||
DK | 24.01.2018 | ||
EE | 24.01.2018 | ||
ES | 24.01.2018 | ||
FI | 24.01.2018 | ||
HR | 24.01.2018 | ||
LT | 24.01.2018 | ||
LV | 24.01.2018 | ||
MC | 24.01.2018 | ||
NL | 24.01.2018 | ||
PL | 24.01.2018 | ||
RO | 24.01.2018 | ||
RS | 24.01.2018 | ||
SE | 24.01.2018 | ||
SK | 24.01.2018 | ||
SM | 24.01.2018 | ||
BG | 24.04.2018 | ||
NO | 24.04.2018 | ||
GR | 25.04.2018 | ||
IS | 24.05.2018 | ||
LU | 26.08.2018 | ||
BE | 31.08.2018 | ||
CH | 31.08.2018 | ||
LI | 31.08.2018 | ||
Former [2019/21] | AL | 24.01.2018 | |
AT | 24.01.2018 | ||
CY | 24.01.2018 | ||
CZ | 24.01.2018 | ||
DK | 24.01.2018 | ||
EE | 24.01.2018 | ||
ES | 24.01.2018 | ||
FI | 24.01.2018 | ||
HR | 24.01.2018 | ||
LT | 24.01.2018 | ||
LV | 24.01.2018 | ||
MC | 24.01.2018 | ||
NL | 24.01.2018 | ||
PL | 24.01.2018 | ||
RO | 24.01.2018 | ||
RS | 24.01.2018 | ||
SE | 24.01.2018 | ||
SK | 24.01.2018 | ||
SM | 24.01.2018 | ||
BG | 24.04.2018 | ||
NO | 24.04.2018 | ||
GR | 25.04.2018 | ||
IS | 24.05.2018 | ||
LU | 26.08.2018 | ||
CH | 31.08.2018 | ||
LI | 31.08.2018 | ||
Former [2019/15] | AL | 24.01.2018 | |
AT | 24.01.2018 | ||
CY | 24.01.2018 | ||
CZ | 24.01.2018 | ||
DK | 24.01.2018 | ||
EE | 24.01.2018 | ||
ES | 24.01.2018 | ||
FI | 24.01.2018 | ||
HR | 24.01.2018 | ||
LT | 24.01.2018 | ||
LV | 24.01.2018 | ||
MC | 24.01.2018 | ||
NL | 24.01.2018 | ||
PL | 24.01.2018 | ||
RO | 24.01.2018 | ||
RS | 24.01.2018 | ||
SE | 24.01.2018 | ||
SK | 24.01.2018 | ||
SM | 24.01.2018 | ||
BG | 24.04.2018 | ||
NO | 24.04.2018 | ||
GR | 25.04.2018 | ||
IS | 24.05.2018 | ||
Former [2018/52] | AL | 24.01.2018 | |
AT | 24.01.2018 | ||
CY | 24.01.2018 | ||
CZ | 24.01.2018 | ||
DK | 24.01.2018 | ||
EE | 24.01.2018 | ||
ES | 24.01.2018 | ||
FI | 24.01.2018 | ||
HR | 24.01.2018 | ||
LT | 24.01.2018 | ||
LV | 24.01.2018 | ||
NL | 24.01.2018 | ||
PL | 24.01.2018 | ||
RO | 24.01.2018 | ||
RS | 24.01.2018 | ||
SE | 24.01.2018 | ||
SK | 24.01.2018 | ||
SM | 24.01.2018 | ||
BG | 24.04.2018 | ||
NO | 24.04.2018 | ||
GR | 25.04.2018 | ||
IS | 24.05.2018 | ||
Former [2018/51] | AL | 24.01.2018 | |
AT | 24.01.2018 | ||
CY | 24.01.2018 | ||
CZ | 24.01.2018 | ||
DK | 24.01.2018 | ||
EE | 24.01.2018 | ||
ES | 24.01.2018 | ||
FI | 24.01.2018 | ||
HR | 24.01.2018 | ||
LT | 24.01.2018 | ||
LV | 24.01.2018 | ||
NL | 24.01.2018 | ||
PL | 24.01.2018 | ||
RO | 24.01.2018 | ||
RS | 24.01.2018 | ||
SE | 24.01.2018 | ||
SK | 24.01.2018 | ||
BG | 24.04.2018 | ||
NO | 24.04.2018 | ||
GR | 25.04.2018 | ||
IS | 24.05.2018 | ||
Former [2018/50] | AL | 24.01.2018 | |
AT | 24.01.2018 | ||
CY | 24.01.2018 | ||
CZ | 24.01.2018 | ||
EE | 24.01.2018 | ||
ES | 24.01.2018 | ||
FI | 24.01.2018 | ||
HR | 24.01.2018 | ||
LT | 24.01.2018 | ||
LV | 24.01.2018 | ||
NL | 24.01.2018 | ||
PL | 24.01.2018 | ||
RO | 24.01.2018 | ||
RS | 24.01.2018 | ||
SE | 24.01.2018 | ||
SK | 24.01.2018 | ||
BG | 24.04.2018 | ||
NO | 24.04.2018 | ||
GR | 25.04.2018 | ||
IS | 24.05.2018 | ||
Former [2018/46] | AL | 24.01.2018 | |
AT | 24.01.2018 | ||
CY | 24.01.2018 | ||
ES | 24.01.2018 | ||
FI | 24.01.2018 | ||
HR | 24.01.2018 | ||
LT | 24.01.2018 | ||
LV | 24.01.2018 | ||
NL | 24.01.2018 | ||
PL | 24.01.2018 | ||
RS | 24.01.2018 | ||
SE | 24.01.2018 | ||
BG | 24.04.2018 | ||
NO | 24.04.2018 | ||
GR | 25.04.2018 | ||
IS | 24.05.2018 | ||
Former [2018/40] | AT | 24.01.2018 | |
CY | 24.01.2018 | ||
ES | 24.01.2018 | ||
FI | 24.01.2018 | ||
HR | 24.01.2018 | ||
LT | 24.01.2018 | ||
LV | 24.01.2018 | ||
NL | 24.01.2018 | ||
PL | 24.01.2018 | ||
RS | 24.01.2018 | ||
SE | 24.01.2018 | ||
BG | 24.04.2018 | ||
NO | 24.04.2018 | ||
GR | 25.04.2018 | ||
IS | 24.05.2018 | ||
Former [2018/39] | AT | 24.01.2018 | |
CY | 24.01.2018 | ||
ES | 24.01.2018 | ||
FI | 24.01.2018 | ||
HR | 24.01.2018 | ||
LT | 24.01.2018 | ||
LV | 24.01.2018 | ||
NL | 24.01.2018 | ||
PL | 24.01.2018 | ||
RS | 24.01.2018 | ||
SE | 24.01.2018 | ||
NO | 24.04.2018 | ||
GR | 25.04.2018 | ||
IS | 24.05.2018 | ||
Former [2018/37] | CY | 24.01.2018 | |
ES | 24.01.2018 | ||
FI | 24.01.2018 | ||
HR | 24.01.2018 | ||
LT | 24.01.2018 | ||
NL | 24.01.2018 | ||
PL | 24.01.2018 | ||
NO | 24.04.2018 | ||
GR | 25.04.2018 | ||
Former [2018/36] | CY | 24.01.2018 | |
ES | 24.01.2018 | ||
FI | 24.01.2018 | ||
HR | 24.01.2018 | ||
LT | 24.01.2018 | ||
NL | 24.01.2018 | ||
PL | 24.01.2018 | ||
NO | 24.04.2018 | ||
Former [2018/35] | CY | 24.01.2018 | |
FI | 24.01.2018 | ||
HR | 24.01.2018 | ||
LT | 24.01.2018 | ||
NL | 24.01.2018 | ||
NO | 24.04.2018 | ||
Former [2018/34] | FI | 24.01.2018 | |
LT | 24.01.2018 | ||
NL | 24.01.2018 | ||
NO | 24.04.2018 | Cited in | International search | [A]WO2005079730 (UNILEVER PLC [GB], et al) [A] 4* claim 1 *; | [X]US2012093757 (MURRAY ANDREW MALCOLM [GB], et al) [X] 1-4 * page 1, paragraph 0003 * * example 1 * * page 1, paragraph 0004 *; | [A]WO2013092118 (UNILEVER NV [NL], et al) [A] 1-4 * page 28; table 1 * * the whole document *; | [A]WO2014016350 (UNILEVER PLC [GB], et al) [A] 1-4 * the whole document * | by applicant | WO2008045427 |