EP3113267 - ELECTRICITY-GENERATION SYSTEM AND METHOD FOR OPERATING ELECTRICITY-GENERATION SYSTEM [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 21.02.2020 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 15.03.2019 | ||
Former | Grant of patent is intended Status updated on 07.11.2018 | ||
Former | Examination is in progress Status updated on 06.10.2017 | ||
Former | Request for examination was made Status updated on 02.12.2016 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states Panasonic Intellectual Property Management Co., Ltd. 1-61, Shiromi 2-chome Chuo-ku Osaka-shi, Osaka 570-6207 / JP | [2017/01] | Inventor(s) | 01 /
YAMAGUCHI, Shohei c/o Panasonic Intellectual Property Management Co., Ltd. IP Management Department 7F OBP Panasonic Tower, 1-61, Shiromi 2-chome, Chuo-ku Osaka-shi, Oksaka 540-6207 / JP | 02 /
TATSUI, Hiroshi c/o Panasonic Intellectual Property Management Co., Ltd. IP Management Department 7F OBP Panasonic Tower, 1-61, Shiromi 2-chome, Chuo-ku Osaka-shi, Oksaka 540-6207 / JP | [2017/01] | Representative(s) | Grünecker Patent- und Rechtsanwälte PartG mbB Leopoldstraße 4 80802 München / DE | [2017/01] | Application number, filing date | 15754622.7 | 25.02.2015 | [2017/01] | WO2015JP00947 | Priority number, date | JP20140036327 | 27.02.2014 Original published format: JP 2014036327 | [2017/01] | Filing language | JA | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2015129261 | Date: | 03.09.2015 | Language: | JA | [2015/35] | Type: | A1 Application with search report | No.: | EP3113267 | Date: | 04.01.2017 | Language: | EN | [2017/01] | Type: | B1 Patent specification | No.: | EP3113267 | Date: | 17.04.2019 | Language: | EN | [2019/16] | Search report(s) | International search report - published on: | JP | 03.09.2015 | (Supplementary) European search report - dispatched on: | EP | 21.10.2016 | Classification | IPC: | H01M8/04, H01M8/10, H01M8/12 | [2017/01] | CPC: |
H01M8/04425 (EP);
H01M8/04462 (EP);
H01M8/04761 (EP);
H01M8/0662 (EP);
Y02E60/50 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/01] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | STROMERZEUGUNGSSYSTEM UND VERFAHREN ZUM BETREIBEN DES STROMERZEUGUNGSSYSTEMS | [2017/01] | English: | ELECTRICITY-GENERATION SYSTEM AND METHOD FOR OPERATING ELECTRICITY-GENERATION SYSTEM | [2017/01] | French: | SYSTÈME DE GÉNÉRATION D'ÉLECTRICITÉ ET PROCÉDÉ PERMETTANT D'ACTIONNER UN SYSTÈME DE GÉNÉRATION D'ÉLECTRICITÉ | [2017/01] | Entry into regional phase | 18.02.2016 | Translation filed | 18.02.2016 | National basic fee paid | 18.02.2016 | Search fee paid | 18.02.2016 | Designation fee(s) paid | 18.02.2016 | Examination fee paid | Examination procedure | 01.07.2015 | Request for preliminary examination filed International Preliminary Examining Authority: JP | 18.02.2016 | Examination requested [2017/01] | 18.02.2016 | Date on which the examining division has become responsible | 11.05.2017 | Amendment by applicant (claims and/or description) | 06.10.2017 | Despatch of a communication from the examining division (Time limit: M04) | 15.02.2018 | Reply to a communication from the examining division | 08.11.2018 | Communication of intention to grant the patent | 07.03.2019 | Fee for grant paid | 07.03.2019 | Fee for publishing/printing paid | 07.03.2019 | Receipt of the translation of the claim(s) | Opposition(s) | 20.01.2020 | No opposition filed within time limit [2020/13] | Fees paid | Renewal fee | 17.02.2017 | Renewal fee patent year 03 | 22.02.2018 | Renewal fee patent year 04 | 21.02.2019 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 25.02.2015 | AL | 17.04.2019 | AT | 17.04.2019 | CY | 17.04.2019 | CZ | 17.04.2019 | DK | 17.04.2019 | EE | 17.04.2019 | ES | 17.04.2019 | FI | 17.04.2019 | HR | 17.04.2019 | IT | 17.04.2019 | LT | 17.04.2019 | LV | 17.04.2019 | MC | 17.04.2019 | MK | 17.04.2019 | MT | 17.04.2019 | NL | 17.04.2019 | PL | 17.04.2019 | RO | 17.04.2019 | RS | 17.04.2019 | SE | 17.04.2019 | SI | 17.04.2019 | SK | 17.04.2019 | SM | 17.04.2019 | TR | 17.04.2019 | BG | 17.07.2019 | NO | 17.07.2019 | GR | 18.07.2019 | IS | 17.08.2019 | PT | 17.08.2019 | [2022/32] |
Former [2022/28] | HU | 25.02.2015 | |
AL | 17.04.2019 | ||
AT | 17.04.2019 | ||
CY | 17.04.2019 | ||
CZ | 17.04.2019 | ||
DK | 17.04.2019 | ||
EE | 17.04.2019 | ||
ES | 17.04.2019 | ||
FI | 17.04.2019 | ||
HR | 17.04.2019 | ||
IT | 17.04.2019 | ||
LT | 17.04.2019 | ||
LV | 17.04.2019 | ||
MC | 17.04.2019 | ||
MT | 17.04.2019 | ||
NL | 17.04.2019 | ||
PL | 17.04.2019 | ||
RO | 17.04.2019 | ||
RS | 17.04.2019 | ||
SE | 17.04.2019 | ||
SI | 17.04.2019 | ||
SK | 17.04.2019 | ||
SM | 17.04.2019 | ||
TR | 17.04.2019 | ||
BG | 17.07.2019 | ||
NO | 17.07.2019 | ||
GR | 18.07.2019 | ||
IS | 17.08.2019 | ||
PT | 17.08.2019 | ||
Former [2020/50] | AL | 17.04.2019 | |
AT | 17.04.2019 | ||
CZ | 17.04.2019 | ||
DK | 17.04.2019 | ||
EE | 17.04.2019 | ||
ES | 17.04.2019 | ||
FI | 17.04.2019 | ||
HR | 17.04.2019 | ||
IT | 17.04.2019 | ||
LT | 17.04.2019 | ||
LV | 17.04.2019 | ||
MC | 17.04.2019 | ||
NL | 17.04.2019 | ||
PL | 17.04.2019 | ||
RO | 17.04.2019 | ||
RS | 17.04.2019 | ||
SE | 17.04.2019 | ||
SI | 17.04.2019 | ||
SK | 17.04.2019 | ||
SM | 17.04.2019 | ||
TR | 17.04.2019 | ||
BG | 17.07.2019 | ||
NO | 17.07.2019 | ||
GR | 18.07.2019 | ||
IS | 17.08.2019 | ||
PT | 17.08.2019 | ||
Former [2020/26] | AL | 17.04.2019 | |
AT | 17.04.2019 | ||
CZ | 17.04.2019 | ||
DK | 17.04.2019 | ||
EE | 17.04.2019 | ||
ES | 17.04.2019 | ||
FI | 17.04.2019 | ||
HR | 17.04.2019 | ||
IT | 17.04.2019 | ||
LT | 17.04.2019 | ||
LV | 17.04.2019 | ||
NL | 17.04.2019 | ||
PL | 17.04.2019 | ||
RO | 17.04.2019 | ||
RS | 17.04.2019 | ||
SE | 17.04.2019 | ||
SI | 17.04.2019 | ||
SK | 17.04.2019 | ||
SM | 17.04.2019 | ||
TR | 17.04.2019 | ||
BG | 17.07.2019 | ||
NO | 17.07.2019 | ||
GR | 18.07.2019 | ||
IS | 17.08.2019 | ||
PT | 17.08.2019 | ||
Former [2020/17] | AL | 17.04.2019 | |
AT | 17.04.2019 | ||
CZ | 17.04.2019 | ||
DK | 17.04.2019 | ||
EE | 17.04.2019 | ||
ES | 17.04.2019 | ||
FI | 17.04.2019 | ||
HR | 17.04.2019 | ||
IT | 17.04.2019 | ||
LT | 17.04.2019 | ||
LV | 17.04.2019 | ||
NL | 17.04.2019 | ||
PL | 17.04.2019 | ||
RO | 17.04.2019 | ||
RS | 17.04.2019 | ||
SE | 17.04.2019 | ||
SK | 17.04.2019 | ||
SM | 17.04.2019 | ||
TR | 17.04.2019 | ||
BG | 17.07.2019 | ||
NO | 17.07.2019 | ||
GR | 18.07.2019 | ||
IS | 17.08.2019 | ||
PT | 17.08.2019 | ||
Former [2020/14] | AL | 17.04.2019 | |
AT | 17.04.2019 | ||
CZ | 17.04.2019 | ||
DK | 17.04.2019 | ||
EE | 17.04.2019 | ||
ES | 17.04.2019 | ||
FI | 17.04.2019 | ||
HR | 17.04.2019 | ||
IT | 17.04.2019 | ||
LT | 17.04.2019 | ||
LV | 17.04.2019 | ||
NL | 17.04.2019 | ||
PL | 17.04.2019 | ||
RO | 17.04.2019 | ||
RS | 17.04.2019 | ||
SE | 17.04.2019 | ||
SK | 17.04.2019 | ||
SM | 17.04.2019 | ||
BG | 17.07.2019 | ||
NO | 17.07.2019 | ||
GR | 18.07.2019 | ||
IS | 17.08.2019 | ||
PT | 17.08.2019 | ||
Former [2020/12] | AL | 17.04.2019 | |
AT | 17.04.2019 | ||
CZ | 17.04.2019 | ||
DK | 17.04.2019 | ||
EE | 17.04.2019 | ||
ES | 17.04.2019 | ||
FI | 17.04.2019 | ||
HR | 17.04.2019 | ||
IT | 17.04.2019 | ||
LT | 17.04.2019 | ||
LV | 17.04.2019 | ||
NL | 17.04.2019 | ||
PL | 17.04.2019 | ||
RO | 17.04.2019 | ||
RS | 17.04.2019 | ||
SE | 17.04.2019 | ||
SK | 17.04.2019 | ||
BG | 17.07.2019 | ||
NO | 17.07.2019 | ||
GR | 18.07.2019 | ||
IS | 17.08.2019 | ||
PT | 17.08.2019 | ||
Former [2020/11] | AL | 17.04.2019 | |
AT | 17.04.2019 | ||
CZ | 17.04.2019 | ||
DK | 17.04.2019 | ||
EE | 17.04.2019 | ||
ES | 17.04.2019 | ||
FI | 17.04.2019 | ||
HR | 17.04.2019 | ||
LT | 17.04.2019 | ||
LV | 17.04.2019 | ||
NL | 17.04.2019 | ||
PL | 17.04.2019 | ||
RO | 17.04.2019 | ||
RS | 17.04.2019 | ||
SE | 17.04.2019 | ||
SK | 17.04.2019 | ||
BG | 17.07.2019 | ||
NO | 17.07.2019 | ||
GR | 18.07.2019 | ||
IS | 17.08.2019 | ||
PT | 17.08.2019 | ||
Former [2020/10] | AL | 17.04.2019 | |
AT | 17.04.2019 | ||
CZ | 17.04.2019 | ||
DK | 17.04.2019 | ||
ES | 17.04.2019 | ||
FI | 17.04.2019 | ||
HR | 17.04.2019 | ||
LT | 17.04.2019 | ||
LV | 17.04.2019 | ||
NL | 17.04.2019 | ||
PL | 17.04.2019 | ||
RO | 17.04.2019 | ||
RS | 17.04.2019 | ||
SE | 17.04.2019 | ||
BG | 17.07.2019 | ||
NO | 17.07.2019 | ||
GR | 18.07.2019 | ||
IS | 17.08.2019 | ||
PT | 17.08.2019 | ||
Former [2020/09] | AL | 17.04.2019 | |
CZ | 17.04.2019 | ||
DK | 17.04.2019 | ||
ES | 17.04.2019 | ||
FI | 17.04.2019 | ||
HR | 17.04.2019 | ||
LT | 17.04.2019 | ||
LV | 17.04.2019 | ||
NL | 17.04.2019 | ||
PL | 17.04.2019 | ||
RS | 17.04.2019 | ||
SE | 17.04.2019 | ||
BG | 17.07.2019 | ||
NO | 17.07.2019 | ||
GR | 18.07.2019 | ||
IS | 17.08.2019 | ||
PT | 17.08.2019 | ||
Former [2020/04] | AL | 17.04.2019 | |
ES | 17.04.2019 | ||
FI | 17.04.2019 | ||
HR | 17.04.2019 | ||
LT | 17.04.2019 | ||
LV | 17.04.2019 | ||
NL | 17.04.2019 | ||
PL | 17.04.2019 | ||
RS | 17.04.2019 | ||
SE | 17.04.2019 | ||
BG | 17.07.2019 | ||
NO | 17.07.2019 | ||
GR | 18.07.2019 | ||
IS | 17.08.2019 | ||
PT | 17.08.2019 | ||
Former [2019/52] | AL | 17.04.2019 | |
ES | 17.04.2019 | ||
FI | 17.04.2019 | ||
HR | 17.04.2019 | ||
LT | 17.04.2019 | ||
LV | 17.04.2019 | ||
NL | 17.04.2019 | ||
PL | 17.04.2019 | ||
RS | 17.04.2019 | ||
SE | 17.04.2019 | ||
BG | 17.07.2019 | ||
NO | 17.07.2019 | ||
GR | 18.07.2019 | ||
PT | 17.08.2019 | ||
Former [2019/51] | AL | 17.04.2019 | |
ES | 17.04.2019 | ||
FI | 17.04.2019 | ||
HR | 17.04.2019 | ||
LT | 17.04.2019 | ||
LV | 17.04.2019 | ||
NL | 17.04.2019 | ||
RS | 17.04.2019 | ||
SE | 17.04.2019 | ||
BG | 17.07.2019 | ||
NO | 17.07.2019 | ||
GR | 18.07.2019 | ||
PT | 17.08.2019 | ||
Former [2019/50] | AL | 17.04.2019 | |
ES | 17.04.2019 | ||
FI | 17.04.2019 | ||
HR | 17.04.2019 | ||
LT | 17.04.2019 | ||
LV | 17.04.2019 | ||
NL | 17.04.2019 | ||
RS | 17.04.2019 | ||
SE | 17.04.2019 | ||
NO | 17.07.2019 | ||
GR | 18.07.2019 | ||
PT | 17.08.2019 | ||
Former [2019/49] | AL | 17.04.2019 | |
ES | 17.04.2019 | ||
FI | 17.04.2019 | ||
HR | 17.04.2019 | ||
LT | 17.04.2019 | ||
NL | 17.04.2019 | ||
SE | 17.04.2019 | ||
NO | 17.07.2019 | ||
PT | 17.08.2019 | ||
Former [2019/48] | ES | 17.04.2019 | |
FI | 17.04.2019 | ||
LT | 17.04.2019 | ||
NL | 17.04.2019 | ||
SE | 17.04.2019 | ||
NO | 17.07.2019 | ||
PT | 17.08.2019 | ||
Former [2019/47] | ES | 17.04.2019 | |
FI | 17.04.2019 | ||
LT | 17.04.2019 | ||
NL | 17.04.2019 | ||
NO | 17.07.2019 | ||
Former [2019/44] | NL | 17.04.2019 | Documents cited: | Search | [A]US2011212375 (TAGUCHI KIYOSHI [JP], et al) [A] 1,4-6* the whole document * | International search | [A]US2005058861 (PETTIT WILLIAM H [US], et al) [A] 1-5* , entire text; all drawings (Family: none) *; | [Y]JP2009014473 (HONDA MOTOR CO LTD) [Y] 1-3, 5 * , paragraphs [0003], [0026] to [0035]; fig. 1 to 2 (Family: none) *; | [Y]JP2009070747 (TOSHIBA FUEL CELL POWER SYS, et al) [Y] 1-3, 5 * , paragraphs [0019] to [0020]; fig. 1 (Family: none) *; | [A]JP2009211972 (PANASONIC CORP) [A] 1-5 * , entire text; all drawings (Family: none) *; | [YA]WO2012081220 (PANASONIC CORP [JP], et al) [Y] 1-3, 5 * , claim 1; paragraphs [0229] to [0244]; fig. 18, 19 & JP 5190561 B & US 2013/0189599 A1 & EP 2506355 A1 * [A] 4; | [Y]WO2012153482 (PANASONIC CORP [JP], et al) [Y] 1-3, 5 * , paragraphs [0047] to [0048]; fig. 1 & JP 5336022 B & US 2013/0252125 A1 & EP 2637241 A1 * |