EP3113553 - METHOD FOR TRANSMITTING SYNCHRONIZATION SIGNAL FOR DIRECT DEVICE-TO-DEVICE COMMUNICATION IN A WIRELESS COMMUNICATION SYSTEM, AND APPARATUS THEREFOR [Right-click to bookmark this link] | |||
Former [2017/01] | METHOD FOR TRANSMITTING SYNCHRONIZATION SIGNAL FOR DIRECT DEVICE-TO-DEVICE COMMUNICATION IN WIRELESS COMMUNICATION SYSTEM, AND APPARATUS FOR SAME | ||
[2019/25] | Status | No opposition filed within time limit Status updated on 28.08.2020 Database last updated on 20.05.2024 | |
Former | The patent has been granted Status updated on 20.09.2019 | ||
Former | Grant of patent is intended Status updated on 27.05.2019 | ||
Former | Request for examination was made Status updated on 02.12.2016 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states LG Electronics Inc. 128, Yeoui-daero Yeongdeungpo-gu Seoul 150-721 / KR | [2017/01] | Inventor(s) | 01 /
SEO, Hanbyul 19 Yangjae-daero 11gil Seocho-gu Seoul 137-893 / KR | [2017/01] | Representative(s) | Frenkel, Matthias Alexander Wuesthoff & Wuesthoff Patentanwälte und Rechtsanwalt PartG mbB Schweigerstraße 2 81541 München / DE | [N/P] |
Former [2017/01] | Frenkel, Matthias Alexander Wuesthoff & Wuesthoff Patentanwälte PartG mbB Schweigerstrasse 2 81541 München / DE | Application number, filing date | 15755883.4 | 25.02.2015 | [2017/01] | WO2015KR01812 | Priority number, date | US201461945795P | 27.02.2014 Original published format: US 201461945795 P | US201461945793P | 27.02.2014 Original published format: US 201461945793 P | [2017/01] | Filing language | KO | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | WO2015130074 | Date: | 03.09.2015 | Language: | KO | [2015/35] | Type: | A2 Application without search report | No.: | EP3113553 | Date: | 04.01.2017 | Language: | EN | [2017/01] | Type: | B1 Patent specification | No.: | EP3113553 | Date: | 23.10.2019 | Language: | EN | [2019/43] | Search report(s) | International search report - published on: | KR | 05.01.2017 | (Supplementary) European search report - dispatched on: | EP | 18.01.2018 | Classification | IPC: | H04W56/00, H04W72/12, H04W72/02, // H04W88/16 | [2019/25] | CPC: |
H04W56/002 (EP,US);
H04W72/1215 (US);
H04W72/23 (EP,US);
H04W88/16 (US)
|
Former IPC [2017/01] | H04W56/00, H04W72/12, H04W72/02 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/01] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | VERFAHREN ZUR ÜBERTRAGUNG VON SYNCHRONISATIONSSIGNALEN FÜR DIREKTE KOMMUNIKATION VON VORRICHTUNG ZU VORRICHTUNG IN EINEM DRAHTLOSKOMMUNIKATIONSSYSTEM UND VORRICHTUNG DAFÜR | [2017/01] | English: | METHOD FOR TRANSMITTING SYNCHRONIZATION SIGNAL FOR DIRECT DEVICE-TO-DEVICE COMMUNICATION IN A WIRELESS COMMUNICATION SYSTEM, AND APPARATUS THEREFOR | [2019/25] | French: | PROCÉDÉ D'ÉMISSION D'UN SIGNAL DE SYNCHRONISATION POUR UNE COMMUNICATION DE DISPOSITIF À DISPOSITIF DANS UN SYSTÈME DE COMMUNICATION SANS FIL, ET APPAREIL ASSOCIÉ | [2017/01] |
Former [2017/01] | METHOD FOR TRANSMITTING SYNCHRONIZATION SIGNAL FOR DIRECT DEVICE-TO-DEVICE COMMUNICATION IN WIRELESS COMMUNICATION SYSTEM, AND APPARATUS FOR SAME | Entry into regional phase | 23.09.2016 | Translation filed | 23.09.2016 | National basic fee paid | 23.09.2016 | Search fee paid | 23.09.2016 | Designation fee(s) paid | 23.09.2016 | Examination fee paid | Examination procedure | 23.09.2016 | Examination requested [2017/01] | 23.09.2016 | Date on which the examining division has become responsible | 13.08.2018 | Amendment by applicant (claims and/or description) | 28.05.2019 | Communication of intention to grant the patent | 12.09.2019 | Fee for grant paid | 12.09.2019 | Fee for publishing/printing paid | 12.09.2019 | Receipt of the translation of the claim(s) | Opposition(s) | 24.07.2020 | No opposition filed within time limit [2020/40] | Fees paid | Renewal fee | 17.02.2017 | Renewal fee patent year 03 | 22.02.2018 | Renewal fee patent year 04 | 21.02.2019 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 25.02.2015 | AL | 23.10.2019 | AT | 23.10.2019 | CY | 23.10.2019 | CZ | 23.10.2019 | DK | 23.10.2019 | EE | 23.10.2019 | ES | 23.10.2019 | FI | 23.10.2019 | HR | 23.10.2019 | IT | 23.10.2019 | LT | 23.10.2019 | LV | 23.10.2019 | MC | 23.10.2019 | MK | 23.10.2019 | MT | 23.10.2019 | NL | 23.10.2019 | PL | 23.10.2019 | RO | 23.10.2019 | RS | 23.10.2019 | SE | 23.10.2019 | SI | 23.10.2019 | SK | 23.10.2019 | SM | 23.10.2019 | TR | 23.10.2019 | BG | 23.01.2020 | NO | 23.01.2020 | GR | 24.01.2020 | IS | 23.02.2020 | PT | 24.02.2020 | GB | 25.02.2020 | IE | 25.02.2020 | LU | 25.02.2020 | BE | 29.02.2020 | CH | 29.02.2020 | FR | 29.02.2020 | LI | 29.02.2020 | [2022/32] |
Former [2022/27] | HU | 25.02.2015 | |
AL | 23.10.2019 | ||
AT | 23.10.2019 | ||
CY | 23.10.2019 | ||
CZ | 23.10.2019 | ||
DK | 23.10.2019 | ||
EE | 23.10.2019 | ||
ES | 23.10.2019 | ||
FI | 23.10.2019 | ||
HR | 23.10.2019 | ||
IT | 23.10.2019 | ||
LT | 23.10.2019 | ||
LV | 23.10.2019 | ||
MC | 23.10.2019 | ||
MT | 23.10.2019 | ||
NL | 23.10.2019 | ||
PL | 23.10.2019 | ||
RO | 23.10.2019 | ||
RS | 23.10.2019 | ||
SE | 23.10.2019 | ||
SI | 23.10.2019 | ||
SK | 23.10.2019 | ||
SM | 23.10.2019 | ||
TR | 23.10.2019 | ||
BG | 23.01.2020 | ||
NO | 23.01.2020 | ||
GR | 24.01.2020 | ||
IS | 23.02.2020 | ||
PT | 24.02.2020 | ||
GB | 25.02.2020 | ||
IE | 25.02.2020 | ||
LU | 25.02.2020 | ||
BE | 29.02.2020 | ||
CH | 29.02.2020 | ||
FR | 29.02.2020 | ||
LI | 29.02.2020 | ||
Former [2021/10] | AL | 23.10.2019 | |
AT | 23.10.2019 | ||
CZ | 23.10.2019 | ||
DK | 23.10.2019 | ||
EE | 23.10.2019 | ||
ES | 23.10.2019 | ||
FI | 23.10.2019 | ||
HR | 23.10.2019 | ||
IT | 23.10.2019 | ||
LT | 23.10.2019 | ||
LV | 23.10.2019 | ||
MC | 23.10.2019 | ||
NL | 23.10.2019 | ||
PL | 23.10.2019 | ||
RO | 23.10.2019 | ||
RS | 23.10.2019 | ||
SE | 23.10.2019 | ||
SI | 23.10.2019 | ||
SK | 23.10.2019 | ||
SM | 23.10.2019 | ||
BG | 23.01.2020 | ||
NO | 23.01.2020 | ||
GR | 24.01.2020 | ||
IS | 23.02.2020 | ||
PT | 24.02.2020 | ||
GB | 25.02.2020 | ||
IE | 25.02.2020 | ||
LU | 25.02.2020 | ||
BE | 29.02.2020 | ||
CH | 29.02.2020 | ||
FR | 29.02.2020 | ||
LI | 29.02.2020 | ||
Former [2021/08] | AL | 23.10.2019 | |
AT | 23.10.2019 | ||
CZ | 23.10.2019 | ||
DK | 23.10.2019 | ||
EE | 23.10.2019 | ||
ES | 23.10.2019 | ||
FI | 23.10.2019 | ||
HR | 23.10.2019 | ||
IT | 23.10.2019 | ||
LT | 23.10.2019 | ||
LV | 23.10.2019 | ||
MC | 23.10.2019 | ||
NL | 23.10.2019 | ||
PL | 23.10.2019 | ||
RO | 23.10.2019 | ||
RS | 23.10.2019 | ||
SE | 23.10.2019 | ||
SI | 23.10.2019 | ||
SK | 23.10.2019 | ||
SM | 23.10.2019 | ||
BG | 23.01.2020 | ||
NO | 23.01.2020 | ||
GR | 24.01.2020 | ||
IS | 23.02.2020 | ||
PT | 24.02.2020 | ||
GB | 25.02.2020 | ||
IE | 25.02.2020 | ||
LU | 25.02.2020 | ||
CH | 29.02.2020 | ||
FR | 29.02.2020 | ||
LI | 29.02.2020 | ||
Former [2021/07] | AL | 23.10.2019 | |
AT | 23.10.2019 | ||
CZ | 23.10.2019 | ||
DK | 23.10.2019 | ||
EE | 23.10.2019 | ||
ES | 23.10.2019 | ||
FI | 23.10.2019 | ||
HR | 23.10.2019 | ||
IT | 23.10.2019 | ||
LT | 23.10.2019 | ||
LV | 23.10.2019 | ||
MC | 23.10.2019 | ||
NL | 23.10.2019 | ||
PL | 23.10.2019 | ||
RO | 23.10.2019 | ||
RS | 23.10.2019 | ||
SE | 23.10.2019 | ||
SI | 23.10.2019 | ||
SK | 23.10.2019 | ||
SM | 23.10.2019 | ||
BG | 23.01.2020 | ||
NO | 23.01.2020 | ||
GR | 24.01.2020 | ||
IS | 23.02.2020 | ||
PT | 24.02.2020 | ||
IE | 25.02.2020 | ||
LU | 25.02.2020 | ||
CH | 29.02.2020 | ||
FR | 29.02.2020 | ||
LI | 29.02.2020 | ||
Former [2020/51] | AL | 23.10.2019 | |
AT | 23.10.2019 | ||
CZ | 23.10.2019 | ||
DK | 23.10.2019 | ||
EE | 23.10.2019 | ||
ES | 23.10.2019 | ||
FI | 23.10.2019 | ||
HR | 23.10.2019 | ||
IT | 23.10.2019 | ||
LT | 23.10.2019 | ||
LV | 23.10.2019 | ||
MC | 23.10.2019 | ||
NL | 23.10.2019 | ||
PL | 23.10.2019 | ||
RO | 23.10.2019 | ||
RS | 23.10.2019 | ||
SE | 23.10.2019 | ||
SI | 23.10.2019 | ||
SK | 23.10.2019 | ||
SM | 23.10.2019 | ||
BG | 23.01.2020 | ||
NO | 23.01.2020 | ||
GR | 24.01.2020 | ||
IS | 23.02.2020 | ||
PT | 24.02.2020 | ||
LU | 25.02.2020 | ||
CH | 29.02.2020 | ||
LI | 29.02.2020 | ||
Former [2020/50] | AL | 23.10.2019 | |
AT | 23.10.2019 | ||
CZ | 23.10.2019 | ||
DK | 23.10.2019 | ||
EE | 23.10.2019 | ||
ES | 23.10.2019 | ||
FI | 23.10.2019 | ||
HR | 23.10.2019 | ||
IT | 23.10.2019 | ||
LT | 23.10.2019 | ||
LV | 23.10.2019 | ||
MC | 23.10.2019 | ||
NL | 23.10.2019 | ||
PL | 23.10.2019 | ||
RO | 23.10.2019 | ||
RS | 23.10.2019 | ||
SE | 23.10.2019 | ||
SI | 23.10.2019 | ||
SK | 23.10.2019 | ||
SM | 23.10.2019 | ||
BG | 23.01.2020 | ||
NO | 23.01.2020 | ||
GR | 24.01.2020 | ||
IS | 23.02.2020 | ||
PT | 24.02.2020 | ||
LU | 25.02.2020 | ||
Former [2020/48] | AL | 23.10.2019 | |
CZ | 23.10.2019 | ||
DK | 23.10.2019 | ||
EE | 23.10.2019 | ||
ES | 23.10.2019 | ||
FI | 23.10.2019 | ||
HR | 23.10.2019 | ||
IT | 23.10.2019 | ||
LT | 23.10.2019 | ||
LV | 23.10.2019 | ||
NL | 23.10.2019 | ||
PL | 23.10.2019 | ||
RO | 23.10.2019 | ||
RS | 23.10.2019 | ||
SE | 23.10.2019 | ||
SK | 23.10.2019 | ||
SM | 23.10.2019 | ||
BG | 23.01.2020 | ||
NO | 23.01.2020 | ||
GR | 24.01.2020 | ||
IS | 23.02.2020 | ||
PT | 24.02.2020 | ||
LU | 25.02.2020 | ||
Former [2020/38] | AL | 23.10.2019 | |
CZ | 23.10.2019 | ||
DK | 23.10.2019 | ||
EE | 23.10.2019 | ||
ES | 23.10.2019 | ||
FI | 23.10.2019 | ||
HR | 23.10.2019 | ||
IT | 23.10.2019 | ||
LT | 23.10.2019 | ||
LV | 23.10.2019 | ||
NL | 23.10.2019 | ||
PL | 23.10.2019 | ||
RO | 23.10.2019 | ||
RS | 23.10.2019 | ||
SE | 23.10.2019 | ||
SK | 23.10.2019 | ||
SM | 23.10.2019 | ||
BG | 23.01.2020 | ||
NO | 23.01.2020 | ||
GR | 24.01.2020 | ||
IS | 23.02.2020 | ||
PT | 24.02.2020 | ||
Former [2020/37] | AL | 23.10.2019 | |
CZ | 23.10.2019 | ||
DK | 23.10.2019 | ||
EE | 23.10.2019 | ||
ES | 23.10.2019 | ||
FI | 23.10.2019 | ||
HR | 23.10.2019 | ||
LT | 23.10.2019 | ||
LV | 23.10.2019 | ||
NL | 23.10.2019 | ||
PL | 23.10.2019 | ||
RO | 23.10.2019 | ||
RS | 23.10.2019 | ||
SE | 23.10.2019 | ||
SK | 23.10.2019 | ||
SM | 23.10.2019 | ||
BG | 23.01.2020 | ||
NO | 23.01.2020 | ||
GR | 24.01.2020 | ||
IS | 23.02.2020 | ||
PT | 24.02.2020 | ||
Former [2020/36] | AL | 23.10.2019 | |
CZ | 23.10.2019 | ||
DK | 23.10.2019 | ||
EE | 23.10.2019 | ||
ES | 23.10.2019 | ||
FI | 23.10.2019 | ||
HR | 23.10.2019 | ||
LT | 23.10.2019 | ||
LV | 23.10.2019 | ||
NL | 23.10.2019 | ||
PL | 23.10.2019 | ||
RO | 23.10.2019 | ||
RS | 23.10.2019 | ||
SE | 23.10.2019 | ||
BG | 23.01.2020 | ||
NO | 23.01.2020 | ||
GR | 24.01.2020 | ||
IS | 23.02.2020 | ||
PT | 24.02.2020 | ||
Former [2020/35] | AL | 23.10.2019 | |
CZ | 23.10.2019 | ||
ES | 23.10.2019 | ||
FI | 23.10.2019 | ||
HR | 23.10.2019 | ||
LT | 23.10.2019 | ||
LV | 23.10.2019 | ||
NL | 23.10.2019 | ||
PL | 23.10.2019 | ||
RO | 23.10.2019 | ||
RS | 23.10.2019 | ||
SE | 23.10.2019 | ||
BG | 23.01.2020 | ||
NO | 23.01.2020 | ||
GR | 24.01.2020 | ||
IS | 24.02.2020 | ||
PT | 24.02.2020 | ||
Former [2020/34] | AL | 23.10.2019 | |
ES | 23.10.2019 | ||
FI | 23.10.2019 | ||
HR | 23.10.2019 | ||
LT | 23.10.2019 | ||
LV | 23.10.2019 | ||
NL | 23.10.2019 | ||
PL | 23.10.2019 | ||
RS | 23.10.2019 | ||
SE | 23.10.2019 | ||
BG | 23.01.2020 | ||
NO | 23.01.2020 | ||
GR | 24.01.2020 | ||
IS | 24.02.2020 | ||
PT | 24.02.2020 | ||
Former [2020/32] | AL | 23.10.2019 | |
FI | 23.10.2019 | ||
HR | 23.10.2019 | ||
LT | 23.10.2019 | ||
LV | 23.10.2019 | ||
NL | 23.10.2019 | ||
PL | 23.10.2019 | ||
RS | 23.10.2019 | ||
SE | 23.10.2019 | ||
BG | 23.01.2020 | ||
NO | 23.01.2020 | ||
GR | 24.01.2020 | ||
IS | 24.02.2020 | ||
PT | 24.02.2020 | ||
Former [2020/25] | FI | 23.10.2019 | |
HR | 23.10.2019 | ||
LT | 23.10.2019 | ||
LV | 23.10.2019 | ||
NL | 23.10.2019 | ||
PL | 23.10.2019 | ||
RS | 23.10.2019 | ||
SE | 23.10.2019 | ||
BG | 23.01.2020 | ||
NO | 23.01.2020 | ||
GR | 24.01.2020 | ||
IS | 24.02.2020 | ||
PT | 24.02.2020 | ||
Former [2020/24] | FI | 23.10.2019 | |
LT | 23.10.2019 | ||
LV | 23.10.2019 | ||
NL | 23.10.2019 | ||
PL | 23.10.2019 | ||
SE | 23.10.2019 | ||
BG | 23.01.2020 | ||
NO | 23.01.2020 | ||
GR | 24.01.2020 | ||
IS | 24.02.2020 | ||
PT | 24.02.2020 | ||
Former [2020/23] | FI | 23.10.2019 | |
LT | 23.10.2019 | ||
LV | 23.10.2019 | ||
NL | 23.10.2019 | ||
PL | 23.10.2019 | ||
SE | 23.10.2019 | ||
BG | 23.01.2020 | ||
NO | 23.01.2020 | ||
GR | 24.01.2020 | ||
PT | 24.02.2020 | ||
Former [2020/22] | FI | 23.10.2019 | |
LT | 23.10.2019 | ||
NL | 23.10.2019 | ||
SE | 23.10.2019 | ||
BG | 23.01.2020 | ||
NO | 23.01.2020 | ||
PT | 24.02.2020 | ||
Former [2020/21] | NL | 23.10.2019 | |
NO | 23.01.2020 | ||
Former [2020/20] | NL | 23.10.2019 | Documents cited: | Search | [A]US2013322413 (PELLETIER GHYSLAIN [CA], et al) [A] 1-14 * paragraph [0001] - paragraph [0004] ** paragraph [0135] - paragraph [0139] *; | [IA] - ERICSSON, "Frame Structure for D2D-Enabled LTE Carriers", vol. RAN WG1, no. Prague, Czech Republic; 20140210 - 20140214, (20140209), 3GPP DRAFT; R1-140775 FRAME MAPPING D2D, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/RAN/RAN1/Docs/, (20140209), XP050736276 [I] 1-3,5-10,12-14 * the whole document * [A] 4,11 | [IA] - ERICSSON, "Overview of D2D functions needing standardization", vol. RAN WG2, no. Prague; 20140210 - 20140214, (20140209), 3GPP DRAFT; R2-140797 - OVERVIEW OF D2D FUNCTIONS NEEDING STANDARDIZATION, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDE, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/RAN2/Docs/, (20140209), XP050792083 [I] 1-3,5-10,12-14 * the whole document * [A] 4,11 | [A] - "3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Study on LTE Device to Device Proximity Services; Radio Aspects (Release 12)", (20140220), 3GPP DRAFT; R1-140944_QC_DRAFT_TR, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/tsg_ran/WG1_RL1/TSGR1_76/Docs/, (20140220), XP050770871 [A] 1-14 * section 1 "Scope" * * section 7 "Synchronization" * * section 9.1.2 "Resource allocation" * | International search | [Y]US2007258404 (TIRKKONEN OLAV [FI], et al) [Y] 1-14 * See paragraphs [0043]-[0046], [0055]-[0062], [0116]-[0119]; and figures 3, 4. *; | [A]WO2010082797 (KOREA ELECTRONICS TELECOMM [KR], et al) [A] 1-14* See paragraphs [12], [13], [49]-[53]; and claim 1. *; | [Y]WO2013055271 (ERICSSON TELEFON AB L M [SE], et al) [Y] 5, 12 * See page 30, lines 3-13; and claim 1. *; | [Y]US2013148566 (DOPPLER KLAUS FRANZ [US], et al) [Y] 4, 6, 7, 11, 13, 14 * See paragraphs [0071]-[0083]; and claim 41. *; | [Y]US2013155974 (PAPASAKELLARIOU ARIS [US], et al) [Y] 1-14 * See paragraphs [0144]-[0146]; and claim 13. * |