EP3183927 - SENDING CELLULAR-RELATED PAGING MESSAGES OVER A NON-CELLULAR RAT [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 22.04.2022 Database last updated on 20.05.2024 | |
Former | The patent has been granted Status updated on 14.05.2021 | ||
Former | Grant of patent is intended Status updated on 18.01.2021 | ||
Former | Examination is in progress Status updated on 07.02.2020 | ||
Former | Request for examination was made Status updated on 26.05.2017 | ||
Former | The international publication has been made Status updated on 20.01.2017 | Most recent event Tooltip | 27.04.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 29.05.2024 [2024/22] | Applicant(s) | For all designated states Qualcomm Incorporated 5775 Morehouse Drive San Diego, CA 92121-1714 / US | [2017/26] | Inventor(s) | 01 /
HORN, Gavin, Bernard 5775 Morehouse Drive San Diego, California 92121-1714 / US | 02 /
FACCIN, Stefano 5775 Morehouse Drive San Diego, California 92121-1714 / US | 03 /
SONG, Osok 5775 Morehouse Drive San Diego, California 92121-1714 / US | 04 /
LOPES, Luis, Fernando Brisson 5775 Morehouse Drive San Diego, California 92121-1714 / US | [2017/26] | Representative(s) | Bardehle Pagenberg Partnerschaft mbB Patentanwälte Rechtsanwälte Prinzregentenplatz 7 81675 München / DE | [2021/24] |
Former [2017/26] | Wegner, Hans Bardehle Pagenberg Partnerschaft mbB Patentanwälte, Rechtsanwälte Prinzregentenplatz 7 81675 München / DE | Application number, filing date | 15757049.0 | 12.08.2015 | [2017/26] | WO2015US44770 | Priority number, date | US201462040954P | 22.08.2014 Original published format: US 201462040954 P | US201514599934 | 19.01.2015 Original published format: US201514599934 | [2017/26] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2016028560 | Date: | 25.02.2016 | Language: | EN | [2016/08] | Type: | A1 Application with search report | No.: | EP3183927 | Date: | 28.06.2017 | Language: | EN | The application published by WIPO in one of the EPO official languages on 25.02.2016 takes the place of the publication of the European patent application. | [2017/26] | Type: | B1 Patent specification | No.: | EP3183927 | Date: | 16.06.2021 | Language: | EN | [2021/24] | Search report(s) | International search report - published on: | EP | 25.02.2016 | Classification | IPC: | H04W60/00, H04W68/12, // H04W84/04, H04W88/06 | [2021/03] | CPC: |
H04W60/005 (EP,KR,US);
H04W68/12 (EP,CN,KR,US);
H04W8/18 (CN,KR,US);
H04W60/04 (CN,KR,US);
H04W48/18 (CN);
H04W88/06 (EP,CN,KR,US);
H04W84/04 (EP,US)
(-)
|
Former IPC [2017/26] | H04W68/12, H04W88/06 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/26] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | Title | German: | SENDEN VON MOBILFUNKBEZOGENEN FUNKRUFNACHRICHTEN ÜBER EIN NICHT-MOBILFUNK-RAT | [2017/26] | English: | SENDING CELLULAR-RELATED PAGING MESSAGES OVER A NON-CELLULAR RAT | [2017/26] | French: | ENVOI DE MESSAGES DE RADIOMESSAGERIE À ASSOCIATION CELLULAIRE SUR UNE TECHNOLOGIE D'ACCÈS RADIO (RAT) NON CELLULAIRE | [2017/26] | Entry into regional phase | 19.01.2017 | National basic fee paid | 19.01.2017 | Designation fee(s) paid | 19.01.2017 | Examination fee paid | Examination procedure | 02.03.2016 | Request for preliminary examination filed International Preliminary Examining Authority: EP | 19.01.2017 | Examination requested [2017/26] | 19.01.2017 | Date on which the examining division has become responsible | 09.10.2017 | Amendment by applicant (claims and/or description) | 11.02.2020 | Despatch of a communication from the examining division (Time limit: M04) | 02.06.2020 | Reply to a communication from the examining division | 16.12.2020 | Cancellation of oral proceeding that was planned for 17.12.2020 | 17.12.2020 | Date of oral proceedings (cancelled) | 19.01.2021 | Communication of intention to grant the patent | 06.05.2021 | Fee for grant paid | 06.05.2021 | Fee for publishing/printing paid | 06.05.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 17.03.2022 | No opposition filed within time limit [2022/21] | Fees paid | Renewal fee | 05.07.2017 | Renewal fee patent year 03 | 10.08.2018 | Renewal fee patent year 04 | 08.08.2019 | Renewal fee patent year 05 | 17.08.2020 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 12.08.2015 | AL | 16.06.2021 | AT | 16.06.2021 | CY | 16.06.2021 | CZ | 16.06.2021 | DK | 16.06.2021 | EE | 16.06.2021 | ES | 16.06.2021 | FI | 16.06.2021 | HR | 16.06.2021 | IT | 16.06.2021 | LT | 16.06.2021 | LV | 16.06.2021 | MC | 16.06.2021 | MK | 16.06.2021 | NL | 16.06.2021 | PL | 16.06.2021 | RO | 16.06.2021 | RS | 16.06.2021 | SE | 16.06.2021 | SI | 16.06.2021 | SK | 16.06.2021 | SM | 16.06.2021 | IE | 12.08.2021 | LU | 12.08.2021 | FR | 16.08.2021 | BE | 31.08.2021 | CH | 31.08.2021 | LI | 31.08.2021 | BG | 16.09.2021 | NO | 16.09.2021 | GR | 17.09.2021 | IS | 16.10.2021 | PT | 18.10.2021 | [2024/22] |
Former [2023/30] | HU | 12.08.2015 | |
AL | 16.06.2021 | ||
AT | 16.06.2021 | ||
CY | 16.06.2021 | ||
CZ | 16.06.2021 | ||
DK | 16.06.2021 | ||
EE | 16.06.2021 | ||
ES | 16.06.2021 | ||
FI | 16.06.2021 | ||
HR | 16.06.2021 | ||
IT | 16.06.2021 | ||
LT | 16.06.2021 | ||
LV | 16.06.2021 | ||
MC | 16.06.2021 | ||
NL | 16.06.2021 | ||
PL | 16.06.2021 | ||
RO | 16.06.2021 | ||
RS | 16.06.2021 | ||
SE | 16.06.2021 | ||
SI | 16.06.2021 | ||
SK | 16.06.2021 | ||
SM | 16.06.2021 | ||
IE | 12.08.2021 | ||
LU | 12.08.2021 | ||
FR | 16.08.2021 | ||
BE | 31.08.2021 | ||
CH | 31.08.2021 | ||
LI | 31.08.2021 | ||
BG | 16.09.2021 | ||
NO | 16.09.2021 | ||
GR | 17.09.2021 | ||
IS | 16.10.2021 | ||
PT | 18.10.2021 | ||
Former [2023/29] | HU | 12.08.2015 | |
AL | 16.06.2021 | ||
AT | 16.06.2021 | ||
CZ | 16.06.2021 | ||
DK | 16.06.2021 | ||
EE | 16.06.2021 | ||
ES | 16.06.2021 | ||
FI | 16.06.2021 | ||
HR | 16.06.2021 | ||
IT | 16.06.2021 | ||
LT | 16.06.2021 | ||
LV | 16.06.2021 | ||
MC | 16.06.2021 | ||
NL | 16.06.2021 | ||
PL | 16.06.2021 | ||
RO | 16.06.2021 | ||
RS | 16.06.2021 | ||
SE | 16.06.2021 | ||
SI | 16.06.2021 | ||
SK | 16.06.2021 | ||
SM | 16.06.2021 | ||
IE | 12.08.2021 | ||
LU | 12.08.2021 | ||
FR | 16.08.2021 | ||
BE | 31.08.2021 | ||
CH | 31.08.2021 | ||
LI | 31.08.2021 | ||
BG | 16.09.2021 | ||
NO | 16.09.2021 | ||
GR | 17.09.2021 | ||
IS | 16.10.2021 | ||
PT | 18.10.2021 | ||
Former [2022/36] | AL | 16.06.2021 | |
AT | 16.06.2021 | ||
CZ | 16.06.2021 | ||
DK | 16.06.2021 | ||
EE | 16.06.2021 | ||
ES | 16.06.2021 | ||
FI | 16.06.2021 | ||
HR | 16.06.2021 | ||
IT | 16.06.2021 | ||
LT | 16.06.2021 | ||
LV | 16.06.2021 | ||
MC | 16.06.2021 | ||
NL | 16.06.2021 | ||
PL | 16.06.2021 | ||
RO | 16.06.2021 | ||
RS | 16.06.2021 | ||
SE | 16.06.2021 | ||
SI | 16.06.2021 | ||
SK | 16.06.2021 | ||
SM | 16.06.2021 | ||
IE | 12.08.2021 | ||
LU | 12.08.2021 | ||
FR | 16.08.2021 | ||
BE | 31.08.2021 | ||
CH | 31.08.2021 | ||
LI | 31.08.2021 | ||
BG | 16.09.2021 | ||
NO | 16.09.2021 | ||
GR | 17.09.2021 | ||
IS | 16.10.2021 | ||
PT | 18.10.2021 | ||
Former [2022/35] | AL | 16.06.2021 | |
AT | 16.06.2021 | ||
CZ | 16.06.2021 | ||
DK | 16.06.2021 | ||
EE | 16.06.2021 | ||
ES | 16.06.2021 | ||
FI | 16.06.2021 | ||
HR | 16.06.2021 | ||
LT | 16.06.2021 | ||
LV | 16.06.2021 | ||
MC | 16.06.2021 | ||
NL | 16.06.2021 | ||
PL | 16.06.2021 | ||
RO | 16.06.2021 | ||
RS | 16.06.2021 | ||
SE | 16.06.2021 | ||
SI | 16.06.2021 | ||
SK | 16.06.2021 | ||
SM | 16.06.2021 | ||
IE | 12.08.2021 | ||
LU | 12.08.2021 | ||
FR | 16.08.2021 | ||
BE | 31.08.2021 | ||
CH | 31.08.2021 | ||
LI | 31.08.2021 | ||
BG | 16.09.2021 | ||
NO | 16.09.2021 | ||
GR | 17.09.2021 | ||
IS | 16.10.2021 | ||
PT | 18.10.2021 | ||
Former [2022/34] | AL | 16.06.2021 | |
AT | 16.06.2021 | ||
CZ | 16.06.2021 | ||
DK | 16.06.2021 | ||
EE | 16.06.2021 | ||
ES | 16.06.2021 | ||
FI | 16.06.2021 | ||
HR | 16.06.2021 | ||
LT | 16.06.2021 | ||
LV | 16.06.2021 | ||
MC | 16.06.2021 | ||
NL | 16.06.2021 | ||
PL | 16.06.2021 | ||
RO | 16.06.2021 | ||
RS | 16.06.2021 | ||
SE | 16.06.2021 | ||
SI | 16.06.2021 | ||
SK | 16.06.2021 | ||
SM | 16.06.2021 | ||
LU | 12.08.2021 | ||
FR | 16.08.2021 | ||
BE | 31.08.2021 | ||
CH | 31.08.2021 | ||
LI | 31.08.2021 | ||
BG | 16.09.2021 | ||
NO | 16.09.2021 | ||
GR | 17.09.2021 | ||
IS | 16.10.2021 | ||
PT | 18.10.2021 | ||
Former [2022/29] | AL | 16.06.2021 | |
AT | 16.06.2021 | ||
CZ | 16.06.2021 | ||
DK | 16.06.2021 | ||
EE | 16.06.2021 | ||
ES | 16.06.2021 | ||
FI | 16.06.2021 | ||
HR | 16.06.2021 | ||
LT | 16.06.2021 | ||
LV | 16.06.2021 | ||
MC | 16.06.2021 | ||
NL | 16.06.2021 | ||
PL | 16.06.2021 | ||
RO | 16.06.2021 | ||
RS | 16.06.2021 | ||
SE | 16.06.2021 | ||
SI | 16.06.2021 | ||
SK | 16.06.2021 | ||
SM | 16.06.2021 | ||
LU | 12.08.2021 | ||
CH | 31.08.2021 | ||
LI | 31.08.2021 | ||
BG | 16.09.2021 | ||
NO | 16.09.2021 | ||
GR | 17.09.2021 | ||
IS | 16.10.2021 | ||
PT | 18.10.2021 | ||
Former [2022/26] | AL | 16.06.2021 | |
AT | 16.06.2021 | ||
CZ | 16.06.2021 | ||
DK | 16.06.2021 | ||
EE | 16.06.2021 | ||
ES | 16.06.2021 | ||
FI | 16.06.2021 | ||
HR | 16.06.2021 | ||
LT | 16.06.2021 | ||
LV | 16.06.2021 | ||
MC | 16.06.2021 | ||
NL | 16.06.2021 | ||
PL | 16.06.2021 | ||
RO | 16.06.2021 | ||
RS | 16.06.2021 | ||
SE | 16.06.2021 | ||
SK | 16.06.2021 | ||
SM | 16.06.2021 | ||
LU | 12.08.2021 | ||
CH | 31.08.2021 | ||
LI | 31.08.2021 | ||
BG | 16.09.2021 | ||
NO | 16.09.2021 | ||
GR | 17.09.2021 | ||
IS | 16.10.2021 | ||
PT | 18.10.2021 | ||
Former [2022/24] | AT | 16.06.2021 | |
CZ | 16.06.2021 | ||
DK | 16.06.2021 | ||
EE | 16.06.2021 | ||
ES | 16.06.2021 | ||
FI | 16.06.2021 | ||
HR | 16.06.2021 | ||
LT | 16.06.2021 | ||
LV | 16.06.2021 | ||
MC | 16.06.2021 | ||
NL | 16.06.2021 | ||
PL | 16.06.2021 | ||
RO | 16.06.2021 | ||
RS | 16.06.2021 | ||
SE | 16.06.2021 | ||
SK | 16.06.2021 | ||
SM | 16.06.2021 | ||
LU | 12.08.2021 | ||
CH | 31.08.2021 | ||
LI | 31.08.2021 | ||
BG | 16.09.2021 | ||
NO | 16.09.2021 | ||
GR | 17.09.2021 | ||
IS | 16.10.2021 | ||
PT | 18.10.2021 | ||
Former [2022/21] | AT | 16.06.2021 | |
CZ | 16.06.2021 | ||
DK | 16.06.2021 | ||
EE | 16.06.2021 | ||
ES | 16.06.2021 | ||
FI | 16.06.2021 | ||
HR | 16.06.2021 | ||
LT | 16.06.2021 | ||
LV | 16.06.2021 | ||
MC | 16.06.2021 | ||
NL | 16.06.2021 | ||
PL | 16.06.2021 | ||
RO | 16.06.2021 | ||
RS | 16.06.2021 | ||
SE | 16.06.2021 | ||
SK | 16.06.2021 | ||
SM | 16.06.2021 | ||
CH | 31.08.2021 | ||
LI | 31.08.2021 | ||
BG | 16.09.2021 | ||
NO | 16.09.2021 | ||
GR | 17.09.2021 | ||
IS | 16.10.2021 | ||
PT | 18.10.2021 | ||
Former [2022/18] | AT | 16.06.2021 | |
CZ | 16.06.2021 | ||
EE | 16.06.2021 | ||
ES | 16.06.2021 | ||
FI | 16.06.2021 | ||
HR | 16.06.2021 | ||
LT | 16.06.2021 | ||
LV | 16.06.2021 | ||
MC | 16.06.2021 | ||
NL | 16.06.2021 | ||
PL | 16.06.2021 | ||
RO | 16.06.2021 | ||
RS | 16.06.2021 | ||
SE | 16.06.2021 | ||
SK | 16.06.2021 | ||
SM | 16.06.2021 | ||
BG | 16.09.2021 | ||
NO | 16.09.2021 | ||
GR | 17.09.2021 | ||
IS | 16.10.2021 | ||
PT | 18.10.2021 | ||
Former [2022/10] | AT | 16.06.2021 | |
CZ | 16.06.2021 | ||
EE | 16.06.2021 | ||
ES | 16.06.2021 | ||
FI | 16.06.2021 | ||
HR | 16.06.2021 | ||
LT | 16.06.2021 | ||
LV | 16.06.2021 | ||
NL | 16.06.2021 | ||
PL | 16.06.2021 | ||
RO | 16.06.2021 | ||
RS | 16.06.2021 | ||
SE | 16.06.2021 | ||
SK | 16.06.2021 | ||
SM | 16.06.2021 | ||
BG | 16.09.2021 | ||
NO | 16.09.2021 | ||
GR | 17.09.2021 | ||
IS | 16.10.2021 | ||
PT | 18.10.2021 | ||
Former [2022/09] | AT | 16.06.2021 | |
CZ | 16.06.2021 | ||
ES | 16.06.2021 | ||
FI | 16.06.2021 | ||
HR | 16.06.2021 | ||
LT | 16.06.2021 | ||
LV | 16.06.2021 | ||
NL | 16.06.2021 | ||
RO | 16.06.2021 | ||
RS | 16.06.2021 | ||
SE | 16.06.2021 | ||
SK | 16.06.2021 | ||
SM | 16.06.2021 | ||
BG | 16.09.2021 | ||
NO | 16.09.2021 | ||
GR | 17.09.2021 | ||
PT | 18.10.2021 | ||
Former [2022/08] | AT | 16.06.2021 | |
CZ | 16.06.2021 | ||
ES | 16.06.2021 | ||
FI | 16.06.2021 | ||
HR | 16.06.2021 | ||
LT | 16.06.2021 | ||
LV | 16.06.2021 | ||
NL | 16.06.2021 | ||
RS | 16.06.2021 | ||
SE | 16.06.2021 | ||
SM | 16.06.2021 | ||
BG | 16.09.2021 | ||
NO | 16.09.2021 | ||
GR | 17.09.2021 | ||
Former [2022/07] | AT | 16.06.2021 | |
FI | 16.06.2021 | ||
HR | 16.06.2021 | ||
LT | 16.06.2021 | ||
LV | 16.06.2021 | ||
NL | 16.06.2021 | ||
RS | 16.06.2021 | ||
SE | 16.06.2021 | ||
SM | 16.06.2021 | ||
BG | 16.09.2021 | ||
NO | 16.09.2021 | ||
GR | 17.09.2021 | ||
Former [2021/51] | FI | 16.06.2021 | |
HR | 16.06.2021 | ||
LT | 16.06.2021 | ||
LV | 16.06.2021 | ||
RS | 16.06.2021 | ||
SE | 16.06.2021 | ||
BG | 16.09.2021 | ||
NO | 16.09.2021 | ||
GR | 17.09.2021 | ||
Former [2021/49] | FI | 16.06.2021 | |
HR | 16.06.2021 | ||
LT | 16.06.2021 | ||
LV | 16.06.2021 | ||
SE | 16.06.2021 | ||
BG | 16.09.2021 | ||
NO | 16.09.2021 | ||
GR | 17.09.2021 | ||
Former [2021/47] | FI | 16.06.2021 | |
LT | 16.06.2021 | ||
BG | 16.09.2021 | ||
Former [2021/46] | FI | 16.06.2021 | |
LT | 16.06.2021 | Cited in | International search | [A]US2008227445 (TANG HAITAO [FI], et al) [A] 1-30* paragraph [0053] - paragraph [0057]; figure 2 *; | [A]US2008259912 (WANG JIN [US], et al) [A] 1-30 * paragraph [0019] - paragraph [0033]; figure 4 * * paragraph [0024] - paragraph [0036]; figures 2A,2B *; | [I]US2010067433 (CHENG STEVEN [US], et al) [I] 1-30 * paragraph [0058] - paragraph [0063]; figure 6 *; | [I]US2011065430 (JEE JUNGHOON [KR], et al) [I] 1-30 * paragraph [0027] - paragraph [0040]; figures 2,3 *; | [A]WO2013089524 (LG ELECTRONICS INC [KR]) [A] 1-30 * abstract *; | [A]US2014106793 (LEE EUNJONG [KR], et al) [A] 1-30 * paragraph [0193] - paragraph [0201]; figure 10 * * paragraph [0216] - paragraph [0222]; figures 14,15A,15B *; | [P]US2014378172 (LIM JAEWON [KR]) [P] * paragraph [0067] - paragraph [0084]; figure 6 * |