EP3191213 - FLUID SEPARATION MODULE FOR USE IN AIRCRAFTS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 26.03.2021 Database last updated on 19.07.2024 | |
Former | The patent has been granted Status updated on 17.04.2020 | ||
Former | Grant of patent is intended Status updated on 16.12.2019 | ||
Former | Examination is in progress Status updated on 17.04.2019 | ||
Former | Request for examination was made Status updated on 16.06.2017 | ||
Former | The international publication has been made Status updated on 06.03.2017 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states Eaton Intelligent Power Limited 30 Pembroke Road Dublin 4 / IE | [2019/03] |
Former [2017/29] | For all designated states Eaton Limited 554 Abbey Park Southampton Road Titchfield, Hampshire PO14 9ED / GB | Inventor(s) | 01 /
ASHTON, Dominic 21 Marston Lane Ladera Ranch, California 92694 / US | 02 /
RUSALI, Rudy Haryanto 9311 Flicker Avenue Fountain Valley, California 92708 / US | 03 /
MASSEY, Alan Ernest 18 Summerfields Locksheath Southampton Hampshire S031 6NN / GB | [2017/29] | Representative(s) | Eaton IP Group EMEA c/o Eaton Intellectual Power Limited Eaton House 30 Pembroke Road Dublin 4 / IE | [N/P] |
Former [2017/29] | Eaton IP Group EMEA c/o Eaton Industries Manufacturing GmbH Route de la Longeraie 7 1110 Morges / CH | Application number, filing date | 15760465.3 | 10.09.2015 | [2017/29] | WO2015EP70705 | Priority number, date | US201462049694P | 12.09.2014 Original published format: US 201462049694 P | [2017/29] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2016038138 | Date: | 17.03.2016 | Language: | EN | [2016/11] | Type: | A1 Application with search report | No.: | EP3191213 | Date: | 19.07.2017 | Language: | EN | The application published by WIPO in one of the EPO official languages on 17.03.2016 takes the place of the publication of the European patent application. | [2017/29] | Type: | B1 Patent specification | No.: | EP3191213 | Date: | 20.05.2020 | Language: | EN | [2020/21] | Search report(s) | International search report - published on: | EP | 17.03.2016 | Classification | IPC: | B01D53/22, B01D53/26, C01B21/04, C01B13/02, A62C3/06, A62C3/08, B64D37/32 | [2017/29] | CPC: |
B01D53/229 (EP,US);
B01D53/22 (EP,US);
B01D53/26 (EP,US);
B64D13/00 (EP,US);
B64D37/32 (EP,US);
C01B13/0251 (EP,US);
C01B21/0438 (EP,US);
B01D2053/224 (US);
B01D2256/10 (EP,US);
B01D2257/104 (EP,US);
B01D2257/80 (EP,US);
B01D2259/4575 (EP,US);
B64D13/06 (US);
B64D2013/0662 (EP,US);
C01B2210/001 (US);
C01B2210/0045 (US)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/29] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | Title | German: | FLÜSSIGKEITSTRENNUNGSMODUL FÜR FLUGZEUGE | [2017/29] | English: | FLUID SEPARATION MODULE FOR USE IN AIRCRAFTS | [2017/29] | French: | MODULE DE SÉPARATION DE FLUIDE À UTILISER DANS DES AÉRONEFS | [2017/29] | Entry into regional phase | 13.03.2017 | National basic fee paid | 13.03.2017 | Designation fee(s) paid | 13.03.2017 | Examination fee paid | Examination procedure | 06.03.2017 | Date on which the examining division has become responsible | 13.03.2017 | Examination requested [2017/29] | 01.11.2017 | Amendment by applicant (claims and/or description) | 24.04.2019 | Despatch of a communication from the examining division (Time limit: M06) | 04.11.2019 | Reply to a communication from the examining division | 17.12.2019 | Communication of intention to grant the patent | 09.04.2020 | Fee for grant paid | 09.04.2020 | Fee for publishing/printing paid | 09.04.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 23.02.2021 | No opposition filed within time limit [2021/17] | Fees paid | Renewal fee | 11.09.2017 | Renewal fee patent year 03 | 21.09.2018 | Renewal fee patent year 04 | 19.09.2019 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 10.09.2015 | AL | 20.05.2020 | AT | 20.05.2020 | CY | 20.05.2020 | CZ | 20.05.2020 | DK | 20.05.2020 | EE | 20.05.2020 | ES | 20.05.2020 | FI | 20.05.2020 | HR | 20.05.2020 | IT | 20.05.2020 | LT | 20.05.2020 | LV | 20.05.2020 | MC | 20.05.2020 | MK | 20.05.2020 | MT | 20.05.2020 | NL | 20.05.2020 | PL | 20.05.2020 | RO | 20.05.2020 | RS | 20.05.2020 | SE | 20.05.2020 | SI | 20.05.2020 | SK | 20.05.2020 | SM | 20.05.2020 | TR | 20.05.2020 | BG | 20.08.2020 | NO | 20.08.2020 | GR | 21.08.2020 | IE | 10.09.2020 | LU | 10.09.2020 | IS | 20.09.2020 | PT | 21.09.2020 | BE | 30.09.2020 | CH | 30.09.2020 | LI | 30.09.2020 | [2022/32] |
Former [2022/27] | HU | 10.09.2015 | |
AL | 20.05.2020 | ||
AT | 20.05.2020 | ||
CY | 20.05.2020 | ||
CZ | 20.05.2020 | ||
DK | 20.05.2020 | ||
EE | 20.05.2020 | ||
ES | 20.05.2020 | ||
FI | 20.05.2020 | ||
HR | 20.05.2020 | ||
IT | 20.05.2020 | ||
LT | 20.05.2020 | ||
LV | 20.05.2020 | ||
MC | 20.05.2020 | ||
MT | 20.05.2020 | ||
NL | 20.05.2020 | ||
PL | 20.05.2020 | ||
RO | 20.05.2020 | ||
RS | 20.05.2020 | ||
SE | 20.05.2020 | ||
SI | 20.05.2020 | ||
SK | 20.05.2020 | ||
SM | 20.05.2020 | ||
TR | 20.05.2020 | ||
BG | 20.08.2020 | ||
NO | 20.08.2020 | ||
GR | 21.08.2020 | ||
IE | 10.09.2020 | ||
LU | 10.09.2020 | ||
IS | 20.09.2020 | ||
PT | 21.09.2020 | ||
BE | 30.09.2020 | ||
CH | 30.09.2020 | ||
LI | 30.09.2020 | ||
Former [2021/37] | AL | 20.05.2020 | |
AT | 20.05.2020 | ||
CZ | 20.05.2020 | ||
DK | 20.05.2020 | ||
EE | 20.05.2020 | ||
ES | 20.05.2020 | ||
FI | 20.05.2020 | ||
HR | 20.05.2020 | ||
IT | 20.05.2020 | ||
LT | 20.05.2020 | ||
LV | 20.05.2020 | ||
MC | 20.05.2020 | ||
NL | 20.05.2020 | ||
PL | 20.05.2020 | ||
RO | 20.05.2020 | ||
RS | 20.05.2020 | ||
SE | 20.05.2020 | ||
SI | 20.05.2020 | ||
SK | 20.05.2020 | ||
SM | 20.05.2020 | ||
BG | 20.08.2020 | ||
NO | 20.08.2020 | ||
GR | 21.08.2020 | ||
IE | 10.09.2020 | ||
LU | 10.09.2020 | ||
IS | 20.09.2020 | ||
PT | 21.09.2020 | ||
BE | 30.09.2020 | ||
CH | 30.09.2020 | ||
LI | 30.09.2020 | ||
Former [2021/36] | AL | 20.05.2020 | |
AT | 20.05.2020 | ||
CZ | 20.05.2020 | ||
DK | 20.05.2020 | ||
EE | 20.05.2020 | ||
ES | 20.05.2020 | ||
FI | 20.05.2020 | ||
HR | 20.05.2020 | ||
IT | 20.05.2020 | ||
LT | 20.05.2020 | ||
LV | 20.05.2020 | ||
MC | 20.05.2020 | ||
NL | 20.05.2020 | ||
PL | 20.05.2020 | ||
RO | 20.05.2020 | ||
RS | 20.05.2020 | ||
SE | 20.05.2020 | ||
SI | 20.05.2020 | ||
SK | 20.05.2020 | ||
SM | 20.05.2020 | ||
BG | 20.08.2020 | ||
NO | 20.08.2020 | ||
GR | 21.08.2020 | ||
LU | 10.09.2020 | ||
IS | 20.09.2020 | ||
PT | 21.09.2020 | ||
BE | 30.09.2020 | ||
Former [2021/27] | AL | 20.05.2020 | |
AT | 20.05.2020 | ||
CZ | 20.05.2020 | ||
DK | 20.05.2020 | ||
EE | 20.05.2020 | ||
ES | 20.05.2020 | ||
FI | 20.05.2020 | ||
HR | 20.05.2020 | ||
IT | 20.05.2020 | ||
LT | 20.05.2020 | ||
LV | 20.05.2020 | ||
MC | 20.05.2020 | ||
NL | 20.05.2020 | ||
PL | 20.05.2020 | ||
RO | 20.05.2020 | ||
RS | 20.05.2020 | ||
SE | 20.05.2020 | ||
SI | 20.05.2020 | ||
SK | 20.05.2020 | ||
SM | 20.05.2020 | ||
BG | 20.08.2020 | ||
NO | 20.08.2020 | ||
GR | 21.08.2020 | ||
LU | 10.09.2020 | ||
IS | 20.09.2020 | ||
PT | 21.09.2020 | ||
Former [2021/23] | AL | 20.05.2020 | |
AT | 20.05.2020 | ||
CZ | 20.05.2020 | ||
DK | 20.05.2020 | ||
EE | 20.05.2020 | ||
ES | 20.05.2020 | ||
FI | 20.05.2020 | ||
HR | 20.05.2020 | ||
IT | 20.05.2020 | ||
LT | 20.05.2020 | ||
LV | 20.05.2020 | ||
MC | 20.05.2020 | ||
NL | 20.05.2020 | ||
PL | 20.05.2020 | ||
RO | 20.05.2020 | ||
RS | 20.05.2020 | ||
SE | 20.05.2020 | ||
SI | 20.05.2020 | ||
SK | 20.05.2020 | ||
SM | 20.05.2020 | ||
BG | 20.08.2020 | ||
NO | 20.08.2020 | ||
GR | 21.08.2020 | ||
IS | 20.09.2020 | ||
PT | 21.09.2020 | ||
Former [2021/10] | AL | 20.05.2020 | |
AT | 20.05.2020 | ||
CZ | 20.05.2020 | ||
DK | 20.05.2020 | ||
EE | 20.05.2020 | ||
ES | 20.05.2020 | ||
FI | 20.05.2020 | ||
HR | 20.05.2020 | ||
IT | 20.05.2020 | ||
LT | 20.05.2020 | ||
LV | 20.05.2020 | ||
NL | 20.05.2020 | ||
PL | 20.05.2020 | ||
RO | 20.05.2020 | ||
RS | 20.05.2020 | ||
SE | 20.05.2020 | ||
SK | 20.05.2020 | ||
SM | 20.05.2020 | ||
BG | 20.08.2020 | ||
NO | 20.08.2020 | ||
GR | 21.08.2020 | ||
IS | 20.09.2020 | ||
PT | 21.09.2020 | ||
Former [2021/09] | AL | 20.05.2020 | |
AT | 20.05.2020 | ||
CZ | 20.05.2020 | ||
DK | 20.05.2020 | ||
EE | 20.05.2020 | ||
ES | 20.05.2020 | ||
FI | 20.05.2020 | ||
HR | 20.05.2020 | ||
IT | 20.05.2020 | ||
LT | 20.05.2020 | ||
LV | 20.05.2020 | ||
NL | 20.05.2020 | ||
RO | 20.05.2020 | ||
RS | 20.05.2020 | ||
SE | 20.05.2020 | ||
SM | 20.05.2020 | ||
BG | 20.08.2020 | ||
NO | 20.08.2020 | ||
GR | 21.08.2020 | ||
IS | 20.09.2020 | ||
PT | 21.09.2020 | ||
Former [2021/08] | AL | 20.05.2020 | |
DK | 20.05.2020 | ||
ES | 20.05.2020 | ||
FI | 20.05.2020 | ||
HR | 20.05.2020 | ||
LT | 20.05.2020 | ||
LV | 20.05.2020 | ||
NL | 20.05.2020 | ||
RO | 20.05.2020 | ||
RS | 20.05.2020 | ||
SE | 20.05.2020 | ||
SM | 20.05.2020 | ||
BG | 20.08.2020 | ||
NO | 20.08.2020 | ||
GR | 21.08.2020 | ||
IS | 20.09.2020 | ||
PT | 21.09.2020 | ||
Former [2021/04] | AL | 20.05.2020 | |
FI | 20.05.2020 | ||
HR | 20.05.2020 | ||
LT | 20.05.2020 | ||
LV | 20.05.2020 | ||
NL | 20.05.2020 | ||
RS | 20.05.2020 | ||
SE | 20.05.2020 | ||
BG | 20.08.2020 | ||
NO | 20.08.2020 | ||
GR | 21.08.2020 | ||
IS | 20.09.2020 | ||
PT | 21.09.2020 | ||
Former [2021/01] | FI | 20.05.2020 | |
HR | 20.05.2020 | ||
LT | 20.05.2020 | ||
LV | 20.05.2020 | ||
RS | 20.05.2020 | ||
SE | 20.05.2020 | ||
BG | 20.08.2020 | ||
NO | 20.08.2020 | ||
GR | 21.08.2020 | ||
IS | 20.09.2020 | ||
PT | 21.09.2020 | ||
Former [2020/51] | FI | 20.05.2020 | |
HR | 20.05.2020 | ||
LT | 20.05.2020 | ||
LV | 20.05.2020 | ||
RS | 20.05.2020 | ||
SE | 20.05.2020 | ||
NO | 20.08.2020 | ||
GR | 21.08.2020 | ||
IS | 20.09.2020 | ||
PT | 21.09.2020 | ||
Former [2020/50] | FI | 20.05.2020 | |
HR | 20.05.2020 | ||
LT | 20.05.2020 | ||
LV | 20.05.2020 | ||
SE | 20.05.2020 | ||
NO | 20.08.2020 | ||
GR | 21.08.2020 | ||
IS | 20.09.2020 | ||
PT | 21.09.2020 | ||
Former [2020/48] | FI | 20.05.2020 | |
LT | 20.05.2020 | ||
SE | 20.05.2020 | ||
NO | 20.08.2020 | ||
IS | 20.09.2020 | ||
PT | 21.09.2020 | ||
Former [2020/47] | LT | 20.05.2020 | |
NO | 20.08.2020 | ||
IS | 20.09.2020 | ||
Former [2020/46] | IS | 20.09.2020 | Cited in | International search | [XI]EP0692297 (PRAXAIR TECHNOLOGY INC [US]) [X] 1,4,15,18 * figure 4 * * page 6, line 48 - line 55 * [I] 2,3,5-13,16,17,19-27; | [XI]WO0228714 (AIR LIQUIDE [FR], et al) [X] 1,4,14,15,18,28-31 * figure 3 * * page 4, line 19 - page 7, line 26 * [I] 2,3,5-13,16,17,19-27; | [A]US6491739 (CROME VICTOR P [US], et al) [A] 1-31 * figure 1 ** column 4 *; | [A]US2004065778 (JONES PHILIP E [US]) [A] 1-31 * figure 1 * * paragraphs [0024] , [ 0025] *; | [XI]WO2014075850 (EVONIK FIBRES GMBH [AT], et al) [X] 1 * figure 1 * * 1st paragraph; page 4 * [I] 2,3,5-13 |