blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3347634

EP3347634 - FLUID SYSTEM AND PROCESS VALVE [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  01.07.2022
Database last updated on 13.09.2024
FormerThe patent has been granted
Status updated on  23.07.2021
FormerGrant of patent is intended
Status updated on  25.03.2021
FormerRequest for examination was made
Status updated on  15.06.2018
FormerThe international publication has been made
Status updated on  21.03.2017
Most recent event   Tooltip06.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 09.10.2024 [2024/41]
Applicant(s)For all designated states
Festo SE & Co. KG
Ruiter Strasse 82
73734 Esslingen / DE
[2020/12]
Former [2018/29]For all designated states
Festo AG & Co. KG
Ruiter Strasse 82
73734 Esslingen / DE
Inventor(s)01 / NEEF, Bodo
Waagenbachstraße 24
73765 Neuhausen / DE
02 / MAILE, Christoph
Reußensteinweg 13
73269 Hochdorf / DE
 [2018/29]
Representative(s)Patentanwälte Magenbauer & Kollegen Partnerschaft mbB
Plochinger Straße 109
73730 Esslingen / DE
[2018/29]
Application number, filing date15760478.610.09.2015
[2018/29]
WO2015EP70766
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report
No.:WO2017041848
Date:16.03.2017
Language:DE
[2017/11]
Type: A1 Application with search report 
No.:EP3347634
Date:18.07.2018
Language:DE
The application published by WIPO in one of the EPO official languages on 16.03.2017 takes the place of the publication of the European patent application.
[2018/29]
Type: B1 Patent specification 
No.:EP3347634
Date:25.08.2021
Language:DE
[2021/34]
Search report(s)International search report - published on:EP16.03.2017
ClassificationIPC:F16K37/00, F15B9/09, F15B13/16
[2018/29]
CPC:
F15B13/16 (EP,US); F15B9/09 (EP,US); F16K37/005 (EP,US);
F16K37/0091 (EP,US); F15B2211/50563 (EP,US); F15B2211/6656 (EP,US);
Y10T137/2693 (US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/29]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
TitleGerman:FLUIDSYSTEM UND PROZESSVENTIL[2018/29]
English:FLUID SYSTEM AND PROCESS VALVE[2018/29]
French:SYSTÈME DE FLUIDE ET SOUPAPE DE PROCÉDÉ[2021/14]
Former [2018/29]SYSTÈME DE FLUIDE ET SOUPAPE DE PROCESSUS
Entry into regional phase02.05.2018National basic fee paid 
02.05.2018Designation fee(s) paid 
02.05.2018Examination fee paid 
Examination procedure10.04.2018Amendment by applicant (claims and/or description)
10.04.2018Date on which the examining division has become responsible
02.05.2018Examination requested  [2018/29]
26.03.2021Communication of intention to grant the patent
15.07.2021Fee for grant paid
15.07.2021Fee for publishing/printing paid
15.07.2021Receipt of the translation of the claim(s)
Opposition(s)27.05.2022No opposition filed within time limit [2022/31]
Request for further processing for:The application is deemed to be withdrawn due to non-payment of the filing fee
02.05.2018Request for further processing filed
02.05.2018Full payment received (date of receipt of payment)
Request granted
01.06.2018Decision despatched
The application is deemed to be withdrawn due to non-payment of the examination fee
02.05.2018Request for further processing filed
02.05.2018Full payment received (date of receipt of payment)
Request granted
01.06.2018Decision despatched
The application is deemed to be withdrawn due to non-payment of designation fees
TR, SM, SK, SI, SE, RS, RO, PT, PL, NO, NL, MT, MK, MC, LV, LU, LT, IT, IS, IE, HU, HR, GR, GB, FR, FI, ES, EE, DK, DE, CZ, CY, CH, BG, BE, AT, AL
02.05.2018Request for further processing filed
02.05.2018Full payment received (date of receipt of payment)
Request granted
01.06.2018Decision despatched
Fees paidRenewal fee
02.05.2018Renewal fee patent year 03
18.07.2018Renewal fee patent year 04
13.08.2019Renewal fee patent year 05
15.07.2020Renewal fee patent year 06
Penalty fee
Additional fee for renewal fee
10.04.201803   M06   Fee paid on   02.05.2018
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU10.09.2015
AL25.08.2021
CY25.08.2021
CZ25.08.2021
DK25.08.2021
EE25.08.2021
ES25.08.2021
HR25.08.2021
IT25.08.2021
LT25.08.2021
LV25.08.2021
MC25.08.2021
MK25.08.2021
MT25.08.2021
NL25.08.2021
PL25.08.2021
RO25.08.2021
RS25.08.2021
SE25.08.2021
SI25.08.2021
SK25.08.2021
SM25.08.2021
AT10.09.2021
IE10.09.2021
LU10.09.2021
BE30.09.2021
CH30.09.2021
LI30.09.2021
FR25.10.2021
BG25.11.2021
GB25.11.2021
NO25.11.2021
GR26.11.2021
IS25.12.2021
PT27.12.2021
[2024/41]
Former [2024/22]HU10.09.2015
AL25.08.2021
CY25.08.2021
CZ25.08.2021
DK25.08.2021
EE25.08.2021
ES25.08.2021
HR25.08.2021
IT25.08.2021
LT25.08.2021
LV25.08.2021
MC25.08.2021
MK25.08.2021
NL25.08.2021
PL25.08.2021
RO25.08.2021
RS25.08.2021
SE25.08.2021
SI25.08.2021
SK25.08.2021
SM25.08.2021
AT10.09.2021
IE10.09.2021
LU10.09.2021
BE30.09.2021
CH30.09.2021
LI30.09.2021
FR25.10.2021
BG25.11.2021
GB25.11.2021
NO25.11.2021
GR26.11.2021
IS25.12.2021
PT27.12.2021
Former [2023/30]HU10.09.2015
AL25.08.2021
CY25.08.2021
CZ25.08.2021
DK25.08.2021
EE25.08.2021
ES25.08.2021
HR25.08.2021
IT25.08.2021
LT25.08.2021
LV25.08.2021
MC25.08.2021
NL25.08.2021
PL25.08.2021
RO25.08.2021
RS25.08.2021
SE25.08.2021
SI25.08.2021
SK25.08.2021
SM25.08.2021
AT10.09.2021
IE10.09.2021
LU10.09.2021
BE30.09.2021
CH30.09.2021
LI30.09.2021
FR25.10.2021
BG25.11.2021
GB25.11.2021
NO25.11.2021
GR26.11.2021
IS25.12.2021
PT27.12.2021
Former [2023/29]HU10.09.2015
AL25.08.2021
CZ25.08.2021
DK25.08.2021
EE25.08.2021
ES25.08.2021
HR25.08.2021
IT25.08.2021
LT25.08.2021
LV25.08.2021
MC25.08.2021
NL25.08.2021
PL25.08.2021
RO25.08.2021
RS25.08.2021
SE25.08.2021
SI25.08.2021
SK25.08.2021
SM25.08.2021
AT10.09.2021
IE10.09.2021
LU10.09.2021
BE30.09.2021
CH30.09.2021
LI30.09.2021
FR25.10.2021
BG25.11.2021
GB25.11.2021
NO25.11.2021
GR26.11.2021
IS25.12.2021
PT27.12.2021
Former [2023/07]AL25.08.2021
CZ25.08.2021
DK25.08.2021
EE25.08.2021
ES25.08.2021
HR25.08.2021
IT25.08.2021
LT25.08.2021
LV25.08.2021
MC25.08.2021
NL25.08.2021
PL25.08.2021
RO25.08.2021
RS25.08.2021
SE25.08.2021
SI25.08.2021
SK25.08.2021
SM25.08.2021
AT10.09.2021
IE10.09.2021
LU10.09.2021
BE30.09.2021
CH30.09.2021
LI30.09.2021
FR25.10.2021
BG25.11.2021
GB25.11.2021
NO25.11.2021
GR26.11.2021
IS25.12.2021
PT27.12.2021
Former [2022/47]AL25.08.2021
CZ25.08.2021
DK25.08.2021
EE25.08.2021
ES25.08.2021
HR25.08.2021
IT25.08.2021
LT25.08.2021
LV25.08.2021
MC25.08.2021
NL25.08.2021
PL25.08.2021
RO25.08.2021
RS25.08.2021
SE25.08.2021
SI25.08.2021
SK25.08.2021
SM25.08.2021
IE10.09.2021
LU10.09.2021
BE30.09.2021
CH30.09.2021
LI30.09.2021
FR25.10.2021
BG25.11.2021
GB25.11.2021
NO25.11.2021
GR26.11.2021
IS25.12.2021
PT27.12.2021
Former [2022/41]AL25.08.2021
CZ25.08.2021
DK25.08.2021
EE25.08.2021
ES25.08.2021
HR25.08.2021
IT25.08.2021
LT25.08.2021
LV25.08.2021
MC25.08.2021
NL25.08.2021
PL25.08.2021
RO25.08.2021
RS25.08.2021
SE25.08.2021
SI25.08.2021
SK25.08.2021
SM25.08.2021
IE10.09.2021
LU10.09.2021
BE30.09.2021
CH30.09.2021
LI30.09.2021
FR25.10.2021
BG25.11.2021
NO25.11.2021
GR26.11.2021
IS25.12.2021
PT27.12.2021
Former [2022/37]AL25.08.2021
CZ25.08.2021
DK25.08.2021
EE25.08.2021
ES25.08.2021
HR25.08.2021
IT25.08.2021
LT25.08.2021
LV25.08.2021
MC25.08.2021
NL25.08.2021
PL25.08.2021
RO25.08.2021
RS25.08.2021
SE25.08.2021
SI25.08.2021
SK25.08.2021
SM25.08.2021
IE10.09.2021
LU10.09.2021
BE30.09.2021
CH30.09.2021
LI30.09.2021
BG25.11.2021
NO25.11.2021
GR26.11.2021
IS25.12.2021
PT27.12.2021
Former [2022/36]AL25.08.2021
CZ25.08.2021
DK25.08.2021
EE25.08.2021
ES25.08.2021
HR25.08.2021
IT25.08.2021
LT25.08.2021
LV25.08.2021
MC25.08.2021
NL25.08.2021
PL25.08.2021
RO25.08.2021
RS25.08.2021
SE25.08.2021
SI25.08.2021
SK25.08.2021
SM25.08.2021
IE10.09.2021
LU10.09.2021
BE30.09.2021
BG25.11.2021
NO25.11.2021
GR26.11.2021
IS25.12.2021
PT27.12.2021
Former [2022/35]AL25.08.2021
CZ25.08.2021
DK25.08.2021
EE25.08.2021
ES25.08.2021
HR25.08.2021
LT25.08.2021
LV25.08.2021
MC25.08.2021
NL25.08.2021
PL25.08.2021
RO25.08.2021
RS25.08.2021
SE25.08.2021
SK25.08.2021
SM25.08.2021
IE10.09.2021
LU10.09.2021
BE30.09.2021
BG25.11.2021
NO25.11.2021
GR26.11.2021
IS25.12.2021
PT27.12.2021
Former [2022/34]AL25.08.2021
CZ25.08.2021
DK25.08.2021
EE25.08.2021
ES25.08.2021
HR25.08.2021
LT25.08.2021
LV25.08.2021
MC25.08.2021
NL25.08.2021
PL25.08.2021
RO25.08.2021
RS25.08.2021
SE25.08.2021
SK25.08.2021
SM25.08.2021
LU10.09.2021
BE30.09.2021
BG25.11.2021
NO25.11.2021
GR26.11.2021
IS25.12.2021
PT27.12.2021
Former [2022/27]AL25.08.2021
CZ25.08.2021
DK25.08.2021
EE25.08.2021
ES25.08.2021
HR25.08.2021
LT25.08.2021
LV25.08.2021
MC25.08.2021
NL25.08.2021
PL25.08.2021
RO25.08.2021
RS25.08.2021
SE25.08.2021
SK25.08.2021
SM25.08.2021
BG25.11.2021
NO25.11.2021
GR26.11.2021
IS25.12.2021
PT27.12.2021
Former [2022/25]CZ25.08.2021
DK25.08.2021
EE25.08.2021
ES25.08.2021
HR25.08.2021
LT25.08.2021
LV25.08.2021
MC25.08.2021
NL25.08.2021
PL25.08.2021
RO25.08.2021
RS25.08.2021
SE25.08.2021
SK25.08.2021
SM25.08.2021
BG25.11.2021
NO25.11.2021
GR26.11.2021
IS25.12.2021
PT27.12.2021
Former [2022/24]CZ25.08.2021
DK25.08.2021
EE25.08.2021
ES25.08.2021
HR25.08.2021
LT25.08.2021
LV25.08.2021
NL25.08.2021
PL25.08.2021
RO25.08.2021
RS25.08.2021
SE25.08.2021
SK25.08.2021
BG25.11.2021
NO25.11.2021
GR26.11.2021
IS25.12.2021
PT27.12.2021
Former [2022/21]DK25.08.2021
ES25.08.2021
HR25.08.2021
LT25.08.2021
LV25.08.2021
NL25.08.2021
PL25.08.2021
RS25.08.2021
SE25.08.2021
BG25.11.2021
NO25.11.2021
GR26.11.2021
IS25.12.2021
PT27.12.2021
Former [2022/16]ES25.08.2021
HR25.08.2021
LT25.08.2021
LV25.08.2021
NL25.08.2021
PL25.08.2021
RS25.08.2021
SE25.08.2021
BG25.11.2021
NO25.11.2021
GR26.11.2021
IS25.12.2021
PT27.12.2021
Former [2022/10]ES25.08.2021
HR25.08.2021
LT25.08.2021
LV25.08.2021
PL25.08.2021
RS25.08.2021
SE25.08.2021
BG25.11.2021
NO25.11.2021
GR26.11.2021
IS25.12.2021
PT27.12.2021
Former [2022/09]ES25.08.2021
LT25.08.2021
RS25.08.2021
SE25.08.2021
BG25.11.2021
NO25.11.2021
PT27.12.2021
Former [2022/08]ES25.08.2021
LT25.08.2021
SE25.08.2021
BG25.11.2021
NO25.11.2021
Former [2022/07]LT25.08.2021
NO25.11.2021
Cited inInternational search[XI]EP0648900  (KOBE STEEL LTD [JP]) [X] 1,2,10-12 * column 16, lines 6-28 * * page 17, lines 24-35 * * page 18, line 56 - page 19, line 32; figures 11-16 * [I] 3-9;
 [XI]DE19543876  (REXROTH MANNESMANN GMBH [DE]) [X] 1,2,10-12 * page 2, lines 66-67 * * page 3, lines 25-45 * * page 4, lines 55-63 * * figure 1; claims 7,8 * [I] 1-9;
 [A]EP1067319  (WABCO GMBH & CO OHG [DE]) [A] 1,12 * figure 1 *;
 [A]EP1270954  (WABCO GMBH & CO OHG [DE]) [A] 1,12* figure 1 *;
 [A]US2003182938  (SMITH DAVID P [US]) [A] 1,12 * figures 1-3 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.