blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3107290

EP3107290 - METHOD AND DEVICE FOR CONFIGURING MERGE CANDIDATE LIST FOR DECODING AND ENCODING OF INTERLAYER VIDEO [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  03.06.2022
Database last updated on 19.10.2024
FormerThe patent has been granted
Status updated on  25.06.2021
FormerGrant of patent is intended
Status updated on  17.03.2021
FormerExamination is in progress
Status updated on  22.02.2019
FormerRequest for examination was made
Status updated on  18.11.2016
Most recent event   Tooltip13.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 16.10.2024  [2024/42]
Applicant(s)For all designated states
Samsung Electronics Co., Ltd.
129, Samsung-ro
Yeongtong-gu
Suwon-si
Gyeonggi-do 16677 / KR
[2021/30]
Former [2016/51]For all designated states
Samsung Electronics Co., Ltd.
129, Samsung-ro
Yeongtong-gu
Suwon-si
Gyeonggi-do 16677 / KR
Inventor(s)01 / PARK, Min-woo
202-802
33 Saeun-ro 126beon-gil
Giheung-gu
Yongin-si Gyeonggi-do 446-955 / KR
02 / LEE, Jin-young
133-704
55 Gwongwang-ro
Gwonseon-gu
Suwon-si Gyeonggi-do 441-768 / KR
03 / CHO, Yong-jin
2-1402
43 Dokseodang-ro 62-gil
Seongdong-gu
Seoul 133-771 / KR
04 / CHOI, Byeong-doo
2301-903
23 Gwanggyohosu-ro 152beon-gil
Yeongtong-gu
Suwon-si Gyeonggi-do 443-280 / KR
 [2016/51]
Representative(s)Appleyard Lees IP LLP
15 Clare Road
Halifax HX1 2HY / GB
[2016/51]
Application number, filing date15761972.716.03.2015
[2016/51]
WO2015KR02523
Priority number, dateUS201461953158P14.03.2014         Original published format: US 201461953158 P
US201461955305P19.03.2014         Original published format: US 201461955305 P
[2016/51]
Filing languageKO
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2015137783
Date:17.09.2015
Language:KO
[2015/37]
Type: A1 Application with search report 
No.:EP3107290
Date:21.12.2016
Language:EN
[2016/51]
Type: B1 Patent specification 
No.:EP3107290
Date:28.07.2021
Language:EN
[2021/30]
Search report(s)International search report - published on:KR17.09.2015
(Supplementary) European search report - dispatched on:EP23.08.2017
ClassificationIPC:H04N19/105, H04N19/597, H04N19/30, H04N19/503
[2016/51]
CPC:
H04N19/597 (EP,KR,US); H04N19/119 (EP,US); H04N19/134 (EP,US);
H04N19/139 (KR,US); H04N19/176 (EP,KR,US); H04N19/30 (KR);
H04N19/44 (KR); H04N19/46 (EP,KR,US); H04N19/513 (EP,KR,US);
H04N19/521 (US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2016/51]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
TitleGerman:VERFAHREN UND VORRICHTUNG ZUM KONFIGURIEREN EINER ZUSAMMENFÜHRUNGSKANDIDATENLISTE ZUR DECODIERUNG UND CODIERUNG EINES ZWISCHENSCHICHTVIDEOS[2016/51]
English:METHOD AND DEVICE FOR CONFIGURING MERGE CANDIDATE LIST FOR DECODING AND ENCODING OF INTERLAYER VIDEO[2016/51]
French:PROCÉDÉ ET DISPOSITIF DE CONFIGURATION D'UNE LISTE DE CANDIDATS DE FUSION POUR LE CODAGE ET LE DÉCODAGE DE VIDÉO INTERCOUCHE[2016/51]
Entry into regional phase14.09.2016Translation filed 
14.09.2016National basic fee paid 
14.09.2016Search fee paid 
14.09.2016Designation fee(s) paid 
14.09.2016Examination fee paid 
Examination procedure14.09.2016Examination requested  [2016/51]
14.09.2016Date on which the examining division has become responsible
08.03.2018Amendment by applicant (claims and/or description)
26.02.2019Despatch of a communication from the examining division (Time limit: M04)
20.06.2019Reply to a communication from the examining division
18.03.2021Communication of intention to grant the patent
16.06.2021Fee for grant paid
16.06.2021Fee for publishing/printing paid
16.06.2021Receipt of the translation of the claim(s)
Opposition(s)29.04.2022No opposition filed within time limit [2022/27]
Fees paidRenewal fee
27.03.2017Renewal fee patent year 03
23.03.2018Renewal fee patent year 04
22.03.2019Renewal fee patent year 05
24.03.2020Renewal fee patent year 06
24.03.2021Renewal fee patent year 07
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU16.03.2015
AL28.07.2021
AT28.07.2021
CY28.07.2021
CZ28.07.2021
DK28.07.2021
EE28.07.2021
ES28.07.2021
FI28.07.2021
HR28.07.2021
IT28.07.2021
LT28.07.2021
LV28.07.2021
MC28.07.2021
MK28.07.2021
MT28.07.2021
NL28.07.2021
PL28.07.2021
RO28.07.2021
RS28.07.2021
SE28.07.2021
SI28.07.2021
SK28.07.2021
SM28.07.2021
TR28.07.2021
BG28.10.2021
NO28.10.2021
GR29.10.2021
IS28.11.2021
PT29.11.2021
IE16.03.2022
LU16.03.2022
BE31.03.2022
CH31.03.2022
LI31.03.2022
[2024/42]
Former [2024/29]HU16.03.2015
AL28.07.2021
AT28.07.2021
CY28.07.2021
CZ28.07.2021
DK28.07.2021
EE28.07.2021
ES28.07.2021
FI28.07.2021
HR28.07.2021
IT28.07.2021
LT28.07.2021
LV28.07.2021
MC28.07.2021
MK28.07.2021
NL28.07.2021
PL28.07.2021
RO28.07.2021
RS28.07.2021
SE28.07.2021
SI28.07.2021
SK28.07.2021
SM28.07.2021
TR28.07.2021
BG28.10.2021
NO28.10.2021
GR29.10.2021
IS28.11.2021
PT29.11.2021
IE16.03.2022
LU16.03.2022
BE31.03.2022
CH31.03.2022
LI31.03.2022
Former [2024/22]HU16.03.2015
AL28.07.2021
AT28.07.2021
CY28.07.2021
CZ28.07.2021
DK28.07.2021
EE28.07.2021
ES28.07.2021
FI28.07.2021
HR28.07.2021
IT28.07.2021
LT28.07.2021
LV28.07.2021
MC28.07.2021
MK28.07.2021
NL28.07.2021
PL28.07.2021
RO28.07.2021
RS28.07.2021
SE28.07.2021
SI28.07.2021
SK28.07.2021
SM28.07.2021
BG28.10.2021
NO28.10.2021
GR29.10.2021
IS28.11.2021
PT29.11.2021
IE16.03.2022
LU16.03.2022
BE31.03.2022
CH31.03.2022
LI31.03.2022
Former [2024/20]HU16.03.2015
AL28.07.2021
AT28.07.2021
CY28.07.2021
CZ28.07.2021
DK28.07.2021
EE28.07.2021
ES28.07.2021
FI28.07.2021
HR28.07.2021
IT28.07.2021
LT28.07.2021
LV28.07.2021
MC28.07.2021
NL28.07.2021
PL28.07.2021
RO28.07.2021
RS28.07.2021
SE28.07.2021
SI28.07.2021
SK28.07.2021
SM28.07.2021
BG28.10.2021
NO28.10.2021
GR29.10.2021
IS28.11.2021
PT29.11.2021
IE16.03.2022
LU16.03.2022
BE31.03.2022
CH31.03.2022
LI31.03.2022
Former [2024/18]HU16.03.2015
AL28.07.2021
AT28.07.2021
CZ28.07.2021
DK28.07.2021
EE28.07.2021
ES28.07.2021
FI28.07.2021
HR28.07.2021
IT28.07.2021
LT28.07.2021
LV28.07.2021
MC28.07.2021
NL28.07.2021
PL28.07.2021
RO28.07.2021
RS28.07.2021
SE28.07.2021
SI28.07.2021
SK28.07.2021
SM28.07.2021
BG28.10.2021
NO28.10.2021
GR29.10.2021
IS28.11.2021
PT29.11.2021
IE16.03.2022
LU16.03.2022
BE31.03.2022
CH31.03.2022
LI31.03.2022
Former [2023/10]AL28.07.2021
AT28.07.2021
CZ28.07.2021
DK28.07.2021
EE28.07.2021
ES28.07.2021
FI28.07.2021
HR28.07.2021
IT28.07.2021
LT28.07.2021
LV28.07.2021
MC28.07.2021
NL28.07.2021
PL28.07.2021
RO28.07.2021
RS28.07.2021
SE28.07.2021
SI28.07.2021
SK28.07.2021
SM28.07.2021
BG28.10.2021
NO28.10.2021
GR29.10.2021
IS28.11.2021
PT29.11.2021
IE16.03.2022
LU16.03.2022
BE31.03.2022
CH31.03.2022
LI31.03.2022
Former [2023/09]AL28.07.2021
AT28.07.2021
CZ28.07.2021
DK28.07.2021
EE28.07.2021
ES28.07.2021
FI28.07.2021
HR28.07.2021
IT28.07.2021
LT28.07.2021
LV28.07.2021
MC28.07.2021
NL28.07.2021
PL28.07.2021
RO28.07.2021
RS28.07.2021
SE28.07.2021
SI28.07.2021
SK28.07.2021
SM28.07.2021
BG28.10.2021
NO28.10.2021
GR29.10.2021
IS28.11.2021
PT29.11.2021
IE16.03.2022
LU16.03.2022
CH31.03.2022
LI31.03.2022
Former [2023/08]AL28.07.2021
AT28.07.2021
CZ28.07.2021
DK28.07.2021
EE28.07.2021
ES28.07.2021
FI28.07.2021
HR28.07.2021
IT28.07.2021
LT28.07.2021
LV28.07.2021
MC28.07.2021
NL28.07.2021
PL28.07.2021
RO28.07.2021
RS28.07.2021
SE28.07.2021
SI28.07.2021
SK28.07.2021
SM28.07.2021
BG28.10.2021
NO28.10.2021
GR29.10.2021
IS28.11.2021
PT29.11.2021
IE16.03.2022
LU16.03.2022
Former [2022/47]AL28.07.2021
AT28.07.2021
CZ28.07.2021
DK28.07.2021
EE28.07.2021
ES28.07.2021
FI28.07.2021
HR28.07.2021
IT28.07.2021
LT28.07.2021
LV28.07.2021
MC28.07.2021
NL28.07.2021
PL28.07.2021
RO28.07.2021
RS28.07.2021
SE28.07.2021
SI28.07.2021
SK28.07.2021
SM28.07.2021
BG28.10.2021
NO28.10.2021
GR29.10.2021
IS28.11.2021
PT29.11.2021
Former [2022/36]AL28.07.2021
AT28.07.2021
CZ28.07.2021
DK28.07.2021
EE28.07.2021
ES28.07.2021
FI28.07.2021
HR28.07.2021
IT28.07.2021
LT28.07.2021
LV28.07.2021
NL28.07.2021
PL28.07.2021
RO28.07.2021
RS28.07.2021
SE28.07.2021
SI28.07.2021
SK28.07.2021
SM28.07.2021
BG28.10.2021
NO28.10.2021
GR29.10.2021
IS28.11.2021
PT29.11.2021
Former [2022/29]AL28.07.2021
AT28.07.2021
CZ28.07.2021
DK28.07.2021
EE28.07.2021
ES28.07.2021
FI28.07.2021
HR28.07.2021
LT28.07.2021
LV28.07.2021
NL28.07.2021
PL28.07.2021
RO28.07.2021
RS28.07.2021
SE28.07.2021
SI28.07.2021
SK28.07.2021
SM28.07.2021
BG28.10.2021
NO28.10.2021
GR29.10.2021
IS28.11.2021
PT29.11.2021
Former [2022/26]AT28.07.2021
CZ28.07.2021
DK28.07.2021
EE28.07.2021
ES28.07.2021
FI28.07.2021
HR28.07.2021
LT28.07.2021
LV28.07.2021
NL28.07.2021
PL28.07.2021
RO28.07.2021
RS28.07.2021
SE28.07.2021
SK28.07.2021
SM28.07.2021
BG28.10.2021
NO28.10.2021
GR29.10.2021
IS28.11.2021
PT29.11.2021
Former [2022/24]AT28.07.2021
CZ28.07.2021
DK28.07.2021
EE28.07.2021
ES28.07.2021
FI28.07.2021
HR28.07.2021
LT28.07.2021
LV28.07.2021
NL28.07.2021
PL28.07.2021
RO28.07.2021
RS28.07.2021
SE28.07.2021
SK28.07.2021
BG28.10.2021
NO28.10.2021
GR29.10.2021
IS28.11.2021
PT29.11.2021
Former [2022/21]AT28.07.2021
DK28.07.2021
ES28.07.2021
FI28.07.2021
HR28.07.2021
LT28.07.2021
LV28.07.2021
NL28.07.2021
PL28.07.2021
RS28.07.2021
SE28.07.2021
BG28.10.2021
NO28.10.2021
GR29.10.2021
IS28.11.2021
PT29.11.2021
Former [2022/11]AT28.07.2021
ES28.07.2021
FI28.07.2021
HR28.07.2021
LT28.07.2021
LV28.07.2021
NL28.07.2021
PL28.07.2021
RS28.07.2021
SE28.07.2021
BG28.10.2021
NO28.10.2021
GR29.10.2021
IS28.11.2021
PT29.11.2021
Former [2022/09]AT28.07.2021
ES28.07.2021
FI28.07.2021
LT28.07.2021
NL28.07.2021
RS28.07.2021
SE28.07.2021
BG28.10.2021
NO28.10.2021
PT29.11.2021
Former [2022/08]AT28.07.2021
ES28.07.2021
FI28.07.2021
LT28.07.2021
NL28.07.2021
SE28.07.2021
BG28.10.2021
NO28.10.2021
Former [2022/07]AT28.07.2021
LT28.07.2021
NL28.07.2021
NO28.10.2021
Documents cited:Search[X]  - ZHANG L ET AL, "Test Model 7 of 3D-HEVC and MV-HEVC", 7. JCT-3V MEETING; 11-1-2014 - 17-1-2014; SAN JOSE; (THE JOINT COLLABORATIVE TEAM ON 3D VIDEO CODING EXTENSION DEVELOPMENT OF ISO/IEC JTC1/SC29/WG11 AND ITU-T SG.16 ); URL: HTTP://PHENIX.INT-EVRY.FR/JCT2/,, (20140214), no. JCT3V-G1005, XP030132043 [X] 1-11 * paragraph [0001] - paragraph [0002] * * paragraphs [2.2.2.1.3] , [ 2.2.3] , [ 2.4.4] , [ 2.4.1] , [ 2.2.7] , [ 2.2.8] * * figures 1-11, 16, 18, 19 *
 [I]  - JAGER FABIAN, "Depth-based block partitioning for 3D video coding", 2013 PICTURE CODING SYMPOSIUM (PCS), IEEE, (20131208), doi:10.1109/PCS.2013.6737770, pages 410 - 413, XP032566956 [I] 1-11 * paragraph [00II] - paragraph [0III] * * figures 1-3 *

DOI:   http://dx.doi.org/10.1109/PCS.2013.6737770
 [I]  - JÄGER (RWTH AACHEN UNIVERSITY) F ET AL, "CE3: Results on Depth-based Block Partitioning (DBBP)", 7. JCT-3V MEETING; 11-1-2014 - 17-1-2014; SAN JOSE; (THE JOINT COLLABORATIVE TEAM ON 3D VIDEO CODING EXTENSION DEVELOPMENT OF ISO/IEC JTC1/SC29/WG11 AND ITU-T SG.16 ); URL: HTTP://PHENIX.INT-EVRY.FR/JCT2/,, (20140103), no. JCT3V-G0106, XP030131874 [I] 1-11 * paragraph [0001] - paragraph [0002] * * figures 1-3 *
 [A]  - TECH G ET AL, "3D-HEVC Draft Text 3", 7. JCT-3V MEETING; 11-1-2014 - 17-1-2014; SAN JOSE; (THE JOINT COLLABORATIVE TEAM ON 3D VIDEO CODING EXTENSION DEVELOPMENT OF ISO/IEC JTC1/SC29/WG11 AND ITU-T SG.16 ); URL: HTTP://PHENIX.INT-EVRY.FR/JCT2/,, (20140218), no. JCT3V-G1001, XP030132037 [A] 1-11 * paragraph [I.7.4.9.4] * * paragraph [I.8.4.4.4] * * paragraph [I.8.5.3.2.18] *
International search[A]WO2012171477  (MEDIATEK INC [CN], et al) [A] 1-11* . See paragraphs [0019]-[0020] and figure 5. *;
 [Y]KR20130043651  (LG ELECTRONICS INC [KR]) [Y] 1-2, 5, 7, 9, 11 * See paragraphs [0076]-[0077], claim 3 and figure 5. *;
 [Y]  - FABIAN JAGER et al., "CE3-related: Depth-based Block Partitioning", Joint Collaborative Team on 3D Video Coding Extensions of ITU-T SG 16 WP 3 and ISO/IEC JTC 1/SC 29/WG 11, 5th Meeting, Vienna, AT, (20130721), pages 1 - 8, XP 030131132 [Y] 1-11 * . See pages 2, 4 and figure 4. *
 [Y]  - GERHARD TECH et al., "3D-HEVC Test Model 4", Joint Collaborative Team on 3D Video Coding Extension Development of ITU-T SG 16 WP 3 and ISO/IEC JTC 1/SC 29/WG 11, 4th Meeting, (20130624), pages 1 - 53, XP055302002 [Y] 3-4, 6, 8, 10 * . See pages 17, 19-21 and figure 16. *
 [A]  - JIN YOUNG LEE et al., "3D-CE3 related: VSP and temporal candidates in Merge list construction", Joint Collaborative Team on 3D Video Coding Extensions of ITU-T SG 16 WP 3 and ISO/IEC JTC 1/SC 29/WG 11, 5th Meeting, Vienna, AT, (20130727), pages 1 - 5, XP030131366 [A] 1-11 * . See pages 1-4. *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.