EP3117549 - METHOD AND APPARATUS FOR ENCODING AND DECODING PACKET [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 03.04.2021 Database last updated on 04.06.2024 | |
Former | The patent has been granted Status updated on 24.04.2020 | ||
Former | Grant of patent is intended Status updated on 05.12.2019 | ||
Former | Examination is in progress Status updated on 22.02.2019 | ||
Former | Request for examination was made Status updated on 16.12.2016 | ||
Former | The international publication has been made Status updated on 16.11.2016 | Most recent event Tooltip | 27.04.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 29.05.2024 [2024/22] | Applicant(s) | For all designated states Samsung Electronics Co., Ltd. 129, Samsung-ro Yeongtong-gu Suwon-si, Gyeonggi-do 443-742 / KR | [2017/03] | Inventor(s) | 01 /
PARK, Chang Soon c/o Samsung Advanced Institute of Technology 130 Samsung-ro Youngtong-gu Suwon-si Gyeonggi-do 443-803 / KR | 02 /
HONG, Young Jun c/o Samsung Advanced Institute of Technology 130 Samsung-ro Youngtong-gu Suwon-si Gyeonggi-do 443-803 / KR | 03 /
KIM, Young Soo c/o Samsung Advanced Institute of Technology 130 Samsung-ro Youngtong-gu Suwon-si Gyeonggi-do 443-803 / KR | 04 /
HWANG, Hyo Sun c/o Samsung Advanced Institute of Technology 130 Samsung-ro Youngtong-gu Suwon-si Gyeonggi-do 443-803 / KR | [2017/03] | Representative(s) | Grünecker Patent- und Rechtsanwälte PartG mbB Leopoldstraße 4 80802 München / DE | [2017/03] | Application number, filing date | 15762363.8 | 16.03.2015 | [2017/03] | WO2015KR02503 | Priority number, date | KR20140030435 | 14.03.2014 Original published format: KR 20140030435 | KR20150030298 | 04.03.2015 Original published format: KR 20150030298 | [2017/03] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2015137779 | Date: | 17.09.2015 | Language: | EN | [2015/37] | Type: | A1 Application with search report | No.: | EP3117549 | Date: | 18.01.2017 | Language: | EN | The application published by WIPO in one of the EPO official languages on 17.09.2015 takes the place of the publication of the European patent application. | [2017/03] | Type: | B1 Patent specification | No.: | EP3117549 | Date: | 27.05.2020 | Language: | EN | [2020/22] | Search report(s) | International search report - published on: | KR | 17.09.2015 | (Supplementary) European search report - dispatched on: | EP | 21.03.2018 | Classification | IPC: | H04L1/00, H04L27/26 | [2017/03] | CPC: |
H04L1/0009 (EP);
H04L27/2601 (KR);
H04L69/22 (US);
H04L1/001 (EP);
H04L1/0013 (EP);
H04L1/0025 (EP);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/03] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | Title | German: | VERFAHREN UND VORRICHTUNG ZUR KODIERUNG UND DECODIERUNG EINES PAKETS | [2020/01] | English: | METHOD AND APPARATUS FOR ENCODING AND DECODING PACKET | [2017/03] | French: | PROCÉDÉ ET APPAREIL D'ENCODAGE ET DE DÉCODAGE DE PAQUET | [2017/03] |
Former [2017/03] | VERFAHREN UND VORRICHTUNG ZUR CODIERUNG UND DECODIERUNG EINES PAKETS | Entry into regional phase | 14.10.2016 | National basic fee paid | 14.10.2016 | Search fee paid | 14.10.2016 | Designation fee(s) paid | 14.10.2016 | Examination fee paid | Examination procedure | 14.10.2016 | Examination requested [2017/03] | 14.10.2016 | Date on which the examining division has become responsible | 17.10.2018 | Amendment by applicant (claims and/or description) | 27.02.2019 | Despatch of a communication from the examining division (Time limit: M04) | 03.06.2019 | Reply to a communication from the examining division | 06.12.2019 | Communication of intention to grant the patent | 14.04.2020 | Fee for grant paid | 14.04.2020 | Fee for publishing/printing paid | 14.04.2020 | Receipt of the translation of the claim(s) | Divisional application(s) | EP20169382.7 / EP3751767 | Opposition(s) | 02.03.2021 | No opposition filed within time limit [2021/18] | Fees paid | Renewal fee | 27.03.2017 | Renewal fee patent year 03 | 28.03.2018 | Renewal fee patent year 04 | 28.03.2019 | Renewal fee patent year 05 | 18.03.2020 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 16.03.2015 | AL | 27.05.2020 | AT | 27.05.2020 | CY | 27.05.2020 | CZ | 27.05.2020 | DK | 27.05.2020 | EE | 27.05.2020 | ES | 27.05.2020 | FI | 27.05.2020 | HR | 27.05.2020 | LT | 27.05.2020 | LV | 27.05.2020 | MC | 27.05.2020 | MK | 27.05.2020 | PL | 27.05.2020 | RO | 27.05.2020 | RS | 27.05.2020 | SE | 27.05.2020 | SI | 27.05.2020 | SK | 27.05.2020 | SM | 27.05.2020 | BG | 27.08.2020 | NO | 27.08.2020 | GR | 28.08.2020 | IS | 27.09.2020 | PT | 28.09.2020 | [2024/22] |
Former [2023/30] | HU | 16.03.2015 | |
AL | 27.05.2020 | ||
AT | 27.05.2020 | ||
CY | 27.05.2020 | ||
CZ | 27.05.2020 | ||
DK | 27.05.2020 | ||
EE | 27.05.2020 | ||
ES | 27.05.2020 | ||
FI | 27.05.2020 | ||
HR | 27.05.2020 | ||
LT | 27.05.2020 | ||
LV | 27.05.2020 | ||
MC | 27.05.2020 | ||
PL | 27.05.2020 | ||
RO | 27.05.2020 | ||
RS | 27.05.2020 | ||
SE | 27.05.2020 | ||
SI | 27.05.2020 | ||
SK | 27.05.2020 | ||
SM | 27.05.2020 | ||
BG | 27.08.2020 | ||
NO | 27.08.2020 | ||
GR | 28.08.2020 | ||
IS | 27.09.2020 | ||
PT | 28.09.2020 | ||
Former [2023/27] | HU | 16.03.2015 | |
AL | 27.05.2020 | ||
AT | 27.05.2020 | ||
CZ | 27.05.2020 | ||
DK | 27.05.2020 | ||
EE | 27.05.2020 | ||
ES | 27.05.2020 | ||
FI | 27.05.2020 | ||
HR | 27.05.2020 | ||
LT | 27.05.2020 | ||
LV | 27.05.2020 | ||
MC | 27.05.2020 | ||
PL | 27.05.2020 | ||
RO | 27.05.2020 | ||
RS | 27.05.2020 | ||
SE | 27.05.2020 | ||
SI | 27.05.2020 | ||
SK | 27.05.2020 | ||
SM | 27.05.2020 | ||
BG | 27.08.2020 | ||
NO | 27.08.2020 | ||
GR | 28.08.2020 | ||
IS | 27.09.2020 | ||
PT | 28.09.2020 | ||
Former [2021/45] | AL | 27.05.2020 | |
AT | 27.05.2020 | ||
CZ | 27.05.2020 | ||
DK | 27.05.2020 | ||
EE | 27.05.2020 | ||
ES | 27.05.2020 | ||
FI | 27.05.2020 | ||
HR | 27.05.2020 | ||
LT | 27.05.2020 | ||
LV | 27.05.2020 | ||
MC | 27.05.2020 | ||
PL | 27.05.2020 | ||
RO | 27.05.2020 | ||
RS | 27.05.2020 | ||
SE | 27.05.2020 | ||
SI | 27.05.2020 | ||
SK | 27.05.2020 | ||
SM | 27.05.2020 | ||
BG | 27.08.2020 | ||
NO | 27.08.2020 | ||
GR | 28.08.2020 | ||
IS | 27.09.2020 | ||
PT | 28.09.2020 | ||
Former [2021/24] | AL | 27.05.2020 | |
AT | 27.05.2020 | ||
CZ | 27.05.2020 | ||
DK | 27.05.2020 | ||
EE | 27.05.2020 | ||
ES | 27.05.2020 | ||
FI | 27.05.2020 | ||
HR | 27.05.2020 | ||
LT | 27.05.2020 | ||
LV | 27.05.2020 | ||
PL | 27.05.2020 | ||
RO | 27.05.2020 | ||
RS | 27.05.2020 | ||
SE | 27.05.2020 | ||
SI | 27.05.2020 | ||
SK | 27.05.2020 | ||
SM | 27.05.2020 | ||
BG | 27.08.2020 | ||
NO | 27.08.2020 | ||
GR | 28.08.2020 | ||
IS | 27.09.2020 | ||
PT | 28.09.2020 | ||
Former [2021/10] | AL | 27.05.2020 | |
AT | 27.05.2020 | ||
CZ | 27.05.2020 | ||
DK | 27.05.2020 | ||
EE | 27.05.2020 | ||
ES | 27.05.2020 | ||
FI | 27.05.2020 | ||
HR | 27.05.2020 | ||
LT | 27.05.2020 | ||
LV | 27.05.2020 | ||
PL | 27.05.2020 | ||
RO | 27.05.2020 | ||
RS | 27.05.2020 | ||
SE | 27.05.2020 | ||
SK | 27.05.2020 | ||
SM | 27.05.2020 | ||
BG | 27.08.2020 | ||
NO | 27.08.2020 | ||
GR | 28.08.2020 | ||
IS | 27.09.2020 | ||
PT | 28.09.2020 | ||
Former [2021/09] | AL | 27.05.2020 | |
AT | 27.05.2020 | ||
CZ | 27.05.2020 | ||
DK | 27.05.2020 | ||
EE | 27.05.2020 | ||
ES | 27.05.2020 | ||
FI | 27.05.2020 | ||
HR | 27.05.2020 | ||
LT | 27.05.2020 | ||
LV | 27.05.2020 | ||
RO | 27.05.2020 | ||
RS | 27.05.2020 | ||
SE | 27.05.2020 | ||
SM | 27.05.2020 | ||
BG | 27.08.2020 | ||
NO | 27.08.2020 | ||
GR | 28.08.2020 | ||
IS | 27.09.2020 | ||
PT | 28.09.2020 | ||
Former [2021/08] | AL | 27.05.2020 | |
DK | 27.05.2020 | ||
ES | 27.05.2020 | ||
FI | 27.05.2020 | ||
HR | 27.05.2020 | ||
LT | 27.05.2020 | ||
LV | 27.05.2020 | ||
RO | 27.05.2020 | ||
RS | 27.05.2020 | ||
SE | 27.05.2020 | ||
SM | 27.05.2020 | ||
BG | 27.08.2020 | ||
NO | 27.08.2020 | ||
GR | 28.08.2020 | ||
IS | 27.09.2020 | ||
PT | 28.09.2020 | ||
Former [2021/04] | AL | 27.05.2020 | |
FI | 27.05.2020 | ||
HR | 27.05.2020 | ||
LT | 27.05.2020 | ||
LV | 27.05.2020 | ||
RS | 27.05.2020 | ||
SE | 27.05.2020 | ||
BG | 27.08.2020 | ||
NO | 27.08.2020 | ||
GR | 28.08.2020 | ||
IS | 27.09.2020 | ||
PT | 28.09.2020 | ||
Former [2021/01] | FI | 27.05.2020 | |
HR | 27.05.2020 | ||
LT | 27.05.2020 | ||
LV | 27.05.2020 | ||
RS | 27.05.2020 | ||
SE | 27.05.2020 | ||
BG | 27.08.2020 | ||
NO | 27.08.2020 | ||
GR | 28.08.2020 | ||
IS | 27.09.2020 | ||
PT | 28.09.2020 | ||
Former [2020/51] | FI | 27.05.2020 | |
HR | 27.05.2020 | ||
LT | 27.05.2020 | ||
LV | 27.05.2020 | ||
RS | 27.05.2020 | ||
SE | 27.05.2020 | ||
NO | 27.08.2020 | ||
GR | 28.08.2020 | ||
IS | 27.09.2020 | ||
PT | 28.09.2020 | ||
Former [2020/50] | FI | 27.05.2020 | |
HR | 27.05.2020 | ||
LT | 27.05.2020 | ||
LV | 27.05.2020 | ||
SE | 27.05.2020 | ||
NO | 27.08.2020 | ||
GR | 28.08.2020 | ||
IS | 27.09.2020 | ||
PT | 28.09.2020 | ||
Former [2020/48] | FI | 27.05.2020 | |
LT | 27.05.2020 | ||
SE | 27.05.2020 | ||
NO | 27.08.2020 | ||
IS | 27.09.2020 | ||
PT | 28.09.2020 | ||
Former [2020/47] | LT | 27.05.2020 | |
NO | 27.08.2020 | ||
IS | 27.09.2020 | ||
Former [2020/46] | IS | 27.09.2020 | Documents cited: | Search | [A]WO2004114549 (NOKIA CORP [FI], et al) [A] 1-5,9-11,14,15 * page 17 - page 18 *; | [XA]US2012263107 (TAGHAVI NASRABADI MOHAMMAD HOSSEIN [US], et al) [X] 1,3,4,9-11,14 * paragraphs [0079] , [0 87] * * paragraph [0100] - paragraph [0103] * [A] 2,5,15; | [XA]WO2013085362 (LG ELECTRONICS INC [KR]) [X] 1,3 * paragraph [0157] - paragraph [0159] * [A] 6-8; | [T] - Peter Muszynski ET AL, "Introduction to WCDMA", WCDMA for UMTS : Radio Access for Third Generation Mobile Communications, John Wiley & Sons, Incorporated, (20030911), pages 47 - 52, XP055413270 [T] * section 3.3 * | [I] - Kiran Bynam ET AL, "IEEE 802. 5-13-0705-00-004q - Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs)", (20131101), pages 1 - 30, URL: https://mentor.ieee.org/802.15/dcn/13/15-13-0705-00-004q-samsung-physical-layer-proposal.pdf, (20180223), XP055453974 [I] 1,2,10-15 * the whole document * | International search | [A]US2004204101 (QIU HENG [JP], et al) [A] 1-25* See paragraphs [0055]-[0083]; and figures 2-4. *; | [Y]US2006285582 (SUMASU ATSUSHI [JP], et al) [Y] 1-25 * See paragraphs [0102], [0105]; and figures 12, 14. *; | [Y]US2006285580 (KINNUNEN PASI [FI], et al) [Y] 1-25 * See paragraphs [0009], [0015], [0024], [0030], [0039], [0046]; and figure 4. *; | [A]US2010272159 (LIM IN GI [KR], et al) [A] 1-25 * See paragraphs [0049]-[0074], [0086]-[0105]; and figures 4, 7. *; | [A]US8036225 (PAWAR HEMANTH BALAJI [US], et al) [A] 1-25 * See column 5, line 25 - column 7, line 41; and claims 1-6. * |