EP3122147 - APPARATUS, METHOD, AND INTEGRATED CIRCUIT FOR DUAL CONNECTIVITY [Right-click to bookmark this link] | |||
Former [2017/04] | WIRELESS COMMUNICATION SYSTEM, TERMINAL DEVICE, WIRELESS COMMUNICATION METHOD, INTEGRATED CIRCUIT, AND PROCESSING METHOD | ||
[2020/13] | Status | No opposition filed within time limit Status updated on 04.06.2021 Database last updated on 11.05.2024 | |
Former | The patent has been granted Status updated on 26.06.2020 | ||
Former | Grant of patent is intended Status updated on 02.03.2020 | ||
Former | Examination is in progress Status updated on 24.07.2019 | ||
Former | Request for examination was made Status updated on 23.12.2016 | ||
Former | The international publication has been made Status updated on 28.11.2016 | Most recent event Tooltip | 27.04.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 29.05.2024 [2024/22] | Applicant(s) | For all designated states Sharp Kabushiki Kaisha 1, Takumi-cho, Sakai-ku Sakai City Osaka 5908522 / JP | [2017/04] | Inventor(s) | 01 /
KATO, Yasuyuki c/o Sharp Kabushiki Kaisha 1 Takumi-cho, Sakai-ku Sakai-City, Osaka 590-8522 / JP | 02 /
UEMURA, Katsunari c/o Sharp Kabushiki Kaisha 1 Takumi-cho, Sakai-ku Sakai City, Osaka 590-8522 / JP | [2017/04] | Representative(s) | Müller Hoffmann & Partner Patentanwälte mbB St.-Martin-Straße 58 81541 München / DE | [N/P] |
Former [2017/04] | Müller Hoffmann & Partner Patentanwälte mbB St.-Martin-Strasse 58 81541 München / DE | Application number, filing date | 15765499.7 | 17.03.2015 | [2017/04] | WO2015JP57912 | Priority number, date | JP20140054947 | 18.03.2014 Original published format: JP 2014054947 | [2017/04] | Filing language | JA | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2015141682 | Date: | 24.09.2015 | Language: | JA | [2015/38] | Type: | A1 Application with search report | No.: | EP3122147 | Date: | 25.01.2017 | Language: | EN | [2017/04] | Type: | B1 Patent specification | No.: | EP3122147 | Date: | 29.07.2020 | Language: | EN | [2020/31] | Search report(s) | International search report - published on: | JP | 24.09.2015 | (Supplementary) European search report - dispatched on: | EP | 20.10.2017 | Classification | IPC: | H04W76/18, // H04W76/15 | [2020/13] | CPC: |
H04W76/18 (EP,US);
H04L43/0811 (US);
H04L41/0677 (US);
H04W72/23 (US);
H04W76/15 (EP,US);
H04W72/04 (EP,US)
|
Former IPC [2017/47] | H04W76/02, // H04W72/04 | ||
Former IPC [2017/04] | H04W76/04, H04W16/32, H04W72/04 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/04] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | Title | German: | VORRICHTUNG, VERFAHREN UND INTEGRIERTER SCHALTKREIS FÜR DUALE KONNEKTIVITÄT | [2020/13] | English: | APPARATUS, METHOD, AND INTEGRATED CIRCUIT FOR DUAL CONNECTIVITY | [2020/13] | French: | DISPOSITIF, PROCÉDÉ ET CIRCUIT INTÉGRÉ POUR DOUBLE CONNECTIVITÉ | [2020/13] |
Former [2017/04] | DRAHTLOSKOMMUNIKATIONSSYSTEM, ENDGERÄTEVORRICHTUNG, DRAHTLOSKOMMUNIKATIONSVERFAHREN, INTEGRIERTER SCHALTKREIS UND VERARBEITUNGSVERFAHREN | ||
Former [2017/04] | WIRELESS COMMUNICATION SYSTEM, TERMINAL DEVICE, WIRELESS COMMUNICATION METHOD, INTEGRATED CIRCUIT, AND PROCESSING METHOD | ||
Former [2017/04] | SYSTÈME DE COMMUNICATION SANS FIL, DISPOSITIF DE TERMINAL, PROCÉDÉ DE COMMUNICATION SANS FIL, CIRCUIT INTÉGRÉ ET PROCÉDÉ DE TRAITEMENT | Entry into regional phase | 14.09.2016 | Translation filed | 14.09.2016 | National basic fee paid | 14.09.2016 | Search fee paid | 14.09.2016 | Designation fee(s) paid | 14.09.2016 | Examination fee paid | Examination procedure | 14.09.2016 | Examination requested [2017/04] | 14.09.2016 | Date on which the examining division has become responsible | 04.05.2018 | Amendment by applicant (claims and/or description) | 29.07.2019 | Despatch of a communication from the examining division (Time limit: M04) | 20.11.2019 | Reply to a communication from the examining division | 03.03.2020 | Communication of intention to grant the patent | 22.06.2020 | Fee for grant paid | 22.06.2020 | Fee for publishing/printing paid | 22.06.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 30.04.2021 | No opposition filed within time limit [2021/27] | Fees paid | Renewal fee | 24.03.2017 | Renewal fee patent year 03 | 23.03.2018 | Renewal fee patent year 04 | 26.03.2019 | Renewal fee patent year 05 | 24.03.2020 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 17.03.2015 | AL | 29.07.2020 | AT | 29.07.2020 | CY | 29.07.2020 | CZ | 29.07.2020 | DK | 29.07.2020 | EE | 29.07.2020 | ES | 29.07.2020 | FI | 29.07.2020 | HR | 29.07.2020 | IT | 29.07.2020 | LT | 29.07.2020 | LV | 29.07.2020 | MC | 29.07.2020 | MK | 29.07.2020 | NL | 29.07.2020 | PL | 29.07.2020 | RO | 29.07.2020 | RS | 29.07.2020 | SE | 29.07.2020 | SI | 29.07.2020 | SK | 29.07.2020 | SM | 29.07.2020 | BG | 29.10.2020 | NO | 29.10.2020 | GR | 30.10.2020 | IS | 29.11.2020 | PT | 30.11.2020 | IE | 17.03.2021 | LU | 17.03.2021 | BE | 31.03.2021 | CH | 31.03.2021 | LI | 31.03.2021 | [2024/22] |
Former [2023/30] | HU | 17.03.2015 | |
AL | 29.07.2020 | ||
AT | 29.07.2020 | ||
CY | 29.07.2020 | ||
CZ | 29.07.2020 | ||
DK | 29.07.2020 | ||
EE | 29.07.2020 | ||
ES | 29.07.2020 | ||
FI | 29.07.2020 | ||
HR | 29.07.2020 | ||
IT | 29.07.2020 | ||
LT | 29.07.2020 | ||
LV | 29.07.2020 | ||
MC | 29.07.2020 | ||
NL | 29.07.2020 | ||
PL | 29.07.2020 | ||
RO | 29.07.2020 | ||
RS | 29.07.2020 | ||
SE | 29.07.2020 | ||
SI | 29.07.2020 | ||
SK | 29.07.2020 | ||
SM | 29.07.2020 | ||
BG | 29.10.2020 | ||
NO | 29.10.2020 | ||
GR | 30.10.2020 | ||
IS | 29.11.2020 | ||
PT | 30.11.2020 | ||
IE | 17.03.2021 | ||
LU | 17.03.2021 | ||
BE | 31.03.2021 | ||
CH | 31.03.2021 | ||
LI | 31.03.2021 | ||
Former [2023/27] | HU | 17.03.2015 | |
AL | 29.07.2020 | ||
AT | 29.07.2020 | ||
CZ | 29.07.2020 | ||
DK | 29.07.2020 | ||
EE | 29.07.2020 | ||
ES | 29.07.2020 | ||
FI | 29.07.2020 | ||
HR | 29.07.2020 | ||
IT | 29.07.2020 | ||
LT | 29.07.2020 | ||
LV | 29.07.2020 | ||
MC | 29.07.2020 | ||
NL | 29.07.2020 | ||
PL | 29.07.2020 | ||
RO | 29.07.2020 | ||
RS | 29.07.2020 | ||
SE | 29.07.2020 | ||
SI | 29.07.2020 | ||
SK | 29.07.2020 | ||
SM | 29.07.2020 | ||
BG | 29.10.2020 | ||
NO | 29.10.2020 | ||
GR | 30.10.2020 | ||
IS | 29.11.2020 | ||
PT | 30.11.2020 | ||
IE | 17.03.2021 | ||
LU | 17.03.2021 | ||
BE | 31.03.2021 | ||
CH | 31.03.2021 | ||
LI | 31.03.2021 | ||
Former [2022/34] | AL | 29.07.2020 | |
AT | 29.07.2020 | ||
CZ | 29.07.2020 | ||
DK | 29.07.2020 | ||
EE | 29.07.2020 | ||
ES | 29.07.2020 | ||
FI | 29.07.2020 | ||
HR | 29.07.2020 | ||
IT | 29.07.2020 | ||
LT | 29.07.2020 | ||
LV | 29.07.2020 | ||
MC | 29.07.2020 | ||
NL | 29.07.2020 | ||
PL | 29.07.2020 | ||
RO | 29.07.2020 | ||
RS | 29.07.2020 | ||
SE | 29.07.2020 | ||
SI | 29.07.2020 | ||
SK | 29.07.2020 | ||
SM | 29.07.2020 | ||
BG | 29.10.2020 | ||
NO | 29.10.2020 | ||
GR | 30.10.2020 | ||
IS | 29.11.2020 | ||
PT | 30.11.2020 | ||
IE | 17.03.2021 | ||
LU | 17.03.2021 | ||
BE | 31.03.2021 | ||
CH | 31.03.2021 | ||
LI | 31.03.2021 | ||
Former [2022/11] | AL | 29.07.2020 | |
AT | 29.07.2020 | ||
CZ | 29.07.2020 | ||
DK | 29.07.2020 | ||
EE | 29.07.2020 | ||
ES | 29.07.2020 | ||
FI | 29.07.2020 | ||
HR | 29.07.2020 | ||
IT | 29.07.2020 | ||
LT | 29.07.2020 | ||
LV | 29.07.2020 | ||
MC | 29.07.2020 | ||
NL | 29.07.2020 | ||
PL | 29.07.2020 | ||
RO | 29.07.2020 | ||
RS | 29.07.2020 | ||
SE | 29.07.2020 | ||
SI | 29.07.2020 | ||
SK | 29.07.2020 | ||
SM | 29.07.2020 | ||
BG | 29.10.2020 | ||
NO | 29.10.2020 | ||
GR | 30.10.2020 | ||
IS | 29.11.2020 | ||
PT | 30.11.2020 | ||
IE | 17.03.2021 | ||
LU | 17.03.2021 | ||
CH | 31.03.2021 | ||
LI | 31.03.2021 | ||
Former [2022/09] | AL | 29.07.2020 | |
AT | 29.07.2020 | ||
CZ | 29.07.2020 | ||
DK | 29.07.2020 | ||
EE | 29.07.2020 | ||
ES | 29.07.2020 | ||
FI | 29.07.2020 | ||
HR | 29.07.2020 | ||
IT | 29.07.2020 | ||
LT | 29.07.2020 | ||
LV | 29.07.2020 | ||
MC | 29.07.2020 | ||
NL | 29.07.2020 | ||
PL | 29.07.2020 | ||
RO | 29.07.2020 | ||
RS | 29.07.2020 | ||
SE | 29.07.2020 | ||
SI | 29.07.2020 | ||
SK | 29.07.2020 | ||
SM | 29.07.2020 | ||
BG | 29.10.2020 | ||
NO | 29.10.2020 | ||
GR | 30.10.2020 | ||
IS | 29.11.2020 | ||
PT | 30.11.2020 | ||
IE | 17.03.2021 | ||
LU | 17.03.2021 | ||
Former [2022/07] | AL | 29.07.2020 | |
AT | 29.07.2020 | ||
CZ | 29.07.2020 | ||
DK | 29.07.2020 | ||
EE | 29.07.2020 | ||
ES | 29.07.2020 | ||
FI | 29.07.2020 | ||
HR | 29.07.2020 | ||
IT | 29.07.2020 | ||
LT | 29.07.2020 | ||
LV | 29.07.2020 | ||
MC | 29.07.2020 | ||
NL | 29.07.2020 | ||
PL | 29.07.2020 | ||
RO | 29.07.2020 | ||
RS | 29.07.2020 | ||
SE | 29.07.2020 | ||
SI | 29.07.2020 | ||
SK | 29.07.2020 | ||
SM | 29.07.2020 | ||
BG | 29.10.2020 | ||
NO | 29.10.2020 | ||
GR | 30.10.2020 | ||
IS | 29.11.2020 | ||
PT | 30.11.2020 | ||
IE | 17.03.2021 | ||
Former [2021/45] | AL | 29.07.2020 | |
AT | 29.07.2020 | ||
CZ | 29.07.2020 | ||
DK | 29.07.2020 | ||
EE | 29.07.2020 | ||
ES | 29.07.2020 | ||
FI | 29.07.2020 | ||
HR | 29.07.2020 | ||
IT | 29.07.2020 | ||
LT | 29.07.2020 | ||
LV | 29.07.2020 | ||
MC | 29.07.2020 | ||
NL | 29.07.2020 | ||
PL | 29.07.2020 | ||
RO | 29.07.2020 | ||
RS | 29.07.2020 | ||
SE | 29.07.2020 | ||
SI | 29.07.2020 | ||
SK | 29.07.2020 | ||
SM | 29.07.2020 | ||
BG | 29.10.2020 | ||
NO | 29.10.2020 | ||
GR | 30.10.2020 | ||
IS | 29.11.2020 | ||
PT | 30.11.2020 | ||
Former [2021/36] | AL | 29.07.2020 | |
AT | 29.07.2020 | ||
CZ | 29.07.2020 | ||
DK | 29.07.2020 | ||
EE | 29.07.2020 | ||
ES | 29.07.2020 | ||
FI | 29.07.2020 | ||
HR | 29.07.2020 | ||
IT | 29.07.2020 | ||
LT | 29.07.2020 | ||
LV | 29.07.2020 | ||
NL | 29.07.2020 | ||
PL | 29.07.2020 | ||
RO | 29.07.2020 | ||
RS | 29.07.2020 | ||
SE | 29.07.2020 | ||
SI | 29.07.2020 | ||
SK | 29.07.2020 | ||
SM | 29.07.2020 | ||
BG | 29.10.2020 | ||
NO | 29.10.2020 | ||
GR | 30.10.2020 | ||
IS | 29.11.2020 | ||
PT | 30.11.2020 | ||
Former [2021/28] | AL | 29.07.2020 | |
AT | 29.07.2020 | ||
CZ | 29.07.2020 | ||
DK | 29.07.2020 | ||
EE | 29.07.2020 | ||
ES | 29.07.2020 | ||
FI | 29.07.2020 | ||
HR | 29.07.2020 | ||
IT | 29.07.2020 | ||
LT | 29.07.2020 | ||
LV | 29.07.2020 | ||
NL | 29.07.2020 | ||
PL | 29.07.2020 | ||
RO | 29.07.2020 | ||
RS | 29.07.2020 | ||
SE | 29.07.2020 | ||
SK | 29.07.2020 | ||
SM | 29.07.2020 | ||
BG | 29.10.2020 | ||
NO | 29.10.2020 | ||
GR | 30.10.2020 | ||
IS | 29.11.2020 | ||
PT | 30.11.2020 | ||
Former [2021/25] | AL | 29.07.2020 | |
AT | 29.07.2020 | ||
CZ | 29.07.2020 | ||
DK | 29.07.2020 | ||
EE | 29.07.2020 | ||
ES | 29.07.2020 | ||
FI | 29.07.2020 | ||
HR | 29.07.2020 | ||
IT | 29.07.2020 | ||
LT | 29.07.2020 | ||
LV | 29.07.2020 | ||
NL | 29.07.2020 | ||
PL | 29.07.2020 | ||
RO | 29.07.2020 | ||
RS | 29.07.2020 | ||
SE | 29.07.2020 | ||
SM | 29.07.2020 | ||
BG | 29.10.2020 | ||
NO | 29.10.2020 | ||
GR | 30.10.2020 | ||
IS | 29.11.2020 | ||
PT | 30.11.2020 | ||
Former [2021/22] | AT | 29.07.2020 | |
CZ | 29.07.2020 | ||
DK | 29.07.2020 | ||
EE | 29.07.2020 | ||
ES | 29.07.2020 | ||
FI | 29.07.2020 | ||
HR | 29.07.2020 | ||
IT | 29.07.2020 | ||
LT | 29.07.2020 | ||
LV | 29.07.2020 | ||
NL | 29.07.2020 | ||
PL | 29.07.2020 | ||
RO | 29.07.2020 | ||
RS | 29.07.2020 | ||
SE | 29.07.2020 | ||
SM | 29.07.2020 | ||
BG | 29.10.2020 | ||
NO | 29.10.2020 | ||
GR | 30.10.2020 | ||
IS | 29.11.2020 | ||
PT | 30.11.2020 | ||
Former [2021/20] | AT | 29.07.2020 | |
DK | 29.07.2020 | ||
ES | 29.07.2020 | ||
FI | 29.07.2020 | ||
HR | 29.07.2020 | ||
IT | 29.07.2020 | ||
LT | 29.07.2020 | ||
LV | 29.07.2020 | ||
NL | 29.07.2020 | ||
PL | 29.07.2020 | ||
RS | 29.07.2020 | ||
SE | 29.07.2020 | ||
BG | 29.10.2020 | ||
NO | 29.10.2020 | ||
GR | 30.10.2020 | ||
IS | 29.11.2020 | ||
PT | 30.11.2020 | ||
Former [2021/17] | AT | 29.07.2020 | |
ES | 29.07.2020 | ||
FI | 29.07.2020 | ||
HR | 29.07.2020 | ||
LT | 29.07.2020 | ||
LV | 29.07.2020 | ||
NL | 29.07.2020 | ||
PL | 29.07.2020 | ||
RS | 29.07.2020 | ||
SE | 29.07.2020 | ||
BG | 29.10.2020 | ||
NO | 29.10.2020 | ||
GR | 30.10.2020 | ||
IS | 29.11.2020 | ||
PT | 30.11.2020 | ||
Former [2021/10] | AT | 29.07.2020 | |
ES | 29.07.2020 | ||
FI | 29.07.2020 | ||
HR | 29.07.2020 | ||
LT | 29.07.2020 | ||
LV | 29.07.2020 | ||
PL | 29.07.2020 | ||
RS | 29.07.2020 | ||
SE | 29.07.2020 | ||
BG | 29.10.2020 | ||
NO | 29.10.2020 | ||
GR | 30.10.2020 | ||
IS | 29.11.2020 | ||
PT | 30.11.2020 | ||
Former [2021/09] | AT | 29.07.2020 | |
ES | 29.07.2020 | ||
FI | 29.07.2020 | ||
LT | 29.07.2020 | ||
SE | 29.07.2020 | ||
BG | 29.10.2020 | ||
NO | 29.10.2020 | ||
GR | 30.10.2020 | ||
PT | 30.11.2020 | ||
Former [2021/08] | ES | 29.07.2020 | |
FI | 29.07.2020 | ||
LT | 29.07.2020 | ||
SE | 29.07.2020 | ||
BG | 29.10.2020 | ||
NO | 29.10.2020 | ||
PT | 30.11.2020 | ||
Former [2021/07] | FI | 29.07.2020 | |
LT | 29.07.2020 | ||
NO | 29.10.2020 | Documents cited: | Search | [X] - NTT DOCOMO ET AL, "Introduction of Dual Connectivity", vol. RAN WG2, no. Prague, Czech Republic; 20140210 - 20140214, (20140222), 3GPP DRAFT; R2-140906_INTRODUCTION OF DUAL CONNECTIVITY_V8_CLEAN, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANC, URL: http://www.3gpp.org/ftp/tsg_ran/WG2_RL2/TSGR2_85/Docs/, (20140222), XP050770936 [X] 1-3 * paragraph 4.X.1 at page 9 * * paragraph 7 at page 15 * * paragraph 7.X at page 17 * * paragraph 10.1.2.X.1 at pages 25-26 * * paragraph 10.1.2.X.2 at page 26 * * Figure 10.1.2.X.1-1 at page 26 * | [YD] - "3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Study on Small Cell enhancements for E-UTRA and E-UTRAN; Higher layer aspects (Release 12)", 3GPP STANDARD; 3GPP TR 36.842, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20140107), vol. RAN WG2, no. V12.0.0, pages 1 - 71, XP050729403 [YD] 1-3 * paragraph 3.1 * * paragraph 8.1.3.1 * * paragraph 8.1.3.2 * * Annex G.1 * | [Y] - ERICSSON, "RLF handling in dual connectivity", vol. RAN WG2, no. Prague, Czech Republic; 20140210 - 20140214, (20140209), 3GPP DRAFT; R2-140655 RLF HANDLING IN DUAL CONNECTIVITY, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/RAN/RAN2/Docs/, (20140209), XP050737787 [Y] 1-3 * paragraph 1 * * paragraph 2 * * paragraph 2.2 * | International search | [Y]WO2010017376 (INTERDIGITAL PATENT HOLDINGS [US], et al) [Y] 7-9 * , paragraph [0053] & JP 2011-530886 A & US 2011/0002262 A1 & CN 102119501 A & KR 10-2011-0081941 A *; | [X] - LG ELECTRONICS INC., "Handling of Radio Link Problem in SCG SCells", 3GPP TSG-RAN2 Meeting #84 R2-140734, pages 1 - 3, XP050737845 [X] 1-6 | [Y] - ZTE, "MAC layer modelling issue", 3GPP TSG-RAN2 Meeting #84 R2-133906, pages 1 - 3, XP050736738 [Y] 7-9 | [A] - ERICSSON, "RLF handling in dual connectivity", 3GPP TSG-RAN WG2 #85 Tdoc R2-140655, pages 1 - 4, XP050737787 [A] 1-9 |