EP3223269 - DRIVE POWER SUPPLY, DISPLAY DRIVE CIRCUIT, AND ORGANIC LIGHT EMITTING DIODE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 25.06.2021 Database last updated on 17.05.2024 | |
Former | The patent has been granted Status updated on 17.07.2020 | ||
Former | Grant of patent is intended Status updated on 02.04.2020 | ||
Former | Examination is in progress Status updated on 14.03.2019 | ||
Former | Request for examination was made Status updated on 25.08.2017 | ||
Former | The international publication has been made Status updated on 07.11.2016 | Most recent event Tooltip | 27.04.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 29.05.2024 [2024/22] | Applicant(s) | For all designated states BOE Technology Group Co., Ltd. No. 10 Jiuxianqiao Rd. Chaoyang District Beijing 100015 / CN | [2017/39] | Inventor(s) | 01 /
YIN, Xinshe No.9 Dize Rd. BDA Beijing 100176 / CN | [2017/39] | Representative(s) | Michalski Hüttermann & Partner Patentanwälte mbB Kaistraße 16A 40221 Düsseldorf / DE | [N/P] |
Former [2017/39] | Michalski Hüttermann & Partner Patentanwälte mbB Speditionstraße 21 40221 Düsseldorf / DE | Application number, filing date | 15767406.0 | 17.04.2015 | [2017/39] | WO2015CN76833 | Priority number, date | CN201410664662 | 19.11.2014 Original published format: CN201410664662 | [2017/39] | Filing language | ZH | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2016078314 | Date: | 26.05.2016 | Language: | ZH | [2016/21] | Type: | A1 Application with search report | No.: | EP3223269 | Date: | 27.09.2017 | Language: | EN | [2017/39] | Type: | B1 Patent specification | No.: | EP3223269 | Date: | 19.08.2020 | Language: | EN | [2020/34] | Search report(s) | International search report - published on: | CN | 26.05.2016 | (Supplementary) European search report - dispatched on: | EP | 25.05.2018 | Classification | IPC: | G09G3/3225 | [2018/26] | CPC: |
G09G3/3225 (EP,US);
G09G3/3258 (US);
G09G3/3291 (US);
G09G2300/0809 (US);
G09G2320/0242 (EP,US);
G09G2330/02 (EP,US);
|
Former IPC [2017/39] | G09G3/32 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/39] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | Title | German: | ANSTEUERUNGSENERGIEVERSORGUNG, ANZEIGEANSTEUERUNGSSCHALTUNG UND ORGANISCHE LICHTEMITTIERENDE DIODE | [2017/39] | English: | DRIVE POWER SUPPLY, DISPLAY DRIVE CIRCUIT, AND ORGANIC LIGHT EMITTING DIODE | [2017/39] | French: | ALIMENTATION ÉLECTRIQUE DE PILOTAGE, CIRCUIT DE PILOTAGE D'AFFICHAGE ET DIODE ÉLECTROLUMINESCENTE ORGANIQUE | [2017/39] | Entry into regional phase | 01.10.2015 | Translation filed | 01.10.2015 | National basic fee paid | 01.10.2015 | Search fee paid | 01.10.2015 | Designation fee(s) paid | 01.10.2015 | Examination fee paid | Examination procedure | 01.10.2015 | Examination requested [2017/39] | 01.10.2015 | Date on which the examining division has become responsible | 06.12.2018 | Amendment by applicant (claims and/or description) | 18.03.2019 | Despatch of a communication from the examining division (Time limit: M04) | 16.07.2019 | Reply to a communication from the examining division | 03.12.2019 | Despatch of a communication from the examining division (Time limit: M02) | 07.01.2020 | Reply to a communication from the examining division | 03.04.2020 | Communication of intention to grant the patent | 09.07.2020 | Fee for grant paid | 09.07.2020 | Fee for publishing/printing paid | 09.07.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 20.05.2021 | No opposition filed within time limit [2021/30] | Fees paid | Renewal fee | 26.04.2017 | Renewal fee patent year 03 | 25.04.2018 | Renewal fee patent year 04 | 23.04.2019 | Renewal fee patent year 05 | 30.03.2020 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 17.04.2015 | AL | 19.08.2020 | AT | 19.08.2020 | CY | 19.08.2020 | CZ | 19.08.2020 | DK | 19.08.2020 | EE | 19.08.2020 | ES | 19.08.2020 | FI | 19.08.2020 | HR | 19.08.2020 | IT | 19.08.2020 | LT | 19.08.2020 | LV | 19.08.2020 | MC | 19.08.2020 | MK | 19.08.2020 | NL | 19.08.2020 | PL | 19.08.2020 | RO | 19.08.2020 | RS | 19.08.2020 | SE | 19.08.2020 | SI | 19.08.2020 | SK | 19.08.2020 | SM | 19.08.2020 | BG | 19.11.2020 | NO | 19.11.2020 | GR | 20.11.2020 | IS | 19.12.2020 | PT | 21.12.2020 | GB | 17.04.2021 | IE | 17.04.2021 | LU | 17.04.2021 | BE | 30.04.2021 | CH | 30.04.2021 | FR | 30.04.2021 | LI | 30.04.2021 | [2024/22] |
Former [2023/30] | HU | 17.04.2015 | |
AL | 19.08.2020 | ||
AT | 19.08.2020 | ||
CY | 19.08.2020 | ||
CZ | 19.08.2020 | ||
DK | 19.08.2020 | ||
EE | 19.08.2020 | ||
ES | 19.08.2020 | ||
FI | 19.08.2020 | ||
HR | 19.08.2020 | ||
IT | 19.08.2020 | ||
LT | 19.08.2020 | ||
LV | 19.08.2020 | ||
MC | 19.08.2020 | ||
NL | 19.08.2020 | ||
PL | 19.08.2020 | ||
RO | 19.08.2020 | ||
RS | 19.08.2020 | ||
SE | 19.08.2020 | ||
SI | 19.08.2020 | ||
SK | 19.08.2020 | ||
SM | 19.08.2020 | ||
BG | 19.11.2020 | ||
NO | 19.11.2020 | ||
GR | 20.11.2020 | ||
IS | 19.12.2020 | ||
PT | 21.12.2020 | ||
GB | 17.04.2021 | ||
IE | 17.04.2021 | ||
LU | 17.04.2021 | ||
BE | 30.04.2021 | ||
CH | 30.04.2021 | ||
FR | 30.04.2021 | ||
LI | 30.04.2021 | ||
Former [2023/27] | HU | 17.04.2015 | |
AL | 19.08.2020 | ||
AT | 19.08.2020 | ||
CZ | 19.08.2020 | ||
DK | 19.08.2020 | ||
EE | 19.08.2020 | ||
ES | 19.08.2020 | ||
FI | 19.08.2020 | ||
HR | 19.08.2020 | ||
IT | 19.08.2020 | ||
LT | 19.08.2020 | ||
LV | 19.08.2020 | ||
MC | 19.08.2020 | ||
NL | 19.08.2020 | ||
PL | 19.08.2020 | ||
RO | 19.08.2020 | ||
RS | 19.08.2020 | ||
SE | 19.08.2020 | ||
SI | 19.08.2020 | ||
SK | 19.08.2020 | ||
SM | 19.08.2020 | ||
BG | 19.11.2020 | ||
NO | 19.11.2020 | ||
GR | 20.11.2020 | ||
IS | 19.12.2020 | ||
PT | 21.12.2020 | ||
GB | 17.04.2021 | ||
IE | 17.04.2021 | ||
LU | 17.04.2021 | ||
BE | 30.04.2021 | ||
CH | 30.04.2021 | ||
FR | 30.04.2021 | ||
LI | 30.04.2021 | ||
Former [2022/34] | AL | 19.08.2020 | |
AT | 19.08.2020 | ||
CZ | 19.08.2020 | ||
DK | 19.08.2020 | ||
EE | 19.08.2020 | ||
ES | 19.08.2020 | ||
FI | 19.08.2020 | ||
HR | 19.08.2020 | ||
IT | 19.08.2020 | ||
LT | 19.08.2020 | ||
LV | 19.08.2020 | ||
MC | 19.08.2020 | ||
NL | 19.08.2020 | ||
PL | 19.08.2020 | ||
RO | 19.08.2020 | ||
RS | 19.08.2020 | ||
SE | 19.08.2020 | ||
SI | 19.08.2020 | ||
SK | 19.08.2020 | ||
SM | 19.08.2020 | ||
BG | 19.11.2020 | ||
NO | 19.11.2020 | ||
GR | 20.11.2020 | ||
IS | 19.12.2020 | ||
PT | 21.12.2020 | ||
GB | 17.04.2021 | ||
IE | 17.04.2021 | ||
LU | 17.04.2021 | ||
BE | 30.04.2021 | ||
CH | 30.04.2021 | ||
FR | 30.04.2021 | ||
LI | 30.04.2021 | ||
Former [2022/23] | AL | 19.08.2020 | |
AT | 19.08.2020 | ||
CZ | 19.08.2020 | ||
DK | 19.08.2020 | ||
EE | 19.08.2020 | ||
ES | 19.08.2020 | ||
FI | 19.08.2020 | ||
HR | 19.08.2020 | ||
IT | 19.08.2020 | ||
LT | 19.08.2020 | ||
LV | 19.08.2020 | ||
MC | 19.08.2020 | ||
NL | 19.08.2020 | ||
PL | 19.08.2020 | ||
RO | 19.08.2020 | ||
RS | 19.08.2020 | ||
SE | 19.08.2020 | ||
SI | 19.08.2020 | ||
SK | 19.08.2020 | ||
SM | 19.08.2020 | ||
BG | 19.11.2020 | ||
NO | 19.11.2020 | ||
GR | 20.11.2020 | ||
IS | 19.12.2020 | ||
PT | 21.12.2020 | ||
GB | 17.04.2021 | ||
IE | 17.04.2021 | ||
LU | 17.04.2021 | ||
CH | 30.04.2021 | ||
FR | 30.04.2021 | ||
LI | 30.04.2021 | ||
Former [2022/21] | AL | 19.08.2020 | |
AT | 19.08.2020 | ||
CZ | 19.08.2020 | ||
DK | 19.08.2020 | ||
EE | 19.08.2020 | ||
ES | 19.08.2020 | ||
FI | 19.08.2020 | ||
HR | 19.08.2020 | ||
IT | 19.08.2020 | ||
LT | 19.08.2020 | ||
LV | 19.08.2020 | ||
MC | 19.08.2020 | ||
NL | 19.08.2020 | ||
PL | 19.08.2020 | ||
RO | 19.08.2020 | ||
RS | 19.08.2020 | ||
SE | 19.08.2020 | ||
SI | 19.08.2020 | ||
SK | 19.08.2020 | ||
SM | 19.08.2020 | ||
BG | 19.11.2020 | ||
NO | 19.11.2020 | ||
GR | 20.11.2020 | ||
PT | 21.12.2020 | ||
GB | 17.04.2021 | ||
IE | 17.04.2021 | ||
LU | 17.04.2021 | ||
CH | 30.04.2021 | ||
FR | 30.04.2021 | ||
LI | 30.04.2021 | ||
Former [2022/10] | AL | 19.08.2020 | |
AT | 19.08.2020 | ||
CZ | 19.08.2020 | ||
DK | 19.08.2020 | ||
EE | 19.08.2020 | ||
ES | 19.08.2020 | ||
FI | 19.08.2020 | ||
HR | 19.08.2020 | ||
IT | 19.08.2020 | ||
LT | 19.08.2020 | ||
LV | 19.08.2020 | ||
MC | 19.08.2020 | ||
NL | 19.08.2020 | ||
PL | 19.08.2020 | ||
RO | 19.08.2020 | ||
RS | 19.08.2020 | ||
SE | 19.08.2020 | ||
SI | 19.08.2020 | ||
SK | 19.08.2020 | ||
SM | 19.08.2020 | ||
BG | 19.11.2020 | ||
NO | 19.11.2020 | ||
GR | 20.11.2020 | ||
PT | 21.12.2020 | ||
GB | 17.04.2021 | ||
LU | 17.04.2021 | ||
CH | 30.04.2021 | ||
FR | 30.04.2021 | ||
LI | 30.04.2021 | ||
Former [2022/09] | AL | 19.08.2020 | |
AT | 19.08.2020 | ||
CZ | 19.08.2020 | ||
DK | 19.08.2020 | ||
EE | 19.08.2020 | ||
ES | 19.08.2020 | ||
FI | 19.08.2020 | ||
HR | 19.08.2020 | ||
IT | 19.08.2020 | ||
LT | 19.08.2020 | ||
LV | 19.08.2020 | ||
MC | 19.08.2020 | ||
NL | 19.08.2020 | ||
PL | 19.08.2020 | ||
RO | 19.08.2020 | ||
RS | 19.08.2020 | ||
SE | 19.08.2020 | ||
SI | 19.08.2020 | ||
SK | 19.08.2020 | ||
SM | 19.08.2020 | ||
BG | 19.11.2020 | ||
NO | 19.11.2020 | ||
GR | 20.11.2020 | ||
IS | 19.12.2020 | ||
PT | 21.12.2020 | ||
GB | 17.04.2021 | ||
LU | 17.04.2021 | ||
FR | 30.04.2021 | ||
Former [2022/04] | AL | 19.08.2020 | |
AT | 19.08.2020 | ||
CZ | 19.08.2020 | ||
DK | 19.08.2020 | ||
EE | 19.08.2020 | ||
ES | 19.08.2020 | ||
FI | 19.08.2020 | ||
HR | 19.08.2020 | ||
IT | 19.08.2020 | ||
LT | 19.08.2020 | ||
LV | 19.08.2020 | ||
MC | 19.08.2020 | ||
NL | 19.08.2020 | ||
PL | 19.08.2020 | ||
RO | 19.08.2020 | ||
RS | 19.08.2020 | ||
SE | 19.08.2020 | ||
SI | 19.08.2020 | ||
SK | 19.08.2020 | ||
SM | 19.08.2020 | ||
BG | 19.11.2020 | ||
NO | 19.11.2020 | ||
GR | 20.11.2020 | ||
IS | 19.12.2020 | ||
PT | 21.12.2020 | ||
LU | 17.04.2021 | ||
Former [2021/50] | AL | 19.08.2020 | |
AT | 19.08.2020 | ||
CZ | 19.08.2020 | ||
DK | 19.08.2020 | ||
EE | 19.08.2020 | ||
ES | 19.08.2020 | ||
FI | 19.08.2020 | ||
HR | 19.08.2020 | ||
IT | 19.08.2020 | ||
LT | 19.08.2020 | ||
LV | 19.08.2020 | ||
MC | 19.08.2020 | ||
NL | 19.08.2020 | ||
PL | 19.08.2020 | ||
RO | 19.08.2020 | ||
RS | 19.08.2020 | ||
SE | 19.08.2020 | ||
SI | 19.08.2020 | ||
SK | 19.08.2020 | ||
SM | 19.08.2020 | ||
BG | 19.11.2020 | ||
NO | 19.11.2020 | ||
GR | 20.11.2020 | ||
IS | 19.12.2020 | ||
PT | 21.12.2020 | ||
Former [2021/36] | AL | 19.08.2020 | |
AT | 19.08.2020 | ||
CZ | 19.08.2020 | ||
DK | 19.08.2020 | ||
EE | 19.08.2020 | ||
ES | 19.08.2020 | ||
FI | 19.08.2020 | ||
HR | 19.08.2020 | ||
IT | 19.08.2020 | ||
LT | 19.08.2020 | ||
LV | 19.08.2020 | ||
NL | 19.08.2020 | ||
PL | 19.08.2020 | ||
RO | 19.08.2020 | ||
RS | 19.08.2020 | ||
SE | 19.08.2020 | ||
SI | 19.08.2020 | ||
SK | 19.08.2020 | ||
SM | 19.08.2020 | ||
BG | 19.11.2020 | ||
NO | 19.11.2020 | ||
GR | 20.11.2020 | ||
IS | 19.12.2020 | ||
PT | 21.12.2020 | ||
Former [2021/34] | AL | 19.08.2020 | |
AT | 19.08.2020 | ||
CZ | 19.08.2020 | ||
DK | 19.08.2020 | ||
EE | 19.08.2020 | ||
ES | 19.08.2020 | ||
FI | 19.08.2020 | ||
HR | 19.08.2020 | ||
IT | 19.08.2020 | ||
LT | 19.08.2020 | ||
LV | 19.08.2020 | ||
NL | 19.08.2020 | ||
PL | 19.08.2020 | ||
RO | 19.08.2020 | ||
RS | 19.08.2020 | ||
SE | 19.08.2020 | ||
SK | 19.08.2020 | ||
SM | 19.08.2020 | ||
BG | 19.11.2020 | ||
NO | 19.11.2020 | ||
GR | 20.11.2020 | ||
IS | 19.12.2020 | ||
PT | 21.12.2020 | ||
Former [2021/28] | AL | 19.08.2020 | |
AT | 19.08.2020 | ||
CZ | 19.08.2020 | ||
DK | 19.08.2020 | ||
EE | 19.08.2020 | ||
ES | 19.08.2020 | ||
FI | 19.08.2020 | ||
HR | 19.08.2020 | ||
LT | 19.08.2020 | ||
LV | 19.08.2020 | ||
NL | 19.08.2020 | ||
PL | 19.08.2020 | ||
RO | 19.08.2020 | ||
RS | 19.08.2020 | ||
SE | 19.08.2020 | ||
SK | 19.08.2020 | ||
SM | 19.08.2020 | ||
BG | 19.11.2020 | ||
NO | 19.11.2020 | ||
GR | 20.11.2020 | ||
IS | 19.12.2020 | ||
PT | 21.12.2020 | ||
Former [2021/25] | AL | 19.08.2020 | |
AT | 19.08.2020 | ||
CZ | 19.08.2020 | ||
DK | 19.08.2020 | ||
EE | 19.08.2020 | ||
ES | 19.08.2020 | ||
FI | 19.08.2020 | ||
HR | 19.08.2020 | ||
LT | 19.08.2020 | ||
LV | 19.08.2020 | ||
NL | 19.08.2020 | ||
PL | 19.08.2020 | ||
RO | 19.08.2020 | ||
RS | 19.08.2020 | ||
SE | 19.08.2020 | ||
SM | 19.08.2020 | ||
BG | 19.11.2020 | ||
NO | 19.11.2020 | ||
GR | 20.11.2020 | ||
IS | 19.12.2020 | ||
PT | 21.12.2020 | ||
Former [2021/23] | AT | 19.08.2020 | |
CZ | 19.08.2020 | ||
DK | 19.08.2020 | ||
EE | 19.08.2020 | ||
FI | 19.08.2020 | ||
HR | 19.08.2020 | ||
LT | 19.08.2020 | ||
LV | 19.08.2020 | ||
NL | 19.08.2020 | ||
PL | 19.08.2020 | ||
RO | 19.08.2020 | ||
RS | 19.08.2020 | ||
SE | 19.08.2020 | ||
SM | 19.08.2020 | ||
BG | 19.11.2020 | ||
NO | 19.11.2020 | ||
GR | 20.11.2020 | ||
IS | 19.12.2020 | ||
PT | 21.12.2020 | ||
Former [2021/22] | CZ | 19.08.2020 | |
DK | 19.08.2020 | ||
EE | 19.08.2020 | ||
FI | 19.08.2020 | ||
HR | 19.08.2020 | ||
LT | 19.08.2020 | ||
LV | 19.08.2020 | ||
NL | 19.08.2020 | ||
PL | 19.08.2020 | ||
RO | 19.08.2020 | ||
RS | 19.08.2020 | ||
SE | 19.08.2020 | ||
BG | 19.11.2020 | ||
NO | 19.11.2020 | ||
GR | 20.11.2020 | ||
IS | 19.12.2020 | ||
PT | 21.12.2020 | ||
Former [2021/21] | DK | 19.08.2020 | |
FI | 19.08.2020 | ||
HR | 19.08.2020 | ||
LT | 19.08.2020 | ||
LV | 19.08.2020 | ||
NL | 19.08.2020 | ||
PL | 19.08.2020 | ||
RS | 19.08.2020 | ||
SE | 19.08.2020 | ||
BG | 19.11.2020 | ||
NO | 19.11.2020 | ||
GR | 20.11.2020 | ||
IS | 19.12.2020 | ||
PT | 21.12.2020 | ||
Former [2021/12] | FI | 19.08.2020 | |
HR | 19.08.2020 | ||
LT | 19.08.2020 | ||
LV | 19.08.2020 | ||
NL | 19.08.2020 | ||
PL | 19.08.2020 | ||
RS | 19.08.2020 | ||
SE | 19.08.2020 | ||
BG | 19.11.2020 | ||
NO | 19.11.2020 | ||
GR | 20.11.2020 | ||
IS | 19.12.2020 | ||
PT | 21.12.2020 | ||
Former [2021/10] | FI | 19.08.2020 | |
HR | 19.08.2020 | ||
LT | 19.08.2020 | ||
LV | 19.08.2020 | ||
PL | 19.08.2020 | ||
RS | 19.08.2020 | ||
SE | 19.08.2020 | ||
BG | 19.11.2020 | ||
NO | 19.11.2020 | ||
GR | 20.11.2020 | ||
IS | 19.12.2020 | ||
PT | 21.12.2020 | ||
Former [2021/09] | FI | 19.08.2020 | |
LT | 19.08.2020 | ||
SE | 19.08.2020 | ||
BG | 19.11.2020 | ||
NO | 19.11.2020 | ||
GR | 20.11.2020 | ||
PT | 21.12.2020 | ||
Former [2021/08] | FI | 19.08.2020 | |
LT | 19.08.2020 | ||
SE | 19.08.2020 | ||
BG | 19.11.2020 | ||
NO | 19.11.2020 | ||
PT | 21.12.2020 | ||
Former [2021/07] | FI | 19.08.2020 | |
LT | 19.08.2020 | ||
NO | 19.11.2020 | Documents cited: | Search | [Y]US5617015 (GODER DIMITRY [US], et al) [Y] 13 * column 1, lines 20-30 * * column 2, line 36 - column 3, line 5; figure 1 *; | [Y]US2008088385 (GIZARA ANDREW ROMAN [US]) [Y] 5-7 * paragraph [0058]; figure 22 *; | [Y]US2009231052 (LI CHING-SHENG [TW]) [Y] 4-9 * paragraphs [0001] - [0010]; figures 1-3 *; | [A]CN201829173U (BOE TECHNOLOGY GROUP CO LTD) [A] 1-15* abstract *; | [Y]US2012326691 (KUAN CHIEN-WEI [TW], et al) [Y] 1-15 * paragraphs [0001] , [0006] , [0022] - [0027]; figures 1,2 *; | [Y]CN103971634 (BOE TECHNOLOGY GROUP CO LTD) [Y] 1-15 * paragraphs [0004] , [0006] , [0007] , [0013] - [0016] - [0032] - [0033] - [0035]; figures 1-4 *; | US2015302787 [ ] (YIN XINSHE [CN]) [ ] * paragraphs [0004] , [0006] , [0007] , [0013] - [0016] - [0032] - [0035]; figures 1-4 *; | US2015302787 [ ] (YIN XINSHE [CN]) [ ] * paragraphs [0004] , [0006] , [0007] , [0013] - [0016] - [0032] - [0035]; figures 1-4 * | International search | [A]CN101925230 (TPV ELECTRONICS FUJIAN CO LTD) [A] 1-15* . the whole document *; | [Y]CN201829173U (BOE TECHNOLOGY GROUP CO LTD) [Y] 1, 2, 13-15 * description, paragraphs [0012], [0013], [0026] and [0039], and figures 1, 2 and 5 *; | [Y]CN103971634 (BOE TECHNOLOGY GROUP CO LTD) [Y] 1, 2, 13-15 * description, paragraphs [0004]-[0017], [0031]-[0034], and figure 4 *; | [Y]CN203773913U (BOE TECHNOLOGY GROUP CO LTD) [Y] 1, 2, 13-15 * description, paragraphs [0004]-[0017], [0031]-[0034], and figure 4 *; | [Y]US2014313242 (KAPLAN LEONID [KR], et al) [Y] 1, 2, 13-15 * description, paragraphs [0028]-[0034], figure 1, and the abstract *; | [PX]CN104318903 (BOE TECHNOLOGY GROUP CO LTD) [PX] 1-15 * claims 1-15 *; | [PX]CN204204378U (BOE TECHNOLOGY GROUP CO LTD) [PX] 1-15 * claims 1-15 * | Examination | JP2006259239 |