EP3195545 - IMPROVED CAPACITY FOR NARROW-BAND HYBRID MODULATION [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 08.11.2019 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 30.11.2018 | ||
Former | Grant of patent is intended Status updated on 28.06.2018 | ||
Former | Examination is in progress Status updated on 16.03.2018 | ||
Former | Request for examination was made Status updated on 23.06.2017 | ||
Former | The international publication has been made Status updated on 01.03.2017 | Most recent event Tooltip | 01.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 03.08.2022 [2022/31] | Applicant(s) | For all designated states Telefonaktiebolaget LM Ericsson (publ) 164 83 Stockholm / SE | [2019/01] |
Former [2017/30] | For all designated states Telefonaktiebolaget LM Ericsson (publ) 164 83 Stockholm / SE | Inventor(s) | 01 /
LIBERG, Olof Wollmar Yxkullsgatan 50A SE-118 50 Stockholm / SE | 02 /
SUNDBERG, Mårten Sköntorpsvägen 63 SE-120 53 Årsta / SE | [2017/30] | Representative(s) | Ericsson Patent Development Torshamnsgatan 21-23 164 80 Stockholm / SE | [2019/01] |
Former [2017/30] | Rees, Simon John Lewis Haseltine Lake LLP Redcliff Quay 120 Redcliff Street Bristol BS1 6HU / GB | Application number, filing date | 15775495.3 | 25.08.2015 | [2017/30] | WO2015IB56444 | Priority number, date | US201462041597P | 25.08.2014 Original published format: US 201462041597 P | [2017/30] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2016030827 | Date: | 03.03.2016 | Language: | EN | [2016/09] | Type: | A1 Application with search report | No.: | EP3195545 | Date: | 26.07.2017 | Language: | EN | The application published by WIPO in one of the EPO official languages on 03.03.2016 takes the place of the publication of the European patent application. | [2017/30] | Type: | B1 Patent specification | No.: | EP3195545 | Date: | 02.01.2019 | Language: | EN | [2019/01] | Search report(s) | International search report - published on: | EP | 03.03.2016 | Classification | IPC: | H04L27/20, H04L27/18 | [2017/30] | CPC: |
H04L27/18 (EP,US);
H04L27/20 (US);
H04L27/12 (US);
H04L27/14 (US);
H04L27/2017 (EP,US);
H04L27/22 (US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/30] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | Title | German: | VERBESSERTE KAPAZITÄT ZUR SCHMALBANDHYBRIDMODULATION | [2017/30] | English: | IMPROVED CAPACITY FOR NARROW-BAND HYBRID MODULATION | [2017/30] | French: | CAPACITÉ AMÉLIORÉE POUR LA MODULATION HYBRIDE À BANDE ÉTROITE | [2017/30] | Entry into regional phase | 01.03.2017 | National basic fee paid | 01.03.2017 | Designation fee(s) paid | 01.03.2017 | Examination fee paid | Examination procedure | 25.06.2016 | Request for preliminary examination filed International Preliminary Examining Authority: EP | 01.03.2017 | Examination requested [2017/30] | 01.03.2017 | Date on which the examining division has become responsible | 25.09.2017 | Amendment by applicant (claims and/or description) | 16.03.2018 | Despatch of a communication from the examining division (Time limit: M04) | 29.05.2018 | Reply to a communication from the examining division | 29.06.2018 | Communication of intention to grant the patent | 06.11.2018 | Fee for grant paid | 06.11.2018 | Fee for publishing/printing paid | 06.11.2018 | Receipt of the translation of the claim(s) | Opposition(s) | 03.10.2019 | No opposition filed within time limit [2019/50] | Fees paid | Renewal fee | 28.08.2017 | Renewal fee patent year 03 | 27.08.2018 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 25.08.2015 | AL | 02.01.2019 | AT | 02.01.2019 | CY | 02.01.2019 | CZ | 02.01.2019 | DK | 02.01.2019 | EE | 02.01.2019 | ES | 02.01.2019 | FI | 02.01.2019 | HR | 02.01.2019 | IT | 02.01.2019 | LT | 02.01.2019 | LV | 02.01.2019 | MC | 02.01.2019 | MK | 02.01.2019 | MT | 02.01.2019 | NL | 02.01.2019 | PL | 02.01.2019 | RO | 02.01.2019 | RS | 02.01.2019 | SE | 02.01.2019 | SI | 02.01.2019 | SK | 02.01.2019 | SM | 02.01.2019 | TR | 02.01.2019 | BG | 02.04.2019 | NO | 02.04.2019 | GR | 03.04.2019 | IS | 02.05.2019 | PT | 02.05.2019 | IE | 25.08.2019 | LU | 25.08.2019 | BE | 31.08.2019 | CH | 31.08.2019 | LI | 31.08.2019 | [2022/31] |
Former [2021/34] | HU | 25.08.2015 | |
AL | 02.01.2019 | ||
AT | 02.01.2019 | ||
CY | 02.01.2019 | ||
CZ | 02.01.2019 | ||
DK | 02.01.2019 | ||
EE | 02.01.2019 | ||
ES | 02.01.2019 | ||
FI | 02.01.2019 | ||
HR | 02.01.2019 | ||
IT | 02.01.2019 | ||
LT | 02.01.2019 | ||
LV | 02.01.2019 | ||
MC | 02.01.2019 | ||
MT | 02.01.2019 | ||
NL | 02.01.2019 | ||
PL | 02.01.2019 | ||
RO | 02.01.2019 | ||
RS | 02.01.2019 | ||
SE | 02.01.2019 | ||
SI | 02.01.2019 | ||
SK | 02.01.2019 | ||
SM | 02.01.2019 | ||
TR | 02.01.2019 | ||
BG | 02.04.2019 | ||
NO | 02.04.2019 | ||
GR | 03.04.2019 | ||
IS | 02.05.2019 | ||
PT | 02.05.2019 | ||
IE | 25.08.2019 | ||
LU | 25.08.2019 | ||
BE | 31.08.2019 | ||
CH | 31.08.2019 | ||
LI | 31.08.2019 | ||
Former [2021/32] | HU | 25.08.2015 | |
AL | 02.01.2019 | ||
AT | 02.01.2019 | ||
CY | 02.01.2019 | ||
CZ | 02.01.2019 | ||
DK | 02.01.2019 | ||
EE | 02.01.2019 | ||
ES | 02.01.2019 | ||
FI | 02.01.2019 | ||
HR | 02.01.2019 | ||
IT | 02.01.2019 | ||
LT | 02.01.2019 | ||
LV | 02.01.2019 | ||
MC | 02.01.2019 | ||
NL | 02.01.2019 | ||
PL | 02.01.2019 | ||
RO | 02.01.2019 | ||
RS | 02.01.2019 | ||
SE | 02.01.2019 | ||
SI | 02.01.2019 | ||
SK | 02.01.2019 | ||
SM | 02.01.2019 | ||
TR | 02.01.2019 | ||
BG | 02.04.2019 | ||
NO | 02.04.2019 | ||
GR | 03.04.2019 | ||
IS | 02.05.2019 | ||
PT | 02.05.2019 | ||
IE | 25.08.2019 | ||
LU | 25.08.2019 | ||
BE | 31.08.2019 | ||
CH | 31.08.2019 | ||
LI | 31.08.2019 | ||
Former [2021/26] | AL | 02.01.2019 | |
AT | 02.01.2019 | ||
CY | 02.01.2019 | ||
CZ | 02.01.2019 | ||
DK | 02.01.2019 | ||
EE | 02.01.2019 | ||
ES | 02.01.2019 | ||
FI | 02.01.2019 | ||
HR | 02.01.2019 | ||
IT | 02.01.2019 | ||
LT | 02.01.2019 | ||
LV | 02.01.2019 | ||
MC | 02.01.2019 | ||
NL | 02.01.2019 | ||
PL | 02.01.2019 | ||
RO | 02.01.2019 | ||
RS | 02.01.2019 | ||
SE | 02.01.2019 | ||
SI | 02.01.2019 | ||
SK | 02.01.2019 | ||
SM | 02.01.2019 | ||
TR | 02.01.2019 | ||
BG | 02.04.2019 | ||
NO | 02.04.2019 | ||
GR | 03.04.2019 | ||
IS | 02.05.2019 | ||
PT | 02.05.2019 | ||
IE | 25.08.2019 | ||
LU | 25.08.2019 | ||
BE | 31.08.2019 | ||
CH | 31.08.2019 | ||
LI | 31.08.2019 | ||
Former [2020/38] | AL | 02.01.2019 | |
AT | 02.01.2019 | ||
CZ | 02.01.2019 | ||
DK | 02.01.2019 | ||
EE | 02.01.2019 | ||
ES | 02.01.2019 | ||
FI | 02.01.2019 | ||
HR | 02.01.2019 | ||
IT | 02.01.2019 | ||
LT | 02.01.2019 | ||
LV | 02.01.2019 | ||
MC | 02.01.2019 | ||
NL | 02.01.2019 | ||
PL | 02.01.2019 | ||
RO | 02.01.2019 | ||
RS | 02.01.2019 | ||
SE | 02.01.2019 | ||
SI | 02.01.2019 | ||
SK | 02.01.2019 | ||
SM | 02.01.2019 | ||
TR | 02.01.2019 | ||
BG | 02.04.2019 | ||
NO | 02.04.2019 | ||
GR | 03.04.2019 | ||
IS | 02.05.2019 | ||
PT | 02.05.2019 | ||
IE | 25.08.2019 | ||
LU | 25.08.2019 | ||
BE | 31.08.2019 | ||
CH | 31.08.2019 | ||
LI | 31.08.2019 | ||
Former [2020/36] | AL | 02.01.2019 | |
AT | 02.01.2019 | ||
CZ | 02.01.2019 | ||
DK | 02.01.2019 | ||
EE | 02.01.2019 | ||
ES | 02.01.2019 | ||
FI | 02.01.2019 | ||
HR | 02.01.2019 | ||
IT | 02.01.2019 | ||
LT | 02.01.2019 | ||
LV | 02.01.2019 | ||
MC | 02.01.2019 | ||
NL | 02.01.2019 | ||
PL | 02.01.2019 | ||
RO | 02.01.2019 | ||
RS | 02.01.2019 | ||
SE | 02.01.2019 | ||
SI | 02.01.2019 | ||
SK | 02.01.2019 | ||
SM | 02.01.2019 | ||
TR | 02.01.2019 | ||
BG | 02.04.2019 | ||
NO | 02.04.2019 | ||
GR | 03.04.2019 | ||
IS | 02.05.2019 | ||
PT | 02.05.2019 | ||
IE | 25.08.2019 | ||
LU | 25.08.2019 | ||
CH | 31.08.2019 | ||
LI | 31.08.2019 | ||
Former [2020/25] | AL | 02.01.2019 | |
AT | 02.01.2019 | ||
CZ | 02.01.2019 | ||
DK | 02.01.2019 | ||
EE | 02.01.2019 | ||
ES | 02.01.2019 | ||
FI | 02.01.2019 | ||
HR | 02.01.2019 | ||
IT | 02.01.2019 | ||
LT | 02.01.2019 | ||
LV | 02.01.2019 | ||
MC | 02.01.2019 | ||
NL | 02.01.2019 | ||
PL | 02.01.2019 | ||
RO | 02.01.2019 | ||
RS | 02.01.2019 | ||
SE | 02.01.2019 | ||
SI | 02.01.2019 | ||
SK | 02.01.2019 | ||
SM | 02.01.2019 | ||
TR | 02.01.2019 | ||
BG | 02.04.2019 | ||
NO | 02.04.2019 | ||
GR | 03.04.2019 | ||
IS | 02.05.2019 | ||
PT | 02.05.2019 | ||
LU | 25.08.2019 | ||
CH | 31.08.2019 | ||
LI | 31.08.2019 | ||
Former [2020/17] | AL | 02.01.2019 | |
AT | 02.01.2019 | ||
CZ | 02.01.2019 | ||
DK | 02.01.2019 | ||
EE | 02.01.2019 | ||
ES | 02.01.2019 | ||
FI | 02.01.2019 | ||
HR | 02.01.2019 | ||
IT | 02.01.2019 | ||
LT | 02.01.2019 | ||
LV | 02.01.2019 | ||
NL | 02.01.2019 | ||
PL | 02.01.2019 | ||
RO | 02.01.2019 | ||
RS | 02.01.2019 | ||
SE | 02.01.2019 | ||
SI | 02.01.2019 | ||
SK | 02.01.2019 | ||
SM | 02.01.2019 | ||
TR | 02.01.2019 | ||
BG | 02.04.2019 | ||
NO | 02.04.2019 | ||
GR | 03.04.2019 | ||
IS | 02.05.2019 | ||
PT | 02.05.2019 | ||
Former [2020/13] | AL | 02.01.2019 | |
AT | 02.01.2019 | ||
CZ | 02.01.2019 | ||
DK | 02.01.2019 | ||
EE | 02.01.2019 | ||
ES | 02.01.2019 | ||
FI | 02.01.2019 | ||
HR | 02.01.2019 | ||
IT | 02.01.2019 | ||
LT | 02.01.2019 | ||
LV | 02.01.2019 | ||
NL | 02.01.2019 | ||
PL | 02.01.2019 | ||
RO | 02.01.2019 | ||
RS | 02.01.2019 | ||
SE | 02.01.2019 | ||
SI | 02.01.2019 | ||
SK | 02.01.2019 | ||
SM | 02.01.2019 | ||
BG | 02.04.2019 | ||
NO | 02.04.2019 | ||
GR | 03.04.2019 | ||
IS | 02.05.2019 | ||
PT | 02.05.2019 | ||
Former [2019/51] | AL | 02.01.2019 | |
AT | 02.01.2019 | ||
CZ | 02.01.2019 | ||
DK | 02.01.2019 | ||
EE | 02.01.2019 | ||
ES | 02.01.2019 | ||
FI | 02.01.2019 | ||
HR | 02.01.2019 | ||
IT | 02.01.2019 | ||
LT | 02.01.2019 | ||
LV | 02.01.2019 | ||
NL | 02.01.2019 | ||
PL | 02.01.2019 | ||
RO | 02.01.2019 | ||
RS | 02.01.2019 | ||
SE | 02.01.2019 | ||
SK | 02.01.2019 | ||
SM | 02.01.2019 | ||
BG | 02.04.2019 | ||
NO | 02.04.2019 | ||
GR | 03.04.2019 | ||
IS | 02.05.2019 | ||
PT | 02.05.2019 | ||
Former [2019/49] | AL | 02.01.2019 | |
AT | 02.01.2019 | ||
CZ | 02.01.2019 | ||
DK | 02.01.2019 | ||
EE | 02.01.2019 | ||
ES | 02.01.2019 | ||
FI | 02.01.2019 | ||
HR | 02.01.2019 | ||
IT | 02.01.2019 | ||
LT | 02.01.2019 | ||
LV | 02.01.2019 | ||
NL | 02.01.2019 | ||
PL | 02.01.2019 | ||
RO | 02.01.2019 | ||
RS | 02.01.2019 | ||
SE | 02.01.2019 | ||
SK | 02.01.2019 | ||
BG | 02.04.2019 | ||
NO | 02.04.2019 | ||
GR | 03.04.2019 | ||
IS | 02.05.2019 | ||
PT | 02.05.2019 | ||
Former [2019/48] | AT | 02.01.2019 | |
DK | 02.01.2019 | ||
ES | 02.01.2019 | ||
FI | 02.01.2019 | ||
HR | 02.01.2019 | ||
IT | 02.01.2019 | ||
LT | 02.01.2019 | ||
LV | 02.01.2019 | ||
NL | 02.01.2019 | ||
PL | 02.01.2019 | ||
RS | 02.01.2019 | ||
SE | 02.01.2019 | ||
BG | 02.04.2019 | ||
NO | 02.04.2019 | ||
GR | 03.04.2019 | ||
IS | 02.05.2019 | ||
PT | 02.05.2019 | ||
Former [2019/46] | AT | 02.01.2019 | |
ES | 02.01.2019 | ||
FI | 02.01.2019 | ||
HR | 02.01.2019 | ||
IT | 02.01.2019 | ||
LT | 02.01.2019 | ||
LV | 02.01.2019 | ||
NL | 02.01.2019 | ||
PL | 02.01.2019 | ||
RS | 02.01.2019 | ||
SE | 02.01.2019 | ||
BG | 02.04.2019 | ||
NO | 02.04.2019 | ||
GR | 03.04.2019 | ||
IS | 02.05.2019 | ||
PT | 02.05.2019 | ||
Former [2019/39] | ES | 02.01.2019 | |
FI | 02.01.2019 | ||
HR | 02.01.2019 | ||
LT | 02.01.2019 | ||
LV | 02.01.2019 | ||
NL | 02.01.2019 | ||
PL | 02.01.2019 | ||
RS | 02.01.2019 | ||
SE | 02.01.2019 | ||
BG | 02.04.2019 | ||
NO | 02.04.2019 | ||
GR | 03.04.2019 | ||
IS | 02.05.2019 | ||
PT | 02.05.2019 | ||
Former [2019/38] | ES | 02.01.2019 | |
FI | 02.01.2019 | ||
LT | 02.01.2019 | ||
NL | 02.01.2019 | ||
PL | 02.01.2019 | ||
SE | 02.01.2019 | ||
BG | 02.04.2019 | ||
NO | 02.04.2019 | ||
GR | 03.04.2019 | ||
PT | 02.05.2019 | ||
Former [2019/37] | ES | 02.01.2019 | |
FI | 02.01.2019 | ||
LT | 02.01.2019 | ||
NL | 02.01.2019 | ||
PL | 02.01.2019 | ||
SE | 02.01.2019 | ||
NO | 02.04.2019 | ||
GR | 03.04.2019 | ||
PT | 02.05.2019 | ||
Former [2019/35] | ES | 02.01.2019 | |
FI | 02.01.2019 | ||
LT | 02.01.2019 | ||
NL | 02.01.2019 | ||
PL | 02.01.2019 | ||
SE | 02.01.2019 | ||
NO | 02.04.2019 | ||
PT | 02.05.2019 | ||
Former [2019/34] | FI | 02.01.2019 | |
LT | 02.01.2019 | ||
NL | 02.01.2019 | ||
SE | 02.01.2019 | ||
NO | 02.04.2019 | ||
PT | 02.05.2019 | ||
Former [2019/33] | FI | 02.01.2019 | |
LT | 02.01.2019 | ||
NL | 02.01.2019 | ||
NO | 02.04.2019 | ||
PT | 02.05.2019 | ||
Former [2019/30] | NL | 02.01.2019 | Cited in | International search | [A]US2002168026 (KHOINI-POORFARD RAMIN [US]) [A] 1-34 * paragraph [0003] - paragraph [0004] * * paragraph [0024] * * paragraph [0032] - paragraph [0039] ** figures 1A, 1B, 4 *; | [XDI] - NOKIA NETWORKS, "Narrow Band Hybrid Modulation for Cellular IoT", vol. TSG GERAN, no. Ljubljana, Slovenia; 20140825 - 20140829, (20140824), 3GPP DRAFT; GP-140583 - NARROW BAND HYBRID MODULATION FOR CELLULAR IOT, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ;, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/GERAN/Docs/, (20140824), XP050779875 [XD] 13,17,30,34 * Sections 1-3; page 1 - page 6; figures 1-4 * [I] 1-12,14-16,18-29,31-33 | by applicant | - "Cellular System Support for Ulta Low Complexity and Low Throughput Internet of Things", 3GPP TR 45.820, vol. 1.3.1, (20150512), URL: http://www.3gpp.org/DynaReport/45820.htm |