EP3130220 - HYDROPONIC APPARATUS AND HYDROPONIC METHOD [Right-click to bookmark this link] | |||
Former [2017/07] | HYDROPONIC CULTURING APPARATUS AND HYDROPONIC CULTURING METHOD | ||
[2017/46] | Status | No opposition filed within time limit Status updated on 02.11.2018 Database last updated on 15.06.2024 | |
Former | The patent has been granted Status updated on 17.11.2017 | ||
Former | Grant of patent is intended Status updated on 10.11.2017 | ||
Former | Request for examination was made Status updated on 12.10.2017 | ||
Former | Grant of patent is intended Status updated on 01.06.2017 | ||
Former | Request for examination was made Status updated on 13.01.2017 | Most recent event Tooltip | 17.07.2020 | Lapse of the patent in a contracting state New state(s): AL | published on 19.08.2020 [2020/34] | Applicant(s) | For all designated states Panasonic Intellectual Property Management Co., Ltd. 1-61, Shiromi 2-chome Chuo-ku Osaka-shi, Osaka 540-6207 / JP | [2017/26] |
Former [2017/07] | For all designated states Panasonic Intellectual Property Management Co., Ltd. 1-61, Shiromi 2-chome Chuo-ku Osaka-shi, Osaka 570-6207 / JP | Inventor(s) | 01 /
OGATA, Satoshi c/o Panasonic Intellectual Property Management Co., Ltd. IP Management Department 7F OBP Panasonic Tower, 1-61, Shiromi 2- chome Chuo-ku Osaka-shi, Osaka 540-6207 / JP | [2017/07] | Representative(s) | Müller-Boré & Partner Patentanwälte PartG mbB Friedenheimer Brücke 21 80639 München / DE | [2017/07] | Application number, filing date | 15776165.1 | 06.02.2015 | [2017/07] | WO2015JP00566 | Priority number, date | JP20140081747 | 11.04.2014 Original published format: JP 2014081747 | [2017/07] | Filing language | JA | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2015155915 | Date: | 15.10.2015 | Language: | JA | [2015/41] | Type: | A1 Application with search report | No.: | EP3130220 | Date: | 15.02.2017 | Language: | EN | [2017/07] | Type: | B1 Patent specification | No.: | EP3130220 | Date: | 20.12.2017 | Language: | EN | [2017/51] | Search report(s) | International search report - published on: | JP | 15.10.2015 | (Supplementary) European search report - dispatched on: | EP | 20.01.2017 | Classification | IPC: | A01G31/00, A01G7/00, A01G9/00, A01G31/02, A01G1/00, A01G9/24 | [2017/22] | CPC: |
A01G31/02 (EP,US);
A01G22/25 (EP,US);
A01G7/00 (US);
A01G9/241 (US);
A01G9/246 (US);
Y02P60/21 (EP,US)
|
Former IPC [2017/08] | A01G31/00, A01G7/00, A01G9/00, A01G31/02 | ||
Former IPC [2017/07] | A01G31/00, A01G7/00, A01G9/00 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/07] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | VORRICHTUNG UND VERFAHREN FÜR HYDROKULTUR | [2017/07] | English: | HYDROPONIC APPARATUS AND HYDROPONIC METHOD | [2017/46] | French: | APPAREIL DE CULTURE HYDROPONIQUE ET PROCÉDÉ DE CULTURE HYDROPONIQUE | [2017/07] |
Former [2017/07] | HYDROPONIC CULTURING APPARATUS AND HYDROPONIC CULTURING METHOD | Entry into regional phase | 30.09.2016 | Translation filed | 30.09.2016 | National basic fee paid | 30.09.2016 | Search fee paid | 30.09.2016 | Designation fee(s) paid | 30.09.2016 | Examination fee paid | Examination procedure | 30.09.2016 | Examination requested [2017/07] | 30.09.2016 | Date on which the examining division has become responsible | 02.06.2017 | Communication of intention to grant the patent | 02.10.2017 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 02.10.2017 | Fee for grant paid | 02.10.2017 | Fee for publishing/printing paid | 09.11.2017 | Information about intention to grant a patent | 09.11.2017 | Receipt of the translation of the claim(s) | Opposition(s) | 21.09.2018 | No opposition filed within time limit [2018/49] | Fees paid | Renewal fee | 17.02.2017 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 06.02.2015 | AL | 20.12.2017 | AT | 20.12.2017 | CY | 20.12.2017 | CZ | 20.12.2017 | DK | 20.12.2017 | EE | 20.12.2017 | ES | 20.12.2017 | FI | 20.12.2017 | HR | 20.12.2017 | IT | 20.12.2017 | LT | 20.12.2017 | LV | 20.12.2017 | MC | 20.12.2017 | MK | 20.12.2017 | PL | 20.12.2017 | PT | 20.12.2017 | RO | 20.12.2017 | RS | 20.12.2017 | SE | 20.12.2017 | SI | 20.12.2017 | SK | 20.12.2017 | SM | 20.12.2017 | TR | 20.12.2017 | IE | 06.02.2018 | LU | 06.02.2018 | MT | 06.02.2018 | BE | 28.02.2018 | CH | 28.02.2018 | FR | 28.02.2018 | LI | 28.02.2018 | BG | 20.03.2018 | NO | 20.03.2018 | GR | 21.03.2018 | IS | 20.04.2018 | [2020/34] |
Former [2020/31] | HU | 06.02.2015 | |
AT | 20.12.2017 | ||
CY | 20.12.2017 | ||
CZ | 20.12.2017 | ||
DK | 20.12.2017 | ||
EE | 20.12.2017 | ||
ES | 20.12.2017 | ||
FI | 20.12.2017 | ||
HR | 20.12.2017 | ||
IT | 20.12.2017 | ||
LT | 20.12.2017 | ||
LV | 20.12.2017 | ||
MC | 20.12.2017 | ||
MK | 20.12.2017 | ||
PL | 20.12.2017 | ||
PT | 20.12.2017 | ||
RO | 20.12.2017 | ||
RS | 20.12.2017 | ||
SE | 20.12.2017 | ||
SI | 20.12.2017 | ||
SK | 20.12.2017 | ||
SM | 20.12.2017 | ||
TR | 20.12.2017 | ||
IE | 06.02.2018 | ||
LU | 06.02.2018 | ||
MT | 06.02.2018 | ||
BE | 28.02.2018 | ||
CH | 28.02.2018 | ||
FR | 28.02.2018 | ||
LI | 28.02.2018 | ||
BG | 20.03.2018 | ||
NO | 20.03.2018 | ||
GR | 21.03.2018 | ||
IS | 20.04.2018 | ||
Former [2020/30] | HU | 06.02.2015 | |
AT | 20.12.2017 | ||
CY | 20.12.2017 | ||
CZ | 20.12.2017 | ||
DK | 20.12.2017 | ||
EE | 20.12.2017 | ||
ES | 20.12.2017 | ||
FI | 20.12.2017 | ||
HR | 20.12.2017 | ||
IT | 20.12.2017 | ||
LT | 20.12.2017 | ||
LV | 20.12.2017 | ||
MC | 20.12.2017 | ||
PL | 20.12.2017 | ||
PT | 20.12.2017 | ||
RO | 20.12.2017 | ||
RS | 20.12.2017 | ||
SE | 20.12.2017 | ||
SI | 20.12.2017 | ||
SK | 20.12.2017 | ||
SM | 20.12.2017 | ||
TR | 20.12.2017 | ||
IE | 06.02.2018 | ||
LU | 06.02.2018 | ||
MT | 06.02.2018 | ||
BE | 28.02.2018 | ||
CH | 28.02.2018 | ||
FR | 28.02.2018 | ||
LI | 28.02.2018 | ||
BG | 20.03.2018 | ||
NO | 20.03.2018 | ||
GR | 21.03.2018 | ||
IS | 20.04.2018 | ||
Former [2020/28] | AT | 20.12.2017 | |
CY | 20.12.2017 | ||
CZ | 20.12.2017 | ||
DK | 20.12.2017 | ||
EE | 20.12.2017 | ||
ES | 20.12.2017 | ||
FI | 20.12.2017 | ||
HR | 20.12.2017 | ||
IT | 20.12.2017 | ||
LT | 20.12.2017 | ||
LV | 20.12.2017 | ||
MC | 20.12.2017 | ||
PL | 20.12.2017 | ||
PT | 20.12.2017 | ||
RO | 20.12.2017 | ||
RS | 20.12.2017 | ||
SE | 20.12.2017 | ||
SI | 20.12.2017 | ||
SK | 20.12.2017 | ||
SM | 20.12.2017 | ||
TR | 20.12.2017 | ||
IE | 06.02.2018 | ||
LU | 06.02.2018 | ||
MT | 06.02.2018 | ||
BE | 28.02.2018 | ||
CH | 28.02.2018 | ||
FR | 28.02.2018 | ||
LI | 28.02.2018 | ||
BG | 20.03.2018 | ||
NO | 20.03.2018 | ||
GR | 21.03.2018 | ||
IS | 20.04.2018 | ||
Former [2020/16] | AT | 20.12.2017 | |
CY | 20.12.2017 | ||
CZ | 20.12.2017 | ||
DK | 20.12.2017 | ||
EE | 20.12.2017 | ||
ES | 20.12.2017 | ||
FI | 20.12.2017 | ||
HR | 20.12.2017 | ||
IT | 20.12.2017 | ||
LT | 20.12.2017 | ||
LV | 20.12.2017 | ||
MC | 20.12.2017 | ||
PL | 20.12.2017 | ||
RO | 20.12.2017 | ||
RS | 20.12.2017 | ||
SE | 20.12.2017 | ||
SI | 20.12.2017 | ||
SK | 20.12.2017 | ||
SM | 20.12.2017 | ||
TR | 20.12.2017 | ||
IE | 06.02.2018 | ||
LU | 06.02.2018 | ||
MT | 06.02.2018 | ||
BE | 28.02.2018 | ||
CH | 28.02.2018 | ||
FR | 28.02.2018 | ||
LI | 28.02.2018 | ||
BG | 20.03.2018 | ||
NO | 20.03.2018 | ||
GR | 21.03.2018 | ||
IS | 20.04.2018 | ||
Former [2020/08] | AT | 20.12.2017 | |
CY | 20.12.2017 | ||
CZ | 20.12.2017 | ||
DK | 20.12.2017 | ||
EE | 20.12.2017 | ||
ES | 20.12.2017 | ||
FI | 20.12.2017 | ||
HR | 20.12.2017 | ||
IT | 20.12.2017 | ||
LT | 20.12.2017 | ||
LV | 20.12.2017 | ||
MC | 20.12.2017 | ||
PL | 20.12.2017 | ||
RO | 20.12.2017 | ||
RS | 20.12.2017 | ||
SE | 20.12.2017 | ||
SI | 20.12.2017 | ||
SK | 20.12.2017 | ||
SM | 20.12.2017 | ||
IE | 06.02.2018 | ||
LU | 06.02.2018 | ||
MT | 06.02.2018 | ||
BE | 28.02.2018 | ||
CH | 28.02.2018 | ||
FR | 28.02.2018 | ||
LI | 28.02.2018 | ||
BG | 20.03.2018 | ||
NO | 20.03.2018 | ||
GR | 21.03.2018 | ||
IS | 20.04.2018 | ||
Former [2019/12] | AT | 20.12.2017 | |
CY | 20.12.2017 | ||
CZ | 20.12.2017 | ||
DK | 20.12.2017 | ||
EE | 20.12.2017 | ||
ES | 20.12.2017 | ||
FI | 20.12.2017 | ||
HR | 20.12.2017 | ||
IT | 20.12.2017 | ||
LT | 20.12.2017 | ||
LV | 20.12.2017 | ||
MC | 20.12.2017 | ||
PL | 20.12.2017 | ||
RO | 20.12.2017 | ||
RS | 20.12.2017 | ||
SE | 20.12.2017 | ||
SI | 20.12.2017 | ||
SK | 20.12.2017 | ||
SM | 20.12.2017 | ||
IE | 06.02.2018 | ||
LU | 06.02.2018 | ||
BE | 28.02.2018 | ||
CH | 28.02.2018 | ||
FR | 28.02.2018 | ||
LI | 28.02.2018 | ||
BG | 20.03.2018 | ||
NO | 20.03.2018 | ||
GR | 21.03.2018 | ||
IS | 20.04.2018 | ||
Former [2019/09] | AT | 20.12.2017 | |
CY | 20.12.2017 | ||
CZ | 20.12.2017 | ||
DK | 20.12.2017 | ||
EE | 20.12.2017 | ||
ES | 20.12.2017 | ||
FI | 20.12.2017 | ||
HR | 20.12.2017 | ||
IT | 20.12.2017 | ||
LT | 20.12.2017 | ||
LV | 20.12.2017 | ||
MC | 20.12.2017 | ||
PL | 20.12.2017 | ||
RO | 20.12.2017 | ||
RS | 20.12.2017 | ||
SE | 20.12.2017 | ||
SK | 20.12.2017 | ||
SM | 20.12.2017 | ||
IE | 06.02.2018 | ||
LU | 06.02.2018 | ||
CH | 28.02.2018 | ||
LI | 28.02.2018 | ||
BG | 20.03.2018 | ||
NO | 20.03.2018 | ||
GR | 21.03.2018 | ||
IS | 20.04.2018 | ||
Former [2018/52] | AT | 20.12.2017 | |
CY | 20.12.2017 | ||
CZ | 20.12.2017 | ||
DK | 20.12.2017 | ||
EE | 20.12.2017 | ||
ES | 20.12.2017 | ||
FI | 20.12.2017 | ||
HR | 20.12.2017 | ||
IT | 20.12.2017 | ||
LT | 20.12.2017 | ||
LV | 20.12.2017 | ||
MC | 20.12.2017 | ||
PL | 20.12.2017 | ||
RO | 20.12.2017 | ||
RS | 20.12.2017 | ||
SE | 20.12.2017 | ||
SK | 20.12.2017 | ||
SM | 20.12.2017 | ||
LU | 06.02.2018 | ||
CH | 28.02.2018 | ||
LI | 28.02.2018 | ||
BG | 20.03.2018 | ||
NO | 20.03.2018 | ||
GR | 21.03.2018 | ||
IS | 20.04.2018 | ||
Former [2018/51] | AT | 20.12.2017 | |
CY | 20.12.2017 | ||
CZ | 20.12.2017 | ||
DK | 20.12.2017 | ||
EE | 20.12.2017 | ||
ES | 20.12.2017 | ||
FI | 20.12.2017 | ||
HR | 20.12.2017 | ||
IT | 20.12.2017 | ||
LT | 20.12.2017 | ||
LV | 20.12.2017 | ||
MC | 20.12.2017 | ||
PL | 20.12.2017 | ||
RO | 20.12.2017 | ||
RS | 20.12.2017 | ||
SE | 20.12.2017 | ||
SK | 20.12.2017 | ||
SM | 20.12.2017 | ||
CH | 28.02.2018 | ||
LI | 28.02.2018 | ||
BG | 20.03.2018 | ||
NO | 20.03.2018 | ||
GR | 21.03.2018 | ||
IS | 20.04.2018 | ||
Former [2018/44] | AT | 20.12.2017 | |
CY | 20.12.2017 | ||
CZ | 20.12.2017 | ||
EE | 20.12.2017 | ||
ES | 20.12.2017 | ||
FI | 20.12.2017 | ||
HR | 20.12.2017 | ||
IT | 20.12.2017 | ||
LT | 20.12.2017 | ||
LV | 20.12.2017 | ||
MC | 20.12.2017 | ||
PL | 20.12.2017 | ||
RO | 20.12.2017 | ||
RS | 20.12.2017 | ||
SE | 20.12.2017 | ||
SK | 20.12.2017 | ||
SM | 20.12.2017 | ||
BG | 20.03.2018 | ||
NO | 20.03.2018 | ||
GR | 21.03.2018 | ||
IS | 20.04.2018 | ||
Former [2018/40] | AT | 20.12.2017 | |
CY | 20.12.2017 | ||
CZ | 20.12.2017 | ||
EE | 20.12.2017 | ||
ES | 20.12.2017 | ||
FI | 20.12.2017 | ||
HR | 20.12.2017 | ||
IT | 20.12.2017 | ||
LT | 20.12.2017 | ||
LV | 20.12.2017 | ||
PL | 20.12.2017 | ||
RO | 20.12.2017 | ||
RS | 20.12.2017 | ||
SE | 20.12.2017 | ||
SK | 20.12.2017 | ||
SM | 20.12.2017 | ||
BG | 20.03.2018 | ||
NO | 20.03.2018 | ||
GR | 21.03.2018 | ||
IS | 20.04.2018 | ||
Former [2018/39] | AT | 20.12.2017 | |
CY | 20.12.2017 | ||
CZ | 20.12.2017 | ||
EE | 20.12.2017 | ||
ES | 20.12.2017 | ||
FI | 20.12.2017 | ||
HR | 20.12.2017 | ||
IT | 20.12.2017 | ||
LT | 20.12.2017 | ||
LV | 20.12.2017 | ||
PL | 20.12.2017 | ||
RS | 20.12.2017 | ||
SE | 20.12.2017 | ||
SK | 20.12.2017 | ||
SM | 20.12.2017 | ||
BG | 20.03.2018 | ||
NO | 20.03.2018 | ||
GR | 21.03.2018 | ||
IS | 20.04.2018 | ||
Former [2018/38] | AT | 20.12.2017 | |
CY | 20.12.2017 | ||
CZ | 20.12.2017 | ||
EE | 20.12.2017 | ||
ES | 20.12.2017 | ||
FI | 20.12.2017 | ||
HR | 20.12.2017 | ||
LT | 20.12.2017 | ||
LV | 20.12.2017 | ||
PL | 20.12.2017 | ||
RS | 20.12.2017 | ||
SE | 20.12.2017 | ||
SK | 20.12.2017 | ||
SM | 20.12.2017 | ||
BG | 20.03.2018 | ||
NO | 20.03.2018 | ||
GR | 21.03.2018 | ||
IS | 20.04.2018 | ||
Former [2018/37] | CY | 20.12.2017 | |
CZ | 20.12.2017 | ||
EE | 20.12.2017 | ||
ES | 20.12.2017 | ||
FI | 20.12.2017 | ||
HR | 20.12.2017 | ||
LT | 20.12.2017 | ||
LV | 20.12.2017 | ||
PL | 20.12.2017 | ||
RS | 20.12.2017 | ||
SE | 20.12.2017 | ||
SK | 20.12.2017 | ||
SM | 20.12.2017 | ||
BG | 20.03.2018 | ||
NO | 20.03.2018 | ||
GR | 21.03.2018 | ||
Former [2018/24] | FI | 20.12.2017 | |
HR | 20.12.2017 | ||
LT | 20.12.2017 | ||
LV | 20.12.2017 | ||
RS | 20.12.2017 | ||
SE | 20.12.2017 | ||
BG | 20.03.2018 | ||
NO | 20.03.2018 | ||
GR | 21.03.2018 | ||
Former [2018/23] | FI | 20.12.2017 | |
HR | 20.12.2017 | ||
LT | 20.12.2017 | ||
RS | 20.12.2017 | ||
SE | 20.12.2017 | ||
NO | 20.03.2018 | ||
GR | 21.03.2018 | ||
Former [2018/22] | FI | 20.12.2017 | |
LT | 20.12.2017 | ||
NO | 20.03.2018 | Documents cited: | Search | [A]US5136804 (ROTHEM TUVIA [IL], et al) [A] 1-7 * the whole document *; | [A]JP2013111073 (MITSUBISHI ELECTRIC PLANT ENGINEERING CORP) [A] 1-7 * the whole document *; | [A]US2013160362 (DAAS KAMAL [NL], et al) [A] 1-7 * the whole document *; | [A]US4669217 (FRAZE RAYMOND E [US]) [A] 1-7 * the whole document *; | [A]JP2013162750 (ASAHI KASEI HOMES CO) [A] 1-7 * the whole document *; | [A]JP2012231729 (FUJISAWA KENKI KK) [A] 1-7 * the whole document *; | [A]US2013003382 (OHURA CHIKAKO [JP], et al) [A] 1-7 * the whole document *; | [A]US4332105 (NIR ISAAC) [A] 1-7 * the whole document * | International search | [A]JP2013111073 (MITSUBISHI ELECTRIC PLANT ENGINEERING CORP) [A] 1-7 * , entire text; all drawings (Family: none) *; | [A]JP2013051941 (TAIKISHA KK) [A] 1-7 * , entire text; all drawings; particularly, paragraphs [0084], [0085] (Family: none) * |